Planned

Prado AI Industrial Campus

Mississippi — Unknown , Unknown
Mega-Project
2
Sponsors

Sponsors & Partners

Project Timeline

Announced
2026-03-02

Current canonical record

This record tracks Prado AI Industrial Campus in Mississippi.

Prado AI Industrial filed a March 2, 2026 Mississippi Public Service Commission request for declaratory opinion tied to an AI industrial campus with a data center, semiconductor facilities, and a 350 MW natural-gas plant intended to power campus tenants. Mississippi Today reported on April 22, 2026 that the PSC request identified Ridgeland, but Prado later said it was evaluating sites around Mississippi and could build multiple AI campuses. By June 1, after the PSC declined to issue an opinion as premature and hypothetical, Prado said it still planned to proceed but had shifted public location language to the Jackson metro area and would still need funding plus state and local permitting. Location fields are null because the developer no longer publicly identifies a specific city or county.

Record provenance

This page is generated from the reviewed project database snapshot. The record was last reviewed on 2026-07-18. Blank fields mean the value was not publicly disclosed or could not be reconciled safely; they do not mean zero.