Current canonical record
After Phase 1 completion. Current facility is 12,500 sq ft with 1.2 MW. Expansion adds 10,300 sq ft and 1.5 MW for ~200 cabinets. Future plans include second building adding 50,000 sq ft.
A 1547 page published on 2026-03-31 and modified on 2026-07-16 describes the Kapolei AlohaNAP facility as a subsea-cable and satellite landing point with an AWS Direct Connect node, and says a 9,000 sq ft, 1.5 MW expansion is underway and is expected to double capacity. This updates the tracked expansion details, which previously reflected a 10,300 sq ft Phase 1 expansion plan. The source does not disclose project-specific investment.