Announced
2026-01-27

Current canonical record

This record tracks 75 South Data Center Campus in Georgia.

DCA DRI #4607 was completed after February 1, 2026. The Part 2 form reports $6B estimated value at build-out, $86.3M estimated annual local tax revenues, 200 FTEs, 0.030 MGD water demand, 0.0225 MGD sewage flow, Central Georgia EMC service, 450 MW peak connected electrical load, and 21.2% projected impervious surface.

Record provenance

This page is generated from the reviewed project database snapshot. The record was last reviewed on 2026-06-15. Blank fields mean the value was not publicly disclosed or could not be reconciled safely; they do not mean zero.