Nevada
Nevada hosts 20 documented datacenter projects representing $9.4B in announced investment and 5.8 GW of power capacity.
State Overview 20 documented projects
$9.4B
Announced Investment
5.8 GW
Planned Power Capacity
#24
Investment Rank
#7
Power Rank
Project Status Breakdown
Operational
13
65% of projects
Under Construction
4
20% of projects
Planned
3
15% of projects
All Projects in Nevada
20 projects| Project | Location | Investment | Power | Status |
|---|---|---|---|---|
| Vantage Data Centers NV1 Campus Vantage Data Centers | Reno/Sparks | $3.0B | 224 MW | Under Construction |
| TerraScale Energos Reno TerraScale | Fernley | $3.0B | 500 MW | Planned |
| EdgeCore Reno Campus EdgeCore Digital Infrastructure, Partners Group | Reno/Sparks | $1.2B | 216 MW | Under Construction |
| Apple Reno Data Center Apple | Reno | $1.0B | N/A | Operational |
| Google Henderson Data Center Google | Henderson | $600M | N/A | Operational |
| Google Storey County Data Center Google | Reno/Sparks | $600M | N/A | Operational |
| Switch CORE Campus Las Vegas Switch, DigitalBridge... | Las Vegas | N/A | 495 MW | Operational |
| Switch Citadel Campus (Tahoe Reno) Switch, DigitalBridge... | Reno/Sparks | N/A | 650 MW | Operational |
| Tract Peru Shelf Technology Park Tract | Reno/Sparks | N/A | 810 MW | Under Construction |
| Tract South Valley Technology Park Tract | Reno/Sparks | N/A | 1.2 GW | Planned |
| Tract Silver Springs Data Center Park Tract | Silver Springs | N/A | 1.6 GW | Planned |
| Novva Tahoe Reno Data Center Novva Data Centers | Reno/Sparks | N/A | 60 MW | Operational |
| PowerHouse Reno Data Center PowerHouse Data Centers, Harrison Street | Reno/Sparks | N/A | 65 MW | Under Construction |
| Cyxtera LAS10 Las Vegas Cyxtera | Las Vegas | N/A | N/A | Operational |
| Cyxtera LAS11 Las Vegas Cyxtera | Las Vegas | N/A | N/A | Operational |
| Cyxtera LAS12 Las Vegas Cyxtera | Las Vegas | N/A | N/A | Operational |
| Flexential Las Vegas North Flexential | North Las Vegas | N/A | 9 MW | Operational |
| Flexential Las Vegas Downtown Flexential | Las Vegas | N/A | 1 MW | Operational |
| DataBank LAS1 Las Vegas DataBank, DigitalBridge | Las Vegas | N/A | 3.55 MW | Operational |
| Novva Las Vegas Data Center Novva Data Centers | North Las Vegas | N/A | N/A | Operational |
Nevada Data Center Infrastructure
Nevada hosts 20 documented datacenter projects representing $9.4B in disclosed investment and 5.8 GW of power capacity.
Key Statistics
| Metric | Value |
|---|---|
| Total Projects | 20 |
| Total Investment | $9.4B |
| Total Power Capacity | 5.8 GW |
| Investment Rank | #24 |
| Power Rank | #7 |
| Grid Operator | WECC |
Project Status Breakdown
- Operational: 13 projects
- Under Construction: 4 projects
- Planned: 3 projects
Top Projects
Vantage Data Centers NV1 Campus
- Location: Reno/Sparks
- Investment: $3.0B
- Power: 224 MW
- Status: Under Construction
- Sponsors: Vantage Data Centers
TerraScale Energos Reno
- Location: Fernley
- Investment: $3.0B
- Power: 500 MW
- Status: Planned
- Sponsors: TerraScale
EdgeCore Reno Campus
- Location: Reno/Sparks
- Investment: $1.2B
- Power: 216 MW
- Status: Under Construction
- Sponsors: EdgeCore Digital Infrastructure, Partners Group
Apple Reno Data Center
- Location: Reno
- Investment: $1.0B
- Power: N/A
- Status: Operational
- Sponsors: Apple
Google Henderson Data Center
- Location: Henderson
- Investment: $600M
- Power: N/A
- Status: Operational
- Sponsors: Google
Google Storey County Data Center
- Location: Reno/Sparks
- Investment: $600M
- Power: N/A
- Status: Operational
- Sponsors: Google
Switch CORE Campus Las Vegas
- Location: Las Vegas
- Investment: N/A
- Power: 495 MW
- Status: Operational
- Sponsors: Switch, DigitalBridge, IFM Investors
Switch Citadel Campus (Tahoe Reno)
- Location: Reno/Sparks
- Investment: N/A
- Power: 650 MW
- Status: Operational
- Sponsors: Switch, DigitalBridge, IFM Investors
Tract Peru Shelf Technology Park
- Location: Reno/Sparks
- Investment: N/A
- Power: 810 MW
- Status: Under Construction
- Sponsors: Tract
Tract South Valley Technology Park
- Location: Reno/Sparks
- Investment: N/A
- Power: 1.2 GW
- Status: Planned
- Sponsors: Tract