This record tracks Stack Infrastructure POR03 Expansion in Oregon.
Data Center Dynamics reported on 2026-02-11 that STACK Infrastructure said it would add 121 MW to its POR03 campus outside Portland: a 25 MW POR03D building targeted for completion by Q4 2027, followed by 42 MW POR03E and 54 MW POR03F. STACK's POR03 campus page describes the Hillsboro campus as 55 acres with about 200 MW of total critical capacity, including 72 MW operational critical capacity, 25 MW near-term availability, and 96 MW of expansion capacity.
Record provenance
This page is generated from the reviewed project database snapshot. The record was last reviewed on 2026-06-15. Blank fields mean the value was not publicly disclosed or could not be reconciled safely; they do not mean zero.