Top 10 States by Investment

Rank State Investment Projects
#1 Virginia $234.5B 63
#2 Missouri $207.5B 26
#3 Utah $181.3B 24
#4 Texas $177.0B 65
#5 Georgia $153.7B 48
#6 Pennsylvania $128.6B 35
#7 Arizona $127.5B 31
#8 Ohio $119.1B 36
#9 Indiana $76.9B 24
#10 Louisiana $75.7B 11

Top 10 States by Power Capacity

Rank State Power Projects
#1 Texas 42.9 GW 65
#2 Utah 26.9 GW 24
#3 Pennsylvania 24.1 GW 35
#4 Ohio 21.4 GW 36
#5 Virginia 19.2 GW 63
#6 West Virginia 18.7 GW 13
#7 Georgia 14.7 GW 48
#8 Arizona 13.1 GW 31
#9 New Mexico 12.8 GW 9
#10 Illinois 11.8 GW 44

Regional Clusters

Data Center Alley

Northern Virginia
19.2 GW planned in Virginia

The largest concentration of data centers globally, with over 6 GW operational and 6+ GW under construction. Grid constraints emerging as demand outpaces transmission capacity.

View state profile →

Texas Triangle

Austin-Dallas-Houston
42.9 GW planned in Texas

ERCOT's fast-track interconnection process provides advantages, though reliability trade-offs persist. Rapid expansion driven by abundant land and competitive power rates.

View state profile →

Desert Cluster

Arizona/Nevada
13.1 GW in Arizona alone

Growing rapidly despite water constraint challenges. Strong solar integration potential and proximity to California markets drive development.

View state profile →

Silicon Prairie

Kansas/Nebraska
5.9 GW in Kansas

Emerging mega-project hub leveraging wind energy integration, low land costs, and central US location. Rapid transformation from agricultural to digital infrastructure.

View state profile →

Pennsylvania Energy Corridor

Northeastern Pennsylvania
24.1 GW planned in Pennsylvania

Former coal region transforming into data center powerhouse. Natural gas access, available transmission capacity, and economic development incentives attract massive investments.

View state profile →

State Policy Profiles

Incentives, restrictions, utility regulation, and water constraints for all 50 states.

Browse Policies →

Download State Data

Investment by State (CSV)

State-level investment totals and rankings

Power by State (CSV)

State-level power capacity data

CC BY 4.0 This research is free to share and adapt with attribution under Creative Commons Attribution 4.0 International. Cite as: Bommarito, Jillian and Bommarito, Michael James, Data Center Policy across the 50 States: A Survey of Incentives, Land Use, and Energy Regulation (June 18, 2026), https://ssrn.com/abstract=6964278.