This record tracks Sequitor Edge Rapid City Data Center in South Dakota.
July 2026 KOTA reporting says Sequitor Edge plans a 15 MW data center at the Black Hills Industrial Center in Rapid City, reports a 1.3 PUE claim from Sequitor Edge, and says construction is not expected to begin until late 2026. This updates the tracked row's earlier 2 MW initial capacity / 10 MW scale figure and late-summer 2026 groundbreaking expectation. No building-permit approval, construction start, operational opening, or cancellation was found.
Record provenance
This page is generated from the reviewed project database snapshot. The record was last reviewed on 2026-07-18. Blank fields mean the value was not publicly disclosed or could not be reconciled safely; they do not mean zero.