Mega-Project
120 MW
Power Capacity
1
Sponsors
Sponsors & Partners
Far North Digital, LLC
Project Timeline
Announced
2020s
Current canonical record
Initial site: 43-acre pad, expandable to 100 acres. Modular design with significant expansion potential.
Proposed hyperscale facility leveraging North Slope's 35 trillion cubic feet of stranded natural gas reserves. Strategic location for potential transglobal low-latency marine fiber network. Access-controlled location within oil field infrastructure.; QA 2026-07-18: Cleared land area mislabeled as building area and removed generic modeled investment; retained the operator's prospective 120 MW capacity.
Record provenance
This page is generated from the reviewed project database snapshot. The record was last reviewed on 2026-07-18. Blank fields mean the value was not publicly disclosed or could not be reconciled safely; they do not mean zero.