The maximum power demand a facility can draw at any moment, measured in watts (typically MW or GW for data centers). Capacity differs from consumption: a 1 GW data center has the *capability* to draw 1 billion watts, even if it doesn't always operate at full capacity. Grid infrastructure must be built to serve peak capacity, making it the critical constraint for data center siting.