6,000 sq ft PDU laboratory plus 1,500 sq ft microgrid laboratory; part of 40-lab R&D campus
Located at 800 Federal St. Ribbon cutting held February 27, 2025. PDU lab contains three testing bays for high-powered voltage systems for AI data centers. Microgrid lab simulates power demands of ~300 homes and solar energy for 110 homes. Part of €2.26B ($2.4B) global R&D investment in 2024. One of five Schneider Electric R&D centers globally. Employs 700 people at Andover facility, 1,600 statewide.; R&D center, not production data center; small facility (7,500 sqft); minimal estimate
Record provenance
This page is generated from the reviewed project database snapshot. The record was last reviewed on 2026-06-15. Blank fields mean the value was not publicly disclosed or could not be reconciled safely; they do not mean zero.