    "projectName": "Meta Montgomery Data Center",
    "state": "Alabama",
    "city": "Montgomery",
    "county": "Montgomery County",
    "region": "Central Alabama",
    "status": "under-construction",
    "sponsors": "Meta Platforms, Inc.",
    "operators": "Meta Platforms, Inc.",
    "tenants": null,
    "totalSquareFeet": 1300000.0,
    "powerCapacityMW": 195.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Expanded from original 715,000 sq ft and $800 million to 1.3 million sq ft and $1.5 billion. Campus includes multiple buildings optimized for AI workloads.",
    "announcedDate": "2024-05",
    "constructionStartDate": "2024-05",
    "expectedCompletionDate": "2026-12",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Energy use at the Montgomery facility will be matched with 100 percent clean and renewable energy.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Governor announcement: ~1,000 construction workers at peak and 100 operational jobs. Incentive disclosures list job commitments of 50 (2024), 70 (Sept. 2025), and 55 (Jan. 2026) with average hourly wage $38.46.",
    "incentives_type": "Income Tax Credit; Other",
    "incentives_value": 82000000.0,
    "challenges": "Limited open-source availability of local permits/approvals (minutes/vote tallies, building/grading permits) and full incentive/utility agreement texts; related solar supply project drew opposition and litigation.",
    "notes": "Supports over 100 operational jobs and 1,500+ skilled trade workers at peak construction. Second Meta data center in Alabama after Huntsville.; 1.3M sq ft campus, ~195 MW estimated at 150 W/sqft (AI workloads); .5B confirmed from research; Sources: https://datacenters.atmeta.com/2024/05/hello-montgomery/ https://datacenters.atmeta.com/2025/09/montgomery-were-growing/ https://governor.alabama.gov/newsroom/2024/05/governor-ivey-announces-meta-plans-to-build-800-million-next-generation-data-center-in-montgomery/",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Meta Huntsville Data Center",
    "state": "Alabama",
    "city": "Toney (Huntsville area)",
    "county": "Madison County",
    "region": "Northern Alabama",
    "status": "operational",
    "sponsors": "Meta Platforms, Inc.",
    "operators": "Meta Platforms, Inc.",
    "tenants": null,
    "totalSquareFeet": 3500000.0,
    "powerCapacityMW": 214.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Expanded from initial 970,000 sq ft to nearly 3.5 million sq ft with multiple expansion phases.",
    "announcedDate": "2018",
    "constructionStartDate": "2018",
    "expectedCompletionDate": "2022-12",
    "actualCompletionDate": "2021-09",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Water-efficient cooling technology; reuses water multiple times before wastewater discharge.",
    "certifications": "ISO 27001; LEED; SOC 3",
    "sustainabilityNotes": "Meta signed deal with TVA in 2018 to build solar facilities capable of producing 377MW, including one in Colbert County, Alabama.",
    "economicImpact_jobs": 300.0,
    "economicImpact_taxRevenue": 8100000.0,
    "economicImpact_notes": "For the second expansion, City materials/PDA cited about $750M in capital improvements/equipment and at least 50 full-time jobs (avg. $80k). Meta later announced (June 2022) a $1.5B expansion and about 300 jobs. A City presentation projected about $8.1M annual return on investment (city + schools) once build-out is complete; no post-completion audit was identified.",
    "incentives_type": "Infrastructure Support; Expedited Permitting; Property Tax Abatement; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Local reporting stated Meta temporarily stopped construction on the Huntsville expansion in December 2022 while evaluating future data center design/build; public sources after late 2022 did not clearly document whether the paused expansion restarted.",
    "notes": "Located at 5400 Prosperity Dr NW. Supports over 300 operational jobs. Combined with Montgomery, Meta's total Alabama investment exceeds $3 billion.; .5B expansion announced June 2022; construction paused Dec 2022; 214 MW estimated from investment; Sources: https://datacenters.atmeta.com/2022/06/huntsville-were-growing/ https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Huntsville-Data-Center.pdf https://www.datacenterdynamics.com/en/news/meta-expanding-huntsville-data-center-in-alabama/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Bridgeport Data Center",
    "state": "Alabama",
    "city": "Bridgeport",
    "county": "Jackson County",
    "region": "Northern Alabama",
    "status": "expansion",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": null,
    "totalSquareFeet": 270000.0,
    "powerCapacityMW": 143.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": "Initial $600 million investment announced in 2015, with total investment exceeding $1 billion since 2018. Built on 350 acres adjacent to decommissioned Widows Creek coal-fired power plant.",
    "announcedDate": "2015-06",
    "constructionStartDate": "2018-04",
    "expectedCompletionDate": "2019",
    "actualCompletionDate": "2019",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Google committed to match 100 percent of electricity consumption at the Alabama data center with renewable energy purchases.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Groundbreaking statements cited about 100 technicians/administrators. Google reports $2.1B in economic activity in 2024 across Alabama (statewide, not site-specific).",
    "incentives_type": "Other",
    "incentives_value": 100000.0,
    "challenges": "Project-specific incentive agreements, environmental permit records (NEPA/ADEM/NPDES), and detailed utility/interconnection or grid-upgrade documentation were not located in public sources during the research window.",
    "notes": "Alabama's first large-scale data center. Creates 75-100 highly technical jobs. Total economic impact calculated at $129 million over 20 years.; Google reports $2B+ invested since 2018; former Widows Creek coal plant site; TVA power; ~143 MW estimated from investment. On June 15, 2026, Google announced an additional $1.5 billion investment across 2026 and 2027 to expand its operating Jackson County data center campus, plus a $2 million Energy Impact Fund with TVA and CAANEAL and related STEM/community support; the $1.5 billion is incremental expansion investment, not the historical total campus investment. [Source: https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/; Date: 2026-06-15]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Marvel - Bessemer Hyperscale Data Center",
    "state": "Alabama",
    "city": "Bessemer",
    "county": "Jefferson County",
    "region": "Central Alabama",
    "status": "planned",
    "sponsors": "QTS Data Centers; Logistic Land Investment LLC; TPA Group",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 4500000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 14500000000.0,
    "sizeNotes": "Proposed 18-building campus on 673-700 acres. Would be one of the largest data centers in the United States and one of the largest single consumers of electricity in Alabama.",
    "announcedDate": "2025",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Project would require 300-500 diesel generators for backup power and consume up to 2 million gallons of water daily.",
    "economicImpact_jobs": 330.0,
    "economicImpact_taxRevenue": 4000000000.0,
    "economicImpact_notes": "Reported projections at the Nov 18, 2025 council meeting included ~1,000 construction jobs, 330 permanent jobs, average salary ~$112,550, and an estimated ~$4B net benefit over 30 years (BBA estimate).",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Legal challenges included a temporary restraining order (issued Apr 14, 2025; lifted Apr 23, 2025) that halted the rezoning process and led to a court-ordered restart of the rezoning process.",
    "notes": "QTS confirmed it is the company behind Project Marvel and lists Bessemer as a data center campus in development. DCD reported the plan as a $14.5 billion, 18-building project, expanded from about 700 acres toward 1,600 acres, with up to 1.2 GW of capacity; QTS said it is pursuing the proposed Bessemer campus as planning progresses. [Source: https://www.datacenterdynamics.com/en/news/qts-plans-data-center-campus-outside-milan-italy/; Date: 2026-07-03]; Sources: https://q.com/datacenterlocation/alabama/ https://www.datacenterdynamics.com/en/news/900-acre-expansion-to-alabamas-project-marvel-receives-recommendation-from-planning-commission/ https://listingsprod.blob.core.windows.net/ourlistings-usa/d23a4ba8-257a-4ac4-88c4-42cadeca2713/c9c2c43b-1a3a-4bec-bc61-e807d462a81e https://q.com/data-center-status/in-development/ https://www.datacenterdynamics.com/en/news/alabamas-planned-14bn-project-marvel-data-center-could-double-in-size/ https://www.wbrc.com/2026/06/25/bessemer-data-center-rezoning-lawsuit-dismissed/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Microsoft West US 3 Azure Region",
    "state": "Arizona",
    "city": "El Mirage and Goodyear",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "expansion",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft Azure; Microsoft Cloud",
    "totalSquareFeet": 504000.0,
    "powerCapacityMW": null,
    "itLoadMW": 48.327,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Microsoft owns more than 280 acres in El Mirage and more than 450 acres in Goodyear with two data centers operational",
    "announcedDate": "2020",
    "constructionStartDate": "2020",
    "expectedCompletionDate": "2026-06",
    "actualCompletionDate": "2021-06",
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Uses adiabatic cooling with zero water for cooling for more than half the year when temperatures are below 85\u00b0F. Abundant solar energy.",
    "economicImpact_jobs": 110.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company statements cite hundreds of construction jobs and new high-paying operational positions; no third-party study located.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Official statements from Goodyear and El Mirage mayors expressed support; no petitions, lawsuits, or protests located in El Mirage meeting records reviewed for the 2024 approvals.",
    "notes": "By the end of 2026, Microsoft projects 763 full-time employees and contractors will work across its operational facilities in Arizona. Average datacenter job compensation at $148,000 a year in 2023.; 150 MW Sun Streams 2 solar PPA; West US 3 launched 2021; adiabatic cooling; El Mirage/Goodyear sites; Microsoft purchased an additional 100 acres next to its Goodyear data center campus for $131 million, bringing its local footprint to more than 550 acres. [Source: https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/; Date: 2026-06-11]; Sources: https://azure.microsoft.com/en-us/blog/expanding-cloud-services-microsoft-launches-its-sustainable-datacenter-region-in-arizona/ https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-west-valley/ https://www.aps.com/en/About/Construction-and-Power-Line-Siting/Power-Line-Siting/Power-Line-Siting-Projects/Runway-230kV",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Mesa Data Center",
    "state": "Arizona",
    "city": "Mesa",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "operational",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": "Meta Platforms, Inc.",
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "396-acre site with multiple buildings, first two buildings now operational",
    "announcedDate": "2020",
    "constructionStartDate": "2021",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": "2025-01-30",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": "LEED Gold targeted or slated",
    "sustainabilityNotes": "Water service authorized as a Large/Multiple Meter (MLM) customer under a Sustainable Water Service Agreement (SSA), with water allowances tied to transfer of Long-Term Storage Credits (LTSCs). Community discussion highlighted drought/water use concerns at ~1.7 million gallons/day at build-out.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Meta and SRP statements cited ~2,000 peak construction workers and 200+ operational jobs. City materials referenced expected increases in various tax and fee revenues but did not provide quantified totals.",
    "incentives_type": "Expedited Permitting; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Community opposition focused on drought/water use at build-out; research noted difficulty locating additional site-specific permits (e.g., emergency generator air permits, stormwater construction permits) in reviewed city records.",
    "notes": "Located at 3841 S. Ellsworth Road. First two buildings operational as of January 30, 2025. Construction by DPR.; More than $1B and over 2.5M sq ft announced by Meta; first two buildings operational January 2025; QA 2026-07-18: Cleared unsupported exact IT load and removed a modeled 450 MW annotation.; Sources: https://datacenters.atmeta.com/all-locations/ https://www.srpnet.com/grid-water-management/grid-management/improvement-projects/project-huckleberry https://www.constructiondive.com/news/meta-dpr-arizona-data-center-mesa-phoenix/701776/ https://datacenters.atmeta.com/asset/mesa-data-center-info-sheet/ https://www.srpnet.com/assets/srpnet/pdf/grid-water-management/grid-management/improvement-projects/huckleberry/cec/SRP-Huckleberry-CEC-Final_ExhibitJ.pdf https://datacenters.atmeta.com/2025/01/mesa-we-are-online/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Vantage Data Centers Phoenix Campus",
    "state": "Arizona",
    "city": "Goodyear",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "under-construction",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 160.0,
    "itLoadMW": 176.0,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "50-acre campus with five new data centers planned",
    "announcedDate": "2023",
    "constructionStartDate": "2023",
    "expectedCompletionDate": "2024",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop chilled water system with air-side economizers (aiming to use virtually no water for cooling)",
    "certifications": "Green Globes certification for AZ11 and AZ12; overall campus on track for Green Globes certification",
    "sustainabilityNotes": "Vantage states the campus uses a closed-loop chilled water system with air-side economizers and aims to use virtually no water for cooling; city staff presentation cited \u201clittle water use\u201d.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Vantage/City releases cite about 3,000 \u201cconstruction and technology jobs\u201d (not clearly separated into construction vs permanent operational jobs). Investment described as more than $1.5B.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Public records reviewed did not surface incentive agreements, detailed environmental permits (air/water/stormwater), or interconnection/PPA and grid-upgrade cost details.",
    "notes": "Secured $735 million refinancing package for three data centers in Goodyear in June 2024. Investment exceeds $1.5 billion.; Sources: https://vantage-dc.com/news/vantage-data-centers-and-mccarthy-building-companies-celebrate-topping-out-of-construction-on-phase-ii-of-major-data-center-project-in-goodyear-ariz/ https://vantage-dc.com/news/vantage-data-centers-experienced-unprecedented-growth-in-2023-driven-by-ai-and-cloud-demand-globally-secured-10-billion-in-incremental-funding/ https://vantage-dc.com/news/vantage-data-centers-begins-phase-two-construction-at-growing-west-metro-phoenix-campus/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vermaland La Osa Data Center Park",
    "state": "Arizona",
    "city": "Eloy area / Red Rock",
    "county": "Pinal County",
    "region": "Phoenix-Tucson Corridor",
    "status": "planned",
    "sponsors": "Vermaland, LLC",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 33000000000.0,
    "sizeNotes": "3,300-acre site - would become the largest data center development in the U.S.",
    "announcedDate": "2025-08-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Applicant stated data centers would use closed-loop or air cooling and no water for cooling, but this was not yet fully stipulated or enforceable; gas-fired power plant water use remains unresolved.",
    "certifications": null,
    "sustainabilityNotes": "Hybrid energy system combining solar, natural gas, battery storage and grid connectivity. Plans to develop natural gas plant in first phase, then build solar plants.",
    "economicImpact_jobs": 70.0,
    "economicImpact_taxRevenue": 100000000.0,
    "economicImpact_notes": "70 permanent operations roles. 600 construction jobs. Located in Qualified Opportunity Zone.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Project remains in pre-zoning phases; rezoning and site plan approvals still required, including engineering, environmental, and floodplain compliance; community concerns about floodplain risk and environmental impacts.",
    "notes": "KJZZ reported on 2026-05-28 that Vermaland's La Osa plan near Eloy would be reduced by roughly 80%, from 59 data centers to 11 data centers and limited to 1 GW of energy demand; the Pinal County Board of Supervisors continued the rezoning/site-planning application to 2026-08-26 after a public hearing with substantial opposition. [Source: https://www.kjzz.org/fronteras-desk/2026-05-28/largest-proposed-data-center-in-arizona-to-be-scaled-back-80-after-opposition; Date: 2026-05-28]; Sources: https://www.datacenterdynamics.com/en/news/land-developer-vermaland-plans-33bn-data-center-in-arizona/ https://pinalpost.com/commission-advances-la-osa-data-center-rezoning-and-development-plan/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Buckeye Data Center Park",
    "state": "Arizona",
    "city": "Buckeye",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "planned",
    "sponsors": "Tract",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 20000000.0,
    "powerCapacityMW": 1800.0,
    "itLoadMW": null,
    "investmentUSD": 20000000000.0,
    "sizeNotes": "2,069-acre land parcel. Up to 40 individual data centers at full build-out.",
    "announcedDate": "2024-08-28",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Regional coverage of Arizona data center growth highlights water-use and infrastructure concerns; Tract said it secures water for sites but did not disclose detailed water plans for Buckeye.",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "360-500 permanent jobs at full buildout. 2,000 construction jobs. $60M revenue threshold triggers $50M infrastructure reimbursement.",
    "incentives_type": "Infrastructure Support",
    "incentives_value": 50000000.0,
    "challenges": "City packet documents required outreach/notice (neighborhood meeting 2023-06-21; hearing notices). No lawsuits or organized opposition documented in the city packet or major coverage reviewed; some regional concern exists about water and infrastructure impacts from Arizona data center growth.",
    "notes": "Purchased for $136 million. Buckeye City Council approved development agreement in August 2024 with up to $50 million reimbursement once project generates $60 million in revenue. Project would create 300 high-paying jobs and nearly 2,000 construction jobs at peak.; Sources: https://www.tract.com/news/tract-closes-acquisition-of-2069-acres-in-buckeye-arizona/ https://www.tract.com/project/buckeye/ https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/ https://inbuckeye.com/business/small-group-of-petition-signers-concerned-over-water-for-data-centers/ https://www.buckeyeaz.gov/business-development/economic-development/data-centers-fact-vs-fiction",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Novva Data Centers Mesa Campus",
    "state": "Arizona",
    "city": "Mesa",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "planned",
    "sponsors": "Novva Data Centers",
    "operators": "Novva Data Centers",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": 96.0,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "159-160 acre site at northwest alignment of Ellsworth and Warner roads",
    "announcedDate": "2025-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "water-free cooling",
    "certifications": null,
    "sustainabilityNotes": "DRB site plan shows on-site stormwater retention basins (A\u2013D). No project-specific NEPA/EIS, ADEQ air-quality permit, or water-withdrawal permit documentation was identified in the reviewed public materials.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Sponsor announcement references jobs/economic impact generally but no detailed third-party study or tax-revenue projection was located; project remains planned so realized impacts are not yet available in public records.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project remains planned with no verified construction start or commissioning date in the reviewed public records; gaps include missing Planning & Zoning Board agenda/minutes (late Jan 2025), any development agreement/incentive package, ADEQ permits, and any SRP interconnection or rate-impact filings.",
    "notes": "Planning to invest more than $3 billion in two phases over the next decade.; Sources: https://www.novva.com/media-center/novva-data-centers-announces-new-campus-in-mesa/ https://www.novva.com/data-center-facilities/mesa-az/ https://www.abc15.com/news/business/3-billion-mesa-data-center-campus-gets-green-light",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Stream Data Centers Phoenix Campus",
    "state": "Arizona",
    "city": "Goodyear",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "expansion",
    "sponsors": "Stream Data Centers",
    "operators": "Stream Data Centers",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 280.0,
    "itLoadMW": 280.0,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "157-acre campus. Phoenix I is 418,000 square feet and fully leased.",
    "announcedDate": "2019",
    "constructionStartDate": "2019",
    "expectedCompletionDate": "2025",
    "actualCompletionDate": "2021-01",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Air-cooled, closed-loop chiller systems (non-evaporative).",
    "certifications": null,
    "sustainabilityNotes": "Applicant notes air-cooled, closed-loop chillers reduce water usage compared with evaporative cooling. No NEPA EIS or state-level environmental review identified in accessible sources; no ADEQ air quality permit, AZPDES stormwater permit, or water-withdrawal records found in this research run.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "PAD narrative cites $1.5B investment; no jobs or tax-revenue estimates located in accessible documents for this run.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Key gaps include inability to access City Council minutes/ordinance vote in this environment, and missing state permit/interconnection documentation. Capacity figures vary across sources (280 MW industry reporting vs. 350 MW in 2020 Stream materials vs. 480 MW on current Stream website), likely due to phasing/updated plans.",
    "notes": "Located at 2950 S. Litchfield Road, Goodyear. Emerging as the largest development of its kind in The Valley. 20-year sales tax exemption available to tenants leasing 500 kW+ for 3+ years.; Investment estimated at $7M/MW; Sources: https://www.streamdatacenters.com/locations/phoenix/ https://public.destinyhosted.com/goodydocs/2023/CC/20230710_1474/1542_4._PAD_Overlay_Narrative.pdf https://www.datacenterdynamics.com/en/news/stream-tops-out-second-phoenix-data-center-in-arizona/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Prime Data Centers Phoenix Campus",
    "state": "Arizona",
    "city": "Avondale",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "under-construction",
    "sponsors": "Prime Data Centers",
    "operators": "Prime Data Centers",
    "tenants": "Unnamed leading hyperscaler",
    "totalSquareFeet": 1300000.0,
    "powerCapacityMW": 210.0,
    "itLoadMW": 240.0,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "66.5-acre campus with five hyperscale facilities at 11753 W Lower Buckeye Rd",
    "announcedDate": "2023-05",
    "constructionStartDate": "2023",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": "Projected SOC2 Type II and ISO 27001 compliance",
    "sustainabilityNotes": "Closed-loop cooling system saves millions of gallons of water - near-zero WUE and 97% less water than equally sized residential neighborhood. 100% renewable energy.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company press release described $2B+ investment and \"hundreds\" of temporary and permanent jobs, but no specific job counts or tax-revenue studies were identified in the provided research.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary city case files documenting Hermosa Ranch Technology Campus \u2013 South zoning/PAD approvals were not located in the provided research; project-specific incentive certification/awards and ADEQ permit records were also not found and were flagged for follow-up verification.",
    "notes": "Data Center Dynamics reported on 2026-04-08 that Prime had broken ground on the first three buildings at its Avondale campus, covering 66.5 acres at 11753 West Lower Buckeye Road, with 210 MW at full build-out and a reported $3 billion investment. Existing notes: Investment represents more than $2 billion in Avondale. Dark fiber access provides low-latency connectivity to local carrier-hotel meet-me rooms. [Source: https://www.datacenterdynamics.com/en/news/prime-starts-construction-on-3bn-data-center-campus-in-arizona/; Date: 2026-04-08]; Sources: https://primedatacenters.com/news/prime-announces-its-first-phoenix-data-center-campus/ https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/ https://www.commercialsearch.com/news/prime-breaks-ground-on-3b-phoenix-data-center-campus/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "QTS Phoenix 2 Campus",
    "state": "Arizona",
    "city": "Phoenix",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "operational",
    "sponsors": "QTS; Blackstone",
    "operators": "QTS",
    "tenants": "Unnamed hyperscale tenants",
    "totalSquareFeet": 750000.0,
    "powerCapacityMW": 210.0,
    "itLoadMW": null,
    "investmentUSD": 1470000000.0,
    "sizeNotes": "80-acre campus with multiple buildings at 40th Street, Phoenix. Just 5 minutes from Phoenix Sky Harbor International Airport.",
    "announcedDate": "2017-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2023",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Efficient, water-saving technology; quantitative water-use and cooling-system details not provided.",
    "certifications": null,
    "sustainabilityNotes": "Rezoning staff report notes the site is not in a FEMA Special Flood Hazard Area (Shaded Zone X) and references compliance with the Phoenix Green Construction Code.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "2023 Development Agreement states \u201cno financial impact\u201d to the City\u2019s General Fund; no project-specific jobs or tax projections identified in retrieved sources.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Public hearings occurred at the Planning Commission and City Council; no documented local opposition, petitions, or lawsuits tied specifically to the Phoenix 2 campus were located in retrieved city records and accessible news sources.",
    "notes": "Multi-building campus with redundant fiber infrastructure. Locations include 1200, 1250, 1400, 1450, and 1500 N 40th Street.; Investment estimated at $7M/MW; Sources: https://www.prnewswire.com/news-releases/qts-announces-development-of-mega-data-center-campus-in-ashburn-virginia-300542521.html https://phoenix.legistar.com/LegislationDetail.aspx?GUID=71C86CAF-66F0-48FE-89DC-581E1DA8DBA6&ID=6446980&Options=&Search= https://q.com/data-centers/phoenix-2/?from=Cloudscene https://www.datacenterdynamics.com/en/news/qts-breaks-ground-on-data-center-in-phoenix-arizona/ https://arizonaai.com/data-centers/qts-phoenix-ii-campus",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "QTS Phoenix 3 Campus (Glendale)",
    "state": "Arizona",
    "city": "Glendale",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "planned",
    "sponsors": "QTS; Blackstone",
    "operators": "QTS",
    "tenants": null,
    "totalSquareFeet": 3000000.0,
    "powerCapacityMW": 750.0,
    "itLoadMW": 750.0,
    "investmentUSD": null,
    "sizeNotes": "375-acre campus at Camelback Road and Loop 303. 16 buildings, each around 180,000 sq ft.",
    "announcedDate": "2022-07",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Water-free / minimal-no-water cooling design (corporate claim).",
    "certifications": null,
    "sustainabilityNotes": "QTS describes the Glendale project as a \"water positive\" use case replacing water-intensive agriculture; this is a corporate sustainability claim, not a regulatory finding.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific jobs, tax revenue, or economic impact study figures were found in the sources reviewed.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Limited public disclosure of project-specific incentives, environmental permits, and utility/interconnection arrangements; no confirmed construction start or completion milestone found in sources reviewed.",
    "notes": "Site acquired in July 2022 for $255.3 million. QTS is owned by Blackstone.; QA 2026-07-19: Classified 750 MW as QTS-disclosed critical capacity and removed an inapplicable investment-model annotation.; Sources: https://q.com/data-centers/phoenix-3/ https://www.datacenterdynamics.com/en/news/qts-files-for-750mw-campus-in-phoenix-arizona/ https://www.commercialsearch.com/news/qts-eyes-3rd-phoenix-data-center-campus/ https://azbex.com/planning-development/3msf-data-center-campus-planned-in-glendale/ https://www.connectcre.com/stories/qts-building-3rd-phoenix-area-data-center/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "NTT Global Data Centers Mesa Campus (Elliot Road)",
    "state": "Arizona",
    "city": "Mesa",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "expansion",
    "sponsors": "NTT Global Data Centers",
    "operators": "NTT Global Data Centers",
    "tenants": null,
    "totalSquareFeet": 126000.0,
    "powerCapacityMW": 240.0,
    "itLoadMW": 240.0,
    "investmentUSD": 1680000000.0,
    "sizeNotes": "102-acre campus at 10256 Elliot Road. Seven planned data centers, first opened in 2022.",
    "announcedDate": "2021-08",
    "constructionStartDate": "2021",
    "expectedCompletionDate": "2028-11",
    "actualCompletionDate": "2022",
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Air-cooled chillers with airside economizers",
    "certifications": "LEED Core and Shell specifications",
    "sustainabilityNotes": "Campus materials indicate air-cooled chillers with airside economizers and efficient chillers intended to save water while cooling high-density racks.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "City of Mesa press release describes general jobs/economic benefits but provides no project-specific job or tax revenue estimates; no public economic impact study specific to this campus was identified.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Limited public visibility into project-specific incentives (tax exemption amounts confidential) and limited public records on construction milestones beyond PH1, PPAs/interconnection, and utility rate arrangements.",
    "notes": "NTT's second major facility in Phoenix metro area. First of seven planned data centers opened in 2022 with 126,000 sq ft.; Investment estimated at $7M/MW; Sources: https://services.global.ntt/de-de/newsroom/ntt-build-seventh-us-data-center-campus-phoenix-arizona https://services.global.ntt/en-in/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center https://mesa.legistar.com/LegislationDetail.aspx?GUID=EA5F730E-1CEA-4FF5-9AED-6A3C5072298A&ID=4939290&Options=&Search=",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon AWS Phoenix Data Centers",
    "state": "Arizona",
    "city": "Phoenix and Mesa",
    "county": "Maricopa County",
    "region": "Greater Phoenix",
    "status": "under-construction",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 2465541.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 3600000000.0,
    "sizeNotes": "Multiple facilities including 220-acre Laveen site, two Mesa projects totaling 465,541 sq ft, and three West Valley facilities each totaling over 1 million sq ft",
    "announcedDate": "2023-2024",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Air-cooled chiller platforms",
    "certifications": null,
    "sustainabilityNotes": "Applicant narratives reference air-cooled chiller platforms and drought-tolerant/native landscaping. Amazon disclosed global AWS data center water withdrawal of about 2.5 billion gallons in 2025 and 0.12 liters withdrawn per kWh of IT load, but those figures are not site-specific to Phoenix/Mesa.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Mesa staff reports describe data center operations with three shifts and cite roughly 12-38 employees per shift for parking-demand analysis, but no official total permanent headcount, construction jobs, tax revenue estimate, or economic impact study was located.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Primary Mesa/Phoenix records did not disclose investment, power capacity, or IT-load figures and did not tie these Phoenix-Mesa projects to $3.6B, 600 MW, or a specific IT load. PHX062 remains in pre-construction permit review, while PHX065 has active construction support/site-work evidence. Phoenix/Laveen is confirmed as a land acquisition/land bank with a reported $277 million purchase price for about 220 acres, but no post-February 1, 2026 public entitlement or building-permit packet was located.",
    "notes": "Amazon acquired a roughly 220-acre site in the Laveen area near Loop 202 and Dobbins Road for a reported $277 million as one component of this aggregated Phoenix-and-Mesa record. Vintage Partners withdrew the related 206-acre Laveen data-center plan in April 2026 and said the site would instead proceed as mixed-use commercial development. This withdrawal applies to the Laveen component and does not cancel the other active facilities represented by this aggregate row. [Source: https://www.datacenterdynamics.com/en/news/vintage-partners-scraps-phoenix-arizona-data-center-plans/; Date: 2026-04-16]; Sources: https://cushwake.cld.bz/Americas-Data-Center-H2-2024-Update/9/ https://cw-gbl-gws-prod.azureedge.net/-/media/cw/global/insights/2023/americas-oct-2023-data-center-update.pdf?rev=6999a6eb9c364977b49720739abaf564",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Amazon AWS Project Blue (Tucson)",
    "state": "Arizona",
    "city": "Tucson",
    "county": "Pima County",
    "region": "Southern Arizona",
    "status": "under-construction",
    "sponsors": "Beale Infrastructure; Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": "Amazon AWS",
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 286.0,
    "itLoadMW": null,
    "investmentUSD": 3600000000.0,
    "sizeNotes": "290-acre site with up to 10 buildings planned",
    "announcedDate": "2023",
    "constructionStartDate": "2026-04",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Air-cooled design (developer re-scoped after annexation ended; reclaimed-water expansion canceled)",
    "certifications": null,
    "sustainabilityNotes": "Draft City Development Agreement contemplated reclaimed-water system extension (~18 miles of pipe, booster pump station, ~30-acre aquifer recharge facility with new recovery wells) to be built/dedicated by developer; after Aug 6, 2025 City action, reclaimed-water expansion was canceled and developer later shifted to an air-cooled redesign with domestic-only water use per county update.",
    "economicImpact_jobs": 180.0,
    "economicImpact_taxRevenue": 249300000.0,
    "economicImpact_notes": "Applied Economics projected 180 permanent jobs by 2029; 3,024 direct construction jobs and 2,049 indirect jobs during 2026\u20132028. Projected tax revenue for Phase 1 over 10 years: ~$97.3M to City of Tucson and ~$152M to County/schools/state.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "City of Tucson ended annexation negotiations (2025-08-06); reclaimed-water expansion was canceled; project faced significant public opposition and was later re-scoped by developer to an air-cooled design with different water sourcing while continuing the county process.",
    "notes": "Pima County's Project Blue FAQ links a 2026-04-23 progress update and permit tracking; AZ Luminaria reported on 2026-04-24, with on-site photos, that large construction vehicles had started razing the desert for Beale Infrastructure's Project Blue data center south of Tucson near the Pima County Fairgrounds. [Source: https://azluminaria.org/2026/04/24/we-said-no-dozens-protest-as-construction-of-project-blue-data-center-begins/; Date: 2026-04-24]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google West Memphis Data Center (Project Pyramid)",
    "state": "Arkansas",
    "city": "West Memphis",
    "county": "Crittenden County",
    "region": "Eastern Arkansas",
    "status": "under-construction",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": "Google",
    "totalSquareFeet": 900000.0,
    "powerCapacityMW": 1400.0,
    "itLoadMW": null,
    "investmentUSD": 4000000000.0,
    "sizeNotes": "Core campus spans 580 acres on a 1,178-acre site; project will ultimately feature five hyperscale data centers, office facilities, internal roads, stormwater systems, and a major utility substation. Some sources initially reported potential $10 billion investment.",
    "announcedDate": "2025-10-02",
    "constructionStartDate": "2025-10",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Wet-cooling infrastructure indicated by 60 cooling towers reported in DEQ-derived Title V air permit records; water source and consumptive-use terms remain unverified.",
    "certifications": null,
    "sustainabilityNotes": "Powered by Entergy Arkansas with dedicated 600MW Cypress Solar facility and 350MW battery energy storage system near Pine Bluff in Jefferson County. Google committed to net-zero carbon emissions by 2030. $25 million Energy Impact Fund established for Crittenden County energy efficiency and affordability initiatives.",
    "economicImpact_jobs": 300.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Official announcement projects hundreds of operations jobs and thousands of construction jobs (no specific counts located). No fiscal impact study found in accessible records; PILOT agreement not located.",
    "incentives_type": "Sales Tax Exemption; Pilot; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "City Clerk/Agenda Center public records portals were not reachable (JS-rendered or timed out), preventing verification of zoning mechanism and retrieval of PILOT agreement details.",
    "notes": "Largest private capital investment in Arkansas history. Described as Google's first data center in Arkansas. Will employ 300 permanent jobs and thousands of construction workers during build-out. West Memphis City Council approved the project in May 2025.; $4B announced October 2025; Project Pyramid; under construction; QA 2026-07-19: Cleared investment-derived power capacity.; Sources: https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/ https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment https://www.floridapsc.com/pscfiles/library/filings/2025/04357-2025/04357-2025.pdf https://www.datacenterdynamics.com/en/news/google-confirmed-to-be-behind-west-memphis-data-center-project-in-arkansas/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Apollo Project - Helena Harbor Data Center",
    "state": "Arkansas",
    "city": "Helena",
    "county": "Phillips County",
    "region": "Eastern Arkansas",
    "status": "canceled",
    "sponsors": "Stadium Partners; Garrison Data Partners",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Proposed 500-acre greenfield campus within the 4,000-acre Helena Harbor Industrial Park, marketed as a gigawatt hyperscale campus; no land sale or lease was ever closed with the port authority",
    "announcedDate": "2025",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Will operate with blend of on-grid and islanded power; draws power from multiple grids",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic-impact study, job-creation projection, or tax-revenue forecast for the project was found in the provided research.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "No land sale or lease was ever closed with Helena Harbor, the landowner. The port authority reports no current agreement or data-center discussions with Garrison Data Partners.",
    "notes": "Announced as Stadium Helena Harbor LLC, a joint venture between Utah-based Stadium Partners and Arkansas-based Garrison Data Partners, marketing a 500 MW powered-land hyperscale campus in the 4,000-acre Helena Harbor Industrial Park on a Mississippi River slack-water harbor. Correction 2026-10-02: In a written communication to Server Country on October 1, 2026, John Edwards, General Counsel and Economic Development Director of Helena Harbor (the Helena-West Helena/Phillips County Port Authority, which owns the site), stated that Garrison Data Partners and Stadium Partners began evaluating the site in May 2024 but, despite discussions and negotiations, never closed a deal for the sale or lease of any land. Helena Harbor has no agreements with Garrison and is not discussing any data-center deal with it. Edwards added that he understood, without independent confirmation, that Garrison and Stadium had not worked together for more than a year. The project is recorded as canceled; the 500 MW figure is the developer's marketed capacity, not a secured site. QA 2026-07-18: Cleared unsupported $3B investment.; Sources: https://www.apolloproject.net/",
    "lastUpdated": "2026-10-02"
  },
  {
    "projectName": "Little Rock Port Data Center (Willowbend Capital)",
    "state": "Arkansas",
    "city": "Little Rock",
    "county": "Pulaski County",
    "region": "Central Arkansas",
    "status": "planned",
    "sponsors": "Willowbend Capital LLC; Google LLC",
    "operators": "Google LLC",
    "tenants": null,
    "totalSquareFeet": 300000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Project to be built on approximately 780-acre site at Port of Little Rock purchased for $23 million; site allows for potential expansion",
    "announcedDate": "2025-04-29",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Cooling towers (blowdown discharge to wastewater facility referenced in MOU)",
    "certifications": null,
    "sustainabilityNotes": "City materials note ~45 acres of wetlands and 100-year floodplain areas within the annexation; no NEPA/state EIS identified; no PPA/onsite generation plan identified in reviewed public documents.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": 2800000.0,
    "economicImpact_notes": "No formal economic impact study or tax-revenue projection identified in the primary city documents reviewed.",
    "incentives_type": "Property Tax Abatement; Infrastructure Support; Expedited Permitting; Other",
    "incentives_value": null,
    "challenges": "Project remains planned with no construction start documented through July 2025; key terms in Appendix A (City Enrichment Investment) not publicly posted; detailed bond/PILOT documents and environmental permits not included in posted city materials; no public utility interconnection studies or upgrade costs identified.",
    "notes": "Google says it purchased land at the Port of Little Rock for a potential data center and is performing engineering, environmental, and utility-load diligence. DCD reported in January 2026 that Google was behind the previously undisclosed $1 billion Willowbend Capital project. Project remains in evaluation/permitting rather than construction. [Source: https://www.littlerockdatacenter.com/; https://www.datacenterdynamics.com/en/news/google-behind-1bn-data-center-in-little-rock-arkansas-report/; Date: Google site states April 2026 confirmation and is undated, accessed 2026-06-15; 2026-01-20]; Sources: https://www.swl.usace.army.mil/Portals/50/docs/regulatory/publicnotices/SWL%202026-00038%20PN-1.pdf https://www.datacenterdynamics.com/en/news/mystery-developer-plans-1bn-data-center-in-little-rock-arkansas/ https://www.swl.usace.army.mil/Missions/Regulatory/Public-Notices/Article/4447433/swl-2026-00038/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Conway Data Center (Forgelight Ventures)",
    "state": "Arkansas",
    "city": "Conway",
    "county": "Faulkner County",
    "region": "Central Arkansas",
    "status": "planned",
    "sponsors": "Forgelight Ventures LLC; Unknown Fortune 100 Company",
    "operators": "Unknown Fortune 100 Company",
    "tenants": "Unnamed U.S.-based Fortune 100 company",
    "totalSquareFeet": 300000.0,
    "powerCapacityMW": 10.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Largest capital investment in Conway's history",
    "announcedDate": "2025-04-09",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Conway Corp's Tupelo Bayou Wastewater Treatment Plant would supply treated cooling water for the facility",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "City records reviewed did not identify a formal economic impact study or tax-revenue projections; project remains planned.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "At April 21, 2025 Planning Commission hearings, one speaker spoke in favor and one in opposition for annexations and rezoning; requests were approved. No lawsuits, petitions, or formal protests noted in reviewed minutes or coverage.",
    "notes": "Conway City Council approved MoU with Forgelight Ventures for Fortune 100 company (identity not disclosed). Located in southwest Conway on Lollie Road along Arkansas River. Expected to create about 50 'high-quality' jobs. Project in 'very early stage' with discussions ongoing for about a year. Conway Corp agreed to cooperate on water, wastewater, sewer, fiber and other infrastructure upgrades. Property tax abatement of at least 65% for 30 years approved. Forgelight Ventures LLC incorporated by Michael Montfort, who is also connected to Little Rock Port project.; QA 2026-07-19: Removed an inapplicable modeled-power annotation.; Sources: https://media.conwayarkansas.gov/media/council/agenda/April_1_2025_Special_City_Council_Agenda_QLeL2dQ.pdf https://d2dr22b2lm4tvw.cloudfront.net/ar_lcd/2025-04-05/front-page.pdf https://baxtel.com/data-center/forgelight-ventures-conway",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Clarksville Data Center",
    "state": "Arkansas",
    "city": "Clarksville",
    "county": "Johnson County",
    "region": "Northwestern Arkansas",
    "status": "under-construction",
    "sponsors": "Serverfarm; SF ARK1 LLC; Vaughn Property Group",
    "operators": "Serverfarm",
    "tenants": null,
    "totalSquareFeet": 2160000.0,
    "powerCapacityMW": 432.0,
    "itLoadMW": null,
    "investmentUSD": 8000000000.0,
    "sizeNotes": "Described as multi-million dollar facility and first hyperscale data center in the state (though this appears to conflict with other projects)",
    "announcedDate": "2022",
    "constructionStartDate": "2026-03",
    "expectedCompletionDate": "2028-01",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop water cooling system",
    "certifications": null,
    "sustainabilityNotes": "No public PPA, water-use estimate, wastewater-discharge plan, or detailed cooling design was found. Community sources requested disclosure of power and water use, utility-rate impacts, runoff, air-quality, and light-pollution protections.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Clarksville economic developer Steve Houserman said the project was expected to create at least 200 middle- to higher-income jobs; no public economic-impact study or binding job-creation agreement was found.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Key evidence gaps include no public tenant or end-customer disclosure, no completion or energization date, no public critical IT load or executed utility agreement, no public cooling-water source or annual water-use estimate, no final air permit, no project-specific incentive agreement, and no public litigation or cancellation notice.",
    "notes": "DCD reported Serverfarm as developer of an $8 billion, 135-acre Clarksville campus with six planned 360,000-square-foot buildings, SF ARK1 LLC as the site affiliate, and Vaughn Property Group involvement. The Johnson County Graphic subsequently reported site clearing, air-permit requirements and generator plans in March 2026, and local references in April 2026 described the data center as being constructed in Clarksville. [Source: https://www.datacenterdynamics.com/en/news/serverfarm-targets-135-acre-data-center-campus-in-arkansas/; https://www.thegraphic.org/2026/03/03/air-permit-required-for-proposed-data-center-state-records-detail-generator-plans-as-site-clearing-continues/; https://www.thegraphic.org/2026/04/14/jc-quorum-court-waits-on-ordinance-regulating-mineral-extractions-committee-formed-to-delve-into-issue-after-legal-questions-raised/; Date: 2025-11-27; 2026-03-03; 2026-04-14]; Sources: https://www.serverfarmllc.com/arkansas/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CalEthos Lithium Valley Data Center Campus",
    "state": "California",
    "city": "Lithium Valley",
    "county": "Imperial County",
    "region": "Southern California",
    "status": "canceled",
    "sponsors": "CalEthos",
    "operators": "CalEthos",
    "tenants": null,
    "totalSquareFeet": 3000000.0,
    "powerCapacityMW": 420.0,
    "itLoadMW": null,
    "investmentUSD": 2940000000.0,
    "sizeNotes": "315-acre site with potential for 3-4 million sq ft over time",
    "announcedDate": "2024-12",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Powered by 100% geothermal and solar energy from nearby plants",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic impact study or quantified job/tax projections found; company did not renew the land option in July 2025, and there is no evidence of realized local economic impacts tied to this project.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Required approvals and environmental studies not completed on the company's timeline; unresolved community concerns cited; approvals not secured by mid-2025; company did not renew the 315-acre land purchase option in July 2025 and shifted efforts to other locations.",
    "notes": "Located in Imperial County's 51,000-acre Lithium Valley development zone. Benefits from 9.3\u00a2 per kwh electricity rates and proximity to geothermal power plants.; Investment estimated at $7M/MW; Sources: https://www.sec.gov/Archives/edgar/data/1174891/000149315224029802/ex99-1.htm https://www.sec.gov/Archives/edgar/data/1174891/000149315225023306/form10-q.htm https://www.sec.gov/Archives/edgar/data/1174891/000149315226014045/form10-k.htm",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "QTS Aurora-Denver Data Center",
    "state": "Colorado",
    "city": "Aurora",
    "county": "Arapahoe County",
    "region": "Denver Metro",
    "status": "under-construction",
    "sponsors": "QTS Realty Trust",
    "operators": "QTS Realty Trust",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 177.0,
    "itLoadMW": 160.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Planned capacity could escalate up to 252 MW according to regulatory filings. 65 acres of land enables growth capacity.",
    "announcedDate": "2023",
    "constructionStartDate": "2024-03",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Will be Xcel Energy's largest customer, eclipsing steel plants and mines",
    "economicImpact_jobs": 70.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public reporting (GovTech citing Xcel/PUC statements) reported >$1 billion total project cost; 400\u2013600 construction jobs; 70\u201385 permanent workers. No public economic impact study or verified tax revenue outcomes located in the reviewed sources.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Primary city/county incentive agreements and local vote records were not located in the accessible public portals; public reporting and regulators raise concerns about potential cost shifts to other utility customers from discounted EDR terms.",
    "notes": "The complex will employ 400-600 people during construction and 70-85 permanent workers. Location at 1160 N Gun Club Rd, Aurora, CO 80018. Development has sparked debate over energy consumption and tax incentives.; QA 2026-07-18: Normalized the county name; retained distinct 177 MW facility demand and 160 MW critical IT load.; Sources: https://q.com/data-centers/denver/ https://arapahoe.legistar.com/View.ashx?GUID=F7D2B937-879F-4A9E-856B-03D21D1E7BC0&ID=12146687&M=F https://archive.siteselection.com/issues/2023/sep/pioneer-and-partner.html https://coloradosun.com/2025/08/18/colorado-xcel-data-center-demand-spending/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Millstone Nuclear Data Center Campus",
    "state": "Connecticut",
    "city": "Waterford",
    "county": "New London County",
    "region": "Southeastern Connecticut",
    "status": "canceled",
    "sponsors": "NE Edge; Dominion Energy",
    "operators": "NE Edge",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 1600000000.0,
    "sizeNotes": "Two data center buildings totaling 1.14 million sq ft and 428,000 sq ft respectively. Occupies less than 5% of Millstone's 526-acre site.",
    "announcedDate": "2023-02",
    "constructionStartDate": "2024-mid",
    "expectedCompletionDate": "2025-mid",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Powered directly by Millstone Nuclear Power Station, described as 'non-carbon solution' for cloud infrastructure. Direct connection to nuclear plant via electric switchyard.",
    "economicImpact_jobs": 120.0,
    "economicImpact_taxRevenue": 231000000.0,
    "economicImpact_notes": "Host Municipality Fee Agreement (HMFA) provides a 30-year payment stream totaling about 231037500 USD to Waterford; staff report anticipates ~120 employees over three shifts (about 40 cars per shift).",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Pilot",
    "incentives_value": null,
    "challenges": "Connecticut Siting Council declined the declaratory ruling (without prejudice) on 2024-01-04 due to insufficient information; no local site plan/zoning applications filed as of the Council record; boundary revision/regulatory path unresolved.",
    "notes": "A 2026 Governing/Middletown Press report states that the 1.5-million-square-foot hyperscale proposal connected to Millstone was scrubbed, and quotes Governor Lamont saying Connecticut had extended the Millstone nuclear agreement and slowed new data centers unless they add generation. Status updated from planned to canceled/scrubbed. Investment and capacity retained from existing canonical estimate. [Source: https://www.governing.com/finance/connecticuts-data-center-tax-break-bet-isnt-paying-off; Date: 2026-04-01]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Washington",
    "state": "Delaware",
    "city": "Delaware City",
    "county": "New Castle County",
    "region": "Northern Delaware",
    "status": "planned",
    "sponsors": "Starwood Digital Ventures; Starwood Capital Group; New Castle Campus Development LLC; PBF Energy",
    "operators": "Starwood Digital Ventures",
    "tenants": null,
    "totalSquareFeet": 6000000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "11 buildings across two phases on approximately 580 acres",
    "announcedDate": "2024",
    "constructionStartDate": "2026-Q3",
    "expectedCompletionDate": "2028-Q2",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Power requirements would equal nearly twice all residential homes in Delaware; concerns raised about energy grid impact",
    "economicImpact_jobs": 700.0,
    "economicImpact_taxRevenue": 75000000.0,
    "economicImpact_notes": "Developer claims include nearly $10B in economic output during construction and ~$75M/year in tax revenue; local officials and advocates have questioned the basis for these projections.",
    "incentives_type": "Expedited Permitting",
    "incentives_value": null,
    "challenges": "Rezoning required for the North Campus; pre-exploratory reviews marked incomplete; multiple environmental approvals/permits listed as not yet available; significant community opposition; PSC large-load tariff process and pause on new large-load connections.",
    "notes": "Technical.ly reported on June 11, 2026 that Project Washington is currently halted, with projected peak demand of 1,200 MW, after DNREC denied the Coastal Zone permit request. The same article says Delmarva's utility-side list includes an unnamed 1,200 MW New Castle County project that is highly likely to be Project Washington and was under review, but not submitted to PJM's large-load adjustment process because of the PSC moratorium. DNREC's Coastal Zone Industrial Control Board page separately lists a Decision and Final Order dated April 17, 2026 for Starwood Digital Ventures' appeal. Prior reporting: project generated significant community opposition due to energy consumption concerns; plans submitted August 2025; expected to create 500-900 permanent jobs and 3,800 construction jobs. [Source: https://technical.ly/civics/delaware-data-center-foia-reveals-hidden-energy-demands/; Date: 2026-06-11]; Sources: https://www.datacenterdynamics.com/en/news/starwood-files-to-develop-12gw-11-building-data-center-campus-in-delaware/ https://spotlightdelaware.org/2025/10/13/delaware-data-center-developer-launches-pr-campaign-to-boost-project/ https://www.delawarepublic.org/show/the-green/2025-10-24/as-delaware-mulls-plans-for-massive-data-center-worries-persist-over-electric-rates?_amp=true https://projwashington.com/ https://projwashington.com/wp-content/uploads/2025/11/Project-Washington-Quick-Facts.pdf https://www.delawarepublic.org/politics-government/2025-08-19/mega-del-city-data-center-awaits-state-level-approval-county-officials-still-have-concerns?_amp=true",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Osceola County Hyperscale Data Center Campus",
    "state": "Florida",
    "city": "Yeehaw Junction",
    "county": "Osceola County",
    "region": "Central Florida",
    "status": "announced",
    "sponsors": "US Development",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 7000000.0,
    "powerCapacityMW": 700.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Nine data center buildings, each three stories spanning 675,000 sq ft, totaling over 7 million sq ft on 434 acres",
    "announcedDate": "2024-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Wetlands on the property were reported by county staff as expected to be preserved, but no project-specific environmental permit, mitigation plan, or sustainability commitment was found.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public source reviewed disclosed permanent jobs, construction jobs, or tax revenue projections.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Project appears dormant or unadvanced. An August 12, 2025 WOKC report quoted Osceola County Planning Director Raymond Stangle saying county staff had not heard back from the interested data-center party. No approval, construction start, operator announcement, tenant announcement, cancellation notice, or completion milestone was found through 2026-06-15.",
    "notes": "Located on U.S. 441 just north of Florida's Turnpike interchange with State Road 60. Would rival the nation's largest data centers. Water provided by Toho Water Authority, fiber network serviced by AT&T, Century Link and Lumen. Pre-application meeting scheduled for October 15, 2024 to discuss rezoning from agricultural to industrial.; From news: 7M sqft across 9 buildings (675,000 sqft each) on 434 acres; power at 100 W/sqft; investment at M/MW; Sources: https://ktvz.com/cnn-regional/2024/09/18/big-plot-of-land-in-florida-could-become-one-of-nations-largest-data-centers/ https://www.wokc.com/news/news-cast-8-12/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "NextNRG Nassau County Data Center & Microgrid Campus",
    "state": "Florida",
    "city": "Nassau County (near Jacksonville)",
    "county": "Nassau County",
    "region": "Northeast Florida",
    "status": "planned",
    "sponsors": "NextNRG",
    "operators": "NextNRG",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 1400000000.0,
    "sizeNotes": "1,600-acre long-term lease option: 1,200 acres for 200 MW smart microgrid, 400 acres for hyperscale data center development. Access to approximately 6,000 additional acres for future expansion",
    "announcedDate": "2025-09-22",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Hybrid microgrid design with solar + battery integration, NextUOS Utility Operating System, RENCAST predictive analytics",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company announcement and industry coverage reviewed did not quantify jobs or tax revenue; no county/state economic impact study for this project located in the research text.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Limited public documentation as of 2026-02-01: no identified county/state permitting milestones, zoning actions, environmental permits, interconnection filings, or economic impact studies for this specific project.",
    "notes": "Located near Jacksonville International Airport with direct access to major highways and international transport routes. Features firm power availability, reliable water supply for cooling, carrier-grade fiber connectivity with sub-1 millisecond latency, and scalable land for expansion. Operators can start with 50 MW facilities and add capacity incrementally as demand grows.; Investment estimated at $7M/MW; Sources: https://www.globenewswire.com/news-release/2025/09/22/3153989/0/en/NextNRG-Secures-Strategic-Florida-Site-Ideal-for-Hyperscale-Data-Center-Development.html https://investors.nextnrg.com/pr/nextnrg-secures-strategic-florida-site-ideal-for-hyperscale-data-center-development https://www.thecountyinsider.com/home/statement-regarding-rumored-data-center-in-western-nassau",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Project Sail",
    "state": "Georgia",
    "city": "Newnan",
    "county": "Coweta County",
    "region": "South Metro Atlanta",
    "status": "planned",
    "sponsors": "Atlas Development LLC; Prologis",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 4914000.0,
    "powerCapacityMW": 936.0,
    "itLoadMW": null,
    "investmentUSD": 17000000000.0,
    "sizeNotes": "13 buildings, each 378,000 sq ft with 72 MW power capacity",
    "announcedDate": "2024-12-31",
    "constructionStartDate": null,
    "expectedCompletionDate": "2036-12-31",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop air-cooled system without evaporative cooling; county staff report describes a closed-loop chilled-water configuration that may incorporate supplemental cooling and exterior ventilation units.",
    "certifications": null,
    "sustainabilityNotes": "Community opposition with 1,775+ signatures on petition",
    "economicImpact_jobs": 30.0,
    "economicImpact_taxRevenue": 163000000.0,
    "economicImpact_notes": "~30 permanent ops staff (typical). $1.3B tax revenue over 21 years ($100M/year at full build). Developer: Prologis + Atlas Development.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption",
    "incentives_value": 487900000.0,
    "challenges": "Local rezoning process paused pending completion of the state DRI review and ongoing community opposition; Coweta County adopted a 180-day moratorium on new data center projects in May 2025 while reviewing zoning policy.",
    "notes": "832-acre site, 45 miles south of Atlanta. Joint venture between Prologis and Atlas Development. Estimated $100M tax revenue over 10 years. Significant community opposition.; QA 2026-07-18: Corrected county formatting and recomputed exact totals from 13 disclosed 378,000-square-foot, 72 MW buildings.; Sources: https://www.ajc.com/news/business/project-sail-a-17b-data-center-project-pitched-south-of-atlanta/D33GKROJBJEEPATVVCT3OVZR2Q/ https://www.coweta.ga.us/home/showpublisheddocument/32018/638931151043930000 https://www.wsbtv.com/news/local/coweta-county/plans-17-billion-project-sail-data-center-proposed-coweta-county/FESMAPZCOZE5JERPQXJWTIZRCY/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Project Springbank",
    "state": "Georgia",
    "city": "Adairsville",
    "county": "Bartow",
    "region": "Northwest Metro Atlanta",
    "status": "planned",
    "sponsors": "Atlas Development LLC",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 2270000.0,
    "powerCapacityMW": 432.0,
    "itLoadMW": null,
    "investmentUSD": 4500000000.0,
    "sizeNotes": "Six buildings, each approximately 379,000 sq ft with 72 MW power",
    "announcedDate": "2025-02-14",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031-12-31",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Closed-loop water technology to reduce water/sewer demand. Expects to use 15,000 gallons/day",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Local reporting cited developer-side projections in rezoning debate of ~$14M county and ~$33M school system tax revenue; no verified job numbers in DRI portions reviewed as of May 2025.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Local rezoning not approved; planning commission recommended denial and application was withdrawn amid community opposition; no construction reported as of May 2025.",
    "notes": "588-acre site southeast of Adairsville, approximately one hour northwest of Atlanta. Near Horseshoe Loop and Barnsley Gardens Road.; Sources: https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4403 https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4403 https://www.ajc.com/news/business/45b-project-springbank-joins-metro-atlantas-data-center-pipeline/2ZNPEXHMIZBXNPKIPWHJZ4FLH4/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Bunkhouse",
    "state": "Georgia",
    "city": "Stilesboro",
    "county": "Bartow County",
    "region": "Northwest Metro Atlanta",
    "status": "planned",
    "sponsors": "Digital Realty",
    "operators": "Digital Realty",
    "tenants": null,
    "totalSquareFeet": 8600000.0,
    "powerCapacityMW": 1830.0,
    "itLoadMW": null,
    "investmentUSD": 19000000000.0,
    "sizeNotes": "Largest proposed data center project in Atlanta area",
    "announcedDate": "2025-03-31",
    "constructionStartDate": null,
    "expectedCompletionDate": "2035-12-31",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Public-water cooling (water-efficient HVAC), subject to Bartow County Water Department approval",
    "certifications": null,
    "sustainabilityNotes": "DRI additional information notes wetlands and floodplains on site (impacts not anticipated), stream buffers along Raccoon Creek not anticipated to be impacted, and stormwater planning with ~29% impervious surface, detention ponds and buffers; Phase 1B cultural reconnaissance found historic resources present but not expected to be affected.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 40000000.0,
    "economicImpact_notes": "Jobs not disclosed. Est. $40-50M annual property tax. County does not offer incentives to data centers.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Developer/tenant undisclosed (Kimley-Horn filed DRI). County explicitly excludes data centers from local incentives.",
    "notes": "Property along Taff Road, south of Highway 113/Cartersville Highway. 60km northwest of downtown Atlanta. Would require three on-site substations. Annual property tax revenues estimated at $40-50M. Power needs more than entire existing metro Atlanta data center market. Planning Commission recommended approval May 19, 2025.; QA 2026-07-19: Normalized Bartow County.; Sources: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4433 https://www.datacenterdynamics.com/en/news/application-filed-for-86-million-sq-ft-data-center-project-outside-atlanta-georgia/ https://www.ajc.com/news/business/19b-data-center-campus-proposed-northwest-of-atlanta/FPMRPJCYERGXLLAND6IZACSVEM/ https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/MINUTES.PUBLIC_MEETING_6-4-2025.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "T5 Data Centers - Georgia Campus",
    "state": "Georgia",
    "city": "Undisclosed",
    "county": "Unknown",
    "region": "Georgia",
    "status": "announced",
    "sponsors": "T5 Data Centers",
    "operators": "T5 Data Centers",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 16000000000.0,
    "sizeNotes": "20-building campus, T5's fourth project in Georgia and largest by wide margin. Estimated value between $16-18 billion",
    "announcedDate": "2025-05-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Jobs not disclosed for this campus. Georgia data center sector: 5,471 permanent operations jobs statewide (2025).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project site and host jurisdiction are undisclosed, preventing verification of zoning, permitting, incentives, utility interconnection, and environmental review records; no construction or permitting milestones have been publicly reported for this specific campus as of May 2025.",
    "notes": "Part of T5's strategy to build five gigawatt-plus campuses across the country. Individual 60-megawatt data centers built in phases as tenants lease space. Location expected to be announced later in 2025.; Sources: https://www.govtech.com/artificial-intelligence/planned-georgia-data-center-would-be-worth-at-least-16b https://www.bisnow.com/news/national/deal-sheet/data-center-firm-t5-expanding-footprint-in-atlanta-and-chicago-129337 https://www.ajc.com/news/business/t5-data-centers-plans-campus-spanning-20-buildings-in-georgia/P7OWRM6AQJCFTAFM5NHRNZPWMA/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services - Butts County Campus",
    "state": "Georgia",
    "city": "Jackson",
    "county": "Butts",
    "region": "Southeast Metro Atlanta",
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 2272000.0,
    "powerCapacityMW": 786.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Part of $11B total investment across Butts and Douglas counties. Leased 543 acres in Butts County",
    "announcedDate": "2025-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "AWS said Georgia AWS data centers use water for cooling less than 8% of the year and rely on outside air the rest of the time; not disclosed specifically for ATL086.",
    "certifications": null,
    "sustainabilityNotes": "Public sources reviewed did not identify a project-specific renewable energy procurement, NEPA documentation, or other sustainability commitments. County/regional context sources flag potential loss of forested greenfield areas and stream-buffer impacts for comparable Douglas County data center proposals, including watershed protections tied to the Sweetwater Creek water supply watershed.",
    "economicImpact_jobs": 250.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Statewide announcement (Butts + Douglas counties): at least $11B investment in Georgia and 550+ jobs statewide; local fiscal details not disclosed.",
    "incentives_type": "Pilot; Property Tax Abatement; Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary local approvals (rezoning/conditional use/special exceptions/variances) and project-specific permits were not located in publicly accessible records during this sweep; key terms of the local tax arrangement were not publicly disclosed.",
    "notes": "Most significant investment in Butts County's history. Expected to create at least 275 high-skilled jobs. Leased 543 acres in December 2024.; Power estimated at $7M/MW; Sources: https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure https://ted.cviog.uga.edu/financial-documents/sites/default/files/budgetdoc/financial-report/county-butts-fy2025-financial-report.pdf https://www.buttscountyida.com/agendas-minutes_32_1706993085.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services - Douglas County Campus",
    "state": "Georgia",
    "city": "Douglasville",
    "county": "Douglas",
    "region": "West Metro Atlanta",
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 786.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "Part of $11B total investment across Butts and Douglas counties. Multiple land acquisitions totaling ~400 acres",
    "announcedDate": "2025-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "AWS said the Georgia investment supports cloud computing and generative-AI workloads, including GPU-capable data centers. No project-specific public source disclosed cooling technology, water withdrawals, recycled-water arrangements, wastewater terms, PUE target, or certifications.",
    "economicImpact_jobs": 250.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "The broader Georgia AWS expansion was announced as at least $11 billion and at least 550 jobs across Butts and Douglas counties. Douglas County economic-development coverage described the Douglas County campus as at least $5 billion and more than 250 full-time jobs, and called it the largest capital investment in county history. A late-May/June 2026 AWS posting for Lithia Springs data-center operations technician roles indicates active operations staffing in the location but not full campus completion.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "No public source reviewed through June 15, 2026 confirmed full campus completion or cancellation, disclosed total IT load, utility power capacity, square footage, phase count, a utility interconnection agreement, water/cooling arrangements, or an expected completion date. Local scrutiny included concerns about noise, emissions, electricity-rate pressure, limited permanent jobs, and a 2025 Douglas County data-center moratorium.",
    "notes": "Expected to create at least 275 high-skilled jobs. AWS purchased 118 acres in October 2024 for $37M, 156 acres in September for $37.1M, and 129 acres in November for $64.7M. 15-year property tax break approved.; Power estimated at $7M/MW; Sources: https://elevatedouglas.com/wp-content/uploads/2025/01/AWS-Douglas-County-Release-01072025.pdf https://sustainability.aboutamazon.com/reclaimed-water-project-portfolio.pdf https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google - Monroe County Campus",
    "state": "Georgia",
    "city": "Forsyth",
    "county": "Monroe County",
    "region": "Central Georgia",
    "status": "planned",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1100000000.0,
    "sizeNotes": "948 acres purchased for $42.5M along Rumble Road near I-75",
    "announcedDate": "2024-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Google has not identified a project-specific cooling technology, water demand, water-withdrawal volume, discharge arrangement, renewable-energy arrangement, PUE target, or certification. The April 2026 Monroe County data-center ordinance requires public water and sewer access and prohibits private wells for data-center water resources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public reporting on the land purchase and planned campus did not include job creation numbers, tax-revenue projections, or an economic impact study.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "No public construction timeline; transparency concerns around an NDA request; county adopted a temporary data center moratorium (Dec 2, 2025) while revising UDO standards.",
    "notes": "Estimated annual tax revenue of $20M. No development timeline announced yet. Google has stated they don't have a development timeline at this point.; QA 2026-07-18: Normalized Monroe County and cleared modeled power capacity.; Sources: https://www.gpb.org/news/2025/10/14/google-drops-42-million-on-monroe-county-land-for-data-center-what-we-know",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Google - Douglas County Campus",
    "state": "Georgia",
    "city": "Lithia Springs",
    "county": "Douglas",
    "region": "West Metro Atlanta",
    "status": "operational",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 1300000.0,
    "powerCapacityMW": 171.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "Google's first Georgia facility, built in 2007. Multiple expansions including $300M+ investment",
    "announcedDate": "2003",
    "constructionStartDate": "2007",
    "expectedCompletionDate": "2016",
    "actualCompletionDate": "2007",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Among first in industry to use recycled industrial water to cool servers",
    "economicImpact_jobs": 25.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "A 2016 regional business roundup reported a $300 million expansion and 25 new jobs. No county-commissioned economic impact study or tax revenue projection specific to the campus was located in the sources reviewed.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary county permitting, zoning case files, and incentive documents were not available in accessible online public records reviewed; key details likely require public records requests to Douglas County, the Development Authority of Douglas County, Georgia EPD, and the local water/sewer authority.",
    "notes": "Located at 300 Riverside Parkway, Lithia Springs. Total commitment of more than $1.2B since 2007. Supports Google Search, Gmail, Maps, YouTube and other applications.; Power estimated at $7M/MW; Sources: https://www.datacenters.google/locations/georgia/ https://netchoice.org/wp-content/uploads/2020/07/Google-Data-Centers-Report.pdf https://www.ajc.com/news/state--regional-govt--politics/google-invests-300m-expansion-douglas-county-data-center/vsLMtUNvggtx1nAWc6ZW4N/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta - Newton County Campus (Stanton Springs)",
    "state": "Georgia",
    "city": "Social Circle",
    "county": "Newton",
    "region": "East Metro Atlanta",
    "status": "operational",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": "Meta/Facebook",
    "totalSquareFeet": 2470000.0,
    "powerCapacityMW": 250.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Initial 970,000 sq ft, expanded by 1.5M sq ft in second phase. Three-building expansion underway",
    "announcedDate": "2018",
    "constructionStartDate": "2018",
    "expectedCompletionDate": "2020",
    "actualCompletionDate": "2021",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Industrial-quality reclaimed/gray water reuse infrastructure described as intended for uses including data hall cooling",
    "certifications": null,
    "sustainabilityNotes": "Powered by 100% clean and renewable energy. Cooled using outside air",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": 10000000.0,
    "economicImpact_notes": "2018 reporting described 100+ permanent jobs and thousands of construction jobs (not quantified). JDA materials reported $5M in PILOT payments to date and an expectation of ~$10M/year at buildout; local reporting also described a claimed ~$1B expansion and ~300 jobs (secondary reporting).",
    "incentives_type": "Pilot; Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Key primary attachments (full development agreement and water/sewer agreement) were referenced but not located in the reviewed packet; bond/inducement and PILOT agreement documents were not obtained in this pass. Expansion details ($1B, three additional buildings, ~300 jobs) were described as secondary local reporting pending primary filings. Specific state environmental permits were not found in this search.",
    "notes": "Located at 100 Move Fast Way, Social Circle, about 40 miles east of Atlanta in Stanton Springs. Currently adding three-building expansion.; 970K sq ft initial + expansion; 50M + B expansion; Walton EMC 100% renewable; 200+ MW solar contracts; Sources: https://datacenters.atmeta.com/2021/03/hello-georgia/ https://www.plateauexcavation.com/projects/newton-data-center/ https://www.waltonemc.com/images/newsletters/Realite_Apr_2018.pdf https://www.covnews.com/news/business/facebook-adding-more-buildings-newton-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft - East Point Campus",
    "state": "Georgia",
    "city": "East Point",
    "county": "Fulton",
    "region": "South Metro Atlanta",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": null,
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": 324.0,
    "itLoadMW": null,
    "investmentUSD": 1842000000.0,
    "sizeNotes": "125-acre site on Ben Hill Road. Reduced from three to two datacenter buildings based on community feedback",
    "announcedDate": "2021-02-11",
    "constructionStartDate": "2023",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Direct evaporative cooling uses zero water when temps below 29.4\u00b0C, reducing cooling water use to less than 15% of the year",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Development Authority of Fulton County and MEAG materials report an estimated $420 million investment in each 250,000-square-foot data center; no East Point-specific jobs or tax revenue figures were located.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Community concerns led to design changes, including moving the substation away from residences and reducing the campus from three buildings to two. Construction impacts included vegetation and rock removal, grading, dust/debris mitigation, and rock-excavation/vibration concerns. Microsoft said construction was expected to restart February 1, 2024 after earlier site preparation and community meetings.",
    "notes": "Part of Microsoft's East US 3 Azure region. First phase includes one data center building, power substation, privacy screening, and support facilities.; Power estimated at 100 W/sqft from 700,000 sqft; 125-acre campus ATL06/ATL07; investment at M/MW; Sources: https://local.microsoft.com/blog/east-point-datacenter-project-overview/ https://www.fultoncountyga.gov/news/2021/02/11/fulton-county-welcomes-major-investment-from-microsoft-corporation-development-of-east https://blogs.microsoft.com/blog/2021/02/11/investing-to-grow-in-and-with-atlanta/ https://www.developfultoncounty.com/pdf/DAFC%20APS%20Presentation%20Deck_3.28.2021%20%281%29_16375115%281%29.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft - Union City Campus",
    "state": "Georgia",
    "city": "Union City",
    "county": "Fulton",
    "region": "South Metro Atlanta",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft",
    "totalSquareFeet": 2100000.0,
    "powerCapacityMW": 202.0,
    "itLoadMW": null,
    "investmentUSD": 1842000000.0,
    "sizeNotes": "Three physical data centers, larger than Mall of Georgia",
    "announcedDate": "2024-06",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2032-12-31",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Waterless cooling system (limited water use primarily for domestic use and landscaping)",
    "certifications": null,
    "sustainabilityNotes": "DRI final report notes streams/wetlands/buffers and tree preservation requirements; best-practice construction measures (erosion and sediment control, revegetation); and a waterless cooling system with limited water use.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": 40472857.0,
    "economicImpact_notes": "DAFC fact sheet projects average salary about 111950 and net new tax revenue over 10 years of about 40.47M; estimated ad valorem tax savings about 75.19M over 10 years.",
    "incentives_type": "Property Tax Abatement; Pilot",
    "incentives_value": 75185958.0,
    "challenges": "Primary sources reviewed did not identify project-specific Union City zoning approvals, state/federal environmental permits, or utility interconnection/rate filings; Microsoft attribution appears primarily in local media rather than agency documents (which often use ATL11/Project Steamboat).",
    "notes": "Located at 4810 Stonewall Tell Road. Part of Microsoft's East US 3 Azure region.; Sources: https://www.developfultoncounty.com/uploads/meetings-and-minutes_294_3157527442.pdf https://www.ajc.com/news/business/fulton-board-approves-75m-tax-break-for-microsoft-data-center/Q3K2XGXZD5DGRJUPUB3ENQGB4A/ https://www.ajc.com/news/business/new-details-revealed-about-microsofts-18b-data-center-near-atlanta/X7FTPDSJGNAZVNF34XSHTPXS2Y/ https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft - Project Firecracker (Rome/Floyd County)",
    "state": "Georgia",
    "city": "Rome",
    "county": "Floyd",
    "region": "Northwest Georgia",
    "status": "planned",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft Corporation",
    "totalSquareFeet": null,
    "powerCapacityMW": 143.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "347-acre property on Huffaker Road",
    "announcedDate": "2023-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Rezoning approval included a stipulation that no coal ash will be disposed of on the property. Public sources reviewed did not identify a NEPA/state EPD environmental assessment or air/water permit documents specific to Project Firecracker.",
    "economicImpact_jobs": 150.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Inducement resolution ties the project to at least 150 net new jobs and $1.0B investment. Public description indicates property and school taxes are paid on increased land value during the abatement period; no public long-term tax revenue projection identified.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Limited public documentation beyond rezoning and development authority actions; community opposition raised traffic/noise/property value and environmental concerns; utility/interconnection and permitting details not identified in sources reviewed.",
    "notes": "Property east of Fouche Gap Road, across Huffaker Road from Georgia Power property. Creating minimum 150 jobs. $1B in bonds issued with 12-year tax break. Land purchased at $40,000/acre. Expected to go live by 2028.; Power estimated at $7M/MW; Sources: https://www.floydcountyga.gov/sites/default/files/fileattachments/rome-floyd_development_authority/meeting/19765/2023.10.30_rfcda_minutes.pdf https://www.datacenterdynamics.com/en/news/microsoft-to-develop-350-acre-data-center-campus-in-rome-georgia/ https://www.wrganews.com/2026/05/06/planning-director-gives-data-center-update/ https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/217068/98288 https://www.floydcountyga.gov/sites/default/files/fileattachments/rome-floyd_development_authority/meeting/19765/2023.10.30_rfcda_agenda_-_called_meeting.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "QTS - Project Excalibur (Fayetteville)",
    "state": "Georgia",
    "city": "Fayetteville",
    "county": "Fayette",
    "region": "South Metro Atlanta",
    "status": "under-construction",
    "sponsors": "QTS Realty Trust; Blackstone; QTS Eastwood, LLC",
    "operators": "QTS Realty Trust",
    "tenants": null,
    "totalSquareFeet": 7000000.0,
    "powerCapacityMW": 250.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Up to 16 buildings with 6.6M sq ft data center space and 400K sq ft office space. First building 350-440K sq ft",
    "announcedDate": "2026-01-13",
    "constructionStartDate": "2023",
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling",
    "certifications": null,
    "sustainabilityNotes": "Zoning conditions included 100-foot undisturbed buffers; stormwater/floodplain requirements tied to Georgia Stormwater Management Manual; and construction/full build-out traffic studies. No public EIA/EIS, water-withdrawal permit, or air-quality permit specific to the campus was located in the cited sources.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": 200000000.0,
    "economicImpact_notes": "Early reporting cited city hopes for ~100 jobs (not a formal job-creation agreement). No public economic impact study with quantified job/tax projections was found in the cited sources.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Project-specific incentive terms and utility/interconnection details were not publicly located in the cited sources; community opposition raised concerns about noise, water use, traffic, and environmental/quality-of-life impacts.",
    "notes": "ATL2 East should be treated as an expansion of the existing QTS Fayetteville/Project Excalibur campus, not a separate near-duplicate. DCA DRI #4603 was completed after February 1, 2026 and reports QTS Eastwood, LLC as developer, a 313-acre site west of Veterans Parkway, $3B estimated value at build-out, about $29M estimated annual local tax revenues, about 100 FTEs, 0.20 MGD water demand, and on-site substation/new transmission infrastructure. The accessible DCA Part 2 form leaves peak MW as TBD. Existing campus context: 615-acre Project Excalibur/QTS Fayetteville campus around 20 miles south of Atlanta. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4603; Date: 2026-04-21]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Newton County Technology Park (Social Circle Technology Park)",
    "state": "Georgia",
    "city": "Social Circle",
    "county": "Newton",
    "region": "East Metro Atlanta",
    "status": "planned",
    "sponsors": "TPA Group",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 2560000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "Nine buildings spanning 317 acres",
    "announcedDate": "2025-01",
    "constructionStartDate": "2028",
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "DRI materials note wetlands/streams on or near the site requiring buffers, plus regulated stormwater controls and management practices (e.g., detention/retention) consistent with local and state requirements.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 7000000.0,
    "economicImpact_notes": "DRI estimates local taxes at buildout of approximately $7.0M/year; publicly available summary does not provide construction or permanent job counts.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Initial DRI filing (Newton County, #4376) was closed and the project was refiled under the City of Social Circle (DRI #4426) after annexation status was clarified; project remains in zoning/special-use review.",
    "notes": "Located east of SR 11, north of I-20, west of Social Circle Road. About one hour east of Atlanta. Developed by TPA Group. Renamed from 'Newton County Technology Park' to 'Social Circle Technology Park'. Undergoing approval process with Social Circle Planning Commission.; Power estimated at $7M/MW; Sources: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4376 https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4376 https://negrc.org/uploads/sites/4/2025/04/DRI4426.SocialCircleTechnologyPark.SocialCircle.FinalReport.pdf https://www.govtech.com/smart-cities/nine-building-data-center-campus-proposed-north-of-atlanta https://www.covnews.com/news/cities/social-circle-city-council-approves-sup-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "DC BLOX - Atlanta East (Rockdale County)",
    "state": "Georgia",
    "city": "Conyers",
    "county": "Rockdale",
    "region": "East Metro Atlanta",
    "status": "under-construction",
    "sponsors": "DC BLOX",
    "operators": "DC BLOX",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 144.0,
    "itLoadMW": 144.0,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "68 acres, 144MW critical load, up to 216MW total load at full build-out",
    "announcedDate": "2023-12-14",
    "constructionStartDate": "2024-09",
    "expectedCompletionDate": "2025-10",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "First phase described as waterless cooling; larger buildings described as hybrid air/closed-loop water cooling initially primed with utility water and recirculated without replenishment or discharge.",
    "certifications": null,
    "sustainabilityNotes": "DRI materials describe 44% impervious coverage (~30 acres) with two stormwater detention ponds plus pond/stream buffers. DRI notes wetlands will be preserved until Army Corps permits are issued; media reports Georgia EPD review with state water quality certification needs and mitigation credit purchases for wetland/stream impacts.",
    "economicImpact_jobs": 60.0,
    "economicImpact_taxRevenue": 5000000.0,
    "economicImpact_notes": "DRI Part 2 lists estimated local tax revenues of $5M per year, averaged over 10 years at full buildout; FTE field is blank.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Pilot; Other",
    "incentives_value": null,
    "challenges": "Information gaps: local incentive/PILOT documents and vote records; final Board of Adjustment decision/conditions for VAR2024-33; USACE/EPD permit documents (public notice, 401 certification, 404 decision, mitigation instruments); Georgia Power interconnection/cost allocation documentation. Schedule signals conflict between developer-reported 2024 construction start and permit reporting indicating later start dates for permitted wetlands/streams work.",
    "notes": "Located approximately 24 miles east of downtown Atlanta. Officially broke ground September 2024. Building dark fiber ring around metro Atlanta for regional connectivity and global access via Myrtle Beach cable landing station. Granted incentives by Development Authority of Rockdale County.; Investment estimated at $7M/MW; Sources: https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/ https://www.dcblox.com/wp-content/uploads/2024/06/DC-BLOX-hyperscale-data-center.pdf https://www.rockdalecountyga.gov/wp-content/uploads/2025/01/ACFR2023.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "DC BLOX - Atlanta West (Douglas County)",
    "state": "Georgia",
    "city": "Lithia Springs",
    "county": "Douglas",
    "region": "West Metro Atlanta",
    "status": "under-construction",
    "sponsors": "DC BLOX",
    "operators": "DC BLOX",
    "tenants": null,
    "totalSquareFeet": 498000.0,
    "powerCapacityMW": 120.0,
    "itLoadMW": 120.0,
    "investmentUSD": 1150000000.0,
    "sizeNotes": "100 acres, 80MW critical load, 120MW total load, remaining capacity 498K sq ft",
    "announcedDate": "2023-10-31",
    "constructionStartDate": "2023-10-31",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "DC BLOX announced a $1.15B green loan in August 2025 for the Douglas County campus. Public materials retrieved here do not publish project-specific water demand, cooling-water arrangement, PUE, renewable-energy arrangement, or certifications.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "DC BLOX announced expected capital investment of over $1.2B in October 2023; DCD later reported the three-building program was expected to approach $2B across phases. No project-specific permanent jobs, construction jobs, or tax revenue projections were provided in the supplied markdown.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": 98000000.0,
    "challenges": "The clearest public schedule change is the shift from the original Q3 2025 initial customer-move-in target to DCD's July 2024 report that the first 40 MW phase was expected in 2026. Open public-record gaps include electric service and interconnection terms, water/sewer/cooling documentation, executed incentive or bond-for-title agreements, building-permit numbers, certificate-of-occupancy dates, energization/customer move-in dates, tenant identity, and any litigation or administrative challenges not indexed in public web records.",
    "notes": "Located in Douglasville/Lithia Springs. Next to Microsoft's 300-acre facility. Part of DC BLOX's southeastern hyperscale edge node network.; Investment estimated at $7M/MW; Sources: https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/ https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/ https://www.datacenterdynamics.com/en/news/dc-blox-secures-115bn-green-loan-for-atlanta-data-center-development/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Digital Realty - ATL15/ATL16 (Forest Park)",
    "state": "Georgia",
    "city": "Forest Park",
    "county": "Clayton",
    "region": "South Metro Atlanta",
    "status": "planned",
    "sponsors": "Digital Realty",
    "operators": "Digital Realty",
    "tenants": null,
    "totalSquareFeet": 1900000.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 2500000000.0,
    "sizeNotes": "Two-building campus on 97 acres",
    "announcedDate": "2025-05-30",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No project-specific renewable procurement instrument identified in sources reviewed (as of 2026-02-05). Design-review conditions included tree preservation, buffering, lighting limits, and soundproofing requirements.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 52500000.0,
    "economicImpact_notes": "No project-specific job-count estimate, economic impact study, fiscal impact memo, revenue projection, or PILOT schedule located in sources reviewed.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Key open items include locating any executed incentive/PILOT/leaseback documents, identifying building/grading/stormwater permits and any generator air permits, and confirming environmental remediation status for landfill-impacted parcels. Community concerns focused on landfill legacy contamination, water/energy demand, and noise impacts.",
    "notes": "Located approximately nine miles south of Atlanta. Will be designated ATL15 and ATL16. Adds to Digital Realty's existing Atlanta footprint of 484,000 sq ft across three facilities (ATL11, ATL13, ATL14).; -3B for 200+ MW; 97 acres former Fort Gillem; 20M land; expected 2028; Sources: https://www.digitalrealty.com/about/projects/fort-gillem https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4482 https://www.datacenterdynamics.com/en/news/digital-realty-files-to-develop-two-building-campus-outside-atlanta-georgia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Diode Ventures Gemstone Technology Park",
    "state": "Idaho",
    "city": "Kuna",
    "county": "Ada County",
    "region": "Southwestern Idaho",
    "status": "planned",
    "sponsors": "Diode Ventures; Black & Veatch; Gemstone Technology Park LLC",
    "operators": "Diode Ventures",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 700.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "620-acre site. Self-contained wastewater treatment and well water systems.",
    "announcedDate": "2025-04",
    "constructionStartDate": "2026",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Self-contained wastewater treatment system and well water supply, not using city infrastructure.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reported projections: 800\u20131,200 construction jobs during build-out and about 100 permanent jobs when operational.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Primary documents (staff report, ordinance text, minutes) were not publicly indexed in searchable form during research; state/local incentive agreements and environmental permit dockets were not identified in the accessible sources.",
    "notes": "BoiseDev reported on April 28, 2026 that the Diode Ventures proposal was currently on hold because of an ongoing lawsuit. A February 3, 2026 BoiseDev report said Kuna farmers filed suit over the City Council vote approving the project, while Gemstone Technology Park LLC and landowner Duane Yamamoto petitioned to intervene to defend the approval; no hearing had been scheduled at that time. Numeric investment and power capacity are unchanged because the 2026 litigation/hold sources did not provide updated values. [Source: https://boisedev.com/news/2026/03/20/data-center-water/ | https://boisedev.com/news/2026/02/03/data-center-suit/; Date: 2026-04-28; 2026-02-03]; Sources: https://www.diodeventures.com/gemstone-project-updates https://www.datacenterdynamics.com/en/news/diode-ventures-plans-620-acre-data-center-park-in-kuna-idaho/ https://www.idahostatesman.com/news/business/article303505246.html https://boisedev.com/news/2025/04/03/kuna-data-center-diode-ventures/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta DeKalb Data Center Campus",
    "state": "Illinois",
    "city": "DeKalb",
    "county": "DeKalb County",
    "region": "Northern Illinois",
    "status": "operational",
    "sponsors": "Meta Platforms Inc. (Facebook)",
    "operators": "Meta Platforms Inc.",
    "tenants": null,
    "totalSquareFeet": 2300000.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": 19.911,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Five buildings across campus",
    "announcedDate": "2020",
    "constructionStartDate": "2020",
    "expectedCompletionDate": "2022",
    "actualCompletionDate": "2023-12",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": "100% renewable energy",
    "sustainabilityNotes": "Invested in two wind energy projects in Illinois to add 295MW of renewable energy to local grid. Used AI-developed low-carbon concrete with 40% lower emissions. Recycled 90% of construction waste (17,600 tons).",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "City planning staff projected 20-year tax revenues (even with abatements) comparable to the five largest existing industrial companies combined; no dollar figure provided.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": 286800000.0,
    "challenges": "Community concerns about road access/traffic and farmland loss; environmental permits and interconnection details not identified in local approvals.",
    "notes": "Meta's DeKalb campus powers Facebook, Instagram, and other Meta services. Provides more than 200 operational jobs long-term and required 1,200 skilled trade workers during construction.; Sources: https://datacenters.atmeta.com/2022/04/good-news-from-dekalb/ https://datacenters.atmeta.com/2023/11/dekalb-we-are-online/ https://www.datacenterdynamics.com/en/news/meta-launches-data-center-in-dekalb-illinois/ https://www.cityofdekalb.com/DocumentCenter/View/15855/4-DCEDC-2022-Annual-Rpt",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Compass Datacenters - Hoffman Estates (Former Sears HQ)",
    "state": "Illinois",
    "city": "Hoffman Estates",
    "county": "Cook County",
    "region": "Chicago Suburbs",
    "status": "under-construction",
    "sponsors": "Compass Datacenters",
    "operators": "Compass Datacenters",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "197-acre campus with five planned hyperscale facilities",
    "announcedDate": "2024-06",
    "constructionStartDate": "2024-06",
    "expectedCompletionDate": "2026-06",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "water-free cooling",
    "certifications": null,
    "sustainabilityNotes": "Plans for sustainable operations",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Village financial reporting notes tax-base diversification via permit revenue, electrical utility taxes, and property taxes; no standalone economic-impact study located.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Primary village agenda/minutes portal (CivicClerk) was not accessible in the research environment, limiting direct citation of ordinance texts, roll-call votes, and site-plan conditions; several items flagged for verification with primary records.",
    "notes": "Located at 3333 Beverly Road on former Sears headquarters site. First data center expected to be powered by ComEd in mid-2026. Represents Compass's first Illinois campus.; Sources: https://www.compassdatacenters.com/news/compass-kicks-off-development-of-its-first-hyperscale-campus-in-illinois/ https://chicago.suntimes.com/real-estate/2024/06/13/hoffman-estates-modern-era-compass-data-center-sears https://www.dailyherald.com/20251208/business/after-sears-teardown-walls-are-going-up-for-hoffman-estates-data-center-campus/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "T5 @ Chicago IV - Grayslake Campus",
    "state": "Illinois",
    "city": "Grayslake",
    "county": "Lake County",
    "region": "Northern Illinois",
    "status": "planned",
    "sponsors": "T5@Chicago IV, LP; T5 Data Centers",
    "operators": "T5 Data Centers",
    "tenants": null,
    "totalSquareFeet": 5000000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": 1200.0,
    "investmentUSD": 250000000.0,
    "sizeNotes": "18-20 buildings planned, 100-400 MW each. 1.55 GW secured from ComEd.",
    "announcedDate": "2024-05",
    "constructionStartDate": "2027",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling system",
    "certifications": null,
    "sustainabilityNotes": "Water supply via Village of Grayslake (purchased from Central Lake County Joint Action Water Agency). T5 design team indicated total campus water use <50,000 gallons/day (~0.05 MGD), cited as ~0.25% increase in CLCJAWA daily pumpage in an Illinois Commerce Commission presentation (Jan 15, 2026).",
    "economicImpact_jobs": 1680.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No publicly posted job estimates, economic impact studies, or project-specific tax revenue projections identified in the sources reviewed; Village statements about tax benefits apply to the broader Cornerstone of Grayslake development.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Project described as planned with entitlements/platting in progress; limited public disclosure on incentives, utility interconnection terms, and environmental permitting in the sources reviewed.",
    "notes": "One of the largest data center campuses planned in the US. Initially announced at 480 MW, expanded to 1.2 GW. AI-ready infrastructure designed for hyperscale and commercial cloud providers. Illinois DCEO 2025 Data Center Investment Program annual report lists T5@Chicago IV, LP in Grayslake as a 2025 signed MOU with a $250,000,000 investment commitment, an estimated $15,625,000 value of tax benefits, and 20 new jobs; treat $250M as an official investment floor. [Source: https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf; Date: 2026-07-01]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Pioneer Development - Yorkville Project Cardinal",
    "state": "Illinois",
    "city": "Yorkville",
    "county": "Kendall County",
    "region": "Western Chicago Suburbs",
    "status": "planned",
    "sponsors": "Pioneer Development, LLC",
    "operators": "Pioneer Development, LLC",
    "tenants": null,
    "totalSquareFeet": 17000000.0,
    "powerCapacityMW": 1800.0,
    "itLoadMW": null,
    "investmentUSD": 100000000.0,
    "sizeNotes": "1,037 acres across 20 parcels. Fourteen two-story data center buildings, two on-site substations, and switchyard.",
    "announcedDate": "2025",
    "constructionStartDate": "2027-07",
    "expectedCompletionDate": "2047",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Air-quality materials state commitments to Tier IV controls, particulate filters, selective catalytic reduction, oxidation catalysts, HVO renewable fuel for generators, testing/maintenance-only backup-generator operation, and no other backup-generator dispatch under the executed PUD agreement.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No local government economic impact study, job projections, or tax-revenue estimates were found in accessible public records from the city project page or agenda documents.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Key referenced documents (Project Cardinal application package/staff reports/ordinances) could not be retrieved from the city document server via this environment; no interconnection agreement, PPA, or grid-upgrade cost allocation document was located in accessible sources.",
    "notes": "Three-phase development over 20 years. One of two massive data center projects proposed in Yorkville. Shaw Local reported on June 25, 2026 that a settlement was reached with resident John Bryan in litigation over Project Cardinal, with developers agreeing to re-phase the project; other June reporting said the developer sought an 18-month extension to purchase land, indicating acquisition-delay risk. [Source: https://www.shawlocal.com/kendall-county-now/2026/06/25/developers-agree-to-re-phase-project-cardinal-data-center-in-yorkville-in-settlement-with-resident/; Date: 2026-06-25]; QA 2026-07-18: Removed a stale generic investment-estimate annotation.; Sources: https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne https://www.datacenterdynamics.com/en/news/two-data-center-campuses-totaling-38-buildings-proposed-in-yorkville-illinois/ https://www.shawlocal.com/kendall-county-now/2026/03/12/yorkville-data-center-approval-comes-after-nearly-6-hour-contentious-city-council-meeting/ https://www.shawlocal.com/news/2025/09/01/from-data-centers-to-grid-costs-heres-why-your-energy-bill-keeps-rising/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Prologis - Yorkville Project Steel",
    "state": "Illinois",
    "city": "Yorkville",
    "county": "Kendall County",
    "region": "Western Chicago Suburbs",
    "status": "planned",
    "sponsors": "Prologis, L.P.",
    "operators": "Prologis",
    "tenants": null,
    "totalSquareFeet": 6800000.0,
    "powerCapacityMW": 680.0,
    "itLoadMW": null,
    "investmentUSD": 4760000000.0,
    "sizeNotes": "540 acres across sixteen parcels. 18 two-story data center buildings.",
    "announcedDate": "2025",
    "constructionStartDate": "2027-07",
    "expectedCompletionDate": "2047",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling system; developer stated it would not use evaporative cooling.",
    "certifications": null,
    "sustainabilityNotes": "City record discusses noise mitigation requirements at later permitting; developer stated it does not intend to use propylene glycol. Stormwater basins/ponds are included across phases.",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Developer narrative and City staff referenced significant construction jobs, long-term employment opportunities, and tax revenue, but no quantified study or estimates were published in the City record reviewed.",
    "incentives_type": "Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Project appears to remain in planned/pending entitlement status as of the posted record reviewed (through Nov 10, 2025 minutes), with ongoing technical submissions (noise/traffic) and future requirements for final site plans, plats, building permits, and engineering approvals. Infrastructure agreements and reimbursement/recapture mechanisms were described as to-be-negotiated in separate agreements.",
    "notes": "Shaw Local reported on May 28, 2026 that a third lawsuit had been filed over Yorkville data centers, with the latest challenge taking aim at Project Steel and seeking to have the city's rezoning ruled invalid and to halt construction pending judicial review; keep planned status but add active litigation risk. [Source: https://www.shawlocal.com/kendall-county-now/2026/05/28/third-lawsuit-filed-trying-to-halt-yorkville-data-centers-second-by-community-organization/; Date: 2026-05-28]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "CloudHQ ORD Campus - Mount Prospect",
    "state": "Illinois",
    "city": "Mount Prospect",
    "county": "Cook County",
    "region": "Chicago Suburbs",
    "status": "under-construction",
    "sponsors": "CloudHQ",
    "operators": "CloudHQ",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 252.0,
    "itLoadMW": 252.0,
    "investmentUSD": 2500000000.0,
    "sizeNotes": "Three data centers, 84 MW each. Former United Airlines headquarters site.",
    "announcedDate": "2022-08",
    "constructionStartDate": "2022-08",
    "expectedCompletionDate": "2024",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling technology",
    "certifications": null,
    "sustainabilityNotes": "Project conditions referenced compliance with local/state/federal noise and emissions standards and required permits from IEPA and other agencies; final PUD discussions included stormwater basin design changes and landscaping/buffering measures.",
    "economicImpact_jobs": 450.0,
    "economicImpact_taxRevenue": 1000000.0,
    "economicImpact_notes": "Project staff cited ~$2.5B investment, projected ~$100M EAV, and ~$1M annual utility tax; media reported a $2M park district contribution.",
    "incentives_type": "Property Tax Abatement; Tif; Cba",
    "incentives_value": null,
    "challenges": "Project remained incomplete as of July 24, 2025; village officials reported the substation nearing completion and CloudHQ planned a design amendment, with the project described as still far from completion.",
    "notes": "Located at 1200 E Algonquin Rd, near O'Hare International Airport with access to high density fiber and multiple carriers. Capacity expandable to 300 MW.; Sources: https://cloudhq.com/campus/ord-campus/ https://www.nasdaq.com/press-release/comed-cloudhq-break-ground-on-new-hyperscale-data-center-in-mount-prospect-2022-08-23",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Prime Data Centers - Chicago ORD Campus",
    "state": "Illinois",
    "city": "Chicago",
    "county": "Cook County",
    "region": "Chicago Metro",
    "status": "operational",
    "sponsors": "Prime Data Centers",
    "operators": "Prime Data Centers",
    "tenants": "CoreWeave",
    "totalSquareFeet": 384000.0,
    "powerCapacityMW": 175.0,
    "itLoadMW": 270.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Three hyperscale facilities. ORD-01: 384,000 sq ft, 72 MW",
    "announcedDate": "2020",
    "constructionStartDate": "2022-11-17",
    "expectedCompletionDate": "2027-06",
    "actualCompletionDate": "2023",
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling (near-zero WUE claimed for ORD01-01)",
    "certifications": null,
    "sustainabilityNotes": "Prime (Nov. 6, 2024) states ORD01-01 is being developed with a closed-loop cooling system resulting in near-zero WUE (water usage effectiveness).",
    "economicImpact_jobs": 10.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Village communications frame the project as delivering long-term tax revenues and temporary construction jobs, but no job counts or fiscal impact totals were located in the cited sources.",
    "incentives_type": "Tif; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Key gaps include: executed TIF purchase and redevelopment agreement text not publicly posted (limits verification of term, reimbursements, clawbacks); lack of centralized public permit portal for building permits/certificates of occupancy; no public interconnection/special rate filings located; operational/opening status not verified via commissioning/CO/energization records in the cited sources.",
    "notes": "Campus features 180 MW of critical power capacity at full build-out across three facilities.; Investment estimated at $7M/MW; Sources: https://primedatacenters.com/news/prime-data-centers-planning-750k-sq-ft-data-center-campus-in-elk-grove-il/ https://primedatacenters.com/news/chicago-data-center-campus/ https://primedatacenters.com/locations/chicago/ https://www.spglobal.com/ratings/en/regulatory/article/-/view/type/HTML/id/3584908",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services (AWS) New Carlisle Campus",
    "state": "Indiana",
    "city": "New Carlisle",
    "county": "St. Joseph County",
    "region": "Northern Indiana",
    "status": "under-construction",
    "sponsors": "Amazon Web Services; Clayco",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 6600000.0,
    "powerCapacityMW": 2200.0,
    "itLoadMW": null,
    "investmentUSD": 11000000000.0,
    "sizeNotes": "Campus features 33 data center 'shells,' each approximately 200,000 square feet, across two sites totaling 900 acres. 10-year build period.",
    "announcedDate": "2024-04-25",
    "constructionStartDate": "2024-09-30",
    "expectedCompletionDate": "2034",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "outside-air cooling; no cooling water from October through March; cooling water only for a few hours per day on an average April-September day",
    "certifications": null,
    "sustainabilityNotes": "AWS commits to 100% renewable energy goals. $121 million investment in road, water, and sewer infrastructure improvements.",
    "economicImpact_jobs": 1000.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic impact study or tax revenue analysis specific to the AWS New Carlisle campus was located; project remains under construction.",
    "incentives_type": "Income Tax Credit; Sales Tax Exemption; Grant; Property Tax Abatement",
    "incentives_value": 305000000.0,
    "challenges": "Publicly accessible records for AWS-specific zoning vote tallies and project-specific environmental permits were not found in this research pass; community concerns in the broader IEC area include water, electricity, and infrastructure strain.",
    "notes": "Largest capital investment in Indiana state history. Expected to create at least 1,000 new jobs. IEDC committed data center sales tax exemptions for eligible capital investments over a 50-year term, plus up to $18.3 million in headcount-based tax credits, up to $5 million in training grants, up to $55 million in Hoosier Business Investment tax credits, and up to $20 million in redevelopment tax credits.; Sources: https://www.aboutamazon.com/news/aws/aws-indiana-investment-11-billion https://www.iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana https://www.nysrc.org/wp-content/uploads/2025/07/8.1-DER-Report-July-2025-Final-for-NYSRC-Exec-Committee-Attachment-8.1.pdf https://www.concreteinnovations.com/2025winners/new-carlisle-data-center-campus",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Fort Wayne Data Center",
    "state": "Indiana",
    "city": "Fort Wayne",
    "county": "Allen County",
    "region": "Northeast Indiana",
    "status": "operational",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 867435.0,
    "powerCapacityMW": 285.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": "700+ acre site with 12 buildings planned. Codenamed 'Project Zodiac'.",
    "announcedDate": "2024-04",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": "2025-12",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Google has committed to clean energy goals",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 1000000.0,
    "economicImpact_notes": "IEDC projects 200 new jobs and $2.0B investment. Local taxpayer agreement/ERA materials reference 30 full-time jobs and $845M initial capital investment (plus a $400M project cost figure in an ERA resolution). WBOI reports a minimum $1M/year real estate tax payment under the abatement and developers projecting $800M+ in real estate taxes by 2028.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Community opposition (noise/environmental impacts), permitting and public scrutiny related to wetland impacts/stream relocation and proposed expansion of diesel generators; limited public disclosure of state incentive amounts and utility interconnection/grid upgrade details.",
    "notes": "Project granted approval by Allen County in November 2023. Project Zodiac encompasses 700+ acres with 12 buildings.; B state; 45M initial; Project Zodiac; broke ground April 2024; 1.45M sq ft; 285 MW at M/MW; Sources: https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/google-data-centers-ai-skills-investments/ https://www.iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana https://www.in.gov/idem/files/notice_20260430_401_wqc001454_hear.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Franklin Township Data Center (Withdrawn)",
    "state": "Indiana",
    "city": "Franklin Township",
    "county": "Marion County",
    "region": "Indianapolis Metro",
    "status": "canceled",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 1200000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "468 acres along I-74 and Post Road with four buildings planned. Codenamed 'Project Flo'.",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Remonstrance letters raised concerns about energy use, water use, environmental justice, and consistency with city climate/sustainability plans; public zoning documents did not disclose PPA/on-site generation/interconnection details; no NEPA or state EIA identified prior to withdrawal.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "MDC abatement materials projected 50 full-time jobs (avg salary $100,000) and $314M real property investment for the first building; reporting notes the project was withdrawn so projected benefits did not materialize.",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Project withdrawn/canceled before construction; preliminary incentives and zoning actions did not proceed to final approvals; significant community opposition and remonstrance noted in filings and reporting.",
    "notes": "Received initial approval from Metropolitan Development Commission in August 2024 (8-1 vote). Google withdrew the proposal in September 2025 after significant community opposition. Approved for $1 billion investment and 50 jobs. IEDC code name: Project Flo. Also known as Project Redline in some documents.; QA 2026-07-18: Cleared modeled power capacity.; Sources: https://theindianacommons.com/wp-content/uploads/2025/08/fc4264049db5b3336e7a2657bac809d9a6f4f0b7fd332e9f49854586186a.pdf https://www.ibj.com/articles/documents-reveal-google-as-company-behind-proposed-indianapolis-data-center https://mirrorindy.org/data-center-health-pollution-environment-impacts-indianapolis-marion-county/ https://mirrorindy.org/google-withdraws-southside-data-center-proposal-franklin-township/ https://indianapolis-in.municodemeetings.com/sites/indianapolis-in.municodemeetings.com/files/fileattachments/mdc_hearing_examiner/meeting/5153/2025-czn-814_2025-cvr-814_-_remonstrance_mdc_as_of_8-14-25.pdf https://www.axios.com/local/indianapolis/2025/09/23/google-data-center-project-opposition-withdrawal",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Meta Lebanon LEAP District Campus",
    "state": "Indiana",
    "city": "Lebanon",
    "county": "Boone County",
    "region": "Central Indiana",
    "status": "under-construction",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": null,
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "First phase: $800 million. Full build out could total 1,400 acres within the 9,000+ acre LEAP District site. Campus would contain 15 total buildings: 12 data center buildings, 1 network building, 1 logistics warehouse, and 1 administrative building.",
    "announcedDate": "2026-02-11",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Meta commits to 100% renewable energy. Requested phased water supply of up to 3 million gallons per day and wastewater of up to 1.5 million gallons per day, phased from 2027 to 2031.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": 80000000.0,
    "economicImpact_notes": "City communications for the 2024 deal indicate the first phase could employ up to ~50 people. Secondary reporting (Data Center Dynamics) cited expectations of >$80M in property taxes and >$33M in community impact payments over 15 years for Phase 1.",
    "incentives_type": "Property Tax Abatement; Tif; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Key gaps include unavailable/not publicly posted performance-based agreement and clawbacks, limited access to some planning PDFs (403), and unclear power/interconnection details.",
    "notes": "IEDC announced on Feb. 11, 2026 that Meta had broken ground on a more than $10 billion, 1,500-acre LEAP District campus in Lebanon planned over several phases, with 13 total buildings including 10 data center buildings. Existing row already tracks the project as under construction with $10B investment and >1 GW load; this update adds the current public scope from the IEDC source. [Source: https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district; Date: 2026-02-11]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft La Porte Data Center",
    "state": "Indiana",
    "city": "La Porte",
    "county": "La Porte County",
    "region": "Northwest Indiana",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft Cloud; Azure",
    "totalSquareFeet": 245000.0,
    "powerCapacityMW": 538.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "489 acres at Radius Industrial Park. Codenamed 'Project Maize'.",
    "announcedDate": "2024-06-04",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "outside-air cooling, air-cooled chillers, and chip-level cooling; water mainly for people, construction, and testing",
    "certifications": null,
    "sustainabilityNotes": "Designed to accelerate cloud computing infrastructure",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Project announcement projects up to 200 jobs by 2032. Local reporting describes a PILOT/refund structure tied to a personal-property tax exemption for equipment (up to $2.5M/year; up to $2.5M or 30% of tax savings per year), with proceeds split between the city redevelopment commission and the school corporation; no formal tax-revenue projections located.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Pilot; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Construction timeline depends on city design/planning/permitting; permitting/engineering work reported underway in late 2024. As of December 15, 2025, project reportedly had not broken ground; environmental permits and project-specific utility interconnection/upgrade records were not located in accessible sources.",
    "notes": "Construction is underway on Microsoft's first La Porte data center off Boyd Boulevard as of May 2026; La Porte City Council also unanimously allowed a second Microsoft data center campus in city limits, with separate reporting describing annexation adding about 1,200 acres and nearly tripling the planned campus size. [Source: https://wsbt.com/news/local/laporte-city-council-vote-on-second-microsoft-data-center-yes-no-boyd-boulevard-transparency-economic-development-campus-union-workers-project-jobs; Date: 2026-05-18]; Sources: https://iedc.in.gov/events/news/details/2024/06/04/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana https://local.microsoft.com/blog/la-porte-public-meeting-recap/ https://www.citact.org/sites/default/files/Data-Centers-in-Indiana-CAC-Webinar-slides-Aug-2025-1.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Digital Crossroads Hammond Expansion",
    "state": "Indiana",
    "city": "Hammond",
    "county": "Lake County",
    "region": "Northwest Indiana",
    "status": "canceled",
    "sponsors": "Decennial Group; Digital Crossroads; CoreWeave",
    "operators": "Digital Crossroads; CoreWeave",
    "tenants": "CoreWeave",
    "totalSquareFeet": 450000.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": null,
    "investmentUSD": 7000000000.0,
    "sizeNotes": "Existing: 20 MW, 105,000 sq ft facility. Expansion: Additional 180 MW facility for CoreWeave. Total expansion investment: $2 billion for buildings + $5 billion for equipment.",
    "announcedDate": "2025-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12-31",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Existing Digital Crossroad campus described as using a closed-loop multi-modal cooling system using nearby Lake Michigan; CoreWeave general AI data-center materials describe closed-loop direct-to-chip liquid cooling, but no project-specific cooling permit was located for this expansion.",
    "certifications": null,
    "sustainabilityNotes": "Located at former State Line Generating Plant on Lake Michigan",
    "economicImpact_jobs": 35.0,
    "economicImpact_taxRevenue": 4000000.0,
    "economicImpact_notes": "City reports $4,000,000 per year for 20 years ($80,000,000 total) in community impact payments under the development agreement; described as a multi-billion-dollar investment (no specific amount stated).",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": 80000000.0,
    "challenges": "Primary documents (full June 3, 2025 development agreement and attachments) not located in public library; zoning approval pathway (by-right vs discretionary) not confirmed; project-specific state environmental permits not found; utility filings/IURC or MISO interconnection references not identified.",
    "notes": "Hammond announced on July 1, 2026 that the development agreement with Decennial expired. Inside INdiana Business reported that the proposed $7 billion, 450,000-square-foot Digital Crossroads campus expansion would have been built by Decennial and leased to CoreWeave for 20 years, but the final extension expired June 30, 2026 and the project did not move forward under that agreement. [Source: https://www.insideindianabusiness.com/articles/development-agreement-for-7b-data-center-in-hammond-expires; Date: 2026-07-01]; QA 2026-07-18: Corrected area from the existing facility's 105,000 square feet to the canceled expansion's reported 450,000 square feet.",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Morgan County Data Center (Project Louie)",
    "state": "Indiana",
    "city": "Monrovia",
    "county": "Morgan County",
    "region": "Central Indiana",
    "status": "planned",
    "sponsors": "Google; AES Indiana",
    "operators": "Undisclosed",
    "tenants": "Google (reported)",
    "totalSquareFeet": null,
    "powerCapacityMW": 390.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "549 acres total: 391-acre parcel rezoned February 2025, additional 158 acres approved later. Campus with 5 buildings planned.",
    "announcedDate": "2025-02",
    "constructionStartDate": "2026-02",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Google stated onsite groundwater would not be used for cooling or domestic potable needs; no final cooling approach was identified.",
    "certifications": null,
    "sustainabilityNotes": "Available public reporting and county public notices reviewed did not reference a NEPA EIS or state-level EIS; community concerns emphasize water use, and no project-specific IDEM air/water/stormwater permits were identified in accessible sources.",
    "economicImpact_jobs": 40.0,
    "economicImpact_taxRevenue": 825000000.0,
    "economicImpact_notes": "Public reporting tied to the IEDC award cites ~40 permanent jobs and ~$1.2B investment; local reporting cited an estimate of $825M in tax revenue over 35 years.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Ongoing community opposition and reported litigation (lawsuit filed March 2025); limited accessible primary county records in the research environment.",
    "notes": "AES Indiana's April 23, 2026 filing-related reporting identifies Google as the customer for the proposed Morgan County data center near Monrovia and states that the power agreement covers a 390 MW project, with Google paying the full cost of powering it and related energy projects. The $1.3 billion in the source is a power-supply cost estimate, not a replacement for the tracked project investment. [Source: https://www.insideindianabusiness.com/articles/aes-indiana-details-plan-to-power-proposed-google-data-center; Date: 2026-04-23]; Sources: https://www.aesindiana.com/data-centers https://specials.idsnews.com/data-center-morgan-county-indiana-billion-dollar/ https://www.wrtv.com/news/local-news/morgan-county/construction-intensifies-on-googles-morgan-county-data-center-site",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Hancock County MegaSite (Withdrawn)",
    "state": "Indiana",
    "city": "Greenfield",
    "county": "Hancock County",
    "region": "Central Indiana",
    "status": "canceled",
    "sponsors": "Surge Development LLC",
    "operators": "Undisclosed - potentially Google",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 143.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "775-acre site in Buck Creek Township, approximately 15 miles east of downtown Indianapolis. Site plan suggested first phase with five buildings and substation.",
    "announcedDate": "2025-04",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No binding water-supply agreement, water-withdrawal permit, cooling design, consumptive-use estimate, interconnection agreement, PPA, or project-specific renewable energy arrangement was located for the withdrawn project.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Applicant materials described potential for billions in private investment and several hundred jobs, but the rezoning application was withdrawn before approvals; no construction or tax revenue outcomes were reported.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Rezoning/PUD application was withdrawn prior to a Plan Commission hearing amid local opposition and lack of detailed plan materials.",
    "notes": "Developer withdrew application after community opposition. More than 70 people signed up to speak at public hearing May 8, 2025. Tuttle Orchards voiced concerns about impact on local character. All representative images in submitted documents were of known Google facilities, suggesting Google as potential end user. IEDC had approved as part of $168 million incentive package (Project Redline: 50 jobs, $1 billion by 2029). Developer will focus on working directly with specific users.; Power estimated at $7M/MW; Sources: https://www.hancockin.gov/AgendaCenter/ViewFile/Minutes/_04102025-440 https://www.datacenterdynamics.com/en/news/surge-development-withdraws-land-rezoning-proposal-for-indiana-data-center/ https://www.datacenterdynamics.com/en/news/indiana-approves-168m-of-tax-incentives-for-four-data-centers/ https://www.wrtv.com/news/local-news/developer-withdraws-rezoning-application-for-hancock-county-ai-data-center",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google - Council Bluffs Campus (Expansions)",
    "state": "Iowa",
    "city": "Council Bluffs",
    "county": "Pottawattamie",
    "region": "Western Iowa",
    "status": "expansion",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": "Google-operated hyperscale/cloud and AI infrastructure",
    "totalSquareFeet": 2900000.0,
    "powerCapacityMW": 407.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": "Multiple expansions: $1B (2024), $600M (2022), $350M (2023). Total investment of $6.8B+ since 2007",
    "announcedDate": "2007",
    "constructionStartDate": null,
    "expectedCompletionDate": "2025",
    "actualCompletionDate": "2007",
    "numberOfPhases": 4.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": 1.08,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Runs on 95% carbon-free electricity. Google has 407MW wind energy agreement with MidAmerican Energy",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company/news reports for the April 2012 expansion referenced at least 50 additional jobs; no independent post-hoc economic impact study specific to the Council Bluffs expansions was identified in the provided sources.",
    "incentives_type": "Income Tax Credit; Sales Tax Exemption",
    "incentives_value": 16800000.0,
    "challenges": "Key local approvals (zoning, development agreements, TIF/abatements) and utility interconnection/upgrade details were not located in publicly accessible records during this research pass; additional primary-document pulls are needed to confirm these items.",
    "notes": "Google's largest data center campus, located on southern edge of Council Bluffs along I-29. This is the fourth expansion since initial construction in 2007. $1.3M pledged for Missouri River valley water preservation and conservation.; B+ total; 3M sq ft; 407 MW MidAmerican renewable wind; multi-phase since 2009; Sources: https://datacenters.google/locations/iowa/ https://blog.google/feed/new-7-billion-investment-iowa/ https://www.businessrecord.com/growth-of-data-centers-in-iowa/ https://www.utilitydive.com/news/google-makes-biggest-renewables-buy-yet/255052/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google - Palo Data Center Project (Near Duane Arnold)",
    "state": "Iowa",
    "city": "Palo",
    "county": "Linn County",
    "region": "Eastern Iowa",
    "status": "planned",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": "Google LLC",
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Up to six buildings planned near Duane Arnold Energy Center nuclear site",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Project located near nuclear power site for potential direct power access",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public county fiscal impact study or job/tax projection specific to the Palo-area data center campus was found as of 2026-02-05. Related power-enabling DAEC restart announcement cites ~$1.8B restart investment, ~275 full-time jobs, and ~500 contractors during upgrades (not specific to the data center campus).",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Project is pre-entitlement and dependent on adoption of county zoning framework and on the DAEC nuclear restart pathway proceeding through federal approvals and grid/interconnection processes; county is conducting water study prior to rezoning and site-specific applications were not found as of 2026-02-05.",
    "notes": "Six-building complex proposed near Duane Arnold Energy Center. Site attractive for potential power access if nuclear plant restarts by 2028. Located approximately 20 miles north of Cedar Rapids facility.. Linn County approved a data center ordinance for unincorporated Linn County on February 18, 2026 after public hearings and three readings. The ordinance requires large data center projects to complete a water study, sign a Water Use Agreement, sign an Economic Development Agreement, and address setbacks, noise, traffic, emergency planning, lighting, waste management, and road use. Linn County's project page ties this work to the proposed large-scale Google data center near Palo and says Google had indicated willingness to fund a water resources and water balance study. Status remains planned; this is a material entitlement/regulatory requirement, not a construction start. [Source: https://www.linncountyiowa.gov/m/newsflash/Home/Detail/4324?arc=7842 | https://www.linncountyiowa.gov/1862/Data-Centers-in-Unincorporated-Linn-Coun; Date: 2026-02-18; 2026-03-04]; QA 2026-07-19: Normalized Linn County and cleared adjacent-generation capacity plus derived project investment.; Sources: https://www.linncountyiowa.gov/m/newsflash/Home/Detail/4346 https://www.iowapublicradio.org/ipr-news/2026-04-23/google-data-center-linn-county-palo https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/neer-duane-arnold-energy-center-news-release.pdf https://www.thegazette.com/local-government/google-exploring-data-center-project-near-palo/ https://www.iowapublicradio.org/ipr-news/2026-03-04/google-data-center-palo-linn-county",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "QTS - Cedar Rapids Campus",
    "state": "Iowa",
    "city": "Cedar Rapids",
    "county": "Linn County",
    "region": "Eastern Iowa",
    "status": "under-construction",
    "sponsors": "QTS Data Centers; Blackstone",
    "operators": "QTS Realty Trust",
    "tenants": null,
    "totalSquareFeet": 2796000.0,
    "powerCapacityMW": 420.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "612-acre campus with seven planned data-center buildings and a $10 billion long-term investment",
    "announcedDate": "2025-02-12",
    "constructionStartDate": "2025-08",
    "expectedCompletionDate": "2028-Q4",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Water-free cooling system that saves more than 48 million gallons of water annually per data center",
    "economicImpact_jobs": 30.0,
    "economicImpact_taxRevenue": 1000000000.0,
    "economicImpact_notes": "City staff indicated 500+ construction jobs per data center and minimum 15 permanent jobs per phase (30 total for first two phases). Alliant Energy cited hundreds of construction and trade jobs and a minimum of 30 high-tech full-time jobs once operational. QTS claimed over 2,000 construction and permanent jobs across the project.",
    "incentives_type": "Tif; Other",
    "incentives_value": 1018000000.0,
    "challenges": "Full executed development agreement (including attachments and any clawbacks/recapture provisions) not located in sources reviewed; permitting record set (building/stormwater/interconnection) not found; county enforcement action for unpermitted dewatering wells during construction.",
    "notes": "Cedar Rapids' current data center resource page describes QTS as developing a 612-acre campus in Big Cedar Industrial Center, with minimum capital investment of $750 million and estimated total investment of $4.5 billion, at least two project phases, and minimum employment of 15 jobs per phase. Existing canonical row carries a $10 billion long-term investment figure; reconcile the $4.5 billion city resource-page figure against prior $10 billion public reporting before overwriting investmentUSD. [Source: https://www.economicdevelopmentcr.com/data-centers; Date: 2026-07]; QA 2026-07-19: Normalized Linn County and cleared an unsupported campus-area total.; Sources: https://www.weitz.com/projects/qts-data-center-campus/ https://q.com/news/qts-announces-new-world-class-data-center-campus-in-cedar-rapids/?nocache=1770789165",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Meta - Altoona Data Center Campus",
    "state": "Iowa",
    "city": "Altoona",
    "county": "Polk",
    "region": "Central Iowa",
    "status": "operational",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": "Meta Platforms",
    "totalSquareFeet": 5000000.0,
    "powerCapacityMW": 260.0,
    "itLoadMW": 98.4,
    "investmentUSD": 2500000000.0,
    "sizeNotes": "Meta's largest cloud campus with more than 5 million sq ft",
    "announcedDate": "2013",
    "constructionStartDate": "2013",
    "expectedCompletionDate": "2025",
    "actualCompletionDate": "2014",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Water-efficient cooling with water reused multiple times before wastewater discharge, onsite rainwater capture and infiltration, native vegetation where possible, and water-saving fixtures.",
    "certifications": null,
    "sustainabilityNotes": "Powered by 100% clean and renewable energy. Meta matches 100% of Iowa data center energy with contracted carbon-free electricity",
    "economicImpact_jobs": 400.0,
    "economicImpact_taxRevenue": 3000000.0,
    "economicImpact_notes": "2013 HQJ approval tied to at least 31 jobs at qualifying wages. 2019 expansion reported to add ~70 jobs, bringing total campus jobs to ~400. 2019 development agreement included a PILOT of about $3 per square foot (~$3M/year), described as about 60% of what taxes would be; prior abatements generated no property tax revenue.",
    "incentives_type": "Income Tax Credit; Property Tax Abatement; Pilot",
    "incentives_value": 18000000.0,
    "challenges": "Reviewed sources do not specify the zoning/entitlement pathway or Planning & Zoning votes; full development agreement text (including clawbacks/benchmarks) not provided; utility interconnection, special rates, and grid upgrade allocations not located in public sources.",
    "notes": "Meta invested over $2.5B since breaking ground in 2013. More than 400 people work on-site in data center operations each day. Multiple buildings across the campus.; Sources: https://datacenters.atmeta.com/us-locations/ https://datacenters.atmeta.com/2021/05/we-are-expanding-the-facebook-altoona-data-center/ https://www.datacenterfrontier.com/cloud/article/11427725/meta-adds-more-data-centers-in-iowa-pushing-campus-to-5-million-sf https://iaarchives.newzgroup.com/IALegals/2025/42868-2025-01-21_1001.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Apple - Waukee Data Center Campus",
    "state": "Iowa",
    "city": "Waukee",
    "county": "Dallas",
    "region": "Central Iowa",
    "status": "operational",
    "sponsors": "Apple",
    "operators": "Apple",
    "tenants": "Apple Inc.",
    "totalSquareFeet": 400000.0,
    "powerCapacityMW": 40.0,
    "itLoadMW": null,
    "investmentUSD": 1300000000.0,
    "sizeNotes": "2,000-acre site with room for up to five data centers. First building operational in 2024",
    "announcedDate": "2017-08",
    "constructionStartDate": "2017",
    "expectedCompletionDate": "2020",
    "actualCompletionDate": "2024-10",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "High-efficiency air-cooled chillers to minimize water use, according to regional economic-development reporting.",
    "certifications": "Alliance for Water Stewardship recognition for responsible water management",
    "sustainabilityNotes": "Runs entirely on renewable energy from day one, like all Apple data centers",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public reporting at announcement cited 50 full-time jobs; no public economic impact study or post-completion evaluation (jobs or tax receipts vs projections) was located in the sources reviewed.",
    "incentives_type": "Property Tax Abatement; Income Tax Credit",
    "incentives_value": 207000000.0,
    "challenges": "Limited availability of primary incentive/clawback documents and environmental/utility permits in public sources; property tax valuation litigation and subsequent Dallas County assessment correction reported in local media.",
    "notes": "Located at 2995 W Hickman Rd, Waukee. 400,000 sq ft first building opened in 2024 after 7-year construction period. Supports iCloud, App Store, Apple Music, and iMessage for North American users. Apple contributed up to $100M to Public Improvement Fund for community development. Created over 550 construction and operations jobs.; Sources: https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/ https://www.waukee.org/DocumentCenter/View/7101/Staff-Report_Apple-Rezoning_060818 https://www.datacenterdynamics.com/en/news/apple-launches-data-center-in-waukee-iowa/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "COPT Defense Properties - Van Meter Campus",
    "state": "Iowa",
    "city": "Van Meter",
    "county": "Dallas County",
    "region": "Central Iowa",
    "status": "planned",
    "sponsors": "COPT Defense Properties",
    "operators": "COPT Defense Properties",
    "tenants": "Fortune 100 cloud computing tenant",
    "totalSquareFeet": 3300000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 32000000.0,
    "sizeNotes": "365 acres, 15 building campus, 1GW power capacity, approximately 3.3M sq ft",
    "announcedDate": "2024-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No renewable energy commitments, PUE target, cooling approach, or certification targets were identified in the provided research. Site listing notes \"Phase 1 Environmental Study Complete\"; no project-specific EIS/EA identified in sources reviewed.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic impact study located; sources reviewed did not disclose job counts or tax revenue projections.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "As of Feb 1, 2026, no publicly reported construction start, permits, or phasing updates were identified in the city records reviewed.",
    "notes": "Land purchased for $24.6M in October 2024. Site north of Raccoon River and west of R Avenue. Built out for existing Fortune 100 cloud computing tenant. COPT is a REIT based in Columbia, MD specializing in federal government and defense contractor facilities. This is second major data center project in Van Meter after Microsoft.; QA 2026-07-19: Normalized Dallas County and removed an inapplicable investment-model annotation.; Sources: https://d1io3yog0oux5.cloudfront.net/_4042c7bd5d961b2321e9b2739a90d0af/copt/news/2024-10-28_COPT_Defense_Acquires_Land_for_Data_Center_Shell_516.pdf https://investors.copt.com/financial-information/sec-filings/content/0000860546-25-000008/ofc-20241231.htm https://www.datacenterdynamics.com/en/news/copt-plans-1gw-data-center-campus-outside-des-moines-iowa/ https://investors.copt.com/financial-information/sec-filings/content/0000860546-26-000011/0000860546-26-000011.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Edged - Council Bluffs Campus (EDC Omaha)",
    "state": "Iowa",
    "city": "Council Bluffs",
    "county": "Pottawattamie",
    "region": "Western Iowa",
    "status": "under-construction",
    "sponsors": "Edged Data Centers; EDC Omaha LLC",
    "operators": "Edged Data Centers",
    "tenants": null,
    "totalSquareFeet": 570890.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 1400000000.0,
    "sizeNotes": "Nearly 105 acres, two buildings of 285,445 sq ft each (reduced from original 900,000 sq ft total)",
    "announcedDate": "2024",
    "constructionStartDate": "2025-10-29",
    "expectedCompletionDate": "2027-10",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": 1.15,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Carbon-neutral and zero-water mission. Sustainable, energy-efficient and environmentally friendly",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Council packet and referenced press release did not quantify jobs, payroll, or tax revenue.",
    "incentives_type": "Other",
    "incentives_value": null,
    "challenges": "Design revisions and added screening requirements tied to mechanical yard elements (including cooling towers and makeup water tanks) and an amended electrical configuration (owner-operated substations/switchyard), with reported reductions in building size/height in the 2025 PIDP amendment.",
    "notes": "Located south of College Road and Kanesville Boulevard, across from Iowa Western Community College campus. Land sold December for approximately $9.8M. Buildings reduced from 80 feet to 36 feet, 3 inches in height. Originally 900,000 sq ft, now 570,890 sq ft. Construction anticipated to take one year, permanently employing 80 people. Maintains same 200MW capacity despite size reduction.; Investment estimated at $7M/MW; Sources: https://www.linkedin.com/posts/edgedenergy_datacenters-aiinfrastructure-midwesttech-activity-7389305994767495169-cx-d https://councilbluffs.novusagenda.com/agendapublic/AttachmentViewer.ashx?AttachmentID=18769&ItemID=7936 https://www.datacenterdynamics.com/en/news/edged-tops-out-data-center-in-council-bluffs-iowa/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Kestrel",
    "state": "Missouri",
    "city": "Kansas City",
    "county": "Platte County",
    "region": "Northland",
    "status": "planned",
    "sponsors": "Hunt Midwest",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 1800000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 100000000000.0,
    "sizeNotes": "Six hyperscale data centers totaling up to 1.8 million square feet on 380 acres",
    "announcedDate": "2025-08",
    "constructionStartDate": "2026",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "60 cooling towers proposed in Missouri DNR air-construction-permit application.",
    "certifications": null,
    "sustainabilityNotes": "Developer committed to using 50% renewable energy",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": 110000000.0,
    "economicImpact_notes": "Port KC anticipates ~50 high-paying jobs per phase (average salaries above $100,000). Port KC also describes workforce development funding tied to a $0.25 per-square-foot charge (up to an estimated $15.75M at full build-out) and a first payment of $2.62M over the first five years supporting the Northland Career Center.",
    "incentives_type": "Grant; Infrastructure Support",
    "incentives_value": 40000000.0,
    "challenges": "Gaps in public record for project-specific zoning approvals, environmental permits, and utility interconnection/PPA details; community concerns reported regarding electricity and water demand and limited permanent job creation.",
    "notes": "Located on southwest corner of Missouri Highway 92 and N. Winan Avenue, near KCI Airport on industrial mega site KCI-29. Expected to generate more than $110 million in tax revenue across all phases. With each square foot built, a $0.25 per square foot charge will be collected for workforce development, estimated at $15.75 million total. Port KC approved up to $100 billion in private funding.; Power estimated at $7M/MW [State corrected KS->MO 2026-06-10: site is in Missouri (Platte/Clay/Jackson County) per primary sources.]; Sources: https://portkc.com/wp-content/uploads/2025/10/2025-08-25-Board-of-Commissioners-Meeting-Minutes.pdf https://www.co.platte.mo.us/media/Department%20Documents/Commission/Press%20Release%2010-27-25.pdf https://www.datacenterdynamics.com/en/news/google-affiliated-company-buys-430-acres-of-land-in-kansas-city-missouri/ https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/ https://www.kshb.com/news/local-news/tech-firm-eyes-development-for-6-data-centers-north-of-kansas-city-international-airport",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Mica (Google AI Campus)",
    "state": "Missouri",
    "city": "Kansas City",
    "county": "Clay County",
    "region": "Northland",
    "status": "under-construction",
    "sponsors": "Google LLC; AG Rose Solutions LLC; Diode Ventures LLC",
    "operators": "Google LLC",
    "tenants": "Google LLC",
    "totalSquareFeet": 1560000.0,
    "powerCapacityMW": 700.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "Five hyperscale data center buildings totaling 1.56 million square feet on 500 acres",
    "announcedDate": "2023",
    "constructionStartDate": "2025",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Power supplied by adjacent Nashua Power Station and onsite substations",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Port KC indicates hundreds of construction jobs (not quantified). Diode Ventures projects 100+ full-time jobs and 1,000 skilled-trade jobs over time (not provided as exact counts). No published tax-revenue projections were found in the sources reviewed.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Primary-record gaps noted in the research include missing Port KC development agreement/abatement contract and any clawback provisions; missing local permits (grading, stormwater/NPDES, site development plans, building permits); and missing utility filings (interconnection agreement, grid upgrade studies, or rate-case impacts).",
    "notes": "Located at northeast corner of Interstate 435 and Highway 169 on approximately 493 acres. AG Rose Solutions LLC (Google affiliate) acquired the site from Diode Ventures LLC in December. $1 billion will go toward construction, with the remaining $9 billion backing internal systems and ongoing infrastructure upgrades. Port KC Board of Commissioners provided a 75 percent abatement on real property taxes for 25 years. Project includes $1.5 million contribution to Smithville School District's workforce development program and $250,000 to Northland Career Center. First phase expected to take about 18 months. [State corrected KS->MO 2026-06-10: site is in Missouri (Platte/Clay/Jackson County) per primary sources.]; Sources: https://www.datacenterdynamics.com/en/news/construction-begins-at-googles-second-data-center-campus-in-kansas-city-missouri/ https://www.axios.com/local/kansas-city/2026/02/12/google-project-mica-data-center-northland https://www.axios.com/local/kansas-city/2025/07/29/port-kc-google-data-center https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/ https://www.kshb.com/news/local-news/missouri/kansas-city/google-announces-construction-underway-for-second-data-center-campus-in-kansas-city",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Red Wolf DCD Properties Data Center Campus",
    "state": "Kansas",
    "city": "Kansas City",
    "county": "Wyandotte County",
    "region": "Kansas side",
    "status": "planned",
    "sponsors": "Red Wolf DCD Properties LLC",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 1980000.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 12600000000.0,
    "sizeNotes": "Six buildings, each approximately 330,000 square feet, totaling 1.98 million square feet",
    "announcedDate": "2025-04",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Kansas's data-center sales tax exemption statute includes water-conservation requirements (framework applicability noted; no project-specific environmental commitments found in accessible sources).",
    "economicImpact_jobs": 60.0,
    "economicImpact_taxRevenue": 12900000.0,
    "economicImpact_notes": "Reporting estimated ~12.9 million/year in property taxes vs ~43,000/year currently for the land; no definitive job-count commitments or published economic impact study located.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Zoning/entitlement contested with ongoing litigation; rezoning votes complicated by protest petition/supermajority requirement; significant grid planning and infrastructure cost concerns given proposed ~600 MW demand.",
    "notes": "Located at 13000 Parallel Parkway, west of Kansas Speedway on 550-acre site. Campus bisected by Parallel Parkway with three data center buildings to the north and three to the south. Each building valued at approximately $2.1 billion. The Unified Government of Wyandotte County approved rezoning in May-July 2025. Described as the largest single investment Wyandotte County has seen.; Sources: https://ingrams.com/article/ug-of-wyandotte-county-approves-master-plan-for-600mw-data-center/ https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-outside-kansas-city-kansas/ https://www.bizjournals.com/kansascity/news/2026/02/03/red-wolf-12b-data-center-kck-land-sale-parallel.html https://wyandotteecho.com/wp-content/uploads/2025/05/Echo050825A.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "De Soto Data Center Campus (Project Pilot)",
    "state": "Kansas",
    "city": "De Soto",
    "county": "Johnson County",
    "region": "Kansas City Metro",
    "status": "under-construction",
    "sponsors": "Mount Sunflower Properties, LLC; Beale Infrastructure; Blue Owl",
    "operators": null,
    "tenants": "Undisclosed large U.S.-based technology company",
    "totalSquareFeet": 1140000.0,
    "powerCapacityMW": 443.0,
    "itLoadMW": null,
    "investmentUSD": 3100000000.0,
    "sizeNotes": "Four buildings at 285,000 square feet each, totaling 1.14 million square feet on 290-acre parcel",
    "announcedDate": "2024-08",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2035",
    "actualCompletionDate": null,
    "numberOfPhases": 4.0,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Will rely on Kansas River as main water source. Large data centers use millions of gallons of water per day for operations and cooling, equivalent to a town of 10,000 to 50,000.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": 1500000.0,
    "economicImpact_notes": "No job counts or independent economic impact study found in sources reviewed. City materials highlight PILOT payments and electric franchise fees as near-term revenue, with full property taxes after abatements end.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Pilot; Other",
    "incentives_value": null,
    "challenges": "Limited publicly accessible permitting and environmental documentation found in sources reviewed; project described as moving into preliminary design and permitting after August 2025 approvals.",
    "notes": "Located near Panasonic electric vehicle battery plant. City authorized issuance of up to $50 billion in industrial revenue bonds (IRBs) over the life of the project. Mount Sunflower Properties is associated with Blue Owl-backed Beale Infrastructure, formed in 2024 with office in Topeka. Full build-out will take seven to nine years, with completion around 2035. Each phase is expected to cost around $700 million to build.; Power estimated at $7M/MW; Beale detailed the first phase in late April 2026, with first-phase construction expected to break ground in May and to comprise at least two facilities; full build-out remains four buildings and more than 1 million square feet, with Evergy serving power. A later May report said construction was anticipated in 2026 but additional site plans and phased water/sewer agreements still required approval. [Source: https://www.datacenterdynamics.com/en/news/beale-targets-two-campuses-outside-kansas-city-kansas/; Date: 2026-04-30]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Patmos AI Campus (Kansas City Star Building)",
    "state": "Missouri",
    "city": "Kansas City",
    "county": "Jackson County",
    "region": "Downtown",
    "status": "expansion",
    "sponsors": "Patmos",
    "operators": "Patmos",
    "tenants": "Nebius",
    "totalSquareFeet": 400000.0,
    "powerCapacityMW": 100.0,
    "itLoadMW": 35.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "400,000 square foot, five-acre campus. Currently 35 MW total capacity (10 MW newly added). Target 100 MW when fully built out.",
    "announcedDate": "2024-11",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2026-03",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "colocation; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "HVAC and chilled-water infrastructure; detailed water-supply agreement and quantified water demand not disclosed",
    "certifications": null,
    "sustainabilityNotes": "C-PACE financing supports energy-efficiency improvements (HVAC, equipment, plumbing). Public reporting indicates no environmental impact studies disclosed for air, noise, or water usage; project plans 12 diesel generators for backup/peak periods.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No independent economic impact study or job creation figures were identified in the sources reviewed. Sponsor reports multiple tenants have leased space and notes mixed-use/event/co-working space without staffing counts.",
    "incentives_type": "Other; Sales Tax Exemption",
    "incentives_value": 100000000.0,
    "challenges": "Project-specific zoning/permitting records for 1601 McGee St. were not located in the sources reviewed; environmental impact studies were reported as not conducted/disclosed; utility service provider and any grid upgrade obligations for the site were not identified.",
    "notes": "Located at 1601 McGee Street, downtown Kansas City, Missouri. Former Kansas City Star printing press building converted to data center. Billion-dollar retrofit project. Supports high-density GPU, HPC, and AI infrastructure. Rack-ready colocation space in increments of 2.5 MW, supporting densities of 100 kW or more per rack. Campus extends beyond traditional data center functions with office space, conference facilities, and entertainment areas. Patmos assumed operations in November 2024. Nebius is the first client, marking their entry into North American market. [State corrected KS->MO 2026-06-10: site is in Missouri (Platte/Clay/Jackson County) per primary sources.]; Sources: https://www.kansascity.com/news/business/development/article295574259.html https://www.datacenterdynamics.com/en/news/us-hosting-firm-patmos-to-convert-former-printing-press-in-kansas-city-into-100mw-data-center/ https://efis.psc.mo.gov/Document/Display/810156 https://www.globenewswire.com/news-release/2026/01/12/3216865/0/en/patmos-secures-100-million-c-pace-loan-to-complete-ai-data-center-in-kansas-city.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "PowerHouse Data Centers Louisville Campus",
    "state": "Kentucky",
    "city": "Louisville",
    "county": "Jefferson County",
    "region": "Louisville Metro",
    "status": "under-construction",
    "sponsors": "PowerHouse Data Centers; Poe Companies",
    "operators": "PowerHouse Data Centers",
    "tenants": null,
    "totalSquareFeet": 1600000.0,
    "powerCapacityMW": 525.0,
    "itLoadMW": 335.0,
    "investmentUSD": 2800000000.0,
    "sizeNotes": "154-acre campus with initial 335 MW secured, expandable to 402 MW",
    "announcedDate": "2025-01-16",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2026-10",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Cooling supported by Louisville Water Company infrastructure, excess water-treatment capacity, and Ohio River access; specific cooling technology not identified.",
    "certifications": null,
    "sustainabilityNotes": "Access to Louisville Water Co. infrastructure and Ohio River (75 billion gallons flowing daily)",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 68000000.0,
    "economicImpact_notes": "Developers told WDRB they expect hundreds of full-time jobs and up to ~1,000 construction workers; cited millions of dollars annually in tax revenue without a public economic impact study.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Public sources reviewed did not include project-specific primary records (permits, executed MOA, or economic impact study) or a current construction-progress update; community concerns focused on energy use, emissions/air quality, and noise.",
    "notes": "Local reporting after approval says land clearing had been underway for months on the roughly 150-acre Camp Ground Road site. WKYT reported PowerHouse's statement that the West Louisville project would have 525 MW of capacity, which conflicts with earlier 402 MW campus figures; powerCapacityMW uses the newer reported developer figure while noting the conflict. Status remains under-construction because the existing row already used that status and WDRB reported active site clearing, not merely a paper approval. [Source: https://www.wdrb.com/news/louisville-residents-push-back-against-approved-150-acre-data-center-on-camp-ground-road/article_c08bf854-9de5-4ce8-aed8-ecc601cfe4a3.html | https://www.wkyt.com/2026/06/11/wkyt-investigates-kentucky-data-center-boom-raises-concerns-over-costs-transparency/; Date: 2026-03-13; 2026-06-11]; QA 2026-07-18: Removed acreage converted to square feet from the building-area field.; Sources: https://content.govdelivery.com/attachments/KYLOUISVILLE/2026/02/03/file_attachments/3543008/IARC%20Report%20020426.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Project Lincoln (OC Data Center)",
    "state": "Kentucky",
    "city": "Oldham County",
    "county": "Oldham County",
    "region": "Northern Kentucky",
    "status": "canceled",
    "sponsors": "Western Hospitality Partners",
    "operators": "Western Hospitality Partners",
    "tenants": null,
    "totalSquareFeet": 11646948.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": "Original proposal for 267.3-acre site, later reduced to $1.5B facility on smaller site. 8-building campus planned.",
    "announcedDate": "2025-03",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No project-specific NEPA/state EIA documents were located in accessible public records as of 2026-02-01; WHP stated it would work with utilities to upgrade infrastructure without increasing local customer rates.",
    "economicImpact_jobs": 176.0,
    "economicImpact_taxRevenue": 50000000.0,
    "economicImpact_notes": "Economic development study projections cited by WHP: $50M+ annual taxes, ~4,000 construction jobs per year over five years, and 176 direct permanent jobs (avg. ~$83,000). Project was withdrawn and benefits did not materialize.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Strong local opposition; appeals challenging private-utility determination; 150-day moratorium on data center/private utility applications (no exemptions); project application withdrawn and not proceeding in Oldham County.",
    "notes": "Facing significant local opposition led to 150-day moratorium on data centers in Oldham County (passed July 1, 2025). Expected to create 150 on-site jobs and 400 indirect jobs with $50M annual tax revenue. Original application withdrawn June 2025, smaller $1.5B proposal filed for different site.; Sources: https://baynews9.com/content/dam/News/static/pdfs/ky/0409_data_center_announcement.pdf https://psc.ky.gov/pscecf/2025-00045/mike.hornung%40lge-ku.com/06272025095852/02-PSC_DR4_LGE_KU_Responses.pdf https://psc.ky.gov/pscscf/2025%20Cases/2025-00045/20251028_PSC_ORDER.pdf https://www.oldhamcountyky.gov/projectlincoln https://psc.ky.gov/pscscf/2025%20cases/2025-00045/20251028_PSC_ORDER.pdf https://irp.cdn-website.com/fd0fc3bd/files/uploaded/TRC-025-007_Application_WEB-20f2919a.pdf",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Mason County Technology Campus",
    "state": "Kentucky",
    "city": "Maysville area",
    "county": "Mason County",
    "region": "Northern Kentucky",
    "status": "planned",
    "sponsors": "Fortune 100 Company (undisclosed); Maysville-Mason County Industrial Development Authority",
    "operators": null,
    "tenants": "Undisclosed company internal products, platforms, and digital infrastructure; no third-party tenants planned",
    "totalSquareFeet": 217800000.0,
    "powerCapacityMW": 2200.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "5,000 acres being acquired for technology campus including data centers, office space, parking, and green space",
    "announcedDate": "2025-08",
    "constructionStartDate": "2027",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop liquid-cooled system using air coolers with zero water consumed for cooling during normal operations",
    "certifications": null,
    "sustainabilityNotes": "Reporting and public testimony emphasize expected water demands and environmental impacts; available reporting does not cite completed NEPA or Kentucky environmental review documents or specific permits for the project.",
    "economicImpact_jobs": 400.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Local officials/IDA executive claimed up to 400 jobs at ~$80,000 average wages and peak construction employment around 1,000; no public economic impact study or verified tax revenue projections were located.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Developer/sponsor not publicly disclosed (NDA); zoning text amendments and rezoning actions still in process; environmental and utility/water concerns raised by residents; primary local records not publicly posted in the research.",
    "notes": "Local approval advanced materially in 2026. The Mason County Joint Planning Commission approved the proposed data center development plan with conditions on April 22, 2026, and Mason County Fiscal Court held the second reading on May 22, 2026 for Ordinance 26-03 rezoning 28 properties, approximately 2,080 acres north of Germantown Road, to I-3 Rural Industrial for the proposed data center project. The sponsor remains undisclosed in the cited local records. Previously reported: identity of Fortune 100 company remains undisclosed due to NDAs; project requesting 2.2 GW of power from East Kentucky Power Cooperative; expected to create 1,000 construction jobs and 400 full-time positions; facing local opposition. [Source: https://www.cityofmaysvilleky.gov/departments/codes_department/data_center.php; Date: 2026-05-22]; Sources: https://www.weku.org/the-commonwealth/2025-08-21/mason-county-official-says-data-center-could-bring-400-jobs-averaging-80-000-would-require-massive-amounts-of-power-and-water https://www.weku.org/the-commonwealth/2026-03-27/grassroots-organization-announces-plans-to-file-suit-against-mason-county-data-center-proposal https://www.maysville-online.com/news/214292/zoning-request-made-public-for-hyperscale-data-center-project-in-mason-county",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Richland Parish AI Data Center (Hyperion Campus)",
    "state": "Louisiana",
    "city": "Rayville/Delhi",
    "county": "Richland Parish",
    "region": "Northeast Louisiana",
    "status": "under-construction",
    "sponsors": "Meta Platforms, Inc.; Entergy Louisiana",
    "operators": "Meta Platforms, Inc.",
    "tenants": "Meta Platforms, Inc.",
    "totalSquareFeet": 10000000.0,
    "powerCapacityMW": 5000.0,
    "itLoadMW": 5000.0,
    "investmentUSD": 50000000000.0,
    "sizeNotes": "Largest Meta data center to date globally. Custom-designed campus spanning 11 buildings across 2,250 acres on former Franklin Farm megasite, ~30 miles east of Monroe.",
    "announcedDate": "2024-12",
    "constructionStartDate": "2024-12",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Meta pledges to match electricity use with 100% clean and renewable energy. Working with Entergy to bring at least 1,500 MW of new renewable energy to the grid. Committed to water stewardship and restoring more water than consumed. Entergy will construct three combined-cycle combustion turbines (2,260MW capacity), two substations, six customer-owned substations, 100 miles of 500kV transmission lines, and eight new 230kV transmission lines. Exploring nuclear power as part of long-term energy strategy.",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Official statements cite 500+ direct jobs, 1,000+ indirect jobs, ~5,000 construction workers at peak, and $200M+ in local infrastructure improvements. Meta\u2019s Dec 19, 2025 update reports $875M+ in Louisiana contracts, 3,700 construction workers to date, and $300M+ in local infrastructure commitments.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": 3300000000.0,
    "challenges": "Project-specific local approvals, incentive contract terms, and data-center environmental permit packages were not located in open sources; reporting highlights transparency and ratepayer exposure concerns tied to the required power-supply and transmission buildout.",
    "notes": "On July 13, 2026, Louisiana Economic Development and Meta announced a major expansion of the Richland Parish/Hyperion project: Meta now describes the campus as more than a $50 billion investment, nearly 10 million square feet, and 5 GW of compute capacity. LED said the project is expected to support 7,500 peak construction jobs and about 1,000 operational jobs, with more than $1.6 billion already contracted with Louisiana companies. Meta said the expansion includes more than $1 billion in local infrastructure improvements for roads, water, and wastewater systems and that its Entergy agreement will fund seven new gas-fueled plants, three grid-scale batteries, nuclear uprates, and purchased power. This materially supersedes the prior $10B+/2 GW canonical values. [Source: https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history | https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/; Date: 2026-07-13; 2026-07-13]; QA 2026-07-19: Updated area to Meta's nearly-10M-square-foot disclosure and stored 5 GW only as compute/IT capacity.; Sources: https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/ https://datacenters.atmeta.com/richland-parish-data-center/ https://www.entergy.com/news/entergy-louisiana-power-meta-s-data-center-in-richland-parish",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Hut 8 West Feliciana AI Data Center",
    "state": "Louisiana",
    "city": "St. Francisville",
    "county": "West Feliciana Parish",
    "region": "Central Louisiana",
    "status": "under-construction",
    "sponsors": "Hut 8 Corp.; Fluidstack; Google",
    "operators": "Hut 8 Corp.",
    "tenants": "Fluidstack",
    "totalSquareFeet": 900000.0,
    "powerCapacityMW": 330.0,
    "itLoadMW": 245.0,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "Initial phase: two 450,000-square-foot buildings totaling 900,000 square feet; 330 MW initial utility capacity supports 245 MW critical IT load. The site has a structured path toward up to 1,000 MW of utility capacity.",
    "announcedDate": "2025-01",
    "constructionStartDate": "2025-08",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "State-of-the-art liquid-cooled GPU servers for AI and ML training. Proximity to Entergy's River Bend Nuclear Generating Station provides access to excess nuclear power capacity. Working with Entergy to prepare substation and switchyard.",
    "economicImpact_jobs": 75.0,
    "economicImpact_taxRevenue": 90000000.0,
    "economicImpact_notes": "Phase I projected 75 direct jobs, ~193 indirect jobs, and ~1,000 construction workers at peak. Local reporting cited ~90 million/year in combined local revenue allocations.",
    "incentives_type": "Sales Tax Exemption; Income Tax Credit; Pilot",
    "incentives_value": null,
    "challenges": "Primary documents for local incentives (PILOT) and zoning approvals were not located in accessible records; no public environmental permit files or utility/interconnection filings were found in the reviewed sources.",
    "notes": "10/12 Industry Report reported on June 17, 2026 that West Feliciana Parish's council and Industrial Development Board approved a cooperative endeavor agreement for a $10 million advance on Hut 8's future PILOT payments, expected July 1, with $5.3 million for the school board, $3.9 million for parish government, and $800,000 for the sheriff's office. The parish expects to reimburse Hut 8 without interest from the first regular PILOT payment due July 1, 2027; Parish President Kenny Havard estimated the first regular payment at roughly $60 million and a potential annual payment near $90 million once Phase 1 is fully built out by the end of 2027. The same report said construction was accelerating, with about 300 workers on site and expected to rise to about 1,200 at full construction scale, and restated 245 MW of critical IT capacity supported by 330 MW from Entergy. WBRZ reported on July 14, 2026 that Hut 8 hosted the first of several job fairs as construction gets underway, with Hut 8 targeting full operation by Q3 2027. [Source: https://www.1012industryreport.com/technology/west-feliciana-is-getting-a-10m-advance-from-hut-8-heres-how-it-will-be-used/ | https://www.wbrz.com/news/hut-8-west-feliciana-parish-president-address-concerns-over-new-data-center/; Date: 2026-06-17; 2026-07-14]; QA 2026-07-19: Reconciled current utility and critical-IT capacity disclosures.",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Wiscasset Data Center (Proposed)",
    "state": "Maine",
    "city": "Wiscasset",
    "county": "Lincoln County",
    "region": "Midcoast Maine",
    "status": "planned",
    "sponsors": "Unknown site evaluator under NDA; Town of Wiscasset",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 714.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "$5 billion AI hyperscale facility proposal",
    "announcedDate": "2025-09-18",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Would be located adjacent to former Maine Yankee Nuclear Power Plant infrastructure",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Preliminary projections in reporting cite 100\u2013200 permanent jobs and tax revenue potentially comparable (order-of-magnitude) to the former Maine Yankee plant; projections are not based on a filed project plan.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Project remains at discussion stage with no formal proposal filed; limited public information, uncertainty about local infrastructure capacity, and community concerns about transparency and impacts.",
    "notes": "Shelterforce, republishing The Daily Yonder, reported on June 18, 2026 that the prospective $5 billion Wiscasset data center had not broken ground and that the 300-acre Old Ferry Road site remained undeveloped as of publication. The article also reported that on March 3, 2026 Lincoln County reallocated Wiscasset's federal housing funds to Waldoboro and Newcastle after the town's handling of the data center prospect shifted the original housing-funded plan. [Source: https://shelterforce.org/2026/06/18/how-a-data-center-derailed-240000-for-affordable-housing-in-rural-maine/; Date: 2026-06-18]; Sources: https://www.wiscasset.gov/283/NDA-Protected-Documents-Between-Boundles https://www.wiscasset.gov/DocumentCenter/View/1620/Draft-MOU-Between-Wiscasset-and-Boundless-Power-032725 https://www.wiscasset.gov/DocumentCenter/View/1608/RLC-Engineering-Boundless-Power-Flow-Analysis https://www.wiscassetnewspaper.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584 https://www.pressherald.com/2025/09/23/large-data-center-could-come-to-wiscasset/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Quantum Frederick Campus",
    "state": "Maryland",
    "city": "Adamstown",
    "county": "Frederick County",
    "region": "Western Maryland",
    "status": "under-construction",
    "sponsors": "TPG Real Estate; Catellus Development Corporation",
    "operators": "Catellus Development Corporation",
    "tenants": "Rowan Digital Infrastructure; Aligned Data Centers",
    "totalSquareFeet": 91476000.0,
    "powerCapacityMW": 2400.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "2,100-acre campus with former Alcoa Eastalco Works power infrastructure; includes 600-acre nature reserve",
    "announcedDate": "2021",
    "constructionStartDate": "2021",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "600-acre nature reserve designed to store 2,800 tons of carbon annually; QLoop 40-mile fiber ring with 235,000 strands of fiber capacity",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Developer-stated projections described \u201cbillions of dollars\u201d in economic growth and \u201ctens of thousands\u201d of jobs for Frederick County; no third-party study or verified outcomes were found in the provided research.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary-record gaps noted in the research include unavailable Frederick County Planning Commission staff reports/minutes due to archive access errors; limited public disclosure of project-specific incentives and utility/interconnection agreements; stormwater permit processing pauses tied to contaminated soil/groundwater controls; and a 2025 county pause on new data center/substation applications while an overlay policy advanced.",
    "notes": "Technical.ly reported on June 8, 2026 that the 600-acre nature reserve once promoted as a signature Quantum Frederick community and sustainability benefit appears to have disappeared from current public plans after Quantum Loophole exited and Catellus took over; the University of Maryland design contract for the reserve was canceled. Frederick County says its July 1, 2026 pause stops new data center applications through December 31, 2026 but does not stop projects currently under construction or properties with earlier development approvals. [Source: https://technical.ly/civics/catellus-frederick-data-center-nature-reserve/ | https://frederickcountymd.gov/9310/Data-Centers; Date: 2026-06-08; 2026]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Rowan Digital Infrastructure - Bauxite II",
    "state": "Maryland",
    "city": "Adamstown",
    "county": "Frederick County",
    "region": "Western Maryland",
    "status": "under-construction",
    "sponsors": "Rowan Digital Infrastructure; Amazon Data Services, Inc.",
    "operators": "Rowan Digital Infrastructure",
    "tenants": "Amazon Data Services, Inc.",
    "totalSquareFeet": 822620.0,
    "powerCapacityMW": 230.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "Located on 111.5-acre site",
    "announcedDate": "2024-05",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Water building used to treat incoming cooling water for the data-center campus; no Bauxite-II-only final cooling design or withdrawal volume located.",
    "certifications": null,
    "sustainabilityNotes": "MDE approved a Bauxite II Environmental Management Plan for a temporary overhead distribution line and duct banks, with soil stockpile removal, excavated-soil sampling, and PCB-contamination oversight conditions. The Amazon IAD-534 air-permit application proposes synthetic-minor limits for emergency generators, including a site-wide 25.0 tpy NOx limit.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Rowan reported Bauxite II topped out in March 2026, confirming active construction. Public sources do not isolate Bauxite II construction cost, realized tax revenue, or employment outcomes. Rowan's combined 2025 acquisition of 314 acres for Bauxite II/III parcels was reported at 600488225.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Amazon's IAD-534 emergency-generator permit application remained a key open public air-permit proceeding for Bauxite II operations as of June 15, 2026. No cancellation, Bauxite-II-specific lawsuit, appeal, injunction, or stop-work order was located.",
    "notes": "Maryland Department of the Environment air-permit materials for Amazon IAD534 / Bauxite II state that Amazon is entering a lease with Rowan for the IAD534 campus. MDE's 2026 public materials also identify the Bauxite II permitting context, while the tracked capacity and investment estimates remain unchanged pending a more precise project-specific update. [Source: https://mde.maryland.gov/programs/permits/AirManagementPermits/Documents/Public-Review/Alt%20NSPS/Amazon%20Presentation-handouts-FAQ%20Bauxite%20II.pdf | https://mde.maryland.gov/programs/permits/AirManagementPermits/Documents/Public-Review/Alt%20NSPS/Amazon%20Final%20Determination%20RTC%202025.pdf; Date: 2026-06; 2026-04]; QA 2026-07-19: Cleared construction financing from the investment field while retaining permitted area and operator-reported capacity.; Sources: https://www.davispolk.com/experience/rowan-12-billion-project-financing-four-data-centers https://www.quinbrook.com/our-portfolio/rowan-digital-infrastructure/ https://www.frederickcountymd.gov/AgendaCenter/ViewFile/Agenda/580?html=true https://www.rowanfrederick.com/frederick-data-center-1",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Aligned Data Centers - Critical Digital Infrastructure Facility",
    "state": "Maryland",
    "city": "Adamstown",
    "county": "Frederick County",
    "region": "Western Maryland",
    "status": "under-construction",
    "sponsors": "Aligned Data Centers",
    "operators": "Aligned Data Centers",
    "tenants": null,
    "totalSquareFeet": 1599000.0,
    "powerCapacityMW": 264.0,
    "itLoadMW": 264.0,
    "investmentUSD": 6000000000.0,
    "sizeNotes": "Four buildings on 74.89 acres; 450,000-square-foot IAD06 first building plus three additional buildings totaling 1,149,000 square feet; 264 MW campus IT capacity",
    "announcedDate": "2022",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Delta3 air-cooling arrays, secondary loops for DeltaFlow liquid cooling, and a closed-loop chilled-water system with near-zero water utilization efficiency.",
    "certifications": null,
    "sustainabilityNotes": "Noise reduction measures required by planning commission; 508 MW combined backup generator capacity approved",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts or tax projections located. Reporting cites countywide data center-related tax revenue of approximately 55000000 (not attributed to this project).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary county land-use staff reports/minutes not retrievable (HTTP 400), limiting confirmation of zoning basis and vote tallies. Maryland PSC proceedings created uncertainty around emergency generator CPCN exemption (full 504 MW denied; provisional authorization limited to 70 MW in 2023) even as MDE issued an air permit in 2025. Community opposition centered on noise, runoff/water, traffic, farmland preservation, and rate impacts.",
    "notes": "Initially abandoned project due to generator permit denial; resumed after Critical Infrastructure Streamlining Act passed. Maryland Department of Environment approved 170+ emergency generators in January 2024.. Turner announced on March 9, 2026 that the Aligned IAD-06 data center in Frederick topped out, completing the structural phase of a 72 MW facility fewer than five months after breaking ground. DCD reported the two-story 450,000-square-foot IAD-06 building is part of Aligned's 75-acre, four-building, 264 MW plan within Quantum Frederick. Frederick County's July 1, 2026 pause on new data center applications does not stop projects currently under construction. [Source: https://www.turnerconstruction.com/insights/turner-celebrates-topping-out-of-aligned-iad-06-data-center-in-frederick-maryland | https://www.datacenterdynamics.com/en/news/aligned-tops-out-maryland-data-center/ | https://frederickcountymd.gov/9310/Data-Centers; Date: 2026-03-09; 2026-03-12; 2026]; QA 2026-07-19: Corrected full-campus area to 1,599,000 square feet, retained 264 MW only as IT capacity, and cleared modeled investment.; Sources: https://www.datacentermap.com/usa/maryland/frederick/maryland-campus/specs/ https://www.discoverfrederickmd.com/DocumentCenter/View/176/Frederick-County-Profile-PDF https://aligneddc.com/maryland-data-centers/ https://mde.maryland.gov/programs/land/MarylandBrownfieldVCP/Documents/FinalDetermination-Aligned.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Dickerson Power Plant Data Center Proposals",
    "state": "Maryland",
    "city": "Dickerson",
    "county": "Montgomery County",
    "region": "Central Maryland",
    "status": "planned",
    "sponsors": "Terra Energy, LLC; Terra Innovations; Atmosphere DC Dickerson Property Owner, LLC; Atmosphere Data Centers",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 259427.0,
    "powerCapacityMW": 360.0,
    "itLoadMW": null,
    "investmentUSD": 1400000000.0,
    "sizeNotes": "Multiple data centers proposed at former power plant site",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Water-cooled data center using Potomac River water under a Maryland Department of the Environment water-appropriation permit application; existing private well for domestic water only.",
    "certifications": "Atmosphere markets the Dickerson project as Tier III+.",
    "sustainabilityNotes": "Atmosphere claims cutting-edge cooling and up to 50% lower energy. The 2026 statement says water cooling would lower noise impacts relative to air-cooled data centers. No PUE target, executed renewable-energy contract, or sustainability certification was found.",
    "economicImpact_jobs": 85.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "The Hearing Examiner approval limits occupancy to a maximum of 85 employees onsite at one time. No construction-job estimate, tax-revenue projection, capital-expenditure amount, or economic-impact study was found.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "The project remained in planned/permitting status as of June 15, 2026, with no public construction start, tenant announcement, final CU202413A approval, water-appropriation permit issuance, utility interconnection agreement, project incentive award, cancellation, or litigation outcome located. Key concerns include Potomac River withdrawals and discharges, diesel backup generators, grid and ratepayer impacts, air pollution, climate impacts, Agricultural Reserve siting, and lack of detailed public project economics.",
    "notes": "Montgomery County's June 12, 2026 update says County Executive Marc Elrich signed an executive order calling for a six-month pause on permit applications for new data centers. Public testimony and advocacy materials identify the Dickerson proposal as a key project affected by the pause, and accessible reporting says Montgomery County leaders were also considering a two-year moratorium amid debate over the planned Dickerson complex. The project remains planned/permitting, not canceled. [Source: https://content.govdelivery.com/accounts/MDMONTGOMERY/bulletins/41ba262 | https://www.fox5dc.com/video/fmc-8zjdb4sxechxiuhq | https://atmosphere-dc.com/data-centers/dickerson-md/; Date: 2026-06-12; 2026-06-16; 2026]; Sources: https://assets.montgomerycountymd.gov/files/2026-05/CU24-13.a.A-Exhibit-4-a-Final-Statement-of-Case-and-Operations.pdf https://www.montgomerycountymd.gov/DEP/Resources/Files/trash-recycling/dafig/meetings/dafig-minutes-20250909.pdf https://www.mocoalliance.org/uploads/4/8/8/6/48867647/dickerson-power-plant_terra-energy-staff-report-final-2.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Westfield Data Center Campus (Servistar Realties)",
    "state": "Massachusetts",
    "city": "Westfield",
    "county": "Hampden County",
    "region": "Western Massachusetts",
    "status": "planned",
    "sponsors": "Servistar Realties",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 2740000.0,
    "powerCapacityMW": 274.0,
    "itLoadMW": null,
    "investmentUSD": 4000000000.0,
    "sizeNotes": "10 three-story buildings on 155 acres; investment estimates range from $2.7-4 billion at full buildout",
    "announcedDate": "2021-08",
    "constructionStartDate": "2026-Q1",
    "expectedCompletionDate": "2038",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling requiring near-zero potable water for data-center cooling",
    "certifications": null,
    "sustainabilityNotes": "Secured power purchase agreement with Westfield Gas & Electric for below-market electric rates; located on major Eversource high capacity power line",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 360000000.0,
    "economicImpact_notes": "PILOT/Chapter 121A proposal cited $360M over 40 years. Hearing minutes referenced ~$9M\u2013$11M per year averages; also cited ~$6.4M/year PILOT plus ~$2.4M/year sales/excise taxes. Planning Board report referenced construction and long-term operations staffing but did not publish counts in the reviewed excerpts. Local reporting on 2025-12-30 described the project as not yet built (pre-development).",
    "incentives_type": "Pilot",
    "incentives_value": 360000000.0,
    "challenges": "As of 2025-12-30, local reporting described the project as not yet built (still pre-development). Key primary documents (executed Chapter 121A agreement; Planning Board special permit/site plan decisions; utility interconnection agreements/ISO-NE filings) were not located in public records during this review.",
    "notes": "After the prior June 15 research snapshot, Westfield's City Council unanimously approved a one-year data center moratorium on July 6, 2026, and the mayor reportedly signed it the next day. Reporting says the pause is not expected to stop the already approved Servistar project, but it confirms the project is still not under construction and faces a changed local and state policy environment. A July 14 Boston Globe report described the project as a $4 billion, 10-building campus requiring 274 MW at full buildout; it also reported that the needed substation could take about five years, while Servistar co-owner Paul Corey said the project can satisfy Governor Healey's new data center requirements. Earlier July reporting also said the project must obtain a Planning Board time extension before its current permit expires in October 2026 and complete an ISO New England interconnection study and developer-funded substation before completion. [Source: https://www.wamc.org/news/2026-07-13/pioneer-valley-communities-rally-against-data-centers | https://www.bostonglobe.com/2026/07/14/business/westfield-data-center-backlash-healey/ | https://theshoestring.org/2026/07/02/ban-ban-ban-data-center-discontent-reaches-western-massachusetts/ | https://www.cityofwestfield.org/m/NewsFlash/Home/Detail/1724; Date: 2026-07-13; 2026-07-14; 2026-07-02; 2026-06-15]; QA 2026-07-18: Cleared building area derived from a generic power-density assumption; retained the reported 274 MW and $4 billion figures.; Sources: https://www.cityofwestfield.org/AgendaCenter/ViewFile/Minutes/_10052021-5868",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "University of Michigan & Los Alamos National Laboratory Data Center",
    "state": "Michigan",
    "city": "Ypsilanti Township",
    "county": "Washtenaw County",
    "region": "Southeast Michigan",
    "status": "planned",
    "sponsors": "University of Michigan; Los Alamos National Laboratory",
    "operators": "University of Michigan",
    "tenants": null,
    "totalSquareFeet": 290000.0,
    "powerCapacityMW": 110.0,
    "itLoadMW": null,
    "investmentUSD": 1250000000.0,
    "sizeNotes": "124-acre campus on Textile Road south of the Huron River's Ford Lake Dam. Property purchased for $8.1 million.",
    "announcedDate": "2024",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "research; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Direct-to-chip computer cooling",
    "certifications": "LEED Silver targeted with stretch goal of LEED Gold",
    "sustainabilityNotes": "National security and AI focus",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "State memo and MEDC press release project at least 200 direct permanent jobs (knowledge-economy) with average salaries around $200,000; U-M page also notes ~300 construction jobs and 30\u201350 staff to run the computing network.",
    "incentives_type": "Grant",
    "incentives_value": 100000000.0,
    "challenges": "Site selection remains under evaluation; community opposition has been reported; project-specific permits and utility rate impact analyses were not identified in public records during the referenced search.",
    "notes": "The project remains planned, but its site and utility path are materially uncertain. Planet Detroit reported May 18, 2026 that a University of Michigan regent described the Textile Road location as 'dead' and that the university was trending toward a Willow Run/American Center for Mobility alternative, while significant complications and community opposition remained. The Gander's July 16 directory says U-M was still pursuing the facility despite the YCUA water/sewer moratorium and was expected to choose a site by the end of July. [Source: https://planetdetroit.org/2026/05/saline-township-treasurer-resigns/; https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/; Date: 2026-05-18; 2026-07-16]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Switch SUPERNAP Grand Rapids Campus",
    "state": "Michigan",
    "city": "Grand Rapids",
    "county": "Kent County",
    "region": "West Michigan",
    "status": "expansion",
    "sponsors": "Switch Communications Group LLC",
    "operators": "Switch Communications Group LLC",
    "tenants": "Consumers Energy; Michigan DTMB co-location data center contract",
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 237.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "Located at former Steelcase pyramid campus in Gaines Township. Campus designed for up to 1.8 million square feet and 320 MW. Over 1 million square feet already built out.",
    "announcedDate": "2024",
    "constructionStartDate": "2022-10",
    "expectedCompletionDate": "2025-Q2",
    "actualCompletionDate": "2017",
    "numberOfPhases": 3.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "advanced water-cooling systems",
    "certifications": null,
    "sustainabilityNotes": "Township-reported water use: more than 6.4 million gallons (sewer-discharge water only) from 2022-12-01 to 2023-12-01; local official statement cites ~10,000,000 gallons used \"last year\" (contextual). State enterprise data center program conditions (if pursued) include green-building certification and clean energy procurement.",
    "economicImpact_jobs": 1000.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Tax incentives reported agreed in late 2015 tied to promise of 1,000 permanent jobs over 10 years; initial construction involved ~700 people; nearly 1,500 people (Switch staff, contractors, and client employees) reportedly working on-site as of 2024-10-31.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Public sources note statewide criticism of Michigan data center tax breaks (Switch cited as an example) and local commentary about water use; no public hearing records, petitions, lawsuits, or organized protest actions specifically targeting the Switch Pyramid Campus were found in this research pass.",
    "notes": "Largest data center campus in eastern U.S. Expected to be in continuous expansion for at least 10 years. Part of $5 billion financing plan.; Sources: https://www.switch.com/grand-rapids/ https://www.datacenterdynamics.com/en/news/switch-plans-second-expansion-of-pyramid-data-center-campus-in-grand-rapids-michigan/ https://www.sec.gov/Archives/edgar/data/1710583/000171058318000039/switchinvestorpresentati.htm",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Howell Township Data Center Campus",
    "state": "Michigan",
    "city": "Howell Township",
    "county": "Livingston County",
    "region": "Southeast Michigan",
    "status": "canceled",
    "sponsors": "Stantec Consulting Michigan Inc.; Randee LLC",
    "operators": null,
    "tenants": "Undisclosed Fortune 100 company",
    "totalSquareFeet": null,
    "powerCapacityMW": 143.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "1,077-acre site north of I-96, approximately 54 miles from Detroit. Multiple parcels along Marr, Fleming, Warner and Owosso roads.",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Water-efficient cooling systems with water recycling through cooling systems before discharge",
    "certifications": null,
    "sustainabilityNotes": "Offer of Conditions includes commitments related to water infrastructure and conservation, including reimbursement to the township for municipal water infrastructure (including electrical infrastructure for that system). No NEPA EIS/EA located as of 2026-02-01; no EGLE permit filings found in public sources tied to the project.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 11900000.0,
    "economicImpact_notes": "Township Tax Impact document provides estimated fiscal impacts under multiple scenarios tied to assumptions about state sales/use tax exemption and potential IFT abatement; no independent economic impact study or verified job-creation figures located in public record.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Rezoning application withdrawn and township-wide moratorium adopted; significant community opposition; limited primary-source records publicly available for vote counts and permitting/utility agreements.",
    "notes": "Planning Commission voted unanimously to recommend denial after seven-hour meeting with hundreds of public comments. Township Board of Trustees has final say. Project promises 1,000 temporary construction jobs and significant tax revenue.; Power estimated at $7M/MW; Sources: https://howelldatacenter.com/about https://howelldatacenter.com/site-plan https://www.wilx.com/2025/09/24/howell-township-planning-commission-votes-deny-rezoning-proposed-data-center/ https://www.datacenterdynamics.com/en/news/1000-acre-data-center-campus-planned-outside-detroit-michigan-set-to-be-blocked/ https://planetdetroit.org/2025/09/data-center-rezoning-howell/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Form8tion Augusta Township Data Center",
    "state": "Michigan",
    "city": "Augusta Township",
    "county": "Washtenaw County",
    "region": "Southeast Michigan",
    "status": "planned",
    "sponsors": "Thor Equities; Form8tion; JDS Equities II LLC",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 100.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "810-acre campus between Hitchingham Rd & Milan-Oakville Rd. 522.2 acres requiring rezoning. Uses 1 million gallons of water per day.",
    "announcedDate": "2025",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Project would need public water for equipment cooling; specific cooling technology not disclosed.",
    "certifications": null,
    "sustainabilityNotes": "Rezoning analysis notes woodlands and significant wetlands on the site; topography and natural feature setbacks to be reviewed at site plan stage. Public water is expected to be required for cooling; public water/sewer not readily available at the site as of rezoning stage.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No township-published economic impact study, job counts, or tax revenue projections included in rezoning analysis or ordinance/conditions; media coverage cites an approximately $1B investment estimate.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Conditional rezoning approved amid strong local opposition; post-approval petition/referendum effort for 2026 ballot. Utility availability constraints noted (public water/sewer not readily available) and no documented power/interconnection arrangements at rezoning stage.",
    "notes": "Township Board of Trustees unanimously approved rezoning in July. However, Protect Augusta Charter Township (PACT) collected 957 signatures (561 needed) to trigger referendum for 2026 ballot. Faces significant local opposition. Would use 20% of 800-acre site. Thor Equities founded Form8tion in March 2023 as data center development unit.; Power estimated at $7M/MW; Sources: https://augustatownship.org/wp-content/uploads/2025/05/Data_Center_Review.pdf https://www.datacenterdynamics.com/en/news/local-officials-recommend-denial-of-thor-equities-data-center-in-michigan/ https://planetdetroit.org/2025/08/augusta-data-center-petition/ https://augustatownship.org/wp-content/uploads/2025/06/June-PC-Packet.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "OpenAI Stargate - Saline Township Campus",
    "state": "Michigan",
    "city": "Saline Township",
    "county": "Washtenaw County",
    "region": "Southeast Michigan",
    "status": "under-construction",
    "sponsors": "OpenAI; Oracle; SoftBank; MGX; Related Digital",
    "operators": "Stargate LLC",
    "tenants": "OpenAI; Oracle",
    "totalSquareFeet": 2200000.0,
    "powerCapacityMW": 1383.0,
    "itLoadMW": 1000.0,
    "investmentUSD": 16000000000.0,
    "sizeNotes": "575-acre campus at US-12 & Braun Road. Five buildings including three large data halls, generator facility, warehouse, and administrative office. Later 2026 financing and construction announcements describe the Oracle/Stargate campus as a US$16 billion project.",
    "announcedDate": "2025-10-30",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling",
    "certifications": null,
    "sustainabilityNotes": "Sponsors describe a closed-loop cooling design intended to limit daily water use; reporting describes proposed wetlands impacts and an EGLE wetlands permit process with a public hearing in December 2025 and anticipated decision timeline in early 2026.",
    "economicImpact_jobs": 450.0,
    "economicImpact_taxRevenue": 1600000.0,
    "economicImpact_notes": "Jobs and other economic impacts are sponsor projections (e.g., 2,500+ union construction jobs and 450+ onsite jobs) and not realized as of Feb 5, 2026.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Local rezoning denial followed by litigation and reported consent judgment; sustained community opposition focused on water use and farmland/wetlands impacts; environmental permitting (wetlands) and permitting record gaps; large-load utility contracting and rate-impact scrutiny in MPSC proceedings.",
    "notes": "Sources in the Feb-Jun 2026 window report state air and wetland permits issued in January 2026, financing secured at $16 billion, and a June 1, 2026 groundbreaking/shovel ceremony for the 2.2 million sq ft campus. Planet Detroit reported the January permits allow destruction of about 9 acres of wetlands and installation of 15 diesel backup generators; Michigan Public reported the June 1 groundbreaking. [Source: https://www.michiganpublic.org/environment-climate-change/2026-06-10/as-data-centers-expand-in-michigan-so-do-environmental-and-economic-concerns; Date: 2026-06-10]; QA 2026-07-19: Separated 1,383 MW contracted utility service from OpenAI's 1 GW compute-campus disclosure.; Sources: https://www.michiganbuildingtrades.org/PDFs/Building%20Tradesman%20PDF%20Editions/Tradesman-5-1-26-REVISED.pdf https://openai.com/index/expanding-stargate-to-michigan/ https://www.oracle.com/news/announcement/related-digital-oracle-openai-walbridge-and-governor-whitmer-celebrate-construction-of-stargate-campus-in-saline-township-2026-06-01/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Amazon Becker Data Center",
    "state": "Minnesota",
    "city": "Becker",
    "county": "Sherburne County",
    "region": "Central Minnesota",
    "status": "canceled",
    "sponsors": "Amazon Data Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "348 acres purchased",
    "announcedDate": "2024-11",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Modeled data-center cooling water demand and non-contact cooling tower blowdown in the area-wide AUAR; project-specific cooling design not identified.",
    "certifications": null,
    "sustainabilityNotes": "State data-center sales tax exemption program descriptions include sustainability/green-building requirements and a repayment mechanism if conditions are not met; the area-wide AUAR modeled a future data center cooling-water demand of ~1.0 MGD and discussed stormwater BMPs and wastewater pathways (including non-contact cooling tower blowdown) subject to agency approvals.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public reporting described ~100 jobs and ~$1B investment, but the project was publicly reported as suspended/canceled before construction. An October 2022 area-wide AUAR traffic appendix modeled a redevelopment scenario that included 2.38 million square feet of data center as a land-use assumption (not Amazon-specific).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project was publicly reported as suspended/canceled in May 2025, with reporting linking the decision to Minnesota ending the electricity sales tax exemption for data centers and to regulatory classification requiring a PUC Certificate of Need for the large backup generator fleet (CN-24-435).",
    "notes": "Amazon suspended the project in May 2025 following disputes over state regulations, backup generator permitting, and elimination of sales tax exemption on electricity. Amazon retains ownership of the 348 acres.; Power estimated at $7M/MW; 600 MW planned; B estimated; PROJECT SUSPENDED May 2025; Sources: https://minnesotapuc.legistar.com/LegislationDetail.aspx?GUID=98618167-1B2B-48DB-849C-F93B6E9EA253&ID=7131024 https://www.eenews.net/articles/amazon-needs-permit-for-minnesota-data-center-backup-power/ https://www.datacenterdynamics.com/en/news/amazon-buys-350-acre-parcel-in-becker-minnesota-for-data-center/ https://www.startribune.com/amazon-suspends-minnesota-data-center-as-lawmakers-plan-to-reduce-big-tech-tax-breaks/601359665 https://www.industrialinfo.com/iirenergy/industry-news/article/amazon-denied-diesel-generator-exemptions-for-data-center-near-minnesota-coal-fired-site--339565",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Farmington Technology Park",
    "state": "Minnesota",
    "city": "Farmington",
    "county": "Dakota County",
    "region": "Twin Cities Metro",
    "status": "under-construction",
    "sponsors": "Tract",
    "operators": "Various tenants (colocation model)",
    "tenants": null,
    "totalSquareFeet": 2530000.0,
    "powerCapacityMW": 714.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "343 acres, up to 12 data centers planned",
    "announcedDate": "2024-10",
    "constructionStartDate": "2024-11",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Tract says soil and groundwater testing was completed in March-April 2026 and that it planned to work with the Minnesota Department of Agriculture Voluntary Investigation and Cleanup (AgVIC) program in June-July 2026 to address environmental conditions from former golf-course use.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 75000000.0,
    "economicImpact_notes": "At the Sept. 10, 2024 Planning Commission hearing, Tract\u2019s representative estimated over 200 permanent jobs and up to 1,500 construction jobs at build-out; no formal local economic impact study or tax revenue projection was found in city posted records as of Nov. 2025.",
    "incentives_type": "Grant",
    "incentives_value": 33900.0,
    "challenges": "Community opposition and ongoing litigation; as of Nov. 13, 2025 the city reported no specific development proposal pending and no active construction permits for individual data center buildings in posted records.",
    "notes": "Farmington City Council approved final plat and PUD on November 18, 2024. Includes Fountain Valley Golf Club property. Expected to create 275 high-paying jobs. Founded by Cologix founder Grant van Rooyen. Facing community opposition regarding noise, water usage, and electrical usage.; Power estimated at $7M/MW; Sources: https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park https://www.datacenterdynamics.com/en/news/tract-plans-343-acre-data-center-park-outside-minneapolis-minnesota/ https://kstp.com/kstp-news/local-news/contract-for-farmington-data-center-approved/ https://farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park https://www.farmingtonmn.gov/DocumentCenter/View/1245/Tract---Final-Plat-and-PUD-Nov12-mtg-PDF?bidId= https://www.mnlcofarmington.com/updates/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Cannon Falls Technology Park",
    "state": "Minnesota",
    "city": "Cannon Falls",
    "county": "Goodhue County",
    "region": "Southeast Minnesota",
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Various tenants (colocation model)",
    "tenants": null,
    "totalSquareFeet": 1750000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 30000000000.0,
    "sizeNotes": "Nearly 240 acres annexed from Randolph Township",
    "announcedDate": "2025-08",
    "constructionStartDate": "2026",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "water-cooled (assumption in AUAR technology-park scenario)",
    "certifications": null,
    "sustainabilityNotes": "Up to 4MW available through on-site wind turbines; natural gas availability for potential microgrid",
    "economicImpact_jobs": 250.0,
    "economicImpact_taxRevenue": 30000000.0,
    "economicImpact_notes": "City work-session deck claims \"over 1,000\" construction jobs and ~250 permanent jobs. City work-session deck estimates ~$30M in city tax revenue over 20 years; project website separately claims $50M+ in new property taxes over 20 years.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Key uncertainties include required water/wastewater system upgrades and capacity limits, pending annexation/rezoning/CUP/PUD and development-agreement steps, and unresolved grid capacity/upgrade requirements; organized community opposition has focused on water, power, noise, and environmental impacts.",
    "notes": "Located southeast of Minneapolis between Rochester Blvd. and Highway 52. Expected to create 275 long-term jobs averaging six-figure salaries, plus 1,000+ construction jobs. Tract will build new substation. AUAR environmental review completed. Expected groundbreaking within a year if approved.; Tract Cannon Falls Technology Park Minnesota; hyperscale campus estimate; Sources: https://www.cannonfallsmn.gov/DocumentCenter/View/451/Data-Center-Joint-Work-Session-Presentation-10-9-2025-PDF https://www.cannonfallstechnologypark.com/ https://finance-commerce.com/2025/07/cannon-falls-data-center-tract-auar-review/ https://legalectric.org/f/2025/12/MCEA-Brief-Appellant.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Hermantown Data Center",
    "state": "Minnesota",
    "city": "Hermantown",
    "county": "St. Louis County",
    "region": "Northeastern Minnesota",
    "status": "planned",
    "sponsors": "Google; Harmony Group LLC; Mortenson",
    "operators": "Google; Harmony Group LLC",
    "tenants": "Google",
    "totalSquareFeet": 1800000.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "403 acres near Midway Road and Morris Thomas Road; 3 phases planned",
    "announcedDate": "2026-03-03",
    "constructionStartDate": "2027",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Could use up to 50,000 gallons of water per day",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No Hermantown-posted project-specific fiscal impact study or tax revenue projection was located in the reviewed materials; the AUAR discusses increased tax revenues generally for business-park style development.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Project team withdrew near-term local agenda items in late 2025 amid public requests for more information; ongoing MEPA/AUAR litigation challenging adequacy of environmental review; no publicly posted development agreement or utility service agreement located in reviewed sources.",
    "notes": "Google announced plans for a data center project in Hermantown on March 3, 2026. The city and Google jointly agreed to restart/update the AUAR process with a smaller 278-acre, 26-parcel study area and more specific information. The proposed project would include up to four data center buildings and supporting infrastructure. KAXE reported Hermantown was considering tax abatement and development agreements with Google, including $40 million to the school district over 28 years and $130 million in public infrastructure for a four-phase build-out, with agreements not expected to move forward until the AUAR process is complete. DCD reported a Minnesota Power agreement tied to 700 MW of new clean energy resources, but said the data center's expected power draw had not been disclosed. [Source: https://hermantownmn.com/project/ | https://www.kaxe.org/local-news/2026-05-20/more-details-emerge-as-google-hermantown-work-out-data-center-agreements | https://www.datacenterdynamics.com/en/news/google-confirms-it-is-behind-403-acre-data-center-campus-in-hermantown-minnesota/; Date: 2026-03-31; 2026-05-20; 2026-03-04]; QA 2026-07-19: Cleared undisclosed project power and updated investment to the reported $1.2B lower bound of a $1.2B-$1.5B estimate.; Sources: https://hermantownmn.com/wp-content/uploads/2026/08/Presentation-PZ-8-18.pdf https://www.startribune.com/google-hermantown-data-center/601880694 https://mn.gov/puc/activities/v-l-e-c/data-centers/ https://hermantownmn.com/wp-content/uploads/2026/03/PressRelease03032026.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "CloudHQ MSP Campus (Chaska)",
    "state": "Minnesota",
    "city": "Chaska",
    "county": "Carver County",
    "region": "Twin Cities Metro",
    "status": "planned",
    "sponsors": "CloudHQ",
    "operators": "CloudHQ",
    "tenants": null,
    "totalSquareFeet": 1100000.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": 200.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "70 acres north of Engler Boulevard and west of Clover Ridge Drive",
    "announcedDate": "2024-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "air-based chillers rather than water-based chillers",
    "certifications": null,
    "sustainabilityNotes": "No state environmental review documentation (EAW/EIS/AUAR) was identified in the sources reviewed; stormwater drainage and mitigation were raised in planning discussions per a secondary meeting summary.",
    "economicImpact_jobs": 75.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No construction/permanent job counts, tax-revenue projections, or economic-impact studies were identified in the sources reviewed.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Approvals obtained but construction timing remains uncertain; sources reviewed indicated the developer did not yet have a clear construction schedule (mid-2024 report).",
    "notes": "Can deliver up to 200MW of critical IT load in one or two customizable data centers. Preliminary site plan/plat approved by Planning Commission and City Council in October 2024. Chaska's municipal utility with competitive rates is major draw. Site can accommodate phased development.; QA 2026-07-18: Updated area to 1.1 million square feet and retained 200 MW only as operator-labeled critical IT load.; Sources: https://cloudhq.com/campus/msp-campus/ https://chaskamn.gov/841/Cloud-HQ https://cclocalnews.org/2024/10/29/despite-resident-objections-data-center-gains-preliminary-ok/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "AWS Madison County Data Center Campus",
    "state": "Mississippi",
    "city": "Canton and Ridgeland",
    "county": "Madison County",
    "region": "Central Mississippi",
    "status": "expansion",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 4800000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 21000000000.0,
    "sizeNotes": "Two Madison County campus sites totaling 1,713 acres: Canton (927 acres) and Ridgeland (786 acres). The original $10 billion commitment plus an additional $11 billion brings tracked Madison County investment to $21 billion.",
    "announcedDate": "2024-01-25",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Canton currently uses Canton Municipal Utilities water for cooling and plans in 2027 to transition with Veolia to recycled wastewater from the Madison County Wastewater Authority for all cooling needs; Ridgeland expects city water use.",
    "certifications": null,
    "sustainabilityNotes": "Amazon announced a first-of-its-kind deal with Entergy to enable 650 megawatts of new renewable energy projects in Mississippi over the next three years. AWS is poised to enable a total of 1.3 gigawatts of new carbon-free energy in Mississippi through solar and wind farms, producing energy equivalent to powering 303,000 U.S. homes.",
    "economicImpact_jobs": 1000.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Official communications and AWS announcement cite $10B initial investment, later described as $16B total investment, and 1,000 direct jobs; no audited realized tax/job reports were found in the provided research.",
    "incentives_type": "Grant; Infrastructure Support; Pilot; Property Tax Abatement; Sales Tax Exemption; Income Tax Credit",
    "incentives_value": 70400000.0,
    "challenges": "Primary county zoning minutes/agenda archives and executed incentive agreements were not found in the provided research; MDEQ permit listings did not explicitly name AWS and require confirmation from permit files; no public interconnection/PPA documents were found.",
    "notes": "Largest capital investment in Mississippi history. Project will create at least 1,000 high-paying, high-tech jobs with salaries averaging $70,000 annually. Expected to add $3.3 billion to Mississippi's GDP and support over 2,700 full-time equivalent jobs on an annual average basis. May require between 6,000-7,000 construction workers. June 2026 update: Amazon said one of its four announced Mississippi facilities, the Canton site, is already operating, with five buildings operational and plans to at least double that presence; the Ridgeland site is in the early stages of construction. Amazon plans regional cooling water use only during the hottest approximately 9% of the year, with Canton transitioning in 2027 to recycled wastewater from Madison County Wastewater Authority and estimated to use about 83 million gallons of recycled wastewater per year; Ridgeland is expected to use about 93 million gallons per year from the city, and Amazon said it is investing $37 million to increase the city's water-system capacity by 10%. Keep status as expansion because the tracked row covers a multi-site campus with one operational site and continuing buildout. [Source: https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/; Date: 2026-06-09]; QA 2026-07-19: Reconciled size notes to Amazon's latest $21 billion Madison County commitment.; Sources: https://www.cityofclarksdale.org/wp-content/uploads/2026/03/City-of-Clarksdale-Data-Center-Frequently-Asked-Questions-_FAQ_.pdf https://www.aboutamazon.com/news/aws/aws-10-billion-investment-mississippi https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Compass Datacenters Meridian Campus",
    "state": "Mississippi",
    "city": "Meridian",
    "county": "Lauderdale County",
    "region": "East Mississippi",
    "status": "under-construction",
    "sponsors": "Compass Datacenters",
    "operators": "Compass Datacenters",
    "tenants": "Corderill LLC",
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 320.0,
    "itLoadMW": 320.0,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "Eight data centers to be constructed over an eight-year period. Investment includes future tenants' information technology equipment. Located in I-20/59 Industrial Park.",
    "announcedDate": "2025-01-09",
    "constructionStartDate": "2025-03",
    "expectedCompletionDate": "2033",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling system; municipal water use described as limited to small office areas",
    "certifications": null,
    "sustainabilityNotes": "Mississippi Power will supply approximately 500 megawatts of power to the facility. Mississippi Power extended coal operations until mid-2030s (previously planned to end by 2027) to fuel the campus.",
    "economicImpact_jobs": 240.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Projected to create thousands of direct and indirect jobs when fully built out; local reporting mentions 1,000+ direct/indirect jobs.",
    "incentives_type": "Sales Tax Exemption; Grant; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "No public opposition, petitions, or litigation identified in reviewed city council minutes or in state/Compass announcements; planning/zoning hearing records were not located.",
    "notes": "One of the largest hyperscale data center developments in the southeast and Compass' first campus in the region. $10B, eight-data-center campus in Lauderdale County with Mississippi Power expected to supply about 500 MW. April 2026 update: MDA announced Corderill LLC will be a tenant at the Compass Datacenters campus in Meridian, investing at least $100M in data center equipment and creating at least 20 direct jobs. Treat as an update to the tracked Compass row, not a duplicate campus. [Source: https://mississippi.org/news/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/ | https://mississippi.org/news/technology-company-corderill-investing-at-least-100-million-in-meridian/; Date: 2025-01-09; 2026-04-22]; Sources: https://www.compassdatacenters.com/data-center-markets/ https://www.datacenterdynamics.com/en/news/compass-datacenters-breaks-ground-on-10bn-campus-in-meridian-mississippi/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AVAIO Digital Taurus Data Center Hub",
    "state": "Mississippi",
    "city": "Brandon",
    "county": "Rankin County",
    "region": "Central Mississippi",
    "status": "under-construction",
    "sponsors": "AVAIO Digital Partners",
    "operators": "AVAIO Digital Partners",
    "tenants": null,
    "totalSquareFeet": 600000.0,
    "powerCapacityMW": 116.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": "Campus totals 329 acres at East Metropolitan Center Business and Industrial Park",
    "announcedDate": "2025-08-19",
    "constructionStartDate": "2025-09",
    "expectedCompletionDate": "2027-06",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "water-efficient cooling",
    "certifications": null,
    "sustainabilityNotes": "Features water-efficient cooling, rainwater recapture, rooftop solar, and cooling system economization to minimize power demands. Powered by Entergy Mississippi.",
    "economicImpact_jobs": 60.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "State announcement projects 60 direct jobs and $6.0B investment; industry reporting notes expectations of substantial local tax revenue and that computing equipment/software were tax-exempt under state law, without verified post-announcement tax revenue results.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Pilot; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Limited public documentation found for specific local incentive agreements (including PILOT terms/clawbacks), local zoning/land-use approvals, and utility interconnection/rate/grid-upgrade details; community concerns reported about infrastructure strain and electric utility rates.",
    "notes": "Third-largest economic development project in state history. Expected to create at least 60 direct high-tech jobs and hundreds of indirect jobs. AI-ready facility with low-latency interconnection options and access to multiple long-haul fiber routes enabling direct connectivity to Dallas and Atlanta. Site work officially underway as of September 2025.; Sources: https://www.avaiodigital.com/updates/avaio-digital-to-build-new-ai-ready-6-billion-data-center-hub-in-brandon-mississippi https://www.avaiodigital.com/updates/avaio-digital-breaks-ground-on-6-billion-brandon-data-center-campus-leading-mississippi-contractor-begins-site-work https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/ https://brandonms.org/city-of-brandon-welcomes-avaio-digitals-6-billion-investment-in-new-ai-ready-data-center-campus/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Kansas City Data Center",
    "state": "Missouri",
    "city": "Kansas City",
    "county": "Clay/Platte",
    "region": "Northland",
    "status": "under-construction",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": "Google LLC",
    "totalSquareFeet": 1435000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Four-phase development with multiple ancillary buildings",
    "announcedDate": "2024-03",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "400MW carbon-free energy from Beavertail Solar farm via PPA with Evergy, Ranger Power, and DESRI",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Port KC projects hundreds of construction jobs (not quantified). No public economic impact study or tax-revenue projection located in reviewed Port KC/KCMO files.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Discrepancy between user-provided snapshot ($1.0B, 400 MW) and public records describing a much larger campus (up to $10B, 700 MW). No official completion/operational notice located; no public development agreement, clawbacks, permits filings, or utility interconnection/rate filings found in the reviewed records.",
    "notes": "Expected to generate over 1,000 construction jobs and 1,400 total halo jobs. Power provided by Beavertail Solar farm in former coal community.; Sources: https://rangerpower.com/wp-content/uploads/2024/03/2024GoogleKCAnnouncement.pdf https://efis.psc.mo.gov/Document/Display/810156 https://www.datacenterdynamics.com/en/news/google-to-build-1bn-data-center-in-kansas-city-missouri/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Kansas City Data Center (Golden Plains Technology Park)",
    "state": "Missouri",
    "city": "Kansas City",
    "county": "Clay/Platte",
    "region": "Northland",
    "status": "operational",
    "sponsors": "Meta (Facebook); Diode Ventures",
    "operators": "Meta",
    "tenants": "Meta",
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 750.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Expanded from original $800M investment. Part of larger Golden Plains Technology Park with capacity for up to 12 data centers totaling 4.31M sq ft",
    "announcedDate": "2022-03",
    "constructionStartDate": "2022",
    "expectedCompletionDate": "2025-08",
    "actualCompletionDate": "2025-08",
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Cooling technology described by Meta as significantly more water-efficient than the industry standard; specific system type not disclosed.",
    "certifications": "LEED Gold",
    "sustainabilityNotes": "Net-zero carbon emissions, 32% less energy than typical, 80% more water-efficient than industry standard. 430 MW renewable energy from first utility-scale renewable project in Missouri.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": 1800000000.0,
    "economicImpact_notes": "KC approved $8.2B in incentives over 37 years for entire Golden Plains Technology Park (Meta is one tenant). Meta's investment: $1B+.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Pilot; Expedited Permitting; Other",
    "incentives_value": 8200000000.0,
    "challenges": "Some key deal terms and clawback/performance conditions were not located in publicly accessible Chapter 100 plan/lease attachments; reporting described compliance/enforcement controversies around contracting and workforce provisions.",
    "notes": "Opened August 2025 with over 100 jobs. Located at Golden Plains Technology Park at I-435 and US-169. Generated 1,500 construction jobs at peak.; Sources: https://about.fb.com/news/2025/08/metas-kansas-city-data-center/ https://www.diodeventures.com/projects/gptp https://www.diodeventures.com/insights/diodes-golden-plains-technology-park-announced-as-site-of-metas-new-800-million-hyperscale-data-center https://datacenters.atmeta.com/us-locations/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Metrobloks MCI-A Kansas City",
    "state": "Missouri",
    "city": "Kansas City",
    "county": "Cass",
    "region": "South Kansas City",
    "status": "planned",
    "sponsors": "Metrobloks",
    "operators": "Metrobloks",
    "tenants": null,
    "totalSquareFeet": 568800.0,
    "powerCapacityMW": 87.0,
    "itLoadMW": 87.0,
    "investmentUSD": 1400000000.0,
    "sizeNotes": "One of the largest regional hyperscale builds. Power densities exceeding 150kW per rack",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029-06",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": 1.441,
    "waterCooling": "Advanced hybrid cooling systems; closed-loop cooling system filled initially and topped off as water evaporates",
    "certifications": null,
    "sustainabilityNotes": "Project is expected to use 85% less water than a standard office building of its size; backup generators will use advanced Tier-level emissions controls; lighting will be shielded, downward-directed, and compliant with dark-sky and municipal standards.",
    "economicImpact_jobs": 75.0,
    "economicImpact_taxRevenue": 49000000.0,
    "economicImpact_notes": "Missouri DED and Liberty initially announced at least 30 jobs at an average annual wage of $95,649, plus hundreds of construction jobs. Liberty's FAQ later states the completed project will provide approximately 75 jobs at average salaries of about $95,000. Liberty says the project will generate about $49 million for Clay County taxing jurisdictions over the 25-year abatement period, including about $30 million for Liberty Public Schools.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Pilot; Cba",
    "incentives_value": 230450000.0,
    "challenges": "Public sources did not confirm building-permit issuance, construction start, completion date, executed utility agreements, final water or environmental permits, or tenant identity. Residents raised concerns about taxes, water, energy use, utility costs, light pollution, transparency, and local job benefits.",
    "notes": "Located at 2515 Old Hughes Road. Tier III design-equivalent. Utility: Evergy. Low latency access to 14.3M people within 20ms.; Investment estimated at $7M/MW",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Cumulus (St. Charles)",
    "state": "Missouri",
    "city": "St. Charles",
    "county": "St. Charles",
    "region": "St. Charles County",
    "status": "canceled",
    "sponsors": "CRG Cumulus LLC",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "440-acre site inside Elm Point groundwater well field",
    "announcedDate": "2025-03",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "No cooling technology, expected water consumption, water-reuse system, wastewater-discharge arrangement, or renewable-energy commitment was publicly disclosed. Public concerns focused on wellhead protection, drinking-water quality, floodplain siting, diesel storage, power demand, and stormwater.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No formal capital-investment commitment or executed incentive agreement was located. Clayco founder Bob Clark reportedly said a project like this in St. Charles could involve about $2 billion of craft-labor construction payroll, but this was an advocacy claim rather than a binding agreement.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "The proposal was withdrawn before City Council approval after intense public opposition, then blocked by a one-year moratorium and a permanent citywide zoning-code ban on data centers. Key issues included water quality, wellhead protection, floodplain siting, diesel storage, transparency, unknown end user, power demand, noise, property values, utility-rate impacts, and the mayor-relative landowner issue.",
    "notes": "Project withdrawn August 19, 2025 after massive community opposition (5,500+ residents). Concerns about water pollution, location in groundwater well field, and energy costs. Led to nation's first citywide data center construction ban (one year moratorium).; Project Cumulus canceled; no power/investment applicable; Sources: https://www.stlmag.com/business/st-charles-data-center-town-hall/ https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737 https://www.datacenterdynamics.com/en/news/bernie-sanders-praises-residents-after-developers-shelve-planned-data-center-in-st-charles-missouri/ https://www.kcur.org/housing-development-section/2025-08-19/st-charles-data-center-secret-public-opposition https://spectrumnews1.com/oh/columbus/news/2025/08/20/withdrawn-data-center-project-developers-remain-committed",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Diode Ventures Harper Road Technology Park (Peculiar)",
    "state": "Missouri",
    "city": "Peculiar",
    "county": "Cass",
    "region": "South Kansas City Metro",
    "status": "canceled",
    "sponsors": "Diode Ventures",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 2100000.0,
    "powerCapacityMW": 214.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Up to 7 data center buildings, each 300,000 sq ft",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "City engaged Baker Tilly Municipal Advisors for financial advisory services related to the project with Diode reimbursing the city\u2019s fees; no publicly released city economic impact study, job projections, or tax-revenue model found in reviewed BOA/Planning Commission materials.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project faced substantial local opposition, a 100-day moratorium on data center applications, and ultimately a zoning code reversal removing data centers as a permitted use, leading to the project being described as blocked/canceled.",
    "notes": "Blocked by unanimous vote of Peculiar Board of Alderman after significant community opposition. Location: west side of Harper Road between 203rd and 211th Street near Evergy substation. Community group 'Don't Dump Data in Peculiar' organized opposition over noise, sight pollution, and property values.; Power estimated at $7M/MW; Sources: https://www.datacenterdynamics.com/en/news/peculiar-officials-in-missouri-remove-data-centers-from-ordinance-blocking-15bn-diode-project/ https://files.municipalone.com/peculiar-mo/PlanningCommissionPacket04-11-24112235040824AM1722.pdf https://files.municipalone.com/peculiar-mo/PlanningCommissionPacket05-09-24045106050624PM1722.pdf https://www.datacenterdynamics.com/en/news/peculiar-data-center-faces-opposition-in-missouri/",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "TAC Data Centers - Project Cardinal",
    "state": "Montana",
    "city": "Great Falls",
    "county": "Cascade County",
    "region": "North Central Montana",
    "status": "canceled",
    "sponsors": "Ardent TAC Data Centers; TAC Data Centers",
    "operators": "TAC Data Centers",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 1250000000.0,
    "sizeNotes": "Site plans suggest 20 single-story buildings totaling 500-600MW",
    "announcedDate": "2025-06-17",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Recirculating cooling technology (conceptual)",
    "certifications": null,
    "sustainabilityNotes": "Energy supply from NorthWestern Energy grid",
    "economicImpact_jobs": 150.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Project overview estimated $1\u2013$1.5B total investment, 1,500\u20132,000 construction jobs, and 150\u2013200 permanent jobs, but the project was reported withdrawn in Nov. 2025 so projected benefits did not materialize.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Project reported withdrawn due to power-timeline mismatch; transmission study timing and regulated market/transmission ownership cited as key constraints.",
    "notes": "The Electric reported on November 18, 2025 that the 2 million-square-foot hyperscale campus proposed for Great Falls was off. The project had been proposed as a $1.0 billion to $1.5 billion investment on a 569-acre site near AgriTech Park, with 500-600 MW of requested critical load, but GFDA said power would not meet the developer's timetable and TAC had let go of its land option. [Source: https://theelectricgf.com/2025/11/18/proposed-data-center-project-off/; Date: 2025-11-18]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Quantica Infrastructure - Big Sky Digital Infrastructure Campus",
    "state": "Montana",
    "city": "Broadview",
    "county": "Yellowstone County",
    "region": "South Central Montana",
    "status": "planned",
    "sponsors": "Quantica Infrastructure LLC; Big Sky Digital Infrastructure LLC; EnCap Investments L.P.",
    "operators": "Big Sky Digital Infrastructure LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1100.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "5,100-acre campus; phase 1 power ramps to 500 MW beginning in 2028, phase 2 adds 500 MW beginning in 2031, and the current plan totals 1,100 MW",
    "announcedDate": "2025-08-04",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Company says early planning shows water use would be minimal by industrial standards and for domestic purposes, not cooling; earlier materials said it was evaluating zero-water air cooling, deep aquifer wells, treated greywater, and direct-to-chip liquid cooling.",
    "certifications": null,
    "sustainabilityNotes": "Plans to build up to 1 GW of on-site renewable generation and battery energy storage",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Developer claims new property/business tax revenue for Yellowstone County, Broadview schools, and the state, but no quantified job counts or verified tax projections were identified in the cited sources (as of 2026-02-01).",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "County application not filed as of 2025-11-18; public concerns about rate impacts, grid capacity, water resources, and environmental effects; limited public-record documentation to date.",
    "notes": "Quantica announced on May 20, 2026 that it filed interconnection applications with NorthWestern Energy to expand power generation for its 1,100 MW Big Sky Campus, described as a 5,100-acre development about 30 miles north of Billings. The applications cover 7,235 MW of maximum additional generation capacity from renewable and firming generation plus battery storage; Quantica said it would be responsible for the cost and construction of the proposed additional generation, and that the first building is expected to be operational in 2029. [Source: https://quanticainfra.com/2026/05/20/quantica-files-interconnection-applications-to-expand-power-generation-for-its-big-sky-digital-infrastructure-campus/; Date: 2026-05-20]; QA 2026-07-19: Updated the rounded acreage and phased capacity description to the developer's current figures.; Sources: https://bigskydigitalinfra.com/faq/ https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/ https://quanticainfra.com/2025/08/04/quantica-infrastructure-introduces-big-sky-digital-infrastructure-as-its-flagship-development-platform-in-montana/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Meta Sarpy Data Center Campus",
    "state": "Nebraska",
    "city": "Papillion/Springfield",
    "county": "Sarpy County",
    "region": "Omaha Metropolitan Area",
    "status": "operational",
    "sponsors": "Meta Platforms, Inc.",
    "operators": "Meta Platforms, Inc.",
    "tenants": null,
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 320.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "9 buildings spanning over 4 million square feet across Papillion and Springfield",
    "announcedDate": "2017",
    "constructionStartDate": "2017",
    "expectedCompletionDate": "2024",
    "actualCompletionDate": "2019",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Water-efficient cooling technology; water is reused before discharge as wastewater; rainwater captured and infiltrated on site.",
    "certifications": null,
    "sustainabilityNotes": "Powered by 100% renewable energy through Rattlesnake Creek Wind Farm in Dixon, Nebraska",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Nebraska DED\u2019s 2017 announcement cited 100 jobs; Meta\u2019s 2021 update described 100+ operational jobs and construction employing hundreds (no numeric construction-job total given).",
    "incentives_type": "Infrastructure Support",
    "incentives_value": null,
    "challenges": "Air-quality permitting by Nebraska DEE/NDEE included public notice and comment opportunities; reviewed sources did not document organized opposition or litigation.",
    "notes": "1,300 skilled trade workers on site at peak construction. Supports over 300 operational jobs. Originally announced as Papillion Data Center, renamed Sarpy Data Center as it expanded into Springfield.; $1.5B total; 100+ jobs; operational since 2019; Raven Northbrook LLC; OPPD Rate 261M; QA 2026-07-18: Cleared unsupported power capacity while retaining Meta-supported campus area and investment.; Sources: https://datacenters.atmeta.com/2021/03/sarpy-expanding-by-nearly-1-million-square-feet/ https://www.datacenterdynamics.com/en/news/meta-to-expand-sarpy-data-center-in-nebraska/ https://nebraskapublicmedia.org/en/news/news-articles/facebook-expanding-huge-sarpy-county-data-center-campus-again/ https://datacenters.atmeta.com/wp-content/uploads/2023/08/23MET005-Economic-Impact-Report_FC-Final_RVS0803.pdf https://datacenters.atmeta.com/2022/07/keep-on-growing-sarpy-county/ https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/ https://www.windsystemsmag.com/conversation-with-pasquale-roselli/ https://www.nebraskalegislature.gov/FloorDocs/109/PDF/Transcripts/Natural/2026-02-12.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Switch CORE Campus Las Vegas",
    "state": "Nevada",
    "city": "Las Vegas",
    "county": "Clark County",
    "region": "Southern Nevada",
    "status": "expansion",
    "sponsors": "Switch; DigitalBridge; IFM Investors",
    "operators": "Switch",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 495.0,
    "itLoadMW": null,
    "investmentUSD": 3465000000.0,
    "sizeNotes": "11 operational data centers spanning over 2 million square feet",
    "announcedDate": null,
    "constructionStartDate": "2026-06",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Cooling towers documented in 2024 significant air permit revision materials.",
    "certifications": null,
    "sustainabilityNotes": "Air-permit materials for significant revisions reference adding emergency diesel generators and cooling towers, plus biodiesel fuel requirements (2024 proposed significant revision).",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Switch press release for the Las Vegas 10 data center (part of the Las Vegas campus build-out) reported nearly 1,000 construction workers (85% Nevadans). No independent, project-specific economic impact study located.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Public sources reviewed did not locate project-specific GOED abatement approvals, utility interconnection/grid upgrade requirements, or site-specific water/stormwater permits.",
    "notes": "Clark County commissioners approved zoning and development items for Switch's LAS 19 facility in the southwest Las Vegas/Enterprise area, generally east of Edmond Street and north of Warm Springs Road. The approved project is a roughly 56,000-square-foot building; Switch representatives said it would use closed-loop cooling with no daily water use beyond restrooms and kitchenettes, and commissioners added a condition for a Warm Springs Road sidewalk safety barrier contribution. [Source: https://www.fox5vegas.com/2026/06/18/clark-county-approves-switch-data-center-project-southwest-valley-after-public-opposition/; Date: 2026-06-17]; Sources: https://www.switch.com/las-vegas/ https://www.fox5vegas.com/2026/06/18/clark-county-approves-switch-data-center-project-southwest-valley-after-public-opposition/?outputType=amp https://www.switch.com/switch-core-campus-opens-las-vegas-10-data-center/ https://uploads2.craft.co/uploads/operating_source/document/928911/bb7d8d45d83cfd05.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Switch Citadel Campus (Tahoe Reno)",
    "state": "Nevada",
    "city": "Reno/Sparks",
    "county": "Storey County",
    "region": "Northern Nevada",
    "status": "expansion",
    "sponsors": "Switch; DigitalBridge; IFM Investors",
    "operators": "Switch",
    "tenants": "global e-commerce client; Fortune 100 semiconductor client; eBay",
    "totalSquareFeet": 1300000.0,
    "powerCapacityMW": 2000.0,
    "itLoadMW": null,
    "investmentUSD": 4550000000.0,
    "sizeNotes": "1,000+ acres with capacity for 7.2 million square feet of data center space at full build-out",
    "announcedDate": "2017-02-14",
    "constructionStartDate": "2020-11",
    "expectedCompletionDate": "2024-05",
    "actualCompletionDate": "2017-02",
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "100% renewable energy through Gigawatt 1, a 1 gigawatt solar energy project including the largest behind-the-meter solar plus battery project in the world. Campus includes 179 MW of behind-the-meter solar capacity.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Switch referenced job creation and economic investment in its 2020 expansion announcement, but no project-specific job or tax revenue figures were identified in the provided research.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Project-specific public records (abatement agreements, permits, utility filings) were not located in the provided research; multiple gaps were flagged for open-records requests.",
    "notes": "TAHOE RENO 1 opened in February 2017 with 1.3 million square feet and 130 MVA power capacity. Touted as world's largest data center campus. Tier 5 Platinum exascale data center facility.; Investment estimated at $7M/MW; Sources: https://switchdotcom.s3-sites.data.switch.com/media/one-sheets/COLO/Tahoe-Reno-2.pdf https://www.switch.com/switch-breaks-ground-on-second-and-third-tahoe-reno-data-centers-following-multi-megawatt-expansions-with-global-e-commerce-and-semiconductor-clients/ https://www.switch.com/switch-tahoe-reno-data-center-now-open/ https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_04042024-1188",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Apple Reno Data Center",
    "state": "Nevada",
    "city": "Reno",
    "county": "Washoe County",
    "region": "Northern Nevada",
    "status": "operational",
    "sponsors": "Apple",
    "operators": "Apple",
    "tenants": null,
    "totalSquareFeet": 1200000.0,
    "powerCapacityMW": 50.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Reno Technology Park at 21505 Technology Way, expanded to 1.2 million square feet",
    "announcedDate": "2010",
    "constructionStartDate": "2012",
    "expectedCompletionDate": "2012",
    "actualCompletionDate": "2017",
    "numberOfPhases": null,
    "purpose": "cloud; enterprise",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Project-specific water storage and distribution facilities largely for non-potable cooling water.",
    "certifications": "Alliance for Water Stewardship certification; USGBC TRUE zero-waste certification in 2024",
    "sustainabilityNotes": "Powered entirely by renewable energy using solar, geothermal, and fuel cells running on biogas. Agreement with NV Energy to build 200 MW solar farm by 2019.",
    "economicImpact_jobs": 41.0,
    "economicImpact_taxRevenue": 279000000.0,
    "economicImpact_notes": "2012 projections reported via AP: ~$343M economic activity over 10 years; ~41 full-time jobs plus ~200 contract employees. 2024 GOED expansion reporting: 10 new jobs and ~$279M projected new taxes over 10 years; no audited post-project evaluation located for actual job/tax outcomes.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": 62153275.0,
    "challenges": "Primary records for exact incentive terms, compliance milestones, and interconnection/renewables rate treatment (GOED minutes/agreements; PUCN dockets) were not located in accessible public records during this review; vote counts and full hearing minutes for key county meetings were not located; environmental permit records (NDEP and Washoe County Air Quality; stormwater coverage) were not located.",
    "notes": "Announced $1 billion expansion in 2017. Approved for $62.1 million in tax abatements in 2024, expected to create 10 jobs within five years. Whenever anyone calls Siri from California and Nevada, the Reno data center answers.; Power estimated from GOED 2024 filing: 440M kWh/yr renewable generation = ~50 MW avg load; Sources: https://www.apple.com/newsroom/2021/03/apples-four-point-seven-billion-green-bond-spend-is-helping-to-create-one-point-two-gigawatts-of-clean-power/ https://www.datacenterdynamics.com/en/news/apple-to-build-data-center-at-reno-technology-park/ https://www.nnbw.com/news/2019/feb/14/apple-finishes-reno-warehouse-announces-northern-n/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vantage Data Centers NV1 Campus",
    "state": "Nevada",
    "city": "Reno/Sparks",
    "county": "Storey County",
    "region": "Northern Nevada",
    "status": "under-construction",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 1100000.0,
    "powerCapacityMW": 224.0,
    "itLoadMW": 224.0,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "137 acres at Tahoe Reno Industrial Center, four multi-story data centers totaling more than 1 million square feet",
    "announcedDate": "2025-07",
    "constructionStartDate": "2023",
    "expectedCompletionDate": "2026-Q2",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": "LEED certification targeted",
    "sustainabilityNotes": "Closed-loop chiller system minimizes water usage, achieving low WUE. Expected to achieve LEED certification. Supports densities ranging from 360W to 720W per square foot for AI deployments.",
    "economicImpact_jobs": 10.0,
    "economicImpact_taxRevenue": 205500000.0,
    "economicImpact_notes": "Nevada GOED press release (Mar 21, 2024) lists 10 new jobs tied to a state abatement for Vantage Data Centers NV11, LLC. Vantage press release (Jul 15, 2025) states approximately 1,200 individuals across construction and ongoing operations (not split into construction vs permanent jobs).",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": 11531358.0,
    "challenges": "Limited public documentation located for project-specific Storey County zoning/entitlement approvals, GOED board documentation for a reported Nov 2024 abatement, NDEP full permit files, and utility interconnection/PPA details.",
    "notes": "Located at 100 & 200 Electric Avenue. More than 1,200 individuals to be employed across construction and ongoing operations. Vantage's eighth North American market and entry into Nevada. First two buildings fully leased before opening.; QA 2026-07-19: Retained 224 MW only as operator-disclosed critical IT load.; Sources: https://vantage-dc.com/fr/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/ https://ndep.nv.gov/uploads/documents/ap7374-4749-directors-review.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Tract Peru Shelf Technology Park",
    "state": "Nevada",
    "city": "Reno/Sparks",
    "county": "Storey County",
    "region": "Northern Nevada",
    "status": "under-construction",
    "sponsors": "Tract",
    "operators": "Tract; Fleet Data Centers",
    "tenants": "Unnamed AA- investment-grade tenant; Nvidia speculated in media but unconfirmed",
    "totalSquareFeet": null,
    "powerCapacityMW": 810.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "686 acres within Tahoe-Reno Industrial Center. Part of Tract's broader 2,200-acre, 2GW development plan.",
    "announcedDate": "2023-10",
    "constructionStartDate": "2024-04",
    "expectedCompletionDate": "2027-late",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Partnership with Silicon Ranch to develop utility-scale solar and battery projects exceeding 500 MW. Includes 1,100 acre feet of water rights.",
    "economicImpact_jobs": 270.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic impact study or project-specific job/tax projections identified in the provided research.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Limited project-specific primary-source documentation found in the provided research (incentives, county votes/permits, NDEP permits, and PUCN filings not located); follow-up with agency/county records is needed for confirmation.",
    "notes": "Groundbreaking in April/May 2024. Master-planned site designed to support hyperscale data center campuses. Includes NV Energy switch stations, new access roads, and wet utility infrastructure. Tract led by van Rooyen, founder of Cologix.; Investment estimated at $7M/MW; Sources: https://www.tract.com/project/peru-shelf/ https://www.tract.com/news/tract-breaks-ground-on-peru-shelf-technology-park-in-storey-county-nevada/ https://www.nnbw.com/news/2023/oct/18/tract-purchases-2200-acres-at-tric/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract South Valley Technology Park",
    "state": "Nevada",
    "city": "Reno/Sparks",
    "county": "Storey County",
    "region": "Northern Nevada",
    "status": "under-construction",
    "sponsors": "Tract",
    "operators": "Fleet Data Centers; SV RNO Property Owner 1 LLC",
    "tenants": "Unnamed AA- investment-grade tenant",
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 1215.0,
    "itLoadMW": 200.0,
    "investmentUSD": 4600000000.0,
    "sizeNotes": "1,500 acres located seven miles southeast along USA Parkway. Potential to accommodate up to seven distinct campuses.",
    "announcedDate": "2023-10",
    "constructionStartDate": "2026-05",
    "expectedCompletionDate": "2027-09",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Partnership with Silicon Ranch for utility-scale solar projects. Includes 1,100 acre feet of water rights at Peru Shelf and South Valley.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts, tax revenue projections, or economic impact study results were found in the cited public materials.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": 23350806.0,
    "challenges": "Project-specific incentives, permits, entitlements, job/tax projections, and interconnection/PPA terms were not identified in accessible public materials; several key project details remain undisclosed.",
    "notes": "Part of Tract's 2,200-acre portfolio in the greater Reno market. Designed to be a powerhouse with 1,200 MW capacity. Each campus tailored to facilitate cutting-edge technological advancements.; QA 2026-07-18: Confirmed distinct 1,215 MW site capacity and 200 MW initial critical IT load; removed a stale generic investment annotation.; Sources: https://www.tract.com/project/south-valley/ https://www.kolotv.com/2026/05/20/gov-lombardo-construction-companies-break-ground-2-million-sq-ft-data-center-storey-co/ https://fleetdatacenters.com/news/fleet-data-centers-announces-closing-of-upsized-3-8-billion-5-875-senior-secured-notes-offering-to-fund-hyperscale-facility-in-rapidly-growing-reno-hub/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Tract Silver Springs Data Center Park",
    "state": "Nevada",
    "city": "Silver Springs",
    "county": "Lyon County",
    "region": "Northern Nevada",
    "status": "planned",
    "sponsors": "Tract",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "1,060 acres with initial 700 MW currently under utility study",
    "announcedDate": "2025-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Developer states end-users are anticipated to use air-cooled technology and that water/sewer demand is expected to be minimal.",
    "certifications": null,
    "sustainabilityNotes": "Tract states that the project uses large setbacks and buffers, has studied potential environmental and cultural impacts, and received NDOT approval of a Traffic Impact Study. No PUE target, renewable-energy arrangement, certification, NEPA document, Nevada environmental impact statement, NDEP permit, or water-rights decision was located in the reviewed public sources.",
    "economicImpact_jobs": 270.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Tract's FAQ says the campus is anticipated to create approximately 270 permanent jobs at full build-out and generate significant tax revenue for Lyon County, the Lyon County School District, and Central Lyon Fire District. A comprehensive tax-generation analysis was described as in process, and no realized job count, tax receipt, or completed infrastructure-benefit outcome was located as of 2026-06-15.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Key open issues include no public evidence of construction start or operation, no located SSTP-specific building permit, phase completion, large-load electric-service agreement, PPA, final interconnection agreement, incentive award, quantified water demand, environmental permit, or water-rights decision as of 2026-06-15. Public concern in 2026 focused on water use, well protection, cooling technology, wastewater discharge, and incentive accountability. Regional power availability and transmission planning remain important context, but some 2026 GID and large-load proceedings concerned other projects rather than SSTP.",
    "notes": "Located at intersection of US 50 and USA Parkway, east of Reno. Adjacent to planned transmission line, long-haul fiber routes, major gas transmission line, and existing wet utility infrastructure. Brings Tract's Greater Reno portfolio to 12,500+ acres.; Investment estimated at $7M/MW; Sources: https://www.tract.com/news/tract-expands-its-greater-reno-portfolio-closing-on-1060-acres-in-silver-springs-nevada-following-successful-rezoning-and-development-agreement-with-lyon-county/ https://www.datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for-16gw-data-center-park/ https://www.lyon-county.org/AgendaCenter/ViewFile/Agenda/_04082025-1801",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "EdgeCore Reno Campus",
    "state": "Nevada",
    "city": "Reno/Sparks",
    "county": "Storey County",
    "region": "Northern Nevada",
    "status": "under-construction",
    "sponsors": "EdgeCore Digital Infrastructure; Partners Group",
    "operators": "EdgeCore Digital Infrastructure",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 216.0,
    "itLoadMW": 216.0,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "56-acre campus along USA Parkway at Tahoe-Reno Industrial Center",
    "announcedDate": "2023-08",
    "constructionStartDate": "2023-08",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": "LEED (focus/targeted)",
    "sustainabilityNotes": "Air-cooled design utilizing very little water with ultra-efficient close-looped chilled water system carrying WUE rating below 0.01 L/kWh.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts, tax revenue forecasts, or economic impact studies located in sources reviewed.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Limited project-specific public records located for incentives, zoning/entitlements, environmental permits, and utility interconnection/PUCN filings; recommended follow-up includes Storey County planning records, GOED agendas/minutes, NDEP permit applications/approvals, and NV Energy/PUCN filings.",
    "notes": "250 miles east of Silicon Valley with 3-6 milliseconds round trip latency. Lowers total cost of ownership by 30% compared to Bay Area. Onsite dedicated power substation fed from NV Energy. EdgeCore built its own fiber optic cable route. Acquired by Partners Group in November 2022 with $1.2 billion investment.; Sources: https://edgecore.com/locations/reno-data-center https://edgecore.com/resources/thought-leadership/reno-the-ai-booms-emerging-western-hub https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-development-of-reno-nevada-data-center-campus https://www.partnersgroup.com/~/media/Files/P/Partnersgroup/Universal/202409-partners-group-building-the-digital-infrastructure-of-the-future.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "TerraScale Energos Reno",
    "state": "Nevada",
    "city": "Fernley",
    "county": "Lyon County",
    "region": "Northern Nevada",
    "status": "planned",
    "sponsors": "TerraScale",
    "operators": "TerraScale",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 100.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "3,700 acres east of Reno, envisioned as nation's first carbon-free industrial park",
    "announcedDate": "2020-12",
    "constructionStartDate": "2021",
    "expectedCompletionDate": "2022-09",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; enterprise",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "500MW of on-site renewable power generation combining solar, wind, and geothermal. Fully carbon-neutral, off-grid facility with 100% carbon emission-free via on-site power. Behind-the-meter renewable energy generation/storage capable of backup and primary power.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Projected ~50 jobs in 3\u20135 years, with potential for 300\u2013400+ jobs as development and partners grow; no project-specific tax revenue estimates located.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Public reporting conflicts on whether the project is in Victory Logistics District (Fernley/Lyon County area) versus Churchill County along the Reno\u2013Sparks I-80 corridor; no public records confirming construction start, permitting approvals, interconnection agreements, or operational status were located in the sources reviewed.",
    "notes": "Located at Victory Logistics District near Fernley in Lyon County. Described as the largest industrial development in the U.S. powered by hybrid renewable energy. Features proprietary liquid metal battery technology through partnership with Ambri.; QA 2026-07-19: Corrected the county, cleared mixed-use development capex from project investment, and found no current construction evidence after the original 2022 target passed.; QA note reconciliation 2026-07-19: Aligned the narrative location with the corrected county field.; Sources: https://www.prnewswire.com/news-releases/terrascale-selects-victory-logistics-district-as-location-for-data-center-project-301281270.html https://northernnvnow.com/fusion_element/20201-latest-video-pre-economic-update/ https://www.ktvu.com/news/clean-energy-project-in-nevada-desert-could-be-worth-3b",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "CoreWeave NEST Campus",
    "state": "New Jersey",
    "city": "Kenilworth",
    "county": "Union County",
    "region": "Northern New Jersey",
    "status": "under-construction",
    "sponsors": "CoreWeave; Onyx Equities; Machine Investment Group",
    "operators": "CoreWeave",
    "tenants": "CoreWeave",
    "totalSquareFeet": 280000.0,
    "powerCapacityMW": 250.0,
    "itLoadMW": null,
    "investmentUSD": 1800000000.0,
    "sizeNotes": "Former Merck pharmaceutical lab and manufacturing building. Onyx venture spending over $50 million on site preparation.",
    "announcedDate": "2024-10",
    "constructionStartDate": "2024-10",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "low-water closed-loop cooling system",
    "certifications": null,
    "sustainabilityNotes": "Local infrastructure reporting described low-water closed-loop cooling and a quieter-than-highway-traffic sponsor position, but the underlying engineering report or permit record was not found. No NEPA or formal EIS was found.",
    "economicImpact_jobs": 143.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No verified economic impact study, job numbers, or local fiscal projections were located in public records.",
    "incentives_type": "Income Tax Credit",
    "incentives_value": 250000000.0,
    "challenges": "No verified public record found of local opposition, petitions, lawsuits, or organized support specific to the CoreWeave data center conversion at Building 11 NEST in the accessible sources reviewed.",
    "notes": "CoreWeave's first data center in New Jersey despite being headquartered in the state. Converted from pharmaceutical facility. Subsequently purchased building for $322 million after initial lease. PSE&G readying electrical infrastructure.; Power estimated at $7M/MW; Sources: https://www.prnewswire.com/news-releases/coreweave-signs-280-000-sf-lease-at-onyx-and-machines-northeast-science--technology-center-in-kenilworth-302289222.html https://www.njeda.gov/wp-content/uploads/2025/12/November-12-2025-EDA-Board-book.pdf https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Jupiter (Stargate Santa Teresa Campus)",
    "state": "New Mexico",
    "city": "Santa Teresa",
    "county": "Do\u00f1a Ana County",
    "region": "Southern New Mexico (El Paso Border Region)",
    "status": "under-construction",
    "sponsors": "BorderPlex Digital Assets; STACK Infrastructure; Oracle; Bloom Energy",
    "operators": "Oracle Cloud Infrastructure",
    "tenants": "OpenAI; Oracle",
    "totalSquareFeet": 3000000.0,
    "powerCapacityMW": 2450.0,
    "itLoadMW": null,
    "investmentUSD": 50000000000.0,
    "sizeNotes": "Four data center buildings on 1,400 acres. Initial $50 billion over 5 years, up to $165 billion over 30 years. Part of Stargate initiative with $500 billion total commitment.",
    "announcedDate": "2025-08-26",
    "constructionStartDate": "Late 2025",
    "expectedCompletionDate": "2026 (Phase 1)",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "ai-ml; hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Closed-loop water recycling system requiring 10M gallons initial fill and 20,000 gallons daily. On-site microgrid with power generation and battery energy storage system. Partnership with NMSU on water management and potential desalination project with EPCOR. $50M commitment to strengthen drinking water and wastewater systems in Do\u00f1a Ana County.",
    "economicImpact_jobs": 340.0,
    "economicImpact_taxRevenue": 12000000.0,
    "economicImpact_notes": "CDA commits to at least 340 permanent jobs at an average wage of $100,000 and at least 9,000 temporary construction jobs. MOU contemplates 30 years of PILOT payments ($12M/year, $360M total) alongside abatements and gross receipts tax relief via NTTCs.",
    "incentives_type": "Property Tax Abatement; Pilot; Sales Tax Exemption; Grant; Infrastructure Support; Cba; Other",
    "incentives_value": null,
    "challenges": "Air quality permitting reported as still in progress with incomplete determinations on early applications; water availability concerns in a drought-prone region; lawsuit challenging the LEDA award and approvals; some county agenda packets/minutes not accessible in the research environment.",
    "notes": "Oracle, BorderPlex Digital Assets, and Bloom Energy announced that Project Jupiter will use up to 2.45 GW of Bloom fuel-cell capacity to fully power the AI data center campus, replacing the previously planned gas turbines and diesel generators. Oracle said the fuel-cell design would reduce NOx emissions by about 92% versus the prior gas-turbine plan and use closed-loop non-evaporative cooling to minimize day-to-day water use. [Source: https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/; Date: 2026-04-27]; Sources: https://www.abqjournal.com/business/pacheco-how-ai-is-sparking-growth-in-americas-border-region/2940176 https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-reinforces-responsible-development-principles-through-project-jupiter-in-new-mexico/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Meta Los Lunas Data Center Campus",
    "state": "New Mexico",
    "city": "Los Lunas",
    "county": "Valencia County",
    "region": "Central New Mexico (Albuquerque Metro)",
    "status": "expansion",
    "sponsors": "Meta Platforms (Facebook)",
    "operators": "Meta Platforms (Facebook)",
    "tenants": null,
    "totalSquareFeet": 3800000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 2500000000.0,
    "sizeNotes": "Campus on 750 acres. Seven buildings currently, with 2025 expansion adding two AI-focused buildings for $800 million. Total investment including expansions reaches $2.2 billion.",
    "announcedDate": "2016",
    "constructionStartDate": "2016",
    "expectedCompletionDate": "End of 2025 (current phase)",
    "actualCompletionDate": "2019",
    "numberOfPhases": 3.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Water-efficient cooling with water reused multiple times before discharge.",
    "certifications": null,
    "sustainabilityNotes": "Next-generation facilities designed for AI and machine learning applications - first of their kind in Meta's portfolio dedicated to AI workloads.",
    "economicImpact_jobs": 400.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reported January 2025: over 1,100 construction workers at peak; over 180 operational roles at the time; anticipated 400 operational roles at full build-out.",
    "incentives_type": "Property Tax Abatement; Pilot; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Project-specific executed IRB lease/PILOT terms, zoning approvals, utility contracts/interconnection agreements, and detailed grid upgrade requirements for the current expansion were not located in reviewed sources.",
    "notes": "Approved by Los Lunas Village Council with industrial revenue bonds up to $7.5 billion per series to support expansion. Currently employs ~300 full-time Meta employees and ~1,100 construction workers. Expansion will add ~30 new full-time jobs. Initial phases used $30 billion in IRBs, $10M LEDA funding, and up to $1.6M annual GRT reimbursement. Construction began in 2016 with 1,100 skilled trade workers at peak. March 2026 report said the Los Lunas Village Council approved a project partnership and tax incentives for Meta's expansion, requiring Meta to invest $350 million in the expansion by the 10th year of the agreement; Meta had acquired nearly 500 acres adjacent to the existing data center late in 2025. [Source: https://www.kob.com/news/top-news/report-meta-closer-to-expanding-data-center-in-los-lunas/; Date: 2026-03-19]; Sources: https://datacenters.atmeta.com/asset/los-lunas/ https://www.pnm.com/documents/28767612/40780649/Case-No-23-00251-UT.pdf/871bc00d-2805-2796-91e3-06376b6c0326?t=1691612696972 https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/ https://www.prc.nm.gov/wp-content/uploads/2025/07/25-00048-UT-Approved-Form-of-Notice-07-03-2025.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Zenith Volts Roswell Data Center",
    "state": "New Mexico",
    "city": "Roswell",
    "county": "Chaves County",
    "region": "Southeast New Mexico",
    "status": "planned",
    "sponsors": "Zenith Volts Corporation",
    "operators": "Zenith Volts Corporation",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1250.0,
    "itLoadMW": null,
    "investmentUSD": 11700000000.0,
    "sizeNotes": "Site spans 8,500 acres, with 300-acre data center footprint. Designed to support 1.25 gigawatts or more of power capacity. 250-acre battery energy storage system (BESS).",
    "announcedDate": "2025-08",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "November 2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Geothermal cooling (geothermal cooling loops).",
    "certifications": null,
    "sustainabilityNotes": "On-site solar generation, natural gas generators for backup, modular solar-thermal hybrid systems, 250-acre battery energy storage system (BESS), and geothermal cooling.",
    "economicImpact_jobs": 140.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Developer cited \"tens of millions of dollars\" in local tax revenue for Chaves County and New Mexico over five years (no specific figure provided).",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Available sources summarize approval and project features but do not document public hearing testimony, petitions, or protests; a linked local newspaper article was not accessible via the county post.",
    "notes": "Approved by Chaves County Commission in August 2025 after 8 months of planning. Located 20 miles south of Roswell. Zenith Volts is headquartered in Cheyenne, Wyoming. Company founded earlier in 2025, and this is their first data center project. Designed for AI, cloud computing, and high-performance workloads. Currently engaging with technology companies, cloud service providers, and AI innovators as anchor partners.; QA 2026-07-19: Retained disclosed scale and cleared unsupported investment.; Sources: https://www.prnewswire.com/news-releases/zenith-volts-corp-secures-county-approval-for-scalable-data-center-20-miles-south-of-roswell-nm-targeting-operation-by-november-2027-302537746.html https://www.abqjournal.com/business/chaves-county-approves-data-center-project-amid-rising-demand-for-computing-infrastructure/2896546 https://www.datacenterdynamics.com/en/news/zenith-obtains-planning-approval-for-124gw-data-center-project-in-roswell-new-mexico/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Stream Data Centers STAMP Campus",
    "state": "New York",
    "city": "Alabama",
    "county": "Genesee County",
    "region": "Western New York",
    "status": "planned",
    "sponsors": "Stream Data Centers; Apollo Global Management",
    "operators": "Stream Data Centers",
    "tenants": "Unnamed Fortune 50 company expected to lease/use 100% of the space",
    "totalSquareFeet": 900000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 19460000000.0,
    "sizeNotes": "Includes 600MW substation; project seeking expansion beyond initial scope",
    "announcedDate": "2026-02-18",
    "constructionStartDate": "TBD",
    "expectedCompletionDate": "TBD",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "air-cooled technology with no consumptive cooling-water use",
    "certifications": null,
    "sustainabilityNotes": "No specific sustainability features disclosed",
    "economicImpact_jobs": 125.0,
    "economicImpact_taxRevenue": 18000000.0,
    "economicImpact_notes": "Earlier (Mar 2025) GCEDC release cited projected revenues of ~$218.4M over 20 years; 2026 project summary also notes PILOT/Host payments and ongoing local/state sales tax from electricity (~$18M annually).",
    "incentives_type": "Pilot; Sales Tax Exemption; Other",
    "incentives_value": 800715000.0,
    "challenges": "Project scope expanded between the March 2025 announcement and the January 2026 revised application; as of January 2026 the project remained in SEQR and local site plan review with key zoning details, utilities/rate arrangements, and water withdrawal specifics not identified in reviewed materials.",
    "notes": "Revised GCEDC SEQR application dated February 18, 2026 describes Project Double Reed as a 2.2 million-square-foot campus with three two-story buildings on 90 permanent development acres plus 40 temporary construction-logistics acres, approximately 500 MW of utility power, 12 emergency diesel generators, and 120+ to 125 permanent jobs. Data Center Dynamics reported on March 9, 2026 that GCEDC said the revised application increased capital investment to $19.46 billion, up from earlier $6.3 billion and $11.81 billion figures. Sponsors identified as Stream Data Centers and Apollo Global Management. [Source: https://www.gcedc.com/file-library/100319/STREAMUSDataCentersLLC.SEQRDevelopmentApplication.2.18.26.II.ProjectDescription.pdf | https://www.datacenterdynamics.com/en/news/stream-ups-planned-investment-in-new-york-campus-to-1946-billion/; Date: 2026-02-18; 2026-03-09]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Niagara Digital Campus",
    "state": "New York",
    "city": "Niagara Falls",
    "county": "Niagara County",
    "region": "Western New York",
    "status": "planned",
    "sponsors": "Niagara Falls Redevelopment (NFR); Urbacon Data Centre Solutions",
    "operators": "Niagara Falls Redevelopment",
    "tenants": null,
    "totalSquareFeet": 1232715.0,
    "powerCapacityMW": 140.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Nine buildings across 53 acres in five phases",
    "announcedDate": "2021",
    "constructionStartDate": "TBD",
    "expectedCompletionDate": "TBD",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No specific sustainability features disclosed",
    "economicImpact_jobs": 550.0,
    "economicImpact_taxRevenue": 414900000.0,
    "economicImpact_notes": "MRB Group economic/fiscal impact study (Mar 2025) projects 20-year total tax revenue of $414.9M, 19,238 job-years, and $1.66B in earnings; $1.5B investment over 10 years. Projections only; project remains planned.",
    "incentives_type": "Property Tax Abatement; Pilot; Cba; Other",
    "incentives_value": null,
    "challenges": "Zoning/text-amendment process for HEUL; conflict with city land-use plans; eminent domain dispute with the City; noise restriction concerns; lack of publicly available approvals and environmental review documents as of Feb 1, 2026.",
    "notes": "140+ acre site downtown Niagara Falls; 5,600 construction jobs, 550 permanent jobs; $3.76M annual tax revenue potential; facing eminent domain dispute with city over 11 acres; partnership with Toronto-based Urbacon; Sources: https://niagaradigitalcampus.com/wp-content/uploads/2024/10/NFR-PUD-Application-Part-I.pdf https://niagaraexpress.town.news/g/niagara-falls-ny/n/278691/nfr-makes-case-urbacon https://niagarafallsreporter.com/niagara-falls-redevelopment-is-taking-the-next-steps-on-a-1-5-billion-plan-to-construct-a-massive-data-center-campus-in-the-city-of-niagara-falls/ https://niagaradigitalcampus.com/wp-content/uploads/2023/08/NFR-Presentation-08032023-Website.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Digital Realty New York Portfolio",
    "state": "New York",
    "city": "New York",
    "county": "New York County",
    "region": "New York City",
    "status": "operational",
    "sponsors": "Digital Realty",
    "operators": "Digital Realty",
    "tenants": "Oxford Quantum Circuits (OQC); NVIDIA",
    "totalSquareFeet": 1430000.0,
    "powerCapacityMW": 143.0,
    "itLoadMW": null,
    "investmentUSD": 1001000000.0,
    "sizeNotes": "NYC1 (60 Hudson): 148k sq ft; NYC2 (111 8th Ave): 148k sq ft; NYC3 (32 6th Ave): 72k sq ft",
    "announcedDate": null,
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; cloud; edge",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Cooling towers (NYC registration/maintenance framework noted; project-specific configuration not fully documented).",
    "certifications": null,
    "sustainabilityNotes": "NYC2 features quantum computing integrated with NVIDIA-accelerated AI",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts, tax revenue projections, or third-party economic impact study was located for the portfolio definition used in the project database.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Limited public transparency on project-specific incentives, utility arrangements, and economic impact metrics; much of the available evidence is administrative DOB permitting for upgrades within existing buildings.",
    "notes": "60 Hudson is world's premier carrier hotel; 111 8th Avenue is third largest building in Manhattan; serves 550+ customers with 335+ carriers; $7B JV with Blackstone announced in 2024; Power estimated at 100 W/sqft from 1.43M sqft; investment at M/MW; Sources: https://www.digitalrealty.com/data-centers/americas/new-york https://www.digitalrealty.com/data-centers/americas/new-york/jfk12 https://www.sec.gov/Archives/edgar/data/1297996/000155837025001424/dlr-20241231x10k.htm",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services (AWS) Richmond County Campus",
    "state": "North Carolina",
    "city": "Richmond County",
    "county": "Richmond County",
    "region": "Southeast North Carolina",
    "status": "under-construction",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 1600.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "800-acre campus with 20 buildings, each approximately 200,000-225,000 sq ft. Largest single capital project in North Carolina history.",
    "announcedDate": "2025-06",
    "constructionStartDate": "2025-10-31",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Outside-air cooling for about 93% of the year; water anticipated for less than 7% of the year",
    "certifications": null,
    "sustainabilityNotes": "AWS committed to sustainability practices",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Announcement cited at least 500 direct jobs; local economic development materials referenced thousands of construction jobs (not quantified). Amazon also announced a 150000 community fund for local grants.",
    "incentives_type": "Grant; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Primary-source gaps: executed county incentive agreement/clawbacks, planning & zoning records, environmental permits, and utility interconnection/grid-upgrade filings were not found in accessible records during this research.",
    "notes": "Will create 500 jobs. Located 80 miles east of Charlotte.; Power estimated at $7M/MW; Sources: https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond https://www.wunc.org/2026-06-29/public-hearing-planned-for-amazon-and-duke-energy-data-center-project-in-richmond-county https://www.commerce.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure https://richmondnced.com/aws/ https://www.wral.com/news/local/why-one-north-carolina-county-said-yes-to-amazon-10-billion-dollar-data-center-july-2026/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft Catawba County Campus",
    "state": "North Carolina",
    "city": "Multiple locations",
    "county": "Catawba County",
    "region": "Western North Carolina",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 720.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Four data centers across 687 acres in Conover (219 acres), Hickory (176 acres), and Maiden (292 acres)",
    "announcedDate": "2022",
    "constructionStartDate": "2024-03",
    "expectedCompletionDate": "2034",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Public sources reviewed in the research did not identify specific environmental permits, water use approvals, or a NEPA/state EIS; additional records (NC DEQ permits, local stormwater/erosion approvals) were identified as gaps.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Announcement cited 1.0B USD investment and 50 jobs; project remains under construction and no realized tax revenue reports or post-implementation economic impact studies were identified in the reviewed sources.",
    "incentives_type": "Grant; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Key public-record gaps noted in the research include executed incentive agreements/resolutions (including any clawbacks), municipal zoning and permitting records (votes, case files, permit numbers), NC DEQ environmental permits, and utility/interconnection filings and any grid upgrade requirements.",
    "notes": "Four data centers to be built over 10 years. Will create at least 50 jobs. Part of Western North Carolina cloud cluster with Google, Apple, and Meta.; B announced; 50 jobs; multi-site Conover/Hickory/Maiden; 10-year performance-based grants; under construction; 488 MW confirmed; B; 4 data centers; Conover/Hickory/Maiden; QA 2026-07-19: Cleared unsupported aggregate IT load while retaining the disclosed minimum investment and four-facility plan.; Sources: https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/ https://local.microsoft.com/communities/americas/north-carolina/ https://www.datacenterfrontier.com/cloud/article/21437740/microsoft-plans-1-billion-campus-in-north-carolina-cloud-cluster https://www.deq.nc.gov/mitigation-services/document-management-library/administration/miscellaneous-documents/deq-dms-annual-report-legislative-2024/open https://local.microsoft.com/blog/stover-datacenter-construction-update/ https://www.aterio.io/blog/microsoft-catawba-county-810mw-data-center-restart-north-carolina",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Google Lenoir Data Center",
    "state": "North Carolina",
    "city": "Lenoir",
    "county": "Caldwell County",
    "region": "Western North Carolina",
    "status": "expansion",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 337000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Total investment exceeds $1.2 billion since 2007. Potential $600M expansion planned.",
    "announcedDate": "2026-03-13",
    "constructionStartDate": "2007",
    "expectedCompletionDate": "2028-03",
    "actualCompletionDate": "2007",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Google voluntarily contributing $6.8M for water infrastructure",
    "economicImpact_jobs": 210.0,
    "economicImpact_taxRevenue": 37000000.0,
    "economicImpact_notes": "JDIG-era projections referenced up to 210 jobs, ~$1.06B gross state product impact, and net state revenue benefit estimated at $37M over the grant period; later local reporting noted skepticism that promised job numbers materialized.",
    "incentives_type": "Grant; Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": 265000000.0,
    "challenges": "Unclear final zoning/permitting record in available online sources; JDIG incentive reportedly withdrawn/not executed; community concerns reported about job delivery and traffic impacts tied to road closure near the site.",
    "notes": "Google announced a new two-year $1 billion investment in North Carolina to grow data center infrastructure in Lenoir, plus related energy-efficiency and community commitments. The source did not disclose added MW. [Source: https://www.cityoflenoir.com/m/newsflash/Home/Detail/594; Date: 2026-03-17]; QA 2026-07-19: Retained the current $1B investment announcement and cleared modeled power capacity.; Sources: https://www.cityoflenoir.com/m/newsflash/home/detail/594 https://www.datacenterdynamics.com/en/news/google-pledges-1bn-investment-in-north-carolina-data-centers/ https://news.duke-energy.com/releases/duke-energy-google-team-up-on-solar-power-project-in-n-c https://www.datacenters.google/locations/north-carolina/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Apple Maiden Data Center",
    "state": "North Carolina",
    "city": "Maiden",
    "county": "Catawba County",
    "region": "Western North Carolina",
    "status": "operational",
    "sponsors": "Apple",
    "operators": "Apple",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 714.0,
    "itLoadMW": null,
    "investmentUSD": 4175000000.0,
    "sizeNotes": "Four buildings totaling approximately 1 million sq ft across 465+ acres. Latest expansion adds 237,600 sq ft.",
    "announcedDate": "2009",
    "constructionStartDate": "2009",
    "expectedCompletionDate": "2010",
    "actualCompletionDate": "2010-06",
    "numberOfPhases": 3.0,
    "purpose": "hyperscale; enterprise",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Part of Apple's commitment to sustainability and renewable energy",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "2009 commitment: $1B investment over 10 years; 50 direct jobs; ~250 indirect permanent jobs; state analysis cited 3,000+ construction-related jobs. Later local economic development reporting stated Apple invested nearly $3B and created 400+ permanent on-site jobs within ~7 years.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Primary local planning records (planning commission minutes, variance decisions, explicit zoning classification/conditional use findings) were not located in available online archives during this pass; a referenced 2021 incentive extension document could not be accessed; publicly indexed NC DEQ permit files (air permits for generators, NPDES/stormwater IDs) were not found in the reviewed sources.",
    "notes": "Opened June 2010. Located at 5977 Startown Road. Employs approximately 400 people. Part of Apple's $500 billion U.S. expansion plan announced in 2025.; Power estimated at $7M/MW; Sources: https://www.commerce.nc.gov/news/press-releases/gov-perdue-welcomes-apple-north-carolina https://techcrunch.com/2010/07/20/apple-data-center/ https://www.datacenterdynamics.com/en/news/apple-to-invest-175m-in-expanding-north-carolina-data-center/ https://www.apple.com/newsroom/2025/08/apple-increases-us-commitment-to-600-billion-usd-announces-ambitious-program/",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "WhiteFiber NC-1 Madison Data Center",
    "state": "North Carolina",
    "city": "Madison",
    "county": "Rockingham County",
    "region": "Piedmont Triad",
    "status": "under-construction",
    "sponsors": "WhiteFiber",
    "operators": "WhiteFiber",
    "tenants": "Nscale",
    "totalSquareFeet": 946586.0,
    "powerCapacityMW": 40.0,
    "itLoadMW": 24.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "96-acre campus. 24MW initial capacity scalable to 200MW. Tier 3 facility.",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": "2025-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": "Tier 3 standards targeted for retrofit",
    "sustainabilityNotes": "Public materials reviewed do not quantify water demand or identify cooling technology.",
    "economicImpact_jobs": 60.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public statements cite 60+ jobs with average wages of about $67,000.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Limited availability of primary records in this research pass (no project-specific incentive agreements, zoning/permitting files, or environmental permit records located).",
    "notes": "Purpose-built for AI and high-density workloads. Located on former Unifi building site on Island Drive. Will create more than 60 jobs. Within 100 miles of Charlotte, Raleigh-Durham, and Winston-Salem.; Sources: https://www.whitefiber.com/blog/nc-1-data-center https://www.rockinghamcountync.gov/news/6491 https://www.datacenterdynamics.com/en/news/nscale-agrees-865m-deal-for-40mw-of-space-at-whitefiber-data-center-in-north-carolina/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "PowerHouse Data Centers Charlotte Campus",
    "state": "North Carolina",
    "city": "Charlotte",
    "county": "Mecklenburg County",
    "region": "Greater Charlotte",
    "status": "under-construction",
    "sponsors": "PowerHouse Data Centers; Town Lane",
    "operators": "PowerHouse Data Centers",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 3500000000.0,
    "sizeNotes": "122-acre campus along University City Boulevard. 15MW bridging power available Q4 2026, with additional substation to deliver 500MW total.",
    "announcedDate": "2024",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Advanced cooling solutions with heavy-load-ready roofs to support cooling towers; reported city-staff figure said one data center under construction near University Place could use up to 1.2 million gallons per day during summer.",
    "certifications": null,
    "sustainabilityNotes": "Partnership with Duke Energy to deliver >50% renewable power utilizing nuclear power generation",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Petitioner claims include average $134,000 salary and 15\u201330 employees per data center building, but no verified economic impact study or tax revenue projections were located in public filings.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Petitioner community meeting on 2023-07-10 had 9 attendees. Concerns included waterways/wildlife impacts, power reliability/outages, 'radiation' and waste/battery issues, and construction traffic/road closures; no lawsuits or formal protests identified in the public record during this research.",
    "notes": "Joint venture between Town Lane and PowerHouse. Designed for advanced hyperscale and AI-driven applications. Features advanced cooling systems and flexible powered shells.; Investment estimated at $7M/MW; Sources: https://www.powerhousedata.com/data-center/powerhouse-charlotte https://www.datacenterdynamics.com/en/news/powerhouse-acquires-120-acres-in-charlotte-north-carolina-for-300mw-campus/?trk=public_post_main-feed-card-text https://charlottenc.legistar.com/View.ashx?GUID=6FBD42FF-8001-4787-96C2-22080849961A&ID=1063568&M=M",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Compass Datacenters Statesville Campus",
    "state": "North Carolina",
    "city": "Statesville",
    "county": "Iredell County",
    "region": "Greater Charlotte",
    "status": "announced",
    "sponsors": "Compass Datacenters",
    "operators": "Compass Datacenters",
    "tenants": null,
    "totalSquareFeet": 1340000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "330-340 acre campus. Five buildings totaling 1.34 million sq ft planned.",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Air-cooled / non-water cooling; possible hybrid closed-loop cooling filled outside the utility provider's system",
    "certifications": null,
    "sustainabilityNotes": "Compass said backup generators would use hydrotreated vegetable oil fuel and run only for periodic testing or power-failure events. Stormwater would use on-site quantity and quality controls under local, state, and federal rules.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Compass told residents employment would be about 20 to 40 employees per building across up to five buildings, generally above county-average income; tax revenue amounts were not yet quantified.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Substantial community opposition over rural character, noise, emissions, water, groundwater, property values, traffic, cyber/security, schools, and city approval of land outside city limits. No litigation, administrative appeal, cancellation, or formal delay news specific to the campus was located through June 15, 2026.",
    "notes": "Located on Stamey Farm Road off Interstate 40. Dallas-based developer. Statesville City Council unanimously approved project despite local opposition. Previously farmland.; Power estimated at 100 W/sqft from 1.34M sqft; investment at M/MW; Sources: https://assets.locable.com/pdfs/8869/attachments-original-1756311457-PlanningBoardMtg_CLT_8.26.25-1.pdf?1756311457= https://www.datacenterdynamics.com/en/news/compass-datacenters-proposes-333-acre-campus-in-statesville-north-carolina/ https://www.iredellfreenews.com/news-features/2025/breaking-news-statesville-council-unanimously-approves-rezoning-request-for-massive-data-center/ https://www.iredellfreenews.com/news-features/2025/statesville-planning-board-votes-to-support-rezoning-for-compass-data-centers-project-despite-vocal-opposition/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Mooresville Technology Park",
    "state": "North Carolina",
    "city": "Mooresville",
    "county": "Iredell County",
    "region": "Greater Charlotte",
    "status": "canceled",
    "sponsors": "Tract",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 30000000000.0,
    "sizeNotes": "Proposed 400-acre campus. 1.5 million sq ft at full build-out. Never developed.",
    "announcedDate": "2024",
    "constructionStartDate": "2028",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No formal environmental review, NEPA review, state environmental impact statement, or state-level environmental permit was located. Conditional-zoning materials contemplated later stormwater review, a sound study before building permits, and traffic mitigation before the first building permit, but the project was withdrawn before those approvals.",
    "economicImpact_jobs": 195.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "195-277 permanent jobs ($100K-125K avg salary). ~1,000 construction jobs. Application withdrawn Aug 2025.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Application withdrawn Aug 2025 due to community opposition and rezoning denial. Dale Earnhardt family land dispute.",
    "notes": "Project withdrawn August 2025. Would have been located on 400 acres owned by Dale Earnhardt's widow Teresa Earnhardt along Patterson Farm Road and Coddle Creek. Colorado-based Tract founded by former Cologix CEO Grant van Rooyen. Faced significant community opposition and transparency concerns.; QA 2026-07-18: Removed a stale generic power-estimate annotation from the canceled project.; Sources: https://www.datacenterdynamics.com/en/news/tract-plans-400-acre-data-center-park-outside-charlotte-north-carolina/ https://www.wsoctv.com/news/local/mooresville-commissioners-set-deny-rezoning-30-billion-data-center/2P4YPH5WS5CS7M77II5UDDJYKU/ https://www.wccbcharlotte.com/2025/08/13/data-center-developer-pulls-out-of-mooresville-after-pushback-from-residents/ https://www.iredellfreenews.com/news-features/2025/residents-raise-concerns-about-proposed-data-center-ask-mooresville-commissioners-to-delay-vote-on-rezoning-request/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Natelli Investments New Hill Digital Campus (Wake County)",
    "state": "North Carolina",
    "city": "New Hill",
    "county": "Wake County",
    "region": "Research Triangle",
    "status": "canceled",
    "sponsors": "Natelli Investments LLC",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 800000.0,
    "powerCapacityMW": 250.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "89-acre site on Shearon Harris Road. Six data center buildings planned. Energy demand equivalent to 10,000 homes.",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Cooling using treated wastewater (reclaimed water) from the Western Wake Regional Water Reclamation Facility; peak use up to ~1 MGD with evaporative losses",
    "certifications": null,
    "sustainabilityNotes": "Developer materials state cooling water would be treated wastewater; about two-thirds recycled back to the treatment facility (implying roughly one-third evaporates).",
    "economicImpact_jobs": 275.0,
    "economicImpact_taxRevenue": 13500000.0,
    "economicImpact_notes": "Developer site claims 5,800 construction jobs, 275 direct jobs, $1B in economic activity, and $13.5M in combined annual tax revenue; developer FAQ cites a third-party study summary with ~3,000 construction jobs and 100 direct operational jobs (figures differ; no independent verification located in reviewed sources).",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Power capacity appears not finalized publicly (reported as 250 MW campus vs a 300 MW request to Duke Energy); project requires annexation, rezoning, and UDO text amendment and remains under local review with organized community opposition and pending generator permitting and other NCDEQ approvals.",
    "notes": "Canonical CSV row lists the 250 MW New Hill Digital Campus as planned; Natelli withdrew the Apex/New Hill proposal after local opposition, leaving no active data center applications in Apex as of the March 2026 report. [Source: https://www.datacenterdynamics.com/en/news/developer-withdraws-proposal-for-250mw-data-center-in-apex-north-carolina/; Date: 2026-03-06]; QA 2026-07-18: Corrected project capacity to 250 MW and cleared unsupported modeled investment.; Sources: https://newhilldigitalcampus.com/faqs/ https://www.wral.com/news/local/developer-plans-data-storage-facility-apex-sep-2025/ https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/ https://indyweek.com/news/business/development/developer-files-plans-for-digital-campus-in-western-wake/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Applied Digital Polaris Forge 2",
    "state": "North Dakota",
    "city": "Harwood",
    "county": "Cass County",
    "region": "Eastern North Dakota",
    "status": "under-construction",
    "sponsors": "Applied Digital Corporation",
    "operators": "Applied Digital Corporation",
    "tenants": "Oracle",
    "totalSquareFeet": 1814000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": 200.0,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "Campus contracted on more than 900 acres; latest disclosed lease covers 200 MW of critical IT load",
    "announcedDate": "2025-08-18",
    "constructionStartDate": "2025-09",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": true,
    "pueTarget": 1.18,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Power secured through Cass County Electric Cooperative. Will employ 200+ full-time workers plus contractors.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company projection: 200+ full-time employees once fully operational; reporting also cites 200\u2013300 employees plus contractors.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Community opposition at hearings; annexation/jurisdiction dispute; limited public information on environmental permits and utility interconnection/grid upgrades.",
    "notes": "Applied Digital describes Polaris Forge 2 near Harwood as an AI facility leased to Oracle. The company priced $2.15 billion of secured notes in March 2026 for development and construction, and North Dakota regulators approved a $110 million substation and high-voltage transmission project to serve the campus. Public descriptions use both 200 MW and 280 MW measures without consistently distinguishing critical IT load from total facility capacity, so this update does not overwrite the existing capacity fields. [Source: https://www.valleynewslive.com/2026/07/13/applied-digital-expands-north-dakota-eyes-oliver-county-third-data-center/; Date: 2026-07-13]; QA 2026-07-19: Updated to the latest 200 MW critical-IT disclosure and removed duplicate facility power.; Sources: https://ir.applieddigital.com/_assets/_2b270afc37018352de7ef24c16a6e485/appliedblockchaininc/news/2025-10-09_Applied_Digital_Reports_Fiscal_First_Quarter_2026__131.pdf https://resources.news.e.abb.com/attachments/published/130940/en-US/2A3A4FFBCDD9/131125_ABB_expands_power_technology_partnership_with_Applied_Digital_for_AI-ready_data_centers_EN.pdf https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Atlas Power Data Center",
    "state": "North Dakota",
    "city": "Williston",
    "county": "Williams County",
    "region": "Western North Dakota",
    "status": "operational",
    "sponsors": "FX Solutions Inc.; Atlas Power Holdings ND, LLC",
    "operators": "Atlas Power",
    "tenants": null,
    "totalSquareFeet": 168000.0,
    "powerCapacityMW": 700.0,
    "itLoadMW": 700.0,
    "investmentUSD": 1900000000.0,
    "sizeNotes": "77 acres west of Williston. Phase 1 includes 16 buildings, each 350 feet long by 30 feet wide.",
    "announcedDate": "2022-01-26",
    "constructionStartDate": "2022",
    "expectedCompletionDate": "2024",
    "actualCompletionDate": "2023-02",
    "numberOfPhases": 3.0,
    "purpose": "other",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Cryptocurrency mining and high-performance computing facility",
    "economicImpact_jobs": 30.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "January 2022 announcement projected 100+ construction jobs over a two-year build and 30+ permanent jobs. County reported $232,000 in paid fines for prior building code violations as of 2023-06-29.",
    "incentives_type": "Other",
    "incentives_value": null,
    "challenges": "Phase 2 compliance and occupancy issues (final inspections/CO), zoning performance standard violations (buffer strip, noise containment), stop-work and temporary certificate of occupancy conditions, power-disconnection dispute with the utility, and resident litigation focused on noise and enforcement.",
    "notes": "Project faced construction delays and building code violations resulting in temporary power shutoff by county commission. Later received Temporary Certificate of Occupancy after rectifying violations. Described as one of the largest data centers in the world. Charges $3 million per month to keep power running.; Sources: https://www.governor.nd.gov/news/burgum-one-worlds-largest-data-centers-locate-williston-area-industry-targets-growth-nd https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf https://www.kfyrtv.com/2023/06/29/williams-county-grants-atlas-power-data-center-temporary-certificate-occupancy/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Rainbow Energy Coal Creek Data Center Park",
    "state": "North Dakota",
    "city": "Underwood",
    "county": "McLean County",
    "region": "Central North Dakota",
    "status": "planned",
    "sponsors": "Rainbow Energy Center, LLC",
    "operators": "Rainbow Energy Center, LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 415.0,
    "itLoadMW": 500.0,
    "investmentUSD": 3500000000.0,
    "sizeNotes": "800 acres near Coal Creek Station. Includes existing 200MW data center plus planned 300MW expansion.",
    "announcedDate": "2024-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Powered by Coal Creek Station (1,151 MW coal-fired power plant). Rainbow purchased plant in 2022 after it faced closure in 2020. Gas generation also part of plans.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific economic impact study or official jobs/tax projections identified as of Feb 1, 2026.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "No specific tenant or construction start publicly announced as of Feb 1, 2026; additional county permitting required; county conditions related to adequate fire protection/suppression and limits on on-site waste storage/disposal requiring NDDEQ permitting.",
    "notes": "McLean County Commission approved zoning change from agricultural to commercial for 800 acres in June 2024. Data center demand would use just under half of Coal Creek Station's energy production capacity, providing steady local customer. Goal is to run Coal Creek at full capacity.; Investment estimated at $7M/MW; Sources: https://www.inforum.com/news/north-dakota/coal-creek-owner-plans-to-power-north-dakota-data-center-park https://ndlegis.gov/sites/default/files/pdf/committees/69-2025/27.5070.03000appendixb.pdf",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Meta Prometheus (New Albany Campus)",
    "state": "Ohio",
    "city": "New Albany",
    "county": "Franklin County",
    "region": "Central Ohio",
    "status": "under-construction",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": "Meta Platforms",
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": 1000.0,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "World's first gigawatt-capable data center; campus consists of five data centers totaling 2.5M sq ft",
    "announcedDate": "2017",
    "constructionStartDate": "2017",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": "LEED Gold",
    "sustainabilityNotes": "Meta plans on-site power generation facility instead of relying on local infrastructure",
    "economicImpact_jobs": 300.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "JobsOhio (2017) cited at least 50 full-time positions and over $4 million in new annual payroll (initial project). A modeled estimate cited up to 1,688 construction workers and $77.7 million in wages for a similarly sized data center. Later reporting (2022\u20132025) cited $1.5B capital investment and ~300 full-time jobs for the New Albany campus.",
    "incentives_type": "Income Tax Credit; Sales Tax Exemption",
    "incentives_value": 37834000.0,
    "challenges": "Limited public disclosure of incentive terms; community concerns about power reliability and job creation; gaps in accessible public records for zoning actions and site-specific environmental permits.",
    "notes": "Prometheus will be a supercluster, a type of data center known for massive size and capacity. The existing campus provides over $5.5 million annually to local school funding.; QA 2026-07-19: Moved 1 GW from facility power to source-labeled AI compute capacity.; Sources: https://engineering.fb.com/2026/02/09/data-center-engineering/building-prometheus-how-backend-aggregation-enables-gigawatt-scale-ai-clusters/ https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/amp/ https://datacenters.atmeta.com/us-locations/ https://newalbanyohio.org/wp-content/uploads/2026/02/City-of-New-Albany-Uploaded-Financial-Report-Original-1.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Google Central Ohio Campuses",
    "state": "Ohio",
    "city": "New Albany, Columbus, Lancaster",
    "county": "Franklin County, Fairfield County",
    "region": "Central Ohio",
    "status": "expansion",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 275000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 20000000000.0,
    "sizeNotes": "Three facilities: New Albany (275,000 sq ft at 1101 Beech Rd), Lancaster, and Columbus",
    "announcedDate": "2019",
    "constructionStartDate": "2019",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": "2022",
    "numberOfPhases": 2.0,
    "purpose": "cloud; hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Water cooling; Google evaluates cooling methods based on watershed scarcity or depletion risk. Columbus is exploring reclaimed-wastewater service for local data centers.",
    "certifications": null,
    "sustainabilityNotes": "Partnership with EDP Renewables for 500-megawatt community-based energy portfolio with projects mainly in Ohio",
    "economicImpact_jobs": 20.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Columbus CRA ordinance (0520-2021) ties abatement to at least $300M investment and 20 net new permanent jobs (~$2M annual payroll). New Albany CRA amendment (adopted 2025-04-01) cites $500M investment for a 275,000-sq-ft data center building. AP reported an additional $1.7B for completion/expansion of Columbus and Lancaster and expansion in New Albany (announced Aug 2023).",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": 43500000.0,
    "challenges": "In Columbus (Hartman Farm/Far South area), the Far South Area Commission formally opposed rezoning Z20-070 and the staff review acknowledged potential impacts and conditions (e.g., traffic studies, setbacks/height limits near adjacent residential areas). No petitions, lawsuits, or protest actions specific to New Albany or Lancaster campuses were located in sources reviewed.",
    "notes": "Columbus cloud region opened in 2022; clients include State of Ohio, Nationwide, Victoria's Secret, Wendy's, and Huntington National Bank. Total investment since 2019 exceeds $6.7 billion.; Power estimated at $7M/MW; Sources: https://datacenters.google/locations/ohio/ https://economicimpact.google/state/oh/ https://www.gstatic.com/marketing-cms/48/64/6c79851d452ca8df0c21443fb0c5/final-06-18-24-oh-iia-press-release-2024.pdf https://www.aepohiowire.com/aep-to-power-googles-new-data-center/ https://docs.aep.com/docs/investors/eventspresentationsandwebcasts/June_Investor_Meetings-Handout-6-2025.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AWS US East (Ohio) Region",
    "state": "Ohio",
    "city": "New Albany, Dublin, Hilliard, Sunbury",
    "county": "Franklin County, Delaware County",
    "region": "Central Ohio",
    "status": "operational",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": "Amazon Web Services",
    "totalSquareFeet": 6325357.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 7800000000.0,
    "sizeNotes": "46 facilities across Central Ohio; New Albany expansion adding 5 buildings (1.25M sq ft)",
    "announcedDate": "2016",
    "constructionStartDate": "2016",
    "expectedCompletionDate": "2030-12",
    "actualCompletionDate": "2016",
    "numberOfPhases": 3.0,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Sunbury planned closed-loop cooling system using reclaimed water",
    "certifications": null,
    "sustainabilityNotes": "Part of AWS's broader renewable energy commitments",
    "economicImpact_jobs": 105.0,
    "economicImpact_taxRevenue": 3100000.0,
    "economicImpact_notes": "City of New Albany reports $6.2B AWS investment in Licking County (2015\u20132024), ~$1.4B GDP impact, and ~1,550 FTE jobs annually; WOSU reports AWS expects ~105 full-time jobs for the 2023 New Albany expansion plan.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": 600000000.0,
    "challenges": "Evidence gaps for primary CRA/abatement agreements and zoning approvals for AWS data center buildings; state preemption of local review for Hilliard fuel cell facility; appeal of Ohio EPA PTIO permit; community concerns (noise/oversight) influencing local policy responses (e.g., Dublin rezoning).",
    "notes": "Central Ohio is Amazon's third-largest data center hub in the nation (after Virginia and Oregon). Sunbury campus expected to generate 50 new jobs with $4.5M annual payroll.; Sources: https://www.jobsohio.com/newsroom/news-press/amazon-web-services-plans-to-invest-an-estimated-7-8-billion-in-ohio https://www.aboutamazon.com/news/aws/aws-continues-to-invest-in-ohio https://www.aepohio.com/community/projects/scioto-darby-creek/ https://assets.aboutamazon.com/92/87/7d3f1f3d4760bc29c549b22f8e70/ohio-eis-factsheet.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft Licking County Campuses",
    "state": "Ohio",
    "city": "New Albany, Heath, Hebron",
    "county": "Licking County",
    "region": "Central Ohio",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft Azure",
    "tenants": null,
    "totalSquareFeet": 245000.0,
    "powerCapacityMW": 143.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Three campus locations totaling over 700 acres of land purchased; New Albany site: 245,000 sq ft on 197 acres",
    "announcedDate": "2024-10",
    "constructionStartDate": "2025-04",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Part of Microsoft Azure cloud platform",
    "economicImpact_jobs": 30.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reported New Albany campus commitments include $420,000,000 in construction investment and about 30 permanent jobs; no independent public economic impact study (jobs/tax revenue) specific to the Licking County campuses was located in the provided research.",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": 72500000.0,
    "challenges": "Reported project slowdowns/pauses in April 2025 and revised timelines; limited availability of primary incentive/zoning and permit documents in publicly accessible sources.",
    "notes": "Microsoft paused development in April 2025 but maintains land ownership and future development intentions. Ames Construction was hired as general contractor for New Albany site ($420M project). Microsoft committed to funding roadway/utility upgrades and community programs.; B total Licking County; 20M New Albany; 30 jobs; 15-year 100% abatement; paused/slowed April 2025; Sources: https://local.microsoft.com/communities/americas/ohio/ https://local.microsoft.com/blog/newalbany-datacenter-construction-update/ https://growlickingcounty.org/2024-year-in-review/ https://www.datacenterdynamics.com/en/news/microsoft-to-invest-1bn-in-data-center-campuses-in-central-ohio/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vantage OH1 Campus",
    "state": "Ohio",
    "city": "New Albany",
    "county": "Franklin County",
    "region": "Central Ohio",
    "status": "under-construction",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 192.0,
    "itLoadMW": 192.0,
    "investmentUSD": 2000000000.0,
    "sizeNotes": "70-acre campus with three two-story hyperscale data centers totaling 1.5M sq ft",
    "announcedDate": "2024-10",
    "constructionStartDate": "2024-10",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop chilled water system with air-cooled chillers; high economizer capacity; water-use effectiveness near zero",
    "certifications": "LEED Silver (target)",
    "sustainabilityNotes": "Designed for secure and reliable infrastructure",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Vantage reports more than 1,500 individuals employed across construction and long-term operations (not broken out).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project-specific incentives, zoning determinations, and environmental permit records were not located in the sources reviewed; open records requests may be required.",
    "notes": "Vantage's first Midwest campus; Turner Construction selected as general contractor. Expected to employ more than 1,500 individuals across construction and long-term operations.; Sources: https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/ https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio https://newalbanybusiness.org/news/2024/10/vantage-data-centers-breaks-ground-on-oh1-in-new-albany/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "QTS New Albany Campus",
    "state": "Ohio",
    "city": "New Albany",
    "county": "Franklin County",
    "region": "Central Ohio",
    "status": "under-construction",
    "sponsors": "QTS Data Centers; Blackstone",
    "operators": "QTS Data Centers",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 222.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Initial campus: 4 buildings on 93 acres; expansion plans: 8 additional facilities (3.2M sq ft on 240 acres)",
    "announcedDate": "2024",
    "constructionStartDate": "2024-03",
    "expectedCompletionDate": "2025-03",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling system",
    "certifications": null,
    "sustainabilityNotes": "QTS Freedom Design standard",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job or tax-revenue projections for the QTS campus were identified in the sources accessed; City CRA summary discusses data centers generally.",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Key project terms and approvals were not fully documented in the sources accessed, including CRA agreement details (abatement percentage/term/clawbacks), zoning/land-use pathway and votes, project-specific environmental permits, and campus-specific utility service/interconnection and any distribution upgrade costs.",
    "notes": "QTS (Blackstone subsidiary) developing multiple phases. Total potential investment approaches $4.5B with expansion plans.; Sources: https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/ https://ohiosenate.gov/members/michele-reynolds/news/reynolds-commends-15-billion-data-center-investment-in-new-albany https://www.gray.com/projects/qts-data-centers/ https://newalbanyohio.org/wp-content/uploads/2025/04/CD-2025-03.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Cologix Johnstown Campus",
    "state": "Ohio",
    "city": "Johnstown",
    "county": "Licking County",
    "region": "Central Ohio",
    "status": "under-construction",
    "sponsors": "Cologix",
    "operators": "Cologix",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 800.0,
    "itLoadMW": null,
    "investmentUSD": 7000000000.0,
    "sizeNotes": "154-acre campus planned for 8 AI-ready data centers totaling 2M sq ft",
    "announcedDate": "2024-11",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2025",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling systems; COL7 also lists air-cooled chillers and liquid-to-chip readiness, and COL8 lists liquid-cooling readiness with configurable 70-90% liquid-cooled mix",
    "certifications": null,
    "sustainabilityNotes": "AI-ready with sustainable infrastructure for hyperscalers and enterprises",
    "economicImpact_jobs": 90.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic impact study, jobs forecast, or tax revenue projection specific to the Johnstown campus was located in available public sources at the time of the scan.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": 42300000.0,
    "challenges": "Company announcement included supportive statements from local leadership (e.g., Johnstown mayor). No public hearing transcripts, petitions, or lawsuits specific to this project were located in available public sources at the time of the scan.",
    "notes": "Property acquired from Johnstown Land Company (affiliate of New Albany Company). Cologix already operates 4 data centers in Columbus (500,000 sq ft, 80MW). Completed first colocation AI-ready data center in the region in 2024.; Sources: https://www.globenewswire.com/news-release/2024/11/20/2984584/0/en/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus.html https://www.datacenterdynamics.com/en/news/cologix-buys-land-in-ohio-for-800mw-campus/ https://growlickingcounty.org/2024-year-in-review/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Van Wert Mega Site Data Center",
    "state": "Ohio",
    "city": "Van Wert",
    "county": "Van Wert County",
    "region": "Northwest Ohio",
    "status": "planned",
    "sponsors": "QTS Data Centers; Blackstone",
    "operators": "QTS Data Centers",
    "tenants": "QTS Data Centers",
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "220-acre campus on 1,500-acre Mega Site; requires 1.7M gallons/day water for cooling",
    "announcedDate": "2026-05-29",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling system that does not consume water for cooling once operational",
    "certifications": null,
    "sustainabilityNotes": "Significant water requirements (1.7M gallons/day)",
    "economicImpact_jobs": 250.0,
    "economicImpact_taxRevenue": 200000000.0,
    "economicImpact_notes": "No independent economic impact study or tax revenue estimate located; project remains pre-construction as of Feb 1, 2026.",
    "incentives_type": "Property Tax Abatement; Tif; Grant; Cba; Other",
    "incentives_value": null,
    "challenges": "Project remains pre-construction with only land acquisition and annexation/zoning approvals publicly documented; permitting and interconnection/grid upgrade details not disclosed; community concerns noted about road access/traffic and high water usage.",
    "notes": "QTS and Van Wert announced QTS as the campus developer, with up to $10B of investment, seven buildings across about 902 acres, 1,500 construction jobs, and up to 200 full-time QTS positions. [Source: https://www.hometownstations.com/news/van_wert_county/van-wert-announces-10-billion-qts-data-center-campus-investment/article_18b9e9fc-010b-4353-95c0-4ed96293c1ed.html; Date: 2026-05-29]; Sources: https://q.com/data-centers/van-wert/ https://thevwindependent.com/news/2026/05/29/data-center-construction-operations-timeline-shared/ https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/ https://thevwindependent.com/news/2025/01/23/stevens-confirms-data-center-could-be-built-at-mega-site/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Stillwater Data Center Campus",
    "state": "Oklahoma",
    "city": "Stillwater",
    "county": "Payne County",
    "region": "North Central Oklahoma",
    "status": "under-construction",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": null,
    "totalSquareFeet": 1800000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "400-acre site; up to six approximately 300,000-square-foot data-center buildings, for up to 1.8 million square feet",
    "announcedDate": "2024-08",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Part of Google's renewable energy commitments in Oklahoma",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "City summary projects ~30 permanent jobs per phase; notes annual franchise fees of $2.25M per phase and estimated annual sales tax from construction; PILOT payments increase 1% per year for the first 25 years.",
    "incentives_type": "Property Tax Abatement; Pilot",
    "incentives_value": null,
    "challenges": "Zoning pathway and specific permits were not identified in the accessible public sources; community concerns were noted regarding water demand.",
    "notes": "Located at intersection of Perkins and Richmond Roads, north of former Armstrong facility. Part of Google's $9 billion Oklahoma investment. City Council considering agreement for first two phases.; QA 2026-07-19: Corrected full-build area and cleared cost-derived power capacity.; Sources: https://stillwaterok.gov/852/Data-Center-Project https://www.datacenterdynamics.com/en/news/google-behind-ai-data-center-campus-in-stillwater-oklahoma/ https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/oklahoma-energy-affordability-agreement/ https://www.oge.com/web/portal/-/200-press-release",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Project Anthem (Tulsa East)",
    "state": "Oklahoma",
    "city": "Tulsa",
    "county": "Tulsa County",
    "region": "Northeast Oklahoma",
    "status": "under-construction",
    "sponsors": "Atmoss LLC; Meta",
    "operators": "Unknown (believed to be Meta Platforms)",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 114.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "340 acres south and west of intersection of 11th Street and Creek Turnpike",
    "announcedDate": "2024-02",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Water concerns raised by community",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Project plan reports ~5,007 total jobs (direct/indirect/induced) and ~$3.3B total economic output during the construction period (IMPLAN-based estimate).",
    "incentives_type": "Property Tax Abatement; Tif; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Primary documents retrieved for this task do not identify specific environmental permits, utility interconnection/grid-upgrade details, or recorded planning commission vote minutes; local concerns reported about water use, power impacts, and community benefits.",
    "notes": "Atmoss LLC withdrew a rezoning application for Project Anthem's roughly 375-acre second phase between East 11th Street South and East 21st Street South, east of South 193rd East Avenue. The first phase spans 340 acres, the second phase remained possible later, and the withdrawal was separate from Tulsa's temporary data center moratorium because the moratorium exempted Project Anthem's first and second phases. This does not cancel the tracked Project Anthem row or change its under-construction status for the first phase. [Source: https://www.datacenterdynamics.com/en/news/developer-withdraws-plans-to-build-second-phase-of-500-acre-data-center-in-tulsa-oklahoma/; Date: 2026-04-01]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Clydesdale (Tulsa County/Owasso)",
    "state": "Oklahoma",
    "city": "Owasso",
    "county": "Tulsa County",
    "region": "Northeast Oklahoma",
    "status": "under-construction",
    "sponsors": "Beale Infrastructure; Unknown hyperscaler",
    "operators": "Unknown (likely Google, Microsoft, Amazon, or Meta)",
    "tenants": null,
    "totalSquareFeet": 800000.0,
    "powerCapacityMW": 643.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "506 acres of unincorporated Tulsa County land north of Cherokee Industrial Park, east of U.S. 75 between 76th Street North and 86th Street North. Investment estimated between $2-7 billion.",
    "announcedDate": "2025-06",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "unknown",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Will require 7 million gallons of water per day, raising environmental concerns",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public announcements cite \u201c100+ jobs\u201d. Project Plan provides projected PILOT allocations over the project life (e.g., Owasso Public Schools $37.3M\u2013$48.4M; Tulsa County general fund $14.0M\u2013$18.1M). Officials described the project as more than $3B in economic development.",
    "incentives_type": "Property Tax Abatement; Pilot; Tif; Other",
    "incentives_value": null,
    "challenges": "Primary documents for executed tax incentive agreement/clawbacks, interconnection/rate arrangements, and environmental permit filings were not located in the sources reviewed; project faced intense public opposition at the July 17, 2025 hearing with concerns about noise, water use, property values, and grid impacts; hyperscale tenant not publicly named.",
    "notes": "Tulsa County Commissioners unanimously approved in September 2025, creating four special incentive districts. Developer is Beale Infrastructure but operating company not disclosed. Likely one of four major tech giants. Strong community opposition due to water usage concerns (7 million gallons/day). Support from City of Owasso, Owasso Public Schools, and Tulsa Tech.; Power estimated at $7M/MW; Sources: https://bealeinfra.com/beale-infrastructure-announces-new-data-center-campus-in-tulsa-county/ https://bealeinfra.com/location/tulsa-county/ https://tulsaplanning.org/tmapc/agendas/exhibits/Project-Clydesdale-Project-Plan-TMAPC-Staff-Report-FINAL.pdf https://tulsaflyer.org/2025/10/30/government/post/developers-break-ground-on-1b-data-center-near-tulsa/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CoreWeave/Core Scientific Muskogee Data Center",
    "state": "Oklahoma",
    "city": "Muskogee",
    "county": "Muskogee County",
    "region": "East Oklahoma",
    "status": "expansion",
    "sponsors": "Core Scientific; Polaris DS LLC; CoreWeave",
    "operators": "Core Scientific",
    "tenants": "CoreWeave",
    "totalSquareFeet": 138000.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": 70.0,
    "investmentUSD": 4000000000.0,
    "sizeNotes": "Approximately 70 MW of critical IT load for NVIDIA GPUs, 30 MW for ancillary systems. Part of 500 MW contract worth $8.7 billion over 12 years.",
    "announcedDate": "2026-05-06",
    "constructionStartDate": "2024-11",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Designed for high-performance computing and AI workloads with NVIDIA GPUs",
    "economicImpact_jobs": 150.0,
    "economicImpact_taxRevenue": 12000000.0,
    "economicImpact_notes": "Projected >$4B capital investment and ~$182M in local net benefits over the life of the project; supports 150 jobs with average salaries above $65,000; projects >$12M in property and sales taxes for local institutions.",
    "incentives_type": "Other",
    "incentives_value": null,
    "challenges": "Public sources reviewed do not disclose detailed incentive terms, zoning approvals, or utility service/interconnection arrangements; industrial-park annexation and municipal fee disputes in the area indicate governance friction; air permit application (2025-0466-C) listed as in technical review as of 2025-06-23.",
    "notes": "Core Scientific announced a plan to scale its Muskogee campus to about 1.5 GW of gross power, or about 1.0 GW of leasable power, including an agreement to acquire Polaris DS LLC and its 440 MW gross-power position with OG&E. Core Scientific also said construction had begun on a second unleased 82.5 MW building, with initial delivery expected in Q4 2027, while the current leased 70 MW building was in final testing and commissioning for Q2 2026 delivery to its customer. [Source: https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus; Date: 2026-05-06]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "DAMAC/EDGNEX Oklahoma Data Centers",
    "state": "Oklahoma",
    "city": "Unknown",
    "county": "Unknown",
    "region": "Oklahoma (Sunbelt region)",
    "status": "announced",
    "sponsors": "DAMAC Group; EDGNEX Data Centers",
    "operators": "EDGNEX Data Centers",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 3500000000.0,
    "sizeNotes": "Part of $20 billion U.S. investment targeting 2000MW capacity across multiple states. Oklahoma is one of target states along with Texas, Arizona, Louisiana (Sunbelt) and Midwest states.",
    "announcedDate": "2025-01-07",
    "constructionStartDate": "TBD",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "No specific sustainability details disclosed yet",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No Oklahoma-specific economic impact study, job projections, or tax-revenue projections tied to a specific jurisdiction were identified in the provided research (as of 2026-02-05).",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Project remains publicly unsited in Oklahoma; no jurisdiction-specific permits, zoning actions, incentives, utility arrangements, or construction milestones were identified in the provided research as of 2026-02-05. Reported investment and 500 MW capacity are labeled as project-database figures not corroborated by Oklahoma public filings.",
    "notes": "Announced at President-elect Trump's Mar-a-Lago estate January 7, 2025. Specific Oklahoma locations not yet disclosed. Part of expansion into eight U.S. states. Will support AI and cloud services for hyperscalers, AI players, and Fortune 500 companies. Four-year delivery timeline. Potential to double investment based on demand.; DAMAC/EDGNEX Oklahoma data centers; large Middle Eastern investment estimate",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Meta Prineville Data Center Campus",
    "state": "Oregon",
    "city": "Prineville",
    "county": "Crook County",
    "region": "Central Oregon",
    "status": "operational",
    "sponsors": "Meta Platforms (Facebook)",
    "operators": "Meta Platforms",
    "tenants": null,
    "totalSquareFeet": 4600000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": "11 buildings totaling 4.6 million square feet, Meta's largest US data center campus",
    "announcedDate": "2010",
    "constructionStartDate": "2010",
    "expectedCompletionDate": "2023",
    "actualCompletionDate": "2011",
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": 1.06,
    "waterCooling": "True",
    "certifications": "LEED-NC Gold",
    "sustainabilityNotes": "Powered by 100% renewable energy including two Oregon solar projects. One of the lowest PUE ratings in the industry.",
    "economicImpact_jobs": 350.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Meta reports 350+ operational jobs and 1,000+ construction workers at peak; reporting highlights debate over foregone property taxes and school/local government funding impacts during long abatements.",
    "incentives_type": "Property Tax Abatement; Pilot; Other",
    "incentives_value": null,
    "challenges": "Publicly accessible primary records (enterprise zone agreement/abatement schedule/clawbacks; zoning approval type and votes; project-specific DEQ permit numbers; interconnection and grid upgrade filings) were not located in the research sources.",
    "notes": "Meta's first wholly-owned data center facility. Supports 350+ operational jobs with 1,000 skilled trade workers on site at peak construction.; QA 2026-07-18: Cleared unsourced power capacity while retaining operator-supported area and investment.; Sources: https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/ https://edocs.puc.state.or.us/efdocs/HAP/ue421hap163824.pdf https://edocs.puc.state.or.us/efdocs/HAA/um1989haa134934.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Google The Dalles Data Center Campus",
    "state": "Oregon",
    "city": "The Dalles",
    "county": "Wasco County",
    "region": "Columbia River Gorge",
    "status": "expansion",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": null,
    "totalSquareFeet": 1450000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 7000000000.0,
    "sizeNotes": "Fifth data center building (290,000 sq ft) approved in 2024 for $600 million",
    "announcedDate": "2005",
    "constructionStartDate": "2005",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": "2006",
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": 1.09,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Focus on renewable energy and water conservation",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 125000000.0,
    "economicImpact_notes": "OPB reports property taxes discounted by 92% through agreements and $7.3M paid in 2025 (including community service fee). Columbia Community Connection reports projections of up to $125M in new property taxes and fees for a two-data-center package.",
    "incentives_type": "Property Tax Abatement; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Water supply and disclosure controversy (drought/secrecy concerns), public debate over reservoir/water-supply expansion impacts on fish and wildlife, and limited availability of primary zoning/permit records in reviewed sources.",
    "notes": "Google's first data center, operational since 2006. Google reports more than $7 billion invested in Oregon since opening The Dalles campus. Whiting-Turner selected as contractor for fifth building.; QA 2026-07-19: Cleared cost-derived power and reconciled the narrative with Google's current $7B+ investment statement.; Sources: https://datacenters.google/locations/oregon/ https://www.energy.gov/nepa/articles/cx-017560-quenett-creek-substation-construction https://www.publicpower.org/periodical/article/northern-wasco-pud-supply-power-google-data-centers",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Amazon AWS US West (Oregon) Region - Boardman",
    "state": "Oregon",
    "city": "Boardman",
    "county": "Morrow County",
    "region": "Eastern Oregon",
    "status": "expansion",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 5632000.0,
    "powerCapacityMW": 266.0,
    "itLoadMW": null,
    "investmentUSD": 15600000000.0,
    "sizeNotes": "Multiple campuses in Boardman with dozens of data centers totaling about 20 facilities across Morrow and Umatilla counties",
    "announcedDate": "2011",
    "constructionStartDate": "2011",
    "expectedCompletionDate": "2031",
    "actualCompletionDate": "2011",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "industrial cooling-water discharge; onsite wastewater pond storage proposed for PDX 154 until Port of Morrow off-site discharge infrastructure is available",
    "certifications": null,
    "sustainabilityNotes": "95%+ renewable energy. Water recycling system enables up to 96% of cooling water to be reused for irrigation",
    "economicImpact_jobs": 80.0,
    "economicImpact_taxRevenue": 850000.0,
    "economicImpact_notes": "Sources describe projected jobs and investment for incentive applications/agreements: CREZ III enterprise zone applications cite $2.37B investment and 120 full-time employees per property across five sites (projection); SIP agreement cites 80 new permanent FTE jobs plus community payments/fees.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Utility transmission line routing opposition and PUC proceedings; incomplete public documentation in sources reviewed for final zoning vote outcomes (LUD-N-68-24), stormwater/water permits, detailed clawback language, and rate impacts/cost allocation for grid upgrades.",
    "notes": "Existing AWS US West (Oregon) Region Boardman row should be updated to reflect a 2026 Boardman expansion approval: Morrow County planning officials approved Amazon's PDX 154 land-use application at the 2026-03-31 Planning Commission meeting for another data center campus just east of Boardman Airport, with four data center buildings totaling about 816,000 square feet plus water, stormwater, wastewater, and septic facilities, subject to conditions for stormwater/wastewater mitigation and airport lighting impacts. Morrow County agenda listed Land Use Decision LUD-N-089-25 for Amazon Data Services, Inc. to site a data center campus on Airport Light Industrial land southeast of Boardman Airport and southwest of the Tower Road/I-84 interchange. [Source: https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities; Date: 2026-04-14]; QA 2026-07-18: Added the approved 816,000-square-foot PDX 154 expansion to the campus total.; Sources: https://www.oregon.gov/deq/ghgp/Documents/BAER-AmazonPDX109Assessment.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Amazon AWS Hermiston Data Centers",
    "state": "Oregon",
    "city": "Hermiston",
    "county": "Umatilla County",
    "region": "Eastern Oregon",
    "status": "under-construction",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 967900.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 2750000000.0,
    "sizeNotes": "Two data centers currently under construction in Hermiston. City annexed 800 acres for additional data center development",
    "announcedDate": "2017",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": "2024-07",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "AWS reported using outside air for most of the year and water for cooling about 7% of the year in Oregon; Hermiston water strategy uses aquifer storage and recovery for seasonal water supply.",
    "certifications": null,
    "sustainabilityNotes": "City materials describe an Aquifer Storage & Recovery (ASR) approach to inject treated potable water into a deep basalt aquifer; the City submitted an ASR license application in July 2024. The same staff report describes using unused winter capacity in the Columbia River-fed Regional Water System (RWS) to pump and store water for summertime use, with the stated goal of avoiding additional summer withdrawals during low-flow periods.",
    "economicImpact_jobs": 70.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "City enterprise zone materials report $1.4B investment for PDX138 + PDX245 with 500\u2013700 construction jobs and 70 permanent jobs. The same source describes an additional proposed PDX146 site at $700M with 400\u2013600 construction jobs and 30 permanent jobs.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Project-specific land-use approvals, building permits, DEQ permit records (air, stormwater, wastewater), electric interconnection/cost-allocation documentation, and project-specific PPAs/renewable procurement disclosures were not located in the sources reviewed; reporting also notes local infrastructure capacity pressures (electric and water).",
    "notes": "Hermiston City Council annexed 800 acres for data center expansion. Economic analysis projects 1,500+ data center jobs over next 20 years.; Part of 5.6B AWS Oregon investment; Hermiston expansion with 810 acres added 2025; 200 MW estimated for campus portion; Sources: https://www.oregonlegislature.gov/committees/slb/WorkgroupDocuments/Arthur%20Fish%2C%20Business%20Oregon%20%28project%20list%20-%209-25-19%20meeting%29.pdf https://www.opb.org/news/article/npr-amazon-to-expand-data-centers-in-northeastern-oregon-reaping-more-tax-breaks/ https://www.datacenterdynamics.com/en/news/amazon-looking-to-develop-more-data-centers-in-oregons-hermiston/ https://www.hermiston.gov/sites/default/files/fileattachments/community_development/page/17069/hermiston_eoa_report_7_9_24_draft.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon AWS Arlington Expansion",
    "state": "Oregon",
    "city": "Arlington",
    "county": "Gilliam County",
    "region": "Eastern Oregon",
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 17000000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 3500000000.0,
    "sizeNotes": "376 acres purchased for $10 million plus additional 30 acres for $3 million at Port of Arlington",
    "announcedDate": "2024-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028+",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Columbia River water treated and cycled through facility for computer cooling, then sent to a lined pond for evaporation; ASR feasibility and well testing underway.",
    "certifications": null,
    "sustainabilityNotes": "Port marketing materials reference redundant power and wind/fiber grid access; Avangrid announced an Amazon PPA tied to a Gilliam County wind project (Leaning Juniper IIA).",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reporting suggests ~100\u2013120 permanent jobs; no public economic impact study or tax-revenue projection located for this specific expansion in the sources reviewed.",
    "incentives_type": "Property Tax Abatement; Pilot; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Key constraints/unknowns include lack of public site-plan/building permit records located, NDA-related limited disclosure during land transactions, and broader Oregon large-load utility contracting/rate-impact disputes; project remains best described as planned as of 2026-02-05.",
    "notes": "Land purchased on mesa above Arlington in summer 2024. Could be many years until operational due to permitting and infrastructure requirements.; From DCD: 406 acres (3M land) on mesa above Arlington; part of 5B Oregon investment; power estimated for hyperscale campus; Sources: https://www.timesjournal1886.com/story/2024/11/28/news/amazon-data-center-coming-to-gilliam-county/938.html https://www.timesjournal1886.com/story/2026/07/16/news/arlington-pushes-ahead-with-municipal-water-system/2056.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "QTS Hillsboro Data Center Campus",
    "state": "Oregon",
    "city": "Hillsboro",
    "county": "Washington County",
    "region": "Portland Metro",
    "status": "expansion",
    "sponsors": "QTS Realty Trust",
    "operators": "QTS Realty Trust",
    "tenants": "Facebook/Meta",
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 1750000000.0,
    "sizeNotes": "Five buildings totaling 1.5 million square feet planned. Hillsboro 3 will have 100+ MW capacity on 46-acre campus",
    "announcedDate": "2015",
    "constructionStartDate": "2016",
    "expectedCompletionDate": "2020-06",
    "actualCompletionDate": "2020",
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "indirect air-side economizer cooling",
    "certifications": "HITRUST CSF; ISO 27001; PCI DSS; SOC 1; SOC 2",
    "sustainabilityNotes": "Oregon DEQ Cleaner Air Oregon program materials and an ACDP application cover diesel-fired emergency generators (four units) with operating limits and reporting conditions; CAO risk assessment results were within health standards with acute risk at the action level and permit conditions.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 22590000.0,
    "economicImpact_notes": "Washington County tax roll reports 2025 real market value of $2.47B for the QTS property; improvements indicate phased build-out (2019, 2022, and additional improvements recorded in 2023).",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Key gaps in the reviewed sources include missing project-specific enterprise-zone agreements/clawbacks, zoning approval/vote records, utility interconnection/rate filings, and site-specific water/stormwater permitting documentation.",
    "notes": "HIL1: 158,000 sq ft, 24 MW at 4951 NE Huffman St. HIL2: Four buildings at 4755 NE Huffman St. HIL3: 100 MW at 5419 NE Starr Blvd. Facebook/Meta is lead tenant. Network Access Point of the Pacific Northwest.; Investment estimated at $7M/MW; Sources: https://www.nasdaq.com/press-release/qts-announces-development-of-mega-data-center-on-250-megawatt-hillsboro-oregon-campus https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf https://www.sec.gov/Archives/edgar/data/1561164/000155837020001789/qts-20191231x10k1d834c.htm https://q.com/data-centers/hillsboro-1/?nocache=1771426090",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services AI Innovation Campuses",
    "state": "Pennsylvania",
    "city": "Salem Township; Falls Township; Kline Township",
    "county": "Luzerne County; Bucks County; Schuylkill County",
    "region": "Northeastern Pennsylvania",
    "status": "under-construction",
    "sponsors": "Amazon Web Services; Amazon",
    "operators": "Amazon Web Services",
    "tenants": "Amazon Web Services",
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 20000000000.0,
    "sizeNotes": "Salem Township: 1,200-acre campus with 15 planned data centers co-located with Susquehanna nuclear plant. Falls Township: Campus at former U.S. Steel mill site (Keystone Trade Center). Total investment across both sites.",
    "announcedDate": "2025-06-09",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Salem Township data center draws electricity from Susquehanna Steam Electric Station nuclear power plant. Talen Energy sold 960MW nuclear-powered data center campus to Amazon for $650 million. Falls Township initially draws from electrical grid.",
    "economicImpact_jobs": 1250.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Pennsylvania announcement projects 1,250 jobs statewide and $20B investment; local meeting minutes discussed potential increases in earned-income tax and property tax base as projections, not confirmed outcomes.",
    "incentives_type": "Sales Tax Exemption; Grant; Other",
    "incentives_value": null,
    "challenges": "Primary records reviewed did not include signed local incentive agreements (e.g., LERTA/PILOT) or DEP permit files; FERC scrutiny of amended interconnection service agreement related to co-located load at Susquehanna suggests potential interconnection/regulatory risk.",
    "notes": "DCD's July 2026 Pennsylvania market review says Amazon is known to be developing around Salem Township, Falls Township, and Kline Township, with further reported interest in Banks Township. It also says some first buildings are reportedly vertical and nearing operation in Salem and Falls, while the 346-acre Kline site could include ten data center buildings totaling about 2.5 million square feet. The listed 1,920 MW and $20 billion remain the canonical figures for the Salem/Falls statewide investment; Kline/Banks capacity and investment are not separately confirmed in the cited source. [Source: https://www.datacenterdynamics.com/en/analysis/pennsylvanias-appalachian-appeal/; Date: 2026-07-02]; QA 2026-07-19: Replaced zero-area sentinel with unknown and cleared an unsupported multi-campus power aggregate.; Sources: https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation https://www.amazoninnovationinpa.com/falls-township-innovation-campus/ https://www.fallstwp.com/resources/news/article/?id=11625 https://www.datacenterdynamics.com/en/news/aws-plans-25-million-sq-ft-data-center-campus-in-kline-township-pennsylvania/ https://www.amazoninnovationinpa.com/salem-township-innovation-campus/ https://www.sec.gov/Archives/edgar/data/1622536/000162828025038626/tln-20250630.htm",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Pennsylvania Digital I (PAX)",
    "state": "Pennsylvania",
    "city": "Carlisle",
    "county": "Cumberland County",
    "region": "Central Pennsylvania",
    "status": "under-construction",
    "sponsors": "Pennsylvania Data Center Partners; PowerHouse Data Centers",
    "operators": "Pennsylvania Data Center Partners; PowerHouse Data Centers",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1350.0,
    "itLoadMW": null,
    "investmentUSD": 15000000000.0,
    "sizeNotes": "1.35 GW capacity with expandability up to 1.8 GW. Three data center campuses, each featuring six buildings and dedicated 450 MW substation.",
    "announcedDate": "2025-07-15",
    "constructionStartDate": "2025-11-28",
    "expectedCompletionDate": "2032-06-07",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "evaporative cooling during peak thermal conditions",
    "certifications": null,
    "sustainabilityNotes": "Project website says no cooling or process water will be discharged into Conodoguinet Creek and that the site design preserves the existing forested creek buffer. Pennsylvania GRID standards may apply to Commonwealth support, but no PAX-specific GRID certificate or GRID Ready Report was located.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 65000000.0,
    "economicImpact_notes": "Developer press release projects more than $65M in direct tax revenue: $45M+ to Cumberland Valley School District, $10M+ to Middlesex Township, and $10M+ to Cumberland County; jobs described qualitatively (high-skilled employment in construction/engineering/related fields) without counts.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Conflicting/ambiguous public status statements (labeled 'under construction' while also stating construction anticipated to begin in the near future); limited access to primary local records (township document archive inaccessible) and lack of publicly identified project-specific environmental permits and utility interconnection filings.",
    "notes": "Announced at Pennsylvania Energy and Innovation Summit before President Donald Trump. Located in Northeast's emerging AI corridor. Expected to generate over $65 million in direct tax revenue.; Sources: https://pa-data-centers.squarespace.com/campus https://www.powerhousedata.com/news/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania https://www.padatacenters.com/ https://pa-data-centers.squarespace.com/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-135-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "TECfusions Keystone Connect",
    "state": "Pennsylvania",
    "city": "Upper Burrell",
    "county": "Westmoreland County",
    "region": "Western Pennsylvania",
    "status": "under-construction",
    "sponsors": "TECfusions",
    "operators": "TECfusions",
    "tenants": "TensorWave",
    "totalSquareFeet": null,
    "powerCapacityMW": 3000.0,
    "itLoadMW": 3000.0,
    "investmentUSD": null,
    "sizeNotes": "1,395 acres (former Alcoa R&D campus). 3 GW capacity planned over six years. 12 MW immediately available, 1 GW already leased.",
    "announcedDate": "2025-01-14",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop water cooling; direct liquid cooling for AI/HPC deployments",
    "certifications": null,
    "sustainabilityNotes": "On-site natural gas power generation with dual utility and microgrid capabilities. Exploring options to export excess power to local grid.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company release claims the project aims to create \u201cthousands of high-quality jobs,\u201d but no independent impact study or tax revenue projection was located in the sources reviewed.",
    "incentives_type": "Grant",
    "incentives_value": 2000000.0,
    "challenges": "Limited publicly posted local records: no project-specific zoning approvals/votes found in available township minutes through 2025; key permit documents, utility agreements, and incentive contract terms were not located in sources reviewed.",
    "notes": "Received $2 million from Pennsylvania's Redevelopment Assistance Capital Program (RACP). Already spent over $150 million on site prep. Expected to be one of the largest data centers ever constructed.; Sources: https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf https://www.prnewswire.com/news-releases/tecfusions-unveils-massive-1400-acre-data-center-project-in-pennsylvania-revitalizing-former-industrial-plant-302350041.html https://www.sec.gov/Archives/edgar/data/2079253/000121390026080199/ea029866401ex99-2.htm https://www.westmorelandcountypa.gov/AgendaCenter/ViewFile/Minutes/_09112025-629",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Homer City Energy Campus",
    "state": "Pennsylvania",
    "city": "Homer City",
    "county": "Indiana County",
    "region": "Western Pennsylvania",
    "status": "under-construction",
    "sponsors": "Homer City Redevelopment; Kiewit Power Constructors",
    "operators": "Homer City Redevelopment",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 4500.0,
    "itLoadMW": 3700.0,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "3,200+ acre campus. Former coal-burning power plant site. Natural gas-powered delivering up to 4.5 GW.",
    "announcedDate": "2025-04-02",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Natural gas powered. Seven GE Vernova 7HA.02 hydrogen-enabled gas-fired turbines. EQT Corporation to supply natural gas.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public hearing testimony cited roughly 3,500 construction jobs; no verified tax-revenue projections or economic impact study located in reviewed sources.",
    "incentives_type": "Grant; Infrastructure Support",
    "incentives_value": 5000000.0,
    "challenges": "Local zoning/land-use approvals not located in reviewed public sources; incentive documentation not found for reported grant; interconnection studies, required grid upgrades, and rate impacts not located in reviewed sources.",
    "notes": "Brownfield redevelopment of former Homer City Generating Station. Critical infrastructure already in place including transmission lines to PJM and NYISO grids. First GE turbine deliveries expected 2026.; Sources: https://www.homercityredevelopment.com/post/former-homer-city-pa-coal-plant-officially-reopens-as-state-of-the-art-natural-gas-facility https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment https://www.gevernova.com/news/press-releases/homer-city-redevelopment-kiewit-announce-country-largest-natural-gas-powered-data-center-support-ai-hpc-demand",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CoreWeave Lancaster County AI Data Center",
    "state": "Pennsylvania",
    "city": "Lancaster",
    "county": "Lancaster County",
    "region": "South Central Pennsylvania",
    "status": "planned",
    "sponsors": "CoreWeave; Chirisa Technology Parks; Machine Investment Group",
    "operators": "CoreWeave",
    "tenants": "CoreWeave",
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": 100.0,
    "investmentUSD": 6000000000.0,
    "sizeNotes": "Initial 100MW IT capacity scalable to 300MW. Former LSC Communications/R.R. Donnelley printing plants. 144 acres with 1.5 million sq ft industrial space.",
    "announcedDate": "2025-07-15",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "air-cooled chillers and closed-loop water system",
    "certifications": null,
    "sustainabilityNotes": "Purpose-built for AI use cases",
    "economicImpact_jobs": 175.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "CoreWeave claimed ~600 construction jobs and 175 permanent jobs. City estimates a $34.3M property transfer tax (one-time) and $2.5M in permit fees.",
    "incentives_type": "Cba",
    "incentives_value": 20000000.0,
    "challenges": "Zoning appeal and organized community opposition; Phase 2 land development review pending; water withdrawal permitting and interconnection details not confirmed in available public records.",
    "notes": "Sites at 216 Greenfield Road and 1375 Harrisburg Pike. 600 jobs during construction, 70 FTE at launch scaling to 175. Announced at Pennsylvania Energy and Innovation Summit. May be largest single investment in Lancaster County history.; QA 2026-07-18: Retained the disclosed 100 MW in IT load and cleared the duplicate facility-power value.; Sources: https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx https://www.coreweave.com/blog/building-pennsylvania-into-the-mid-atlantic-ai-hub https://chirisatechnologyparks.com/blue-owl-and-chirisa-technology-parks-close-4-billion-joint-venture-partnership-including-machine-investment-group-for-lancaster-campus/ https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Gouldsboro Data Center Campus",
    "state": "Pennsylvania",
    "city": "Gouldsboro (Clifton and Covington Townships)",
    "county": "Lackawanna County",
    "region": "Northeastern Pennsylvania",
    "status": "planned",
    "sponsors": "1778 Rich Pike LLC; Quantm Group LLC",
    "operators": "1778 Rich Pike LLC",
    "tenants": null,
    "totalSquareFeet": 9000000.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 14250000000.0,
    "sizeNotes": "1,000 acres across Clifton and Covington townships. Up to 35 buildings, each up to 379,500 sq ft.",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": "2034",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Developer counsel said the end user plans to truck in water for cooling and will not use groundwater or well water to cool data-center equipment; WVIA also reported a centralized well system for sinks, bathrooms, drinking water, and humidification.",
    "certifications": null,
    "sustainabilityNotes": "The project would need a GRID sustainability plan if it seeks Commonwealth support. Public sources reviewed did not identify a final PA DEP, PennDOT, federal NEPA, or air/water permit approval.",
    "economicImpact_jobs": 450.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "400-500 permanent jobs projected. Est. $60-85M/year net fiscal benefit to local government/schools.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Developer: 1778 Ridge Pike LLC. Zoning challenges in Clifton and Covington townships.",
    "notes": "Facing significant local opposition and zoning challenges. Settlement rejected by Clifton Township in September 2025. Located on both sides of Interstate 380 near Clifton Beach Road. Judge Family Estates LLC major landowner.; Sources: https://covingtontwp.org/wp-content/uploads/2025/06/2025-05-13-BOS-Monthly-Meeting-minutes.pdf https://www.datacenterdynamics.com/en/news/15gw-data-center-campus-proposed-in-pennsylvania/ https://www.wvia.org/news/local/2025-07-30/clifton-twp-zoning-hearing-about-data-centers-moved-to-september-if-needed-at-all https://www.nj.gov/drbc/library/documents/WMAC/101525/Thompson_DataCenters.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "York 2 Energy Center Data Campus",
    "state": "Pennsylvania",
    "city": "Peach Bottom Township",
    "county": "York County",
    "region": "South Central Pennsylvania",
    "status": "planned",
    "sponsors": "Energy Capital Partners; Calpine Corporation",
    "operators": "Calpine Corporation",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 828.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "Built on Calpine's 828MW York 2 Energy Center dual-fuel combined-cycle gas turbine power station.",
    "announcedDate": "2025-07-15",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Powered by on-site natural gas power plant",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public economic impact study or tax-revenue projection identified in township records or project announcements reviewed; project remains planned/early stage.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Limited public disclosure of incentives, environmental permitting, and utility/interconnection details; community concerns about emissions and power reliability.",
    "notes": "Expected to create 2,500 construction jobs. Part of $90 billion investment in Pennsylvania's energy and AI infrastructure.; Sources: https://www.ecpgp.com/about/news-and-insights/press-releases/2025/energy-capital-partners---ecp---attends-the-inaugural-pennsylvan https://www.datacenterdynamics.com/en/news/energy-capital-partners-announces-plans-for-5bn-pennsylvania-data-center/ https://www.jsg.legis.state.pa.us/resources/documents/ftp/publications/2026-01-28%202023%20HR170%20web%201.29.26.pdf https://files.dep.state.pa.us/Water/Wastewater%20Management/eDMRPortalFiles/Permits/PA0088781_FACT_SHEET_20251110_DRAFT_V5.pdf",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Blackstone-QTS Northeastern Pennsylvania Data Centers",
    "state": "Pennsylvania",
    "city": "Salem Township",
    "county": "Luzerne County",
    "region": "Northeastern Pennsylvania",
    "status": "planned",
    "sponsors": "Blackstone; QTS Data Centers",
    "operators": "QTS Realty Trust",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "Multiple land sites secured throughout Northeastern Pennsylvania. Investment includes data centers and natural gas power generation through joint venture with PPL.",
    "announcedDate": "2025-07-15",
    "constructionStartDate": "2028",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling; QTS says the facilities will not consume water for cooling once operational.",
    "certifications": null,
    "sustainabilityNotes": "New gas-fired combined-cycle generation stations to power data centers under long-term agreements with hyperscalers",
    "economicImpact_jobs": 3000.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Jobs figures are projected statewide across Pennsylvania in connection with the announced digital and energy infrastructure build-out (including data centers). Construction jobs are described as ~6,000 annually.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Specific sites/municipalities are not publicly identified; as a result, site-specific incentives, zoning approvals, permitting, utility interconnection details, grid upgrades, construction progress, and community response cannot be verified from public records as of 2026-02-01.",
    "notes": "QTS acquired approximately 1,700 acres in Salem Township for a proposed data center campus near Talen's Susquehanna nuclear plant and Amazon's planned campus. QTS's project page describes a phased plan for 12 data center buildings across about 1,700 acres and identifies the project as a $10 billion QTS investment. [Source: https://www.datacenterdynamics.com/en/news/qts-acquires-1700-acres-of-land-in-pennsylvania-for-data-center-development/ | https://q.com/data-centers/salem-township/; Date: 2026-03-19; 2026-07-17]; Sources: https://www.blackstone.com/news/press/blackstone-to-invest-more-than-25-billion-in-pennsylvanias-digital-and-energy-infrastructure-plus-catalyze-an-additional-60-billion-investment/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Shippingport Power Station and Data Center",
    "state": "Pennsylvania",
    "city": "Shippingport",
    "county": "Beaver County",
    "region": "Western Pennsylvania",
    "status": "planned",
    "sponsors": "Frontier Group of Companies",
    "operators": "Frontier Group of Companies",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2700.0,
    "itLoadMW": null,
    "investmentUSD": 3200000000.0,
    "sizeNotes": "Former 2.7 GW Bruce Mansfield coal plant. New 900MW generation plus existing infrastructure. Will supply substantial power to collocated data center and 1+ GW to PJM grid.",
    "announcedDate": "2025-07-15",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Natural gas powered. Will use ~800 million cubic feet per day from Marcellus and Utica shales. EQT Corporation as natural gas supplier.",
    "economicImpact_jobs": 1000.0,
    "economicImpact_taxRevenue": 13000000.0,
    "economicImpact_notes": "No independent economic impact study or tax revenue projection identified in reviewed sources; project remains in planning/approval stages.",
    "incentives_type": "Grant",
    "incentives_value": 100000.0,
    "challenges": "Conditional-use and variance hearings ongoing (2025\u20132026); PJM interconnection/load request referenced as withdrawn in 2025-01.",
    "notes": "300 permanent jobs and 15,000 construction jobs. Partner secured to build collocated data center for AI infrastructure. Brownfield redevelopment converting decommissioned coal plant.; Sources: https://www.nationalfuel.com/news/the-frontier-group-of-companies-to-transform-bruce-mansfield-power-plant-into-state-of-the-art-natural-gas-power-plant-supporting-americas-energy-goals-and-pennsylvanias-economic-gr/ https://frontier-companies.com/energy-initiatives/ https://www.jsg.legis.state.pa.us/resources/documents/ftp/publications/2026-01-28%202023%20HR170%20web%201.29.26.pdf https://www.tmia.com/node/3619 https://frontier-companies.com/shippingport-industrial-park/ https://www.post-gazette.com/business/tech-news/2026/02/08/beaver-valley-data-centers-shippingport-aligned/stories/202602080033",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft Three Mile Island Energy Supply",
    "state": "Pennsylvania",
    "city": "Londonderry Township",
    "county": "Dauphin County",
    "region": "South Central Pennsylvania",
    "status": "planned",
    "sponsors": "Constellation Energy; Microsoft",
    "operators": "Constellation Energy",
    "tenants": "Microsoft",
    "totalSquareFeet": null,
    "powerCapacityMW": 835.0,
    "itLoadMW": null,
    "investmentUSD": 1600000000.0,
    "sizeNotes": "Nuclear power plant restart to supply 835MW to Microsoft data centers in four states. Not a data center itself but critical power infrastructure.",
    "announcedDate": "2024-09-20",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "100% carbon-free nuclear energy. Three Mile Island Unit 1 reactor (not involved in 1979 accident). Will be renamed Crane Clean Energy Center.",
    "economicImpact_jobs": 627.0,
    "economicImpact_taxRevenue": 3600000000.0,
    "economicImpact_notes": "Constellation cites a Brattle Group study (commissioned by the Pennsylvania Building & Construction Trades Council) projecting ~3,400 direct and indirect jobs, $16 billion in Pennsylvania GDP, and >$3 billion in state and federal taxes; figures are projections and not yet realized.",
    "incentives_type": "Other",
    "incentives_value": 1000000000.0,
    "challenges": "Verification gaps for local zoning votes/minutes (some links reportedly 404); specific DEP permit numbers/statuses not yet identified; interconnection agreement and grid upgrade costs not located in public sources.",
    "notes": "20-year power purchase agreement. Microsoft takes 100% of plant output. Expected to create 3,400 jobs and add 800+ MW carbon-free electricity to PJM grid. Pending NRC approval by 2027. Unit closed in 2019 due to unprofitability.; Sources: https://investors.constellationenergy.com/news-releases/news-release-details/constellation-launch-crane-clean-energy-center-restoring-jobs https://www.constellationenergy.com/news/2024/Constellation-Reports-Third-Quarter-2024-Results.html https://www.energy.gov/nepa/articles/doeeis-0574-final-environmental-impact-statement-august-2025 https://www.microsoft.com/en-us/investor/events/fy-2025/2024-annual-shareholder-meeting/ https://www.sec.gov/Archives/edgar/data/1868275/000186827524000058/ceg-202409208kexh991.htm https://apnews.com/article/three-mile-island-nuclear-power-microsoft-8f47ba63a7aab8831a7805dfde0e2c39",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Berkeley County Data Center Campus",
    "state": "South Carolina",
    "city": "Moncks Corner",
    "county": "Berkeley County",
    "region": "Lowcountry",
    "status": "expansion",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1300000000.0,
    "sizeNotes": "More than $4.5 billion invested since 2007; part of $9 billion 2026-2027 investment plan",
    "announcedDate": "2007",
    "constructionStartDate": "2007",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": "2013",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": 1.1,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Supports local renewable energy projects",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Early reporting on the 2007 project cited ~200 jobs tied to a $600M investment and state job development credits; later phases cite additional investment (including a $1.3B expansion announcement in 2024), but no third-party economic impact study or outcomes audit was located in this research.",
    "incentives_type": "Income Tax Credit; Pilot",
    "incentives_value": null,
    "challenges": "Key documentation gaps include missing publicly accessible FILOT ordinances/agreements (assessment ratio, term length, clawbacks), unclear local zoning vote records, and limited publicly available facility-specific environmental permit documents beyond the groundwater permit; the 2019 groundwater permit process drew substantial scrutiny and resulted in tougher conditions.",
    "notes": "Google's first South Carolina data center, opened in 2013. Location in Mount Holly Commerce Park. Part of ongoing expansion plans.; QA 2026-07-19: Retained project-specific investment and cleared modeled power capacity.; Sources: https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/ https://datacenters.google/locations/south-carolina/ https://governor.sc.gov/news/2018-08/google-investing-600-million-its-berkeley-county-operations",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Google Winding Woods Commerce Park Data Center",
    "state": "South Carolina",
    "city": "St. George",
    "county": "Dorchester County",
    "region": "Lowcountry",
    "status": "under-construction",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 236.0,
    "itLoadMW": null,
    "investmentUSD": 1650000000.0,
    "sizeNotes": "Part of $3.3 billion Dorchester County investment announced September 2024",
    "announcedDate": "2024-09-26",
    "constructionStartDate": "2024-09-26",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Part of Google's commitment to renewable energy matching",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "County and economic development materials cite ~200 permanent jobs and ~1,200 construction jobs; no public economic impact study or tax revenue projections located.",
    "incentives_type": "Pilot",
    "incentives_value": null,
    "challenges": "Public comments during state air permitting raised concerns about emissions and confidentiality/transparency; no lawsuits, formal petitions, or protest actions located in public sources reviewed.",
    "notes": "One of two new Dorchester County campuses. Will create 100 operational jobs and 600 construction jobs. Total Dorchester County project creates 200 operational jobs and 1,200 construction jobs.; Power estimated at $7M/MW; Sources: https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion https://des.sc.gov/sites/des/files/Documents/BAQ/DepartmentDecisions/GannettEnterprises/LettertoCitizens.pdf https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/ https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-two-data-center-campuses-in-south-carolina-at-33bn/ https://www.des.sc.gov/sites/des/files/Documents/BAQ/DepartmentDecisions/GannettEnterprises/Permit.pdf https://www.des.sc.gov/sites/des/files/Documents/BAQ/DepartmentDecisions/GannettEnterprises/StatementofBasis.pdf",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "QTS York County Data Center Campus",
    "state": "South Carolina",
    "city": "York County (unincorporated)",
    "county": "York County",
    "region": "Upstate",
    "status": "under-construction",
    "sponsors": "QTS Realty Trust; Blackstone; Gilbane",
    "operators": "QTS Realty Trust",
    "tenants": null,
    "totalSquareFeet": 5300000.0,
    "powerCapacityMW": 702.0,
    "itLoadMW": null,
    "investmentUSD": 8000000000.0,
    "sizeNotes": "400 acres purchased in July 2023",
    "announcedDate": "2023-09-19",
    "constructionStartDate": "2026-Q1",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Will utilize carbon-free power when feasible and leverage industry-leading, water-saving technology that uses zero water for cooling",
    "economicImpact_jobs": 12.0,
    "economicImpact_taxRevenue": 2500000.0,
    "economicImpact_notes": "County newsletter projects $2.5M/year in tax revenue and 12 jobs; investment described as the main benefit.",
    "incentives_type": "Grant; Pilot",
    "incentives_value": 200000.0,
    "challenges": "Primary documents (signed FILOT/incentive agreement, zoning/rezoning case files, site plan approvals, and environmental permits) were not publicly accessible/located during this research pass; details on zoning pathway, credit formulas, clawbacks, and grid upgrades remain unverified.",
    "notes": "A July 1, 2026 Commercial Property Executive report said QTS topped out the first facility at its Rock Hill/York County campus. The report described the project as a nine-building, three-phase complex, said the total value has grown from the initial $1 billion announcement to $8 billion, and said the first phase includes four buildings across 109 acres with the second phase expected to break ground in early 2027. [Source: https://www.commercialsearch.com/news/qts-advances-8b-data-center-project/; Date: 2026-07-01]; Sources: https://www.colliers.com/en/download-article?itemId=c3a9557d-7976-4de1-af64-2955917f0b60 https://q.com/data-centers/york/ https://www.heraldonline.com/news/business/article306316056.html https://www.yorkcountysc.gov/1313/Data-Centers https://www.gilbaneco.com/about/whats-new/news/gilbane-marks-steel-topping-out-milestone-for-data-center-campus-in-upstate-south-carolina/ https://dms.psc.sc.gov/Attachments/Matter/d56e35aa-49c9-4c23-9903-73bf7ffbd9fb",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Moc-1 (NorthMark Strategies)",
    "state": "South Carolina",
    "city": "Spartanburg",
    "county": "Spartanburg County",
    "region": "Upstate",
    "status": "under-construction",
    "sponsors": "NorthMark Strategies; Valara Holdings",
    "operators": "NorthMark Strategies",
    "tenants": null,
    "totalSquareFeet": 850000.0,
    "powerCapacityMW": 457.0,
    "itLoadMW": null,
    "investmentUSD": 2800000000.0,
    "sizeNotes": "608 acres; approximately 10 miles from downtown Spartanburg; on-site power generation planned",
    "announcedDate": "2025-04-22",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026-Q3",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; research",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "On-site power generation planned to avoid additional demand on local power grid",
    "economicImpact_jobs": 27.0,
    "economicImpact_taxRevenue": 15000000.0,
    "economicImpact_notes": "State announcement projects at least 27 jobs and says the project will use regional businesses and suppliers for maintenance and operations.",
    "incentives_type": "Pilot; Property Tax Abatement; Other",
    "incentives_value": 70000000.0,
    "challenges": "Executed FILOT agreements/ordinances and state incentive documents were not located in publicly posted records; zoning/planning approvals not found in online county records; community groups raised enforceability and environmental justice concerns during air-permit review; permit revisions made after public comments.",
    "notes": "The project remains under construction, but June 2026 air-permit coverage materially updates the on-site generation picture: SCDES held a hearing on Valara/NorthMark's draft permit to add 11 natural-gas turbines, after an earlier permit for about 48 MW of generation. The SCDES fact sheet describes five 17 MW Baker Hughes turbines and six 54 MW GE turbines, or about 409 MW of additional turbine capacity; the 457 MW value is on-site generation capacity, not confirmed IT load. [Source: https://www.foxcarolina.com/2026/06/25/live-public-hearing-held-additions-spartanburg-co-data-center-development/ | https://des.sc.gov/sites/des/files/2026-06/Valara%20Fact%20Sheet.pdf; Date: 2026-06-25; 2026-06]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Applied Digital Toronto AI Data Center",
    "state": "South Dakota",
    "city": "Toronto",
    "county": "Deuel County",
    "region": "Eastern South Dakota",
    "status": "canceled",
    "sponsors": "Applied Digital",
    "operators": "Applied Digital",
    "tenants": null,
    "totalSquareFeet": 1815000.0,
    "powerCapacityMW": 430.0,
    "itLoadMW": 430.0,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "Two buildings of approximately 907,500 sq ft each. Total investment estimate ranges from $10-16 billion including customer investments. Initial Applied Digital investment is $4.3-5.5 billion.",
    "announcedDate": "2025-04",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2027-2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Cold climate reduces cooling costs and water consumption. Site selected near gas turbine and pipeline infrastructure.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 15500000.0,
    "economicImpact_notes": "Company estimate: ~200 permanent workers; 300\u2013600 construction workers during buildout. Minutes also cited Ellendale, ND as a comparative example, claiming local property taxes rose from ~$50,000 to ~$2,000,000 (not a Deuel County projection).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project contingent on state tax incentive legislation; county had no zoning framework at proposal time; as of 2026-01-30 the company had not purchased land or begun zoning/permitting.",
    "notes": "South Dakota Searchlight reported that, after state lawmakers rejected data-center tax incentives, Applied Digital Vice President Nick Phillips said the 430 MW, $5 billion Toronto-area campus \"doesn't make sense at this time\" and that the company's agreement on the land near Toronto was up for renewal soon and would be allowed to lapse. The company could revisit South Dakota depending on future elections and power availability. [Source: https://www.newsfromthestates.com/article/one-data-center-project-unchanged-while-another-doesnt-make-sense-after-rejected-incentives; Date: 2026-04-02]; QA 2026-07-18: Updated investment to the current $5 billion proposal figure and retained 430 MW only as IT load.; Sources: https://www.sec.gov/Archives/edgar/data/1144879/000114487925000076/apld_invxfinalpresentati.htm https://southdakotasearchlight.com/2026/04/02/one-data-center-project-unchanged-while-another-doesnt-make-sense-after-rejected-incentives/ https://www.sdpb.org/business-economics/2025-05-02/company-says-data-center-could-bring-millions-to-state-deuel-county",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Gemini Data Center Sioux Falls",
    "state": "South Dakota",
    "city": "Sioux Falls",
    "county": "Minnehaha County",
    "region": "Southeastern South Dakota",
    "status": "planned",
    "sponsors": "Gemini Data Center SD LLC; Michael Anvar (Capital Gemini)",
    "operators": "Gemini Data Center SD LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "160 acres acquired. Site can support 500 megawatt power load. Would be first hyperscale data center in Sioux Falls area.",
    "announcedDate": "2024-12",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling system planned (not finalized); city officials stated municipal water use limited to domestic purposes (not cooling).",
    "certifications": null,
    "sustainabilityNotes": "Site selected for excess power availability. South Dakota has 30% wind energy generation.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No published economic impact study or job/tax projections were located in rezoning ordinances or city releases as of Feb. 1, 2026.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Significant community opposition focused on large power demand and potential water/environmental impacts; post-rezoning site plan/building permits and any utility interconnection or PUC filings not yet public as of Feb. 1, 2026.",
    "notes": "Located approximately 1 mile south of Veterans Parkway exit for I-90, near intersection with Rice Street, just south of Xcel's Split Rock substation and Angus Anson power station. Site annexed into Sioux Falls. Could support 50-150 full-time positions. Potential to serve major tech companies like Amazon, Meta, or Google. Economic impact estimated at millions per year in property and sales tax. Michael Anvar is California-based family office investor in real estate, renewable energy, and technology.; QA 2026-07-19: Replaced zero/unknown area with null, retained the reported 500 MW site plan, and cleared modeled investment.; Sources: https://www.sftechpark.com/ https://www.sdpb.org/business-economics/2025-08-15/la-based-company-looking-to-build-data-center-in-sioux-falls https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/ https://www.sftechpark.com/_files/ugd/af4233_da95151d21c740c497d6e28a5ffc745b.pdf https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Meta Gallatin Data Center Campus",
    "state": "Tennessee",
    "city": "Gallatin",
    "county": "Sumner County",
    "region": "Greater Nashville",
    "status": "operational",
    "sponsors": "Meta Platforms Inc.",
    "operators": "Meta Platforms Inc.",
    "tenants": "Meta Platforms, Inc.",
    "totalSquareFeet": 1600000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Campus spans approximately 900 acres with 12 data halls and 2 administrative buildings",
    "announcedDate": "2020",
    "constructionStartDate": "2020",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": "2024-11",
    "numberOfPhases": 3.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Direct air cooling with outside air and fan technology; water-efficient cooling that reuses water before wastewater discharge.",
    "certifications": "LEED Gold (target)",
    "sustainabilityNotes": "Supported by 100% renewable energy through TVA partnerships, with 530MW of new solar capacity added in Tennessee",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "2020 state announcement projected 50 permanent jobs and ~1,000 construction jobs; Meta's 2024 update reports ~100 operational jobs and ~$1.5B cumulative investment. No public tax revenue or economic impact study found in this pass.",
    "incentives_type": "Pilot",
    "incentives_value": null,
    "challenges": "Primary document gaps: PILOT/lease agreement terms not located; original zoning/rezoning case files and meeting minutes not located; environmental permit documents not located; power capacity figures (e.g., 500 MW) not verified in sources found in this run.",
    "notes": "At peak construction, employed 1,100 skilled trade workers. Currently supports over 100 operational jobs. Originally announced as $800M investment, expanded to $1.5B+; Sources: https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/ https://datacenters.atmeta.com/us-locations/ https://capitol.tn.gov/Bills/114/Fiscal/HB1461.pdf https://www.gallatingetsit.com/newsroom/meta-formerly-known-as-facebook-tees-up-another-data-center-in-gallatin",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "xAI Colossus Supercomputer",
    "state": "Tennessee",
    "city": "Memphis",
    "county": "Shelby County",
    "region": "Southwest Tennessee",
    "status": "expansion",
    "sponsors": "xAI; MZX Tech",
    "operators": "xAI",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 1563.0,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": "Houses 100,000+ GPUs (200,000 GPUs in Phase 2), dubbed 'gigafactory of compute' by Elon Musk. Investment figure is for new substation only.",
    "announcedDate": "2024",
    "constructionStartDate": "2024-03",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": "2024",
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; enterprise",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Initially trucked water recycled through an internal closed-loop cooling system; proposed recycled-wastewater facility would supply industrial reuse water.",
    "certifications": null,
    "sustainabilityNotes": "Facility backed by Tesla batteries for power stability. Uses natural gas generators.",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": 100000000.0,
    "economicImpact_notes": "The Chamber says the initial phase will bring up to 500 quality, high-paying jobs. xAI says its facilities will create hundreds of permanent jobs and that expansion plans are expected to push local tax revenue above $100 million by the following year.",
    "incentives_type": "Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Active regulatory controversy over alleged unpermitted gas turbines, air permitting appeals, federal Clean Air Act litigation tied to a Southaven turbine plant alleged to power Colossus 2, unresolved water-reuse permit records, utility approval dependencies, and transparency concerns.",
    "notes": "A Tennessee General Assembly Fiscal Review Committee memorandum dated March 2, 2026 states that a second xAI-owned Memphis data center with planned capacity of 1,563 MW is expected to come online in 2026. The same memorandum separately lists xAI's existing Memphis data center at 280 MW, distinguishing the large planned second facility from the existing operating footprint. [Source: https://capitol.tn.gov/Bills/114/Fiscal/FM2136.pdf; Date: 2026-03-02]; Sources: https://memphischamber.com/blog/press-release/xai-memphis-announces-expansion-of-supercomputer-with-addition-of-tech-companies-in-digital-delta/ https://memphischamber.com/blog/press-release/expansion-follows-december-announcement-of-supercomputer-growth-and-tech-partnership-ecosystem/ https://x.ai/memphis",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Tennessee 264 MW Data Center",
    "state": "Tennessee",
    "city": "Unknown",
    "county": "Unknown",
    "region": "Tennessee",
    "status": "operational",
    "sponsors": "ENFRA; Meta Platforms, Inc.; Woolhawk LLC",
    "operators": "Meta Platforms, Inc.",
    "tenants": "Facebook (Meta)",
    "totalSquareFeet": 1750000.0,
    "powerCapacityMW": 264.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Consists of four data centers with 36,100 tons of cooling capacity total",
    "announcedDate": "2020-08-12",
    "constructionStartDate": "2020",
    "expectedCompletionDate": "2024-11",
    "actualCompletionDate": "2024-01",
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Direct air cooling with outside air and fan technology; ENFRA reports 36,100 tons of cooling capacity",
    "certifications": "LEED Gold",
    "sustainabilityNotes": "Built to high standards of efficiency, reliability, and sustainability with advanced cooling systems",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public statements around the Gallatin data center\u2019s launch cite over $1.5B investment, ~1,100 peak construction workers, and over 100 operational jobs; however, the match to the ENFRA \u201c264 MW data center\u201d remains unconfirmed in primary sources.",
    "incentives_type": "Pilot; Tif; Grant",
    "incentives_value": null,
    "challenges": "Primary-source identification is unconfirmed: ENFRA\u2019s 264 MW Tennessee project does not name owner/operator/county, and the overlap with the Gallatin/Meta campus remains unconfirmed without permits, planning records, or an IDB agreement naming the operator.",
    "notes": "Project completed by ENFRA Solutions. Phased approach with advanced HVAC and cooling systems designed for high computational loads. Specific location not disclosed in public sources.; Investment estimated at $7M/MW; Sources: https://enfrasolutions.com/projects/264-mw-data-center https://www.tn.gov/ecd/news/2020/8/12/governor-lee--commissioner-rolfe-announce-facebook-to-build--800-million-data-center-in-gallatin.html https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Stargate Project - Abilene Campus (Oracle/Crusoe)",
    "state": "Texas",
    "city": "Abilene",
    "county": "Taylor County",
    "region": "West Texas",
    "status": "operational",
    "sponsors": "OpenAI; Oracle; SoftBank; Crusoe; Lancium; Microsoft",
    "operators": "Oracle; Crusoe Energy",
    "tenants": "OpenAI",
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 15000000000.0,
    "sizeNotes": "Part of $500 billion Stargate program; 8 buildings at full buildout",
    "announcedDate": "2026-03-27",
    "constructionStartDate": "2024-06",
    "expectedCompletionDate": "2026-06",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Zero-water evaporation cooling system; natural gas turbines for backup; renewable energy integration planned",
    "economicImpact_jobs": 57.0,
    "economicImpact_taxRevenue": 22600000.0,
    "economicImpact_notes": "Minimum 57 FT jobs at $57,600 avg; Crusoe committed to 357 FT positions; ~2,000-5,000 construction workers",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary public records for abatements, zoning/permitting, interconnection, and environmental permits are not centralized or were not located in reviewed sources; some community concerns were raised regarding grid reliability, water usage, and compliance with earlier commitments.",
    "notes": "Crusoe announced an adjacent 900 MW AI factory campus for Microsoft at the Abilene Stargate campus, bringing projected full-site capacity to about 2.1 GW; land clearing is underway and the first building is expected in mid-2027. [Source: https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure; Date: 2026-03-27]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Stargate Project - Milam County Site",
    "state": "Texas",
    "city": "Unknown",
    "county": "Milam County",
    "region": "Central Texas",
    "status": "under-construction",
    "sponsors": "OpenAI; Oracle; SoftBank",
    "operators": "Oracle",
    "tenants": "OpenAI",
    "totalSquareFeet": 548950.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "Powered infrastructure for fast-build data center site",
    "announcedDate": "2025-09",
    "constructionStartDate": "2025-10-20",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling; air-based cooling (reported).",
    "certifications": null,
    "sustainabilityNotes": "Sponsor reporting describes powering the Texas site with new solar generation and battery storage, and prioritizing minimizing water usage via closed-loop and air-based cooling.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Sponsor reporting states \u201cthousands of construction jobs\u201d and \u201cmore than 100 permanent roles,\u201d but it is unclear whether these figures apply specifically to the Milam County site or to a broader multi-site expansion.",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Public records in BoardBook agenda views do not include executed tax abatement agreements/addenda or detailed performance/clawback terms; project-specific building/environmental permits and utility interconnection/upgrade documents were not located in publicly accessible sources cited.",
    "notes": "Part of Stargate $500B program; one of 20 Texas sites planned; From OpenAI: Stargate 1.2 GW site in Milam County; SB Energy partnership; 00M+00M equity investment; total investment at M/MW; Sources: https://group.softbank/en/news/press/20250924 https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/ https://www.datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase/ https://tech.yahoo.com/ai/articles/two-stargate-data-centers-coming-120013936.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vantage Data Centers - Frontier Campus",
    "state": "Texas",
    "city": "Unknown",
    "county": "Shackelford County",
    "region": "West Texas",
    "status": "under-construction",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": "Oracle America Cloud Services, Inc.",
    "totalSquareFeet": 3700000.0,
    "powerCapacityMW": 1400.0,
    "itLoadMW": 1400.0,
    "investmentUSD": 25000000000.0,
    "sizeNotes": "1.4GW GPU compute capacity",
    "announcedDate": "2025",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2026-H2",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop chiller / closed-circuit cooling system",
    "certifications": "LEED (pursuing)",
    "sustainabilityNotes": "Developer claims minimal water use via closed-loop chiller system; community concerns noted about initial local water draw.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 10000000.0,
    "economicImpact_notes": "Developer estimate: more than 5,000 individuals across construction and ongoing operations. Local reporting describes an incentive structure with $10 million per year payments to the county for the first 10 years, plus $150,000 per year in charitable contributions for 10 years; thereafter taxes paid at the tax rate for seven years.",
    "incentives_type": "Property Tax Abatement; Pilot; Other",
    "incentives_value": null,
    "challenges": "Public concerns and reporting focus on water supply and cooling-related water draw; incentive/abatement negotiations referenced via county agenda and local reporting.",
    "notes": "Largest single investment by Vantage to date; mega-scale campus [Hosts OpenAI/Oracle Stargate Shackelford County deployment; duplicate Stargate row removed 2026-06-10.]; Sources: https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/ https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx/ https://digitalbridge.gcs-web.com/news-releases/news-release-details/digitalbridge-backed-portfolio-company-vantage-data-centers https://vantage-dc.com/wp-content/uploads/2025/08/VDC_DataSheet_Frontier.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Data City Texas",
    "state": "Texas",
    "city": "Near Laredo",
    "county": "Webb County",
    "region": "South Texas",
    "status": "planned",
    "sponsors": "Energy Abundance Development Corp",
    "operators": "Energy Abundance Development Corp",
    "tenants": null,
    "totalSquareFeet": 15000000.0,
    "powerCapacityMW": 5000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "50,000-acre site; world's largest behind-the-meter data center",
    "announcedDate": "2025",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "100% on-site green energy 24/7; initially natural gas, transitioning to green hydrogen; hydrogen salt dome storage facility",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public sources reviewed do not provide quantified job counts, tax revenue projections, or an economic impact study.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "No local permits, parcel IDs, zoning case numbers, incentive agreements, or environmental notices were identified in the public sources reviewed; definitive zoning/permitting status depends on parcel-level records.",
    "notes": "Planned to be world's largest green-powered data center hub; 50,000 acres; 15M+ sq ft at completion; Investment estimated at $7M/MW; Sources: https://www.energyabundance.com/homepage/data-city https://www.prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html https://www.kgns.tv/2026/07/31/laredo-officials-call-special-session-moratorium-data-center-permits/?outputType=amp",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "GigaPop Data Center",
    "state": "Texas",
    "city": "Red Oak",
    "county": "Ellis County",
    "region": "Dallas-Fort Worth Metro",
    "status": "planned",
    "sponsors": "Gigabit Fiber; Lincoln Property Co.; Tradition Holdings",
    "operators": "Gigabit Fiber",
    "tenants": null,
    "totalSquareFeet": 800000.0,
    "powerCapacityMW": 540.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "131-acre tract; initial 7,500 sq ft space",
    "announcedDate": "2024",
    "constructionStartDate": "2025-Q1",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No construction/permanent job counts or tax-revenue projections were found in the zoning agenda/council minutes or the project press release reviewed.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "No interconnection/utility agreements or project-specific environmental permits were identified in the publicly available records reviewed; incentives (if any) are not documented in the zoning/council record and require follow-up.",
    "notes": "Approximately $1B investment; 18 miles south of Dallas; Power estimated at $7M/MW; Sources: https://lpc.com/local-news/lincoln-property-company-gigabit-fiber-and-tradition-holdings-team-up-to-develop-131-acre-data-center-campus-in-dallas/ https://techxplore.com/news/2025-01-dallas-firms-center-campus-billion.pdf https://rebusinessonline.com/partnership-to-develop-800000-sf-data-center-campus-in-south-dallas/ https://dallas.urbanize.city/post/lincoln-property-jv-eyes-1b-data-center-campus https://podscan.fm/podcasts/rbn-energy-blogcast/episodes/god-blessed-texas-proposed-data-centers-for-texas-would-be-enormous-but-how-many-will-be-built",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "PowerHouse & Provident - Grand Prairie Campus",
    "state": "Texas",
    "city": "Grand Prairie",
    "county": "Dallas County",
    "region": "Dallas-Fort Worth Metro",
    "status": "under-construction",
    "sponsors": "PowerHouse Data Centers; Provident",
    "operators": "PowerHouse Data Centers",
    "tenants": "Amazon Data Services, Inc.",
    "totalSquareFeet": 8500000.0,
    "powerCapacityMW": 1800.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "1.8GW switchyard planned on-site",
    "announcedDate": "2025-02-25",
    "constructionStartDate": "2026-Q4",
    "expectedCompletionDate": "2026-05",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": 900.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Company estimate (as reported by Dallas Morning News): first phase could generate at least 5000000000 in direct construction; no public job or tax-revenue projections identified.",
    "incentives_type": "Property Tax Abatement; Tif; Grant; Infrastructure Support",
    "incentives_value": 105056000.0,
    "challenges": "Project-specific incentives, interconnection/serving utility, and environmental permits were not identified in the reviewed public sources; linkage between the developer-reported 768-acre campus and the Goodland PD entitlement area is treated as an inference because zoning documents do not explicitly name the PowerHouse/Provident campus.",
    "notes": "Hyperscale campus with major power infrastructure; Investment estimated at $7M/MW; Sources: https://www.providentdatacenters.net/news/powerhouse-and-provident-rewrite-the-data-center-playbook-with-new-texas-hyperscale-campus https://www.powerhousedata.com/data-center/powerhouse-grand-prairie",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "ECP & KKR - Bosque County Campus",
    "state": "Texas",
    "city": "Near Whitney",
    "county": "Bosque County",
    "region": "Central Texas",
    "status": "under-construction",
    "sponsors": "Energy Capital Partners; KKR",
    "operators": "Energy Capital Partners; KKR",
    "tenants": null,
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": 190.0,
    "itLoadMW": 144.0,
    "investmentUSD": 4000000000.0,
    "sizeNotes": "Total investment approaching $4 billion",
    "announcedDate": "2025-07-30",
    "constructionStartDate": "2024-12-01",
    "expectedCompletionDate": "2026-Q4",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling system filled once every 15 years with trucked-in water",
    "certifications": null,
    "sustainabilityNotes": "Project representatives stated the 400 MW buildout would not draw down Lake Whitney; groundwater supply described as seeking well water permits from the Middle Trinity Groundwater Conservation District. No NEPA or state EIA found in the reviewed public sources; potential TCEQ stormwater/air and site-specific water/wastewater permits not located.",
    "economicImpact_jobs": 40.0,
    "economicImpact_taxRevenue": 70000000.0,
    "economicImpact_notes": "Bosque County officials projected the project would increase the county tax base by ~120% and generate about $70 million over 30 years for Bosque County, Clifton ISD, the hospital district, and other entities.",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Primary project documents (signed tax-abatement agreement, commissioners court minutes/vote record, and site-specific environmental permits) were not located in the reviewed public sources; interconnection and grid-upgrade requirements were not documented in public sources.",
    "notes": "190 MW hyperscale campus; Sources: https://www.commercialsearch.com/news/kkr-jv-cyrusone-to-build-4b-data-center-campus/ https://www.prnewswire.com/news-releases/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas-302517470.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CyrusOne & Calpine - DFW10 Whitney Campus",
    "state": "Texas",
    "city": "Whitney",
    "county": "Bosque County",
    "region": "Central Texas",
    "status": "under-construction",
    "sponsors": "CyrusOne; Calpine",
    "operators": "CyrusOne",
    "tenants": null,
    "totalSquareFeet": 190000.0,
    "powerCapacityMW": 190.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "Adjacent to Thad Hill Energy Center; first phase will exceed 190,000 square feet",
    "announcedDate": "2025-07-30",
    "constructionStartDate": "2024-03-05",
    "expectedCompletionDate": "2026-Q4",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling system filled with trucked water stored in an on-site reservoir; not evaporative cooling",
    "certifications": null,
    "sustainabilityNotes": "Public sources reviewed do not describe renewable energy commitments, PUE targets, cooling approach, or sustainability certifications for the Whitney campus.",
    "economicImpact_jobs": 40.0,
    "economicImpact_taxRevenue": 70000000.0,
    "economicImpact_notes": "Public announcements reviewed do not specify job counts or tax revenue projections for the Whitney campus.",
    "incentives_type": "Property Tax Abatement",
    "incentives_value": null,
    "challenges": "TDLR construction records show a county discrepancy (Bosque County vs. Hill County) across related filings; verification against site address and local records is needed.",
    "notes": "$1.2B infrastructure investment; powered by adjacent energy center; QA 2026-07-19: Cleared an unsupported full-campus area and retained the operator's disclosed first-phase minimum.; Sources: https://www.cyrusone.com/resources/press-releases/cyrusone-and-calpine-announce-newhyperscale-data-center-development-in-texas https://www.ecpgp.com/about/news-and-insights/press-releases/2025/energy-capital-partners--ecp--and-kkr-announce-development-of-hy https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025005284",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Skybox Datacenters - PowerCampus Austin",
    "state": "Texas",
    "city": "Hutto",
    "county": "Williamson County",
    "region": "Austin Metro",
    "status": "under-construction",
    "sponsors": "Skybox Datacenters LLC",
    "operators": "Skybox Datacenters",
    "tenants": null,
    "totalSquareFeet": 3900000.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "160 acres; 6 buildings; company's largest campus",
    "announcedDate": "2025-09",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "High-efficiency air-cooled chillers with air-side economization, a bi-directional chilled-water loop, and in-row/in-rack cooling such as immersion or rear-door exchangers; closed-loop cooling discussed cautiously in regional Skybox coverage",
    "certifications": null,
    "sustainabilityNotes": "Marketing notes the site is in Oncor\u2019s deregulated power territory with access to renewable programs; no specific renewable commitment was identified in the provided sources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "A 2025 news report (citing Austin Business Journal) states the full buildout could generate $4\u20135 billion in economic impact for Williamson County; no definitive job commitments were found in the development agreement or city materials accessed.",
    "incentives_type": "Property Tax Abatement; Grant; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Signed Economic Development Performance Agreement and formal tax abatement agreement/ordinance text not located in publicly accessible records during this pass; limited public information on job commitments, clawbacks, and detailed community input.",
    "notes": "600 MW hub; 6-building campus; largest Skybox facility; Sources: https://www.skyboxdatacenters.com/images/PowerCampus-Austin-Brochure-Final.pdf https://www.skyboxdatacenters.com/locations/powercampus-austin https://comptroller.texas.gov/economy/development/search-tools/ch380-381/economic-development-agreements-details.php?agreement=0014278 https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024015381",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Blueprint Projects - Taylor Data Center",
    "state": "Texas",
    "city": "Taylor",
    "county": "Williamson County",
    "region": "Austin Metro",
    "status": "under-construction",
    "sponsors": "Blueprint Projects",
    "operators": "Blueprint Projects",
    "tenants": null,
    "totalSquareFeet": 135000.0,
    "powerCapacityMW": 60.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "52-acre parcel; 3 construction phases over 10 years",
    "announcedDate": "2024-07-24",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling (minimal water use)",
    "certifications": null,
    "sustainabilityNotes": "City-commissioned HDR environmental impact study summary: grid power with diesel backup generators; noise mitigation (enclosures/berms); closed-loop cooling with minimal water use; stormwater detention requirements; generator emissions governed by TCEQ.",
    "economicImpact_jobs": 5.0,
    "economicImpact_taxRevenue": 30000000.0,
    "economicImpact_notes": "City estimates up to 30000000 in additional city revenue over 10 years; school district projects up to 20000000 in benefits. City notes the project does not expect many employees; secondary reporting lists a minimum of 5 jobs to qualify for incentives.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Construction status not independently verified in publicly searchable sources reviewed; litigation over a deed restriction (dismissed with planned appeal); primary agreement and permit documents not located in the reviewed sources.",
    "notes": "Up to $1B investment over 10 years; northeast of Austin; Power estimated at $7M/MW; Sources: https://www.taylortx.gov/1293/Blueprint-Projects-Data-Center https://www.datacenterdynamics.com/en/news/blueprint-projects-gets-greenlight-for-data-center-in-taylor-texas/ https://www.datacenterdynamics.com/en/product-news/blueprint-data-centers-accelerates-85mw-texas-capacity-across-greater-austin-area/ https://taylortx.gov/DocumentCenter/View/14850",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta - Fort Worth Data Center Campus",
    "state": "Texas",
    "city": "Fort Worth",
    "county": "Tarrant County",
    "region": "Dallas-Fort Worth Metro",
    "status": "operational",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": "Facebook, Inc.; Meta Platforms, Inc.",
    "totalSquareFeet": 2600000.0,
    "powerCapacityMW": 214.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "5 data centers at 4500 Like Way",
    "announcedDate": "2015",
    "constructionStartDate": "2015",
    "expectedCompletionDate": "2023",
    "actualCompletionDate": "2017",
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; enterprise",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": "LEED Gold",
    "sustainabilityNotes": "100% clean and renewable energy; water-efficient cooling; contributed to 1,919 MW new renewable energy in Texas",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Meta reported >150 employees on site as of Dec. 2020; DPR reports 200+ permanent operational jobs upon completion. Meta reports >1,200 construction workers at peak. County abatement records include job targets for certain abatements/phases.",
    "incentives_type": "Property Tax Abatement; Grant; Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Limited publicly identified zoning case files and utility interconnection/PPA documents in reviewed sources; ongoing regulatory activity via a TCEQ Title V air permit application as of 2026-01-14.",
    "notes": "$1.5B invested over 9 years; 5 buildings spanning 2.6M sq ft; 100% renewable energy; Power estimated at $7M/MW; Sources: https://about.fb.com/news/2015/07/the-newest-addition-to-the-facebook-data-center-fleet-fort-worth/ https://datacenters.atmeta.com/2020/12/expanding-facebooks-fort-worth-data-center-by-approximately-170000-square-feet/ https://www.dpr.com/projects/facebook-fort-worth-data-center",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft - Medina County Data Centers",
    "state": "Texas",
    "city": "Castroville Area",
    "county": "Medina County",
    "region": "South Central Texas",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": null,
    "totalSquareFeet": 979400.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 1465000000.0,
    "sizeNotes": "4 new data centers planned",
    "announcedDate": "2024",
    "constructionStartDate": "2025-05-13",
    "expectedCompletionDate": "2027-07-31",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Microsoft pledge for Greater San Antonio datacenters: will pay to ensure datacenters don\u2019t increase local electricity prices; will minimize water use and replenish more water than used.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reporting cites Microsoft projection of 791 full-time workers in Texas by 2026 (not Medina County-specific). TDLR filings list $1.465B in construction value across four buildings.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Limited public access to county agenda/minutes and incentives database interface; lack of project-specific utility/interconnection documentation in accessible sources; community concerns about water use and construction impacts.",
    "notes": "$1.4B investment; 4 data centers west of San Antonio; Power estimated at $7M/MW; Sources: https://www.tdlr.texas.gov/TABS/Projects/TABS2025012765 https://www.mysanantonio.com/business/article/microsoft-castroville-medina-county-20189098.php https://local.microsoft.com/blog/county-road-381-datacenter-construction-update/ https://datacenters.microsoft.com/wp-content/uploads/2024/08/Texas%20%28South%20Central%20US%29.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Texas Critical Data Centers (TCDC) - Ector County",
    "state": "Texas",
    "city": "Odessa Area",
    "county": "Ector County",
    "region": "Permian Basin",
    "status": "planned",
    "sponsors": "Texas Critical Data Centers",
    "operators": "Texas Critical Data Centers",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1400.0,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": "Net-zero energy data center leveraging Permian Basin resources",
    "announcedDate": "2025-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "advanced/closed-loop cooling",
    "certifications": null,
    "sustainabilityNotes": "Net-zero energy design; leveraging natural gas and helium from Permian Basin",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No published job counts, tax-revenue projections, or formal economic-impact studies were identified in the reviewed primary documents and coverage.",
    "incentives_type": "Other",
    "incentives_value": null,
    "challenges": "No executed Industrial District agreement, TCEQ air-permit docket/permit number, or water/wastewater service agreements were identified in the reviewed materials; interconnection and grid upgrade details were not published in available sources.",
    "notes": "250 MW net-zero energy facility; Permian Basin location; AI-focused; Investment estimated at $7M/MW; Sources: https://www.odessatex.com/media/userfiles/subsite_260/files/resource-library/JV%20LOI%20PR%20-NEHC-26-FEB-25-FINAL-FINAL2025%20%281%29.pdf https://www.sec.gov/Archives/edgar/data/2028336/000121390025125498/ea0270672-8k_newera.htm https://www.newerainfra.ai/ https://www.sec.gov/Archives/edgar/data/2028336/000121390026029087/ea028197201ex99-1.htm",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Eagle Mountain Data Center",
    "state": "Utah",
    "city": "Eagle Mountain",
    "county": "Utah County",
    "region": "Salt Lake Metro",
    "status": "operational",
    "sponsors": "Meta Platforms, Inc.",
    "operators": "Meta Platforms, Inc.",
    "tenants": null,
    "totalSquareFeet": 4500000.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "7 data center buildings spanning 4.5 million square feet",
    "announcedDate": "2018",
    "constructionStartDate": "2018",
    "expectedCompletionDate": "2020",
    "actualCompletionDate": "2021",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Powered by 673 MW Faraday Solar Farm starting 2025; 80% more water efficient than industry average; water restoration projects equal 200% of facility's water consumption",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "2018 announcement projected 30\u201350 full-time jobs for Phase 1; 2021 update projected operations would 'support' 200 jobs upon completion, with only a few dozen on-site; peak construction workforce reported as 1,200+ (also cited as 1,500 at peak in a 2021 expansion statement).",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption; Tif",
    "incentives_value": null,
    "challenges": "Key public-record gaps include missing/errored links for the original 2018 Development Agreement and City Council minutes/vote tallies; limited visibility into clawbacks/conditions; conflicting public reporting about water-rights ownership versus purchasing water through the city.",
    "notes": "April 2026 Kem C. Gardner Policy Institute inventory lists Meta Eagle Mountain Building 6 and Building 7 in Eagle Mountain as under construction in 2026, each with 40 MW nameplate capacity. Record as an 80 MW expansion delta; do not replace the existing full operational campus capacity with the delta. [Source: https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf; Date: 2026-04]; Sources: https://datacenters.atmeta.com/2021/07/utah-county-we-are-online/ https://www.rockymountainpower.net/about/newsroom/news-releases/rmp-adds-three-large-solar-facilities-in-utah-for-facebook.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Novva Data Centers - West Jordan Campus",
    "state": "Utah",
    "city": "West Jordan",
    "county": "Salt Lake County",
    "region": "Salt Lake Metro",
    "status": "under-construction",
    "sponsors": "Novva Data Centers; CIM Group",
    "operators": "Novva Data Centers",
    "tenants": "Leading global tech company (fully leased)",
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 175.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": "100-acre, one-million-square-foot campus; phases 2 and 3 each add a 318,000-square-foot, 72 MW data center",
    "announcedDate": "2023",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Water-free or very low-water closed-loop system; minimal water use primarily for plumbing.",
    "certifications": "OCP Ready",
    "sustainabilityNotes": "Described as one of the largest direct-to-chip cooled AI data centers in the world",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "West Jordan economic development director stated the full campus can be run by under 200 employees. City communications emphasize high property tax value and low demand for city services, but no formal economic impact study or tax-revenue projection was found for this specific project.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Limited public records located for zoning/permits and utility arrangements; utility not publicly identified; environmental permit documentation beyond a Utah DEQ air-permit status entry was not found in the sources reviewed.",
    "notes": "$2 billion financing secured from J.P. Morgan and Starwood Property Trust in March 2025. Campus fully leased in 2023 to a leading global tech company.; QA 2026-07-19: Removed a phase subtotal from IT load and cleared financing from the investment field.; Sources: https://www.novva.com/media-center/cim-group-novva-data-centers-secure-2b-to-expand-sustainable-data-centers-in-the-western-u-s/ https://www.westjordan.utah.gov/newsroom/2025/03/west-jordans-2b-data-boost-how-novvas-expansion-benefits-you/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Delta Gigasite / Fibernet MercuryDelta",
    "state": "Utah",
    "city": "Delta",
    "county": "Millard County",
    "region": "Central Utah",
    "status": "under-construction",
    "sponsors": "Fibernet MercuryDelta LLC; Creekstone Energy; BluSky AI",
    "operators": "Creekstone Energy",
    "tenants": null,
    "totalSquareFeet": 20000000.0,
    "powerCapacityMW": 10000.0,
    "itLoadMW": null,
    "investmentUSD": 17082408000.0,
    "sizeNotes": "Nearly 1,200 acres; Would be world's largest data center campus",
    "announcedDate": "2024-05",
    "constructionStartDate": "2025-12",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "No evaporative water use for cooling according to EDCUtah companion announcement.",
    "certifications": null,
    "sustainabilityNotes": "Plans to use IPP (Intermountain Power Project), Kern River Pipeline, solar panels, and considering geothermal, wind, and nuclear",
    "economicImpact_jobs": 106.0,
    "economicImpact_taxRevenue": 344381185.0,
    "economicImpact_notes": "3,000-5,000 jobs over decade (unclear permanent vs construction split). $40B total economic activity, $500M annual tax revenue at full build.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": 172190592.5,
    "challenges": "No special incentives offered - attracted by natural resources. State legislators skeptical of incentive requests.",
    "notes": "Utah Governor's Office of Economic Opportunity announced April 9, 2026 that Creekstone Energy plans to invest $17,082,408,000 over 20 years in the Creekstone Gigasite near Delta, Millard County. The project began construction in late 2025 and is described as intended to support 10 GW with integrated on-site natural gas generation, utility-scale solar, and AI data processing facilities. [Source: https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/; Date: 2026-04-09]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Joule Capital Partners - Millard County Campus",
    "state": "Utah",
    "city": "Delta area",
    "county": "Millard County",
    "region": "Central Utah",
    "status": "under-construction",
    "sponsors": "Joule Capital Partners; Caterpillar Inc.; Wheeler Machinery Co.",
    "operators": "Joule Capital Partners",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1400.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "4,000 acres campus; Triple C Farms location; Multi-billion dollar investment",
    "announcedDate": "2025-08",
    "constructionStartDate": "2026-01-30",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Cooling infrastructure in progress; DAQ approval order covers boiler chillers.",
    "certifications": null,
    "sustainabilityNotes": "Powered by Caterpillar G3520K generator sets with integrated CCHP solutions; includes 1.1 GWh of grid-forming battery storage",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Jobs not disclosed. County provided no incentives - attracted by natural gas infrastructure and power diversity.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Primary documentation for conditional-use permit approval was not found in reviewed county records despite media reporting; environmental permit documents (air/stormwater/water-use) were not located in publicly accessible sources reviewed.",
    "notes": "April 2026 Kem C. Gardner Policy Institute inventory lists the Joule HP Compute Campus in Millard/Delta as under construction, expected in 2028, with 1,400 MW nameplate capacity counted among under-construction and permitted projects. Prior row context: Millard County Commission approved a 4,000-acre rezone in August 2025 and agreement with Caterpillar Inc. and Wheeler Machinery Co. to provide 4 GW power capacity. [Source: https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf; Date: 2026-04]; QA 2026-07-19: Aligned project power with Utah's current 1,400 MW nameplate inventory figure.; Sources: https://joulepower.ai/ https://investors.caterpillar.com/news/news-details/2025/Joule-Caterpillar-and-Wheeler-Announce-an-Agreement-to-Power-Americas-Growing-Data-Center-Energy-Needs/default.aspx https://daqpermitting.utah.gov/DocViewer?IntDocID=160548&contentType=application%2Fpdf https://millardcounty.gov/wp-content/uploads/2025/10/09032025-Final.pdf https://www.caterpillar.com/en/news/corporate-press-releases/h/joule-caterpillar-wheeler.html",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Tract - Project Tripletail",
    "state": "Utah",
    "city": "Eagle Mountain",
    "county": "Utah County",
    "region": "Salt Lake Metro",
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 7000000000.0,
    "sizeNotes": "668+ acres master-planned data center park",
    "announcedDate": "2024-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Working with Rocky Mountain Power for new transmission infrastructure",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job creation totals or tax-revenue projections were disclosed in the sources reviewed.",
    "incentives_type": "Tif; Other",
    "incentives_value": null,
    "challenges": "Limited public documentation of incentive terms, permits, and project-specific economic impacts; Eagle Mountain zoning code access reportedly blocked (403) so zoning details were summarized from city overview materials.",
    "notes": "Cleanview's July 2026 Utah tracker identifies two named Tract Eagle Mountain developments under the tracked Project Tripletail land position: Pole Canyon, a planned 844-acre data center with 1,700 MW capacity, and Pony Express, a planned 225-acre data center with 120 MW capacity. Combined named-site capacity is 1,820 MW. Sources do not disclose investment. [Source: https://cleanview.co/data-centers/utah/2137/tract-pole-canyon | https://cleanview.co/data-centers/utah/2138/tract-pony-express; Date: 2026-07; 2026-07]; Sources: https://www.edcutah.org/annual-reports/2023-2024 https://eaglemountain.gov/wp-content/uploads/2024/10/Eagle-Mountain-Press-Release_1.17.2024-1.pdf https://www.datacenterdynamics.com/en/news/tract-plans-400mw-data-center-park-in-eagle-mountain-utah/ https://www.tract.com/news/tract-announces-acquisition-of-668-acres-in-eagle-mountain-ut-promising-further-investment-for-data-center-campuses/ https://www.datacenterdynamics.com/en/analysis/building-for-the-long-term-grant-van-rooyens-tract-masterplan/ https://www.utah.gov/pmn/files/1140441.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Cirrus Data Services - View 78 Campus",
    "state": "Utah",
    "city": "Midvale",
    "county": "Salt Lake County",
    "region": "Salt Lake Metro",
    "status": "planned",
    "sponsors": "Cirrus Data Services; Gardner Company",
    "operators": "Cirrus Data Services",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 160.0,
    "itLoadMW": 256.0,
    "investmentUSD": 1120000000.0,
    "sizeNotes": "Phase 1: 224,000 sq ft, 32 MW; Full buildout: 1M+ sq ft, 160 MW; Expandable to 256 MW for hyperscale",
    "announcedDate": "2024",
    "constructionStartDate": "2018-07",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": 1.2,
    "waterCooling": "free cooling; flexible cooling design for low- and high-density racks; hot-aisle containment",
    "certifications": "Tier III and Tier II topologies",
    "sustainabilityNotes": "Cirrus marketing emphasizes low operating costs from free cooling and a target PUE below 1.20. No project-specific renewable energy commitment, water-use volume, water-right arrangement, utility agreement, or cooling-water permit was located.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public job counts, tax-base estimate, annual tax revenue projection, total tax revenue projection, or sponsor-announced capital investment was located.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "The principal risk flag is lack of public evidence that the original 2018 data-center plan advanced to operation. Cirrus continued to market capacity in 2026 and Baxtel listed the site as under construction/planned, but the April 2026 Kem C. Gardner Policy Institute inventory did not list Cirrus/View 78 among operating Utah data centers or disclosed permitted/under-construction planned projects.",
    "notes": "Cirrus Data Services is a subsidiary of Gardner Company based in Salt Lake City. View 78 campus designed for both hyperscale and wholesale tenants. First phase supports 224,000 sq ft and 32 MW, expandable to 160 MW at full capacity and up to 256 MW for hyperscale deployments.; Investment estimated at $7M/MW; Sources: https://cirrusds.com/midvale-ut-campus.php https://baxtel.com/news/cirrus-data-services-plans-160mw-campus-in-salt-lake-city-eea7f9e3-4bca-401f-8e42-0ecd77c537c4",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google - Eagle Mountain Land Acquisition",
    "state": "Utah",
    "city": "Eagle Mountain",
    "county": "Utah County",
    "region": "Salt Lake Metro",
    "status": "planned",
    "sponsors": "Google LLC",
    "operators": "Google LLC",
    "tenants": "Google, if developed; no third-party tenant announced",
    "totalSquareFeet": null,
    "powerCapacityMW": 171.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "300 acres acquired; $1.2 billion potential investment over 30 years",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Local reporting describes a written promise to spend $1.2B in the area over 30 years; no other sustainability commitments were documented in the sources reviewed.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific jobs or tax-revenue projections were identified in the sources reviewed.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Public sources reviewed do not document construction start, permit issuance, or completed development agreements for this specific project.",
    "notes": "Google acquired 300 acres in Eagle Mountain (31 miles south of Salt Lake City) for potential future data center. Plans $1.2 billion investment over 30 years. Separate from 2020 Salt Lake City cloud region launch.; Power estimated at $7M/MW; Sources: https://www.datacenterdynamics.com/en/news/google-buys-large-plot-of-land-in-eagle-mountain-utah/ https://www.deseret.com/utah/2021/10/4/22709130/google-joins-facebook-in-eagle-mountain-utah-data-center-facebook/ https://eaglemountain.gov/wp-content/uploads/2025/03/EMC-Downtown-Plan.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "NSA Utah Data Center (Bumblehive)",
    "state": "Utah",
    "city": "Bluffdale",
    "county": "Salt Lake County",
    "region": "Salt Lake Metro",
    "status": "operational",
    "sponsors": "National Security Agency; U.S. Department of Defense",
    "operators": "National Security Agency",
    "tenants": "U.S. Intelligence Community",
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 65.0,
    "itLoadMW": 54.0,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "200 acres at Camp Williams; 100,000 sq ft data center space; 900,000+ sq ft technical support and administrative space",
    "announcedDate": "2011",
    "constructionStartDate": "2011",
    "expectedCompletionDate": "2013-09",
    "actualCompletionDate": "2014-05",
    "numberOfPhases": null,
    "purpose": "government",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": "LEED Silver",
    "sustainabilityNotes": "Uses 65 MW of electricity (~$40M annually); 1,210 gallons of water per minute for cooling; 60 diesel emergency generators with 3-day backup",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "At groundbreaking, Sen. Orrin Hatch cited estimates of 5,000\u201310,000 construction/development jobs and 100\u2013200 permanent jobs; no local tax-revenue projections/fiscal impact study specific to the facility located in sources reviewed.",
    "incentives_type": "Infrastructure Support",
    "incentives_value": null,
    "challenges": "Electrical reliability issues during 2013 testing delayed anticipated opening; ongoing community/political concerns about water use and privacy/surveillance; limited public documentation located for original 2010\u20132014 NEPA/permit and utility/interconnection/rate agreements.",
    "notes": "Built 2011-2013, completed May 2014. Cost $1.5 billion. Located at Camp Williams near Bluffdale between Utah Lake and Great Salt Lake. Tier III data center supporting Comprehensive National Cybersecurity Initiative. Precise mission classified. Selected from 38 competing sites due to low utility rates, secure power infrastructure, military installation location, and skilled workforce.; Sources: https://www.nsa.gov/serve-from-netstorage/Press-Room/Press-Releases-Statements/Press-Release-View/Article/1630552/groundbreaking-ceremony-held-for-12-billion-utah-data-center/index.html https://www.tpr.org/science-technology/2013-06-10/amid-data-controversy-nsa-builds-its-biggest-data-farm https://www.wired.com/2012/03/ff-nsadatacenter/ https://www.deseret.com/2013/10/8/20527146/engineers-completing-final-inspections-of-nsa-s-utah-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AWS Louisa County Campus 3",
    "state": "Virginia",
    "city": "Louisa",
    "county": "Louisa County",
    "region": "Central Virginia",
    "status": "canceled",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 7200000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 28800000000.0,
    "sizeNotes": "Proposed third campus in Louisa County on 1,370 acres",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "direct evaporative cooling with onsite water storage for lower-demand-period capture and hotter-month use",
    "certifications": null,
    "sustainabilityNotes": "Preliminary plan retained about 889 acres, or 64.9% of the site, as open space; proposed buffers and stormwater systems adjacent to Northeast Creek Reservoir; no project-specific renewable energy commitment or certification was disclosed.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 115000000.0,
    "economicImpact_notes": "No executed fiscal agreement was found. Application cited Mangum Economics estimates per 250,000 square feet: about 30 operational jobs, 108 indirect/induced local jobs, $77,980,250 annual economic impact from ongoing operations, and $4 million to $5 million annual local tax revenue. Virginia Business reported Amazon representatives said at the June 11, 2025 community meeting that the canceled project could have generated $115 million annually for the county.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Community opposition over noise, traffic, quality of life, power-grid strain, water use, property values, and Northeast Creek Reservoir runoff/contamination risks led AWS to withdraw the zoning applications in July 2025. No revived Campus 3 CUP application was found through June 15, 2026.",
    "notes": "Third major AWS campus in Louisa County; From DCD: 7.2M sqft proposed on 1,370 acres; application withdrawn July 2025 after community opposition; power at 100 W/sqft; Sources: https://www.datacenterdynamics.com/en/news/aws-proposes-72m-sq-ft-data-center-campus-in-louisa-county-virginia/ https://www.29news.com/2025/07/25/amazon-withdraws-request-build-third-louisa-county-data-center/ https://www.datacenterdynamics.com/en/news/aws-withdraws-plans-for-third-data-center-campus-in-louisa-county-virginia/ https://www.bisnow.com/news/national/data-center/amazon-planning-1370-acre-virginia-data-center-campus-129714",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AWS Spotsylvania County Campus",
    "state": "Virginia",
    "city": "Spotsylvania",
    "county": "Spotsylvania County",
    "region": "Central Virginia",
    "status": "under-construction",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": "Amazon Web Services",
    "totalSquareFeet": 1900000.0,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2022",
    "constructionStartDate": "2024-01-16",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "USACE Phase II notice describes impacts to 2.30 acres of wetlands and 2,075 linear feet of streams with proposed mitigation (wetland enhancement/creation). Phase II includes a proposed central water treatment facility and extensive stormwater management facilities; no NEPA EA/EIS, air permits, VPDES stormwater approvals, or water withdrawal permits were found in the accessible sources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public sources with job counts, tax revenue projections, or a formal economic impact study were located in the accessible sources. County materials describe a 329-acre site and 1.9 million sq ft of data center space at full build-out.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Key details (vote counts, proffers, incentive agreements, zoning conditions) were not verifiable from accessible sources because the county Agenda/Document Center appears JS-gated in the research environment.",
    "notes": "Part of AWS's expansion into Central Virginia; Mattameade and Cosner application materials described 770 MW and 450 MW respectively; major expansion; QA 2026-07-18: Removed generic cost-derived power and unsupported investment annotations while retaining application context.; Sources: https://www.nao.usace.army.mil/Media/News-Stories/Article/4018043/nao-2023-01952-amazon-tech-park-spotsylvania-county-virginia/ https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "PowerHouse 95 Campus",
    "state": "Virginia",
    "city": "Spotsylvania",
    "county": "Spotsylvania County",
    "region": "Central Virginia",
    "status": "under-construction",
    "sponsors": "PowerHouse Data Centers",
    "operators": "PowerHouse Data Centers",
    "tenants": null,
    "totalSquareFeet": 3600000.0,
    "powerCapacityMW": 900.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Three 300 MW substations planned at completion",
    "announcedDate": "2024",
    "constructionStartDate": "2024",
    "expectedCompletionDate": "2026-Q3",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public sources accessed did not provide specific job creation numbers, tax revenue projections, or formal economic impact studies.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Timing discrepancy noted in public statements: an earlier company release references October 2024, while subsequent reporting/statement indicates initial 150 MW targeted for delivery by October 2025.",
    "notes": "First major data center campus in Spotsylvania County with construction underway; Investment estimated at $7M/MW; Sources: https://www.linkedin.com/posts/powerhousedatacenters_powerhousedatacenters-datacenters-hyperscale-activity-7438330662287278080-I1hN https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia-2 https://www.nao.usace.army.mil/Media/Public-Notices/Article/4391426/nao-2021-03032-powerhouse95-data-center-phase-ii-spotsylvania-county-virginia/ https://munihub.s3.us-west-1.amazonaws.com/wp-content/uploads/20240814043138/County-of-Spotsylvania-Va-GO-Public-Improvement-Bonds-Series-2024-Preliminary-Official-Statement-1.pdf https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "EdgeCore Louisa County Campus",
    "state": "Virginia",
    "city": "Louisa",
    "county": "Louisa County",
    "region": "Central Virginia",
    "status": "planned",
    "sponsors": "EdgeCore Digital Infrastructure",
    "operators": "EdgeCore Digital Infrastructure",
    "tenants": null,
    "totalSquareFeet": 3900000.0,
    "powerCapacityMW": 1100.0,
    "itLoadMW": null,
    "investmentUSD": 17000000000.0,
    "sizeNotes": null,
    "announcedDate": "2024-06-24",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop / air-cooled system with WUE below 0.01 L/kWh",
    "certifications": null,
    "sustainabilityNotes": "EdgeCore and Louisa County state that the campus will use efficient water use and closed-loop cooling; site-level environmental due diligence documents include a Phase I Environmental Report, wetlands confirmation memo, threatened and endangered species confirmation memo, and cultural resources report.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Jobs not disclosed. Virginia provided no tax incentives to secure this deal (per Governor spokesperson).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": 15000000.0,
    "challenges": "Construction start has not been publicly confirmed; no EdgeCore/EDI air permit was listed as of 2026-06-12; tenant identity, leasing status, phase schedule, construction milestones, project-specific interconnection terms, and grid-upgrade cost allocation remain unverified. Broader county concerns include data-center resource impacts and regional transmission infrastructure.",
    "notes": "One of the largest single data center projects announced in Virginia with $17B investment; QA 2026-07-19: Cleared a duplicate IT-load value while retaining disclosed facility power.; Sources: https://edgecore.com/resources/press-releases/new-louisa-county-virginia-data-center-campus https://www.louisacounty.gov/m/newsflash/home/detail/470 https://edgecore.com/locations/louisa-county-data-center https://www.datacenterdynamics.com/en/news/edgecore-to-develop-11gw-data-center-in-louisa-county-virginia/ https://www.nao.usace.army.mil/Media/Public-Notices/Article/4562787/nao-2025-00089-mrc-2026-1381-edgecore-louisa-phase-2-louisa-county-virginia/ https://www.datacenterdynamics.com/en/news/edgecore-files-to-develop-second-phase-of-louisa-county-campus-virginia/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "EdgeCore Ashburn Facility",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "under-construction",
    "sponsors": "EdgeCore Digital Infrastructure",
    "operators": "EdgeCore Digital Infrastructure",
    "tenants": null,
    "totalSquareFeet": 685000.0,
    "powerCapacityMW": 50.0,
    "itLoadMW": 114.0,
    "investmentUSD": 1500000000.0,
    "sizeNotes": null,
    "announcedDate": "2023-02",
    "constructionStartDate": "2025-02",
    "expectedCompletionDate": "2027-07",
    "actualCompletionDate": "2025-02",
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Low- to no-water cooling solutions with air-cooled chillers",
    "certifications": "Designed to meet LEED specifications",
    "sustainabilityNotes": "AS01 loan structured as a Green Loan aligned with Green Loan Principles and EdgeCore's 2025 Green Finance Framework; both Ashburn sites use low- to no-water cooling solutions, air-cooled chillers, and zoned lighting controls.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific public estimates for permanent jobs, construction jobs, or tax revenue were located in the supplied research.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary gaps include missing public Dominion service/interconnection records, tenant identity, AS01-specific air permit verification, project-specific incentives/MOU records, and water/wastewater/stormwater/wetlands records. Public sources do not report cancellation or formal delay, though AS02 initial occupancy is now scheduled for July 2027 after earlier reporting described delivery expected in 2026.",
    "notes": "Topped out in February 2025; EdgeCore Ashburn facility in Data Center Alley; conservative estimate; Sources: https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia https://www.pzre.com/history/2023/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Iron Mountain Richmond Campus",
    "state": "Virginia",
    "city": "Richmond",
    "county": "Henrico County",
    "region": "Central Virginia",
    "status": "under-construction",
    "sponsors": "Iron Mountain",
    "operators": "Iron Mountain",
    "tenants": null,
    "totalSquareFeet": 1409793.0,
    "powerCapacityMW": 216.0,
    "itLoadMW": 48.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "66-acre development site",
    "announcedDate": "2024-11",
    "constructionStartDate": "2025-05",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; enterprise",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Closed-loop or recycled-water cooling with public water/sewer required by county standards (unless otherwise approved via PUP).",
    "certifications": "BREEAM accreditation standards intended",
    "sustainabilityNotes": "Countywide standards adopted June 10, 2025 include noise studies, buffering/screening, and closed-loop/recycled-water cooling requirements; project marketing claims 100% renewable energy matching.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reporting emphasizes anticipated long-term tax revenue benefits but does not provide quantified projections; no job counts published in cited materials.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project-specific entitlement filings (rezoning/PUP case numbers and votes), utility/interconnection details, grid-upgrade responsibilities, and DEQ permit numbers are not identified in the public sources summarized.",
    "notes": "66-acre site with more than 200 MW expected capacity; Investment estimated at $7M/MW; Sources: https://investors.ironmountain.com/news/news-details/2024/Iron-Mountain-Expands-Planned-Data-Center-Capacity-in-Virginia-by-more-than-350-Megawatts/default.aspx https://www.sec.gov/Archives/edgar/data/1020569/000102056926000068/q22026srpfinal.htm https://virginiabusiness.com/iron-mountain-plans-1b-data-center-campus-in-henrico/ https://resources.ironmountain.com/solution-guides/d/data-centers-richmond-rch-1",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CleanArc Virginia Hyperscale Campus",
    "state": "Virginia",
    "city": "Unknown",
    "county": "Unknown",
    "region": "Virginia",
    "status": "under-construction",
    "sponsors": "CleanArc Data Centers",
    "operators": "CleanArc Data Centers",
    "tenants": null,
    "totalSquareFeet": 1470000.0,
    "powerCapacityMW": 900.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": "Expanded from 700MW to nearly 1GW with 87.5 acres additional land",
    "announcedDate": "2024",
    "constructionStartDate": "2025-Q4",
    "expectedCompletionDate": "2033-2035",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop systems; no potable water used for cooling (county water limited to flushing and washing)",
    "certifications": null,
    "sustainabilityNotes": "CleanArc focuses on sustainable data center solutions",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": 13000000.0,
    "economicImpact_notes": "State cited $3B initial investment and 50 new jobs; county projected $8.8B total investment and $13M+ annual tax revenue (about 17% of the general fund), with jobs at ~150% of county average wage.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement; Grant",
    "incentives_value": null,
    "challenges": "Full performance agreement/grant schedules/clawbacks not found in public sources; no public site plan approvals, land-disturbance permits, or building permits located; no public interconnection/upgrade filings located; zoning ordinance change after application introduced special-exception requirements (with grandfathering discussed).",
    "notes": "VA1 project groundbreaking scheduled for Q4 2025, expanded to nearly 1GW capacity; Investment estimated at $7M/MW; Sources: https://www.cleanarcdatacenters.com/press-release/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-2-2/2/ https://www.cleanarcdatacenters.com/press-release/cleanarc-data-centers-adds-300mw-to-planned-capacity-for-virginia-hyperscale-campus-2/2/ https://co.caroline.va.us/DocumentCenter/View/10552/Final-Statement-on-Approval-of-Economic-Development-Performance-Agreement-with-Clean-Arc https://virginiabusiness.com/for-the-record-8/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Prince William Digital Gateway",
    "state": "Virginia",
    "city": "Gainesville",
    "county": "Prince William County",
    "region": "Northern Virginia",
    "status": "canceled",
    "sponsors": "QTS; Compass Datacenters; H&H Capital Acquisitions; GW Acquisition Co.",
    "operators": "QTS Realty Trust; Compass Datacenters",
    "tenants": null,
    "totalSquareFeet": 23000000.0,
    "powerCapacityMW": 2700.0,
    "itLoadMW": null,
    "investmentUSD": 24700000000.0,
    "sizeNotes": "2,100 acres with up to 34 data centers planned",
    "announcedDate": "2022-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No public power purchase agreement (PPA) or specific interconnection agreement identified in the sources reviewed.",
    "economicImpact_jobs": 570.0,
    "economicImpact_taxRevenue": 400000000.0,
    "economicImpact_notes": "540-600 permanent operations jobs projected at full buildout. $88-400M annual tax revenue.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Court ruling in Aug 2025 voided approval, effectively canceling development.",
    "notes": "On July 3, 2026, DCD reported that QTS terminated the Prince William Digital Gateway project, withdrew associated filings, and dropped its Virginia Supreme Court appeal after Compass and Prince William County had already backed away. Virginia Business reported on July 6, 2026 that QTS affiliate GW Acquisition Co. withdrew petitions challenging the March 31 Court of Appeals ruling that invalidated the rezonings, making the 23 million-square-foot, 2,100-acre proposal officially dead. [Source: https://www.datacenterdynamics.com/en/news/qts-drops-data-center-appeal-kills-gigawatt-pw-digital-gateway-project-in-virginia/; https://virginiabusiness.com/prince-william-digital-gateway-data-center-project-officially-dies/; Date: 2026-07-03; 2026-07-06]; Sources: https://wtop.com/prince-william-county/2023/12/prince-william-supervisors-approve-pw-digital-gateway-expected-to-be-the-worlds-largest-data-center-corridor/ https://www.pwcva.gov/department/planning-office/pw-digital-gateway?ms=memlinkb&ms=tworg&ms=tworg%21&ms=webhome&ms=weblightbox&ms=webnav https://www.datacenterdynamics.com/en/news/officials-in-virginias-prince-william-county-drop-support-for-qtscompass-digital-gateway-data-center-project/ https://virginiabusiness.com/back-to-the-cookie-jar/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Microsoft Leesburg Campus",
    "state": "Virginia",
    "city": "Leesburg",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft Azure",
    "tenants": "Microsoft Azure",
    "totalSquareFeet": 1313355.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": null,
    "announcedDate": "2018-09",
    "constructionStartDate": "2019",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": "2022",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No project-specific PPA, renewable-energy procurement, cooling technology, or water-use volume was located in the reviewed public sources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 50000000.0,
    "economicImpact_notes": "Leesburg's 2023 annexation reply estimated that, once Microsoft data centers were completely outfitted, Loudoun County would collect approximately $50 million per year in personal property tax revenue. The Loudoun-Leesburg settlement includes a county-to-town economic-development payment of $2 million annually, escalated by 3% each year, but this is an annexation settlement term rather than a Microsoft incentive.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Key uncertainties include total campus capital investment, confirmed IT load versus utility service capacity, public Dominion/PJM/SCC interconnection records, project-specific PPA or renewable-energy procurement, cooling technology and water-use volume, final approval status for IAD05, and building-level completion dates after the 2023 Town forecast.",
    "notes": "Part of Microsoft's $80B fiscal year investment in AI-enabled data centers; 180 MW target; Leesburg VA; part of 5B+ Virginia investment; Sources: https://www.bisnow.com/news/washington-dc/land/microsoft-buys-332-acre-loudoun-county-site-for-73m-93142 https://www.petersoncos.com/blog/honoree-microsoft-at-compass-creek/ https://www.dhcd.virginia.gov/sites/default/files/Docx/clg/town-of-leesburg/town-reply.pdf https://www.datacenterdynamics.com/en/news/microsoft-planning-two-more-data-centers-in-leesburg-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Loudoun County Campus 1",
    "state": "Virginia",
    "city": "Leesburg",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "operational",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 200000.0,
    "powerCapacityMW": 214.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": "Located at Energy Park Drive",
    "announcedDate": "2009",
    "constructionStartDate": null,
    "expectedCompletionDate": "2019",
    "actualCompletionDate": "2019",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Cooling towers listed in DEQ air permit; water source and consumption not confirmed.",
    "certifications": null,
    "sustainabilityNotes": "No project-specific sustainability metrics (PUE, water, certifications) were located in the provided research; sources discuss broader corporate clean-energy contracting and county/portfolio-level impacts.",
    "economicImpact_jobs": 400.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Jobs and GDP figures found are county/portfolio-level (e.g., ~400 direct Google jobs in 2022; ~3,500 jobs supported across the local economy; ~$1.1B annual GDP impact cited via Deloitte) and are not specific to the Goose Landing Campus 1 parcel.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Entitlement-stage (Stonewall Secure Business Park) approvals had documented controversy and dissent (planning/comprehensive-plan concerns) and secondary reporting described a contentious 2011 vote. No project-specific petitions, lawsuits, protest actions, or public-hearing testimony focused on Google Loudoun County Campus 1 at Goose Landing were located in the provided research; USACE public notices did involve formal public-comment processes for wetland/stream impacts.",
    "notes": "Google has been in Virginia since 2009; Part of Google B+ Virginia investment; power estimated at M/MW; Sources: https://www.datacenters.google/locations/virginia/ https://loudounpossible.com/blog/google-confirms-1-2-billion-loudoun-investment-stem-education-grants https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/5-ways-googles-data-centers-support-loudoun-county/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Loudoun County Campus 2",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "operational",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 281792.0,
    "powerCapacityMW": 214.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": null,
    "announcedDate": "2021",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": "2021",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Google describes climate-conscious cooling and water-stewardship programs, including watershed work with the Alliance for the Chesapeake Bay and Maryland & Virginia Milk Producers Cooperative Association, but no Campus 2-specific cooling technology, water-use figure, or permit condition was located.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Google reports broader Virginia-wide economic activity and community workforce programs, but no Campus 2-specific jobs figure, payroll estimate, construction-spend total, personal-property-tax value, or economic-impact study was located.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Key gaps include missing Loudoun LandMARC or FOIA records for 20481 Goose Landing Lane, assessment records, DEQ air-permit and compliance records, Dominion Energy/PJM/SCC service or interconnection records, water and wastewater service records, stormwater/SWPPP records, and any local incentive or tax-exemption documents specific to Campus 2.",
    "notes": "Second campus in Loudoun County; Part of Google B+ Virginia investment; power estimated at M/MW; Sources: https://reparcelasmt.loudoun.gov/pt/Datalets/Datalet.aspx?State=1%7C1%7C1%7C1%7C1&UseSearch=no&card=2&item=0&items=4&jur=107&mode=commercial&pin=194498227000&taxyr=2026 https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/5-ways-googles-data-centers-support-loudoun-county/ https://loudounpossible.com/blog/google-announces-600m-data-center-expansion-in-loudoun-county https://www.deq.virginia.gov/home/showpublisheddocument/25865/638816888857770000 https://www.datacenters.google/locations/virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Prince William County Campus",
    "state": "Virginia",
    "city": "Prince William",
    "county": "Prince William County",
    "region": "Northern Virginia",
    "status": "operational",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": "Google",
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 214.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": null,
    "announcedDate": "2017-09",
    "constructionStartDate": "2022-07-15",
    "expectedCompletionDate": "2026",
    "actualCompletionDate": "2023",
    "numberOfPhases": null,
    "purpose": "hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "cooling towers",
    "certifications": null,
    "sustainabilityNotes": "Public sources note extensive on-site diesel emergency generators and cooling towers permitted under Virginia DEQ air permit 74216; project-specific PPAs/interconnection details not found in accessible sources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No campus-specific jobs/tax projections found in accessible public records. Statewide framing in Virginia Governor announcement (June 18, 2025) cites $9B expected investment across Virginia and 1,000 new jobs over ten years (not campus-specific).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Tenant masking/limited public identification in county records (e.g., 'TARGETED \u2013 NDA' descriptors) and limited accessible project-specific disclosures on incentives, MW levels, interconnection/PPAs, and local vote records; broader grid/transmission siting controversy tied to regional data center load growth.",
    "notes": "Built in 2023, part of $1B expansion bringing total Virginia investment to over $4B; Part of Google B+ Virginia investment; power estimated at M/MW; Sources: https://www.datacenters.google/locations/virginia/ https://eservice.pwcgov.org/planning/documents/REZ2017-00023.pdf https://www.datacenterdynamics.com/en/news/25m-sq-ft-project-echo-data-center-is-approved-another-is-planned-aura/ https://www.pwcva.gov/assets/2026-03/University%20Blvd%20Review%20Draft%20EA_20250316%20Public%20Availability.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Henrico White Oak Campus",
    "state": "Virginia",
    "city": "Sandston",
    "county": "Henrico County",
    "region": "Richmond Metro",
    "status": "operational",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": null,
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 243.0,
    "itLoadMW": null,
    "investmentUSD": 1700000000.0,
    "sizeNotes": "7 data centers in 'H' configuration, 130-acre site",
    "announcedDate": "2017-10-05",
    "constructionStartDate": "2017",
    "expectedCompletionDate": "2023",
    "actualCompletionDate": "2020",
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "Outside-air cooling with advanced water-management systems including water reuse and rainwater capture.",
    "certifications": "LEED Gold",
    "sustainabilityNotes": "Runs on 100% renewable energy, enables 700 MW of solar projects across Virginia",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "2017 announcement cited 100+ full-time jobs at completion; 2018 expansion and 2020 EDA release cited 200+ operating jobs and ~1,500 construction jobs. Officials said the campus would become the county\u2019s largest water customer and one of its largest taxpayers, but no public follow-up evaluation of realized jobs/tax revenues was found in the research text.",
    "incentives_type": "Property Tax Abatement; Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Publicly posted project-specific zoning/plan approvals, VEDP MOU/incentive agreements, interconnection/grid-upgrade allocations, and any diesel generator air permits were not located in the research pass; the text suggests FOIA requests to Henrico/VEDP/DEQ to confirm these items.",
    "notes": "Located at 6200 Technology Blvd in White Oak Technology Park, initial buildings came online in 2020, employs 200+ at full capacity; Power estimated at $7M/MW; Sources: https://datacenters.atmeta.com/2020/08/henrico-county-we-are-online/ https://henrico.gov/news/2017/10/henrico-va-governor-announce-facebook-facility/ https://www.dpr.com/projects/meta-henrico-data-center https://www.dpr.com/media/blog/metas-henrico-data-center-celebrates-topping-out-of-final-project-on-campus",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Henrico Expansion (Project Tropical)",
    "state": "Virginia",
    "city": "Sandston",
    "county": "Henrico County",
    "region": "Richmond Metro",
    "status": "planned",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": "Meta / Facebook",
    "totalSquareFeet": 841563.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 1400000000.0,
    "sizeNotes": "475-acre plot acquired for expansion",
    "announcedDate": "2022-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "closed-loop (county ordinance expectation/requirement when applicable); recycled/greywater when applicable",
    "certifications": null,
    "sustainabilityNotes": "Countywide (2025) ordinance/design standards include equipment screening, generator operation/testing restrictions, and water/sewer and cooling-related expectations (closed-loop and recycled/greywater when applicable). Project-specific permits/approvals not located in public repositories as of 2026-02-05.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts, construction employment estimates, or tax revenue projections located in reviewed public materials as of 2026-02-05.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Project-specific approvals and permits (site plan/plan of development, land disturbance approvals, DEQ air permits for generators, DEQ stormwater registrations, etc.) were not located in public-facing repositories as of 2026-02-05; no project-specific planning case file found in public indexes.",
    "notes": "Major expansion in White Oak Technology Park adjacent to existing campus; Meta Project Tropical expansion in Henrico; 475-acre plot; estimated based on Meta typical hyperscale; Sources: https://www.datacenterdynamics.com/en/news/meta-looks-to-expand-data-center-campus-outside-richmond-virginia/ https://www.costar.com/article/56504037/meta-buys-475-acres-in-virginia-to-expand-data-center-development https://www.scc.virginia.gov/docketsearch/DOCS/7vbs01%21.PDF https://henrico.gov/pdfs/planning/2024/dec24pod.pdf https://henrico.gov/pdfs/planning/2025/nov25pod.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "QTS Richmond Expansion",
    "state": "Virginia",
    "city": "Richmond",
    "county": "Henrico County",
    "region": "Richmond Metro",
    "status": "expansion",
    "sponsors": "QTS Realty Trust; Blackstone",
    "operators": "QTS Realty Trust",
    "tenants": null,
    "totalSquareFeet": 1500000.0,
    "powerCapacityMW": 240.0,
    "itLoadMW": null,
    "investmentUSD": 1680000000.0,
    "sizeNotes": "200 acres acquired for expansion",
    "announcedDate": "2024",
    "constructionStartDate": "2028-01",
    "expectedCompletionDate": "2027-06-11",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Henrico ordinance requires data centers to use closed-loop or recycled-water cooling unless another system is approved through a provisional use permit; no project-specific RIC5 cooling-technology filing was located.",
    "certifications": null,
    "sustainabilityNotes": "No public PPA, on-site generation, or interconnection agreement disclosed in sources reviewed; rezoning/proffer record does not include a NEPA EIS or Virginia-level EIA; stormwater addressed in later plan-of-development stages.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts, tax-revenue projections, or economic-impact studies identified in rezoning documentation or local reporting; county context notes data-center tax revenues as a key funding source (e.g., affordable-housing trust fund discussion).",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Community concerns and contentious rezoning history; key infrastructure and permitting steps remain post-rezoning (plan-of-development, stormwater/land disturbance), with grid reinforcement via Dominion's White Oak transmission project; no project-specific incentive agreements or environmental permits publicly identified in sources reviewed.",
    "notes": "QTS filed with the US Army Corps of Engineers to develop RIC 5 south of its existing White Oak Technology Park campus, one of three planned buildings at the site. [Source: https://www.datacenterdynamics.com/en/news/qts-files-to-expand-richmond-data-center-campus-in-virginia/; Date: 2026-06-12]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Digital Realty Digital Dulles Campus",
    "state": "Virginia",
    "city": "Dulles",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "under-construction",
    "sponsors": "Digital Realty",
    "operators": "Digital Realty",
    "tenants": null,
    "totalSquareFeet": 7500000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "World's largest multi-tenant data center campus",
    "announcedDate": "2018",
    "constructionStartDate": "2019-03-27",
    "expectedCompletionDate": null,
    "actualCompletionDate": "2023",
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "rooftop cooling described in application narrative; no quantified water-use plan found",
    "certifications": null,
    "sustainabilityNotes": "Permit-application narrative references rooftop cooling but does not provide a quantified water-use plan; project-specific water withdrawal permits/agreements were not found in the reviewed public sources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "MWAA documented a $236.5 million land sale for 424 acres at Washington Dulles International Airport to Digital Realty (Aug. 29, 2018). No project-specific job counts or tax-revenue projections were located in the reviewed public permit materials and agency listings.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Federal/state aquatic-impact permitting remained active as of the 2026-01-06 USACE major modification notice. Loudoun County grading plan VSMP-2019-0029 was noted as never approved and expected to be replaced by a first-phase site plan.",
    "notes": "Planned 7.5 million square feet campus near Dulles Airport; Power estimated at 100 W/sqft from 7.5M sqft (major multi-building campus); investment at M/MW; Sources: https://www.axios.com/2026/07/23/inside-data-centers-powering-ai-boom https://www.datacenterdynamics.com/en/news/digital-realty-files-to-expand-digital-dulles-campus-in-northern-virginia/ https://www.digitalrealty.com/about/newsroom/press-releases/122524/digital-realty-to-acquire-424-acres-in-loudoun-county-virginia https://www.nao.usace.army.mil/Media/News-Stories/Article/2277654/nao-2006-07410/ https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-purchase-blackstone-interest-three",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Stack Infrastructure Loudoun County Campus",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "announced",
    "sponsors": "Stack Infrastructure",
    "operators": "Stack Infrastructure",
    "tenants": null,
    "totalSquareFeet": 1310000.0,
    "powerCapacityMW": 144.0,
    "itLoadMW": null,
    "investmentUSD": 1008000000.0,
    "sizeNotes": "Two two-story buildings with 72MW each",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop water cooling for high-density environments; no-water-use design where applicable",
    "certifications": "Green-e certified renewable energy certificates",
    "sustainabilityNotes": "Announcement and marketing describe 100% renewable energy supported by Green-e certified RECs and an on-site substation; marketing page (accessed 2026-02-05) lists 200 MW total capacity versus 144 MW in the 2025-02-11 announcement.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific economic impact study (jobs/tax projections) located in the provided research.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project-specific permitting/parcel identification not located in public sources; discrepancy between 144 MW (2025-02-11 announcement) and 200 MW (marketing page accessed 2026-02-05) should be resolved with permitting records; no verified construction start/commissioning milestones found in the provided research.",
    "notes": "New 144MW campus in greater Ashburn area; Investment estimated at $7M/MW; Sources: https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/ https://www.datacenterdynamics.com/en/news/stack-plans-another-data-center-campus-in-virginias-loudoun-county/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vantage VA1 Campus (Ashburn I)",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "operational",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 206.0,
    "itLoadMW": 206.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "52 acres with six multi-story facilities at full build",
    "announcedDate": "2017-12-06",
    "constructionStartDate": "2018",
    "expectedCompletionDate": "2019",
    "actualCompletionDate": "2019",
    "numberOfPhases": null,
    "purpose": "colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop chilled-water cooling system",
    "certifications": null,
    "sustainabilityNotes": "Commitment to reach net zero carbon emissions by 2030",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No VA1-specific public estimates for jobs or tax revenue projections located; only general Loudoun County data-center economic context was found.",
    "incentives_type": "Sales Tax Exemption; Expedited Permitting; Other",
    "incentives_value": null,
    "challenges": "Primary-record linkage gaps: unable to tie 'VA1' campus name to specific Loudoun County land application/site plan/building permit numbers in accessible online records; environmental permits and any Virginia sales-tax-exemption MOU not located; JS-heavy county portals noted as inaccessible in the research environment.",
    "notes": "32MW VA11 site built in 2019 with on-site substation; Investment estimated at $7M/MW; Sources: https://loudounpossible.com/blog/loudoun-wins-new-1-billion-data-center-investment https://vantage-dc.com/news/ashburn-construction-start/ https://vantage-dc.com/data-center-locations/north-america/ashburn-i-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vantage VA3 Campus (Ashburn III)",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "planned",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 288.0,
    "itLoadMW": 288.0,
    "investmentUSD": 2016000000.0,
    "sizeNotes": "134 acres with seven multi-story facilities",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Hyper-efficient cooling with outside-air economization and minimal water",
    "certifications": null,
    "sustainabilityNotes": "Net zero carbon commitment by 2030",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific economic impact study, job estimates, or tax revenue projections were located in public primary sources during this pass; county FAQ provides only countywide fiscal context.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Public sources located so far are limited to environmental permit notices and wetlands/VMRC review items; no primary-source confirmation found for the reported 288 MW capacity, construction start/completion, zoning case file, or utility interconnection/transmission approvals specific to VA3/Ashburn III.",
    "notes": "Third campus brings combined Virginia portfolio to 590MW; Investment estimated at $7M/MW; Sources: https://vantage-dc.com/data-center-locations/north-america/ashburn-iii-virginia/ https://vantage-dc.com/news/vantage-data-centers-growth-continued-in-2024-driven-by-ai-and-cloud-adoption-secured-a-record-13-billion-in-incremental-funding/ https://www.loudoun.gov/DocumentCenter/View/172201/Land-Development-Application-Report-October-1--31_2022?bidId= https://vantage-dc.com/wp-content/uploads/2023/12/VDC_DataSheet_Virginia-III_EN-1.pdf https://www.nao.usace.army.mil/Media/News-Stories/Article/3286314/nao-2022-01498-va3-data-center-loudon-county-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CloudHQ LC Campus",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "under-construction",
    "sponsors": "CloudHQ",
    "operators": "CloudHQ",
    "tenants": "Two unnamed investment-grade hyperscale tenants for LC1A and LC2",
    "totalSquareFeet": 8500000.0,
    "powerCapacityMW": 1256.0,
    "itLoadMW": 1256.0,
    "investmentUSD": null,
    "sizeNotes": "8.5 million sq ft; 1,256 MW total critical IT load; planned customer critical IT load exceeds 1.7 GW across fourteen data centers.",
    "announcedDate": "2016",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Wet cooling towers and dry coolers noted for LC4/LC8/LC11 permit and LC4 tour materials",
    "certifications": null,
    "sustainabilityNotes": "No public project-specific interconnection agreements, PPAs, or onsite generation permits were found in the referenced sources; no project-specific NEPA EIS/EA or Virginia DEQ permit files were found.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific economic impact study, job counts, or tax revenue projections were found in the cited public materials.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Limited project-specific public documentation was located for incentives, environmental permitting, interconnection arrangements, and economic impact; regional grid constraints and community noise concerns are noted in coverage.",
    "notes": "Founded by former DuPont Fabros CEO, targeting 1.7GW across 14 buildings; QA 2026-07-18: Updated area from the operator page and cleared the 1.7 GW facility-power field because CloudHQ describes that figure as planned customer critical IT load.; Sources: https://cloudhq.com/campus/lc-campus/ https://www.datacenterdynamics.com/en/news/cloudhq-seeks-14-billion-in-abs-funding/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "CloudHQ LC4",
    "state": "Virginia",
    "city": "Ashburn",
    "county": "Loudoun County",
    "region": "Northern Virginia",
    "status": "under-construction",
    "sponsors": "CloudHQ",
    "operators": "CloudHQ",
    "tenants": null,
    "totalSquareFeet": 1580560.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": 94.2,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": null,
    "constructionStartDate": null,
    "expectedCompletionDate": "2024",
    "actualCompletionDate": "2024",
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "central utility plant and mechanical yard with cooling towers and dry coolers",
    "certifications": null,
    "sustainabilityNotes": "County proffers reference stormwater LID BMP requirements, RSCR riparian buffer management, and tree canopy preservation requirements; wetland/stream impacts are subject to USACE/Virginia DEQ/VMRC permits as applicable; central water and sewer service via extension of existing facilities was noted by county staff.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Retrieved county packets did not provide project-specific job estimates. Proffers include a one-time $325,000 cash contribution for Prentice Drive turn-lane improvements and a one-time volunteer fire and rescue contribution of $0.22 per gross square foot; staff stated it had no fiscal-impact concerns.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project status differs across non-county sources (operator marketing vs. industry databases). Retrieved county records do not include site plan/building permits or DEQ/USACE/VMRC permit IDs; additional database queries and permit records would be needed for construction timing, generator permits, and environmental permit numbers.",
    "notes": "2-story building with 180MW critical power capacity; Investment estimated at $7M/MW; Sources: https://cloudhq.com/campus/lc-campus/ https://www.awma.org/datacenterstour https://www.constructconnect.com/construction-economic-news/top-10-project-starts-june-2023 https://www.datacentermap.com/usa/virginia/ashburn/cloudhq-lc4/ https://www.datacenterdynamics.com/en/news/prince-william-county-supervisors-shelve-amazon-data-center-proposal-indefinitely/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "BlackChamber Virginia Portfolio",
    "state": "Virginia",
    "city": "Virginia",
    "county": "Multiple",
    "region": "Virginia",
    "status": "under-construction",
    "sponsors": "BlackChamber Group",
    "operators": "BlackChamber Group",
    "tenants": null,
    "totalSquareFeet": 6000000.0,
    "powerCapacityMW": 740.0,
    "itLoadMW": null,
    "investmentUSD": 1200000000.0,
    "sizeNotes": null,
    "announcedDate": "2024",
    "constructionStartDate": "2024",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No portfolio-specific renewable energy, PUE, or cooling disclosures were found in the cited public sources; general Northern Virginia community discussions reference water and grid impacts.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No public documents were found that quantify portfolio construction jobs, permanent jobs, or tax revenue projections; available statements are countywide general context.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Public sources do not clearly enumerate or map all four financed campus sites to specific local zoning cases; project-specific construction progress, environmental permits, and utility interconnection details were not documented in the reviewed public materials.",
    "notes": "JLL arranged $1.2B+ in construction financing throughout 2024 for 740MW of capacity; Sources: https://www.datacenterdynamics.com/en/news/blackchamber-secures-12-billion-for-construction-of-virginia-data-centers-totaling-740mw/ https://rebusinessonline.com/jll-arranges-1-2b-to-fund-construction-of-four-northern-virginia-data-center-projects-for-blackchamber/ https://commercialobserver.com/2025/01/blackchamber-1billion-data-centers-nova/ https://www.jll.com/en-us/newsroom/jll-raises-financing-for-data-center-developer-in-virginia",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Advance Phase LLC Walla Walla Campus (Project Tree)",
    "state": "Washington",
    "city": "Wallula",
    "county": "Walla Walla County",
    "region": "Eastern Washington",
    "status": "planned",
    "sponsors": "Amazon Data Services; Advance Phase LLC",
    "operators": "Advance Phase LLC",
    "tenants": "Amazon Web Services",
    "totalSquareFeet": 3400000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "16 buildings planned across 500 acres in four phases of 125 acres each",
    "announcedDate": "2024",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 4.0,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Active cooling expected only above certain ambient-temperature thresholds, generally in summer; public sources do not identify final cooling design.",
    "certifications": null,
    "sustainabilityNotes": "Expected to leverage Columbia River Basin hydroelectric power",
    "economicImpact_jobs": 320.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Local reporting estimated ~320 full-time jobs and ~400 vendor positions once operating. Port materials cited in local business reporting projected a ~50% tax-base increase and ~720 direct and indirect jobs across build-out.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Limited public documentation located for project-specific zoning, environmental filings (SEPA/permits), incentives, and utility arrangements; Port meeting packet PDFs were not accessible from the research environment.",
    "notes": "Walla Walla County's Amazon Data Center FAQ, last updated 2026-06-24, says the Port of Walla Walla approved the sale of 554 acres in the Wallula Gap Business Park to Amazon Data Services on 2026-02-12, lists a 2026-06-23 Notice of Incomplete Application for SDP26-01/SEPA26-05, and lists an Amazon-hosted 2026-08-11 open house. Tri-City Herald reporting on 2026-05-12 said Amazon Data Services was revealed as the company behind Advance Phase LLC and would pay $36 million for 553 acres at Wallula Gap to construct 16 data centers in a $5 billion project. [Source: https://www.wwcowa.gov/government/community_development/amazon_data_center_faqs.php; Date: 2026-06-24]; QA 2026-07-19: Retained reported area and $5B investment while clearing modeled power capacity.; Sources: https://www.tri-cityherald.com/news/business/article314662893.html https://www.tri-cityherald.com/news/business/article315181948.html https://www.datacenterdynamics.com/en/news/walla-walla-officials-green-light-land-sale-for-48bn-data-center-campus-in-washington/ https://www.portwallawalla.com/images/meeting/minutes/2024/20_Signed_Minutes_10-24-24.pdf https://www.tricitiesbusinessnews.com/articles/wallula-data-center",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Port of Walla Walla - Project Forest",
    "state": "Washington",
    "city": "Walla Walla",
    "county": "Walla Walla County",
    "region": "Eastern Washington",
    "status": "planned",
    "sponsors": "Amazon Data Services, Inc.; Advance Phase LLC",
    "operators": "Amazon Data Services, Inc.; AWS",
    "tenants": "Amazon Data Services / AWS",
    "totalSquareFeet": 3400000.0,
    "powerCapacityMW": 100.0,
    "itLoadMW": null,
    "investmentUSD": 4800000000.0,
    "sizeNotes": "100 acres reserved",
    "announcedDate": "2025-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No verified water-right arrangement, cooling design, PUE target, renewable-energy commitment, or certification was located. Public official comments said anticipated data-center water use would be less than full agricultural production and active cooling would generally be needed during hotter ambient conditions rather than continuously.",
    "economicImpact_jobs": 320.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No Project Forest job count was located. Later Amazon/Project Tree reporting said the project description expected 320 jobs and described hundreds of permanent full-time jobs plus construction jobs, without a specific construction-jobs count.",
    "incentives_type": "Infrastructure Support",
    "incentives_value": null,
    "challenges": "Project Forest's relationship to the later Project Tree / Advance Phase / Amazon campus is not explicitly documented. No public source located through 2026-06-15 states that Project Forest closed, was canceled, or became Amazon's Project Tree. The later Amazon campus remained planned/pre-application with no development application filed as of 2026-05-29.",
    "notes": "One of multiple data center business leads referenced in Port of Walla Walla documents from January 2025; Port of Walla Walla Project Forest; planned development estimate; Sources: https://www.portwallawalla.com/images/pdf/econ_development/EDAC_Meetings/2025/Jan25/Jan2025_EDIM_Agenda.pdf https://www.portwallawalla.com/images/meeting/minutes/2024/20_Signed_Minutes_10-24-24.pdf https://www.datacenterdynamics.com/en/news/aws-likely-behind-48bn-data-center-in-walla-walla-washington/ https://www.tri-cityherald.com/news/business/article294486864.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft East Wenatchee Campus",
    "state": "Washington",
    "city": "East Wenatchee",
    "county": "Douglas County",
    "region": "Central Washington",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft Corporation",
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "Six facilities planned on 170-acre campus. First building (EAT02) valued at $409 million. Additional projects EAT06 and EAT09 add 250,530 sq ft combined.",
    "announcedDate": "2020",
    "constructionStartDate": "2021",
    "expectedCompletionDate": null,
    "actualCompletionDate": "2022-12",
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; cloud; ai-ml",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "non-contact cooling-water discharge to sewer system; connected to East Wenatchee Water District infrastructure expansion",
    "certifications": null,
    "sustainabilityNotes": "Powered by hydroelectric power. Microsoft contributed $24.9 million for 180MW substation and $12.5 million for water infrastructure including 2 million gallon reservoir.",
    "economicImpact_jobs": 60.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "CERB bulletin: $1,000,000 grant + $4,000,000 loan to East Wenatchee Water District; notes $50,000,000 private investment and 60 jobs within five years. Media report: $1B campus; includes a $409M data center building and a $24.9M substation to serve up to 180 MW.",
    "incentives_type": "Grant; Infrastructure Support; Other",
    "incentives_value": 5000000.0,
    "challenges": "SEPA ODNS/Notice of Application records include public comment periods (e.g., June\u2013July 2022; February\u2013March 2024). No lawsuits, petitions, or organized protest actions were found in reviewed sources.",
    "notes": "Microsoft acquired 170 acres in 2020 for $19.3 million. Investment could exceed $1 billion. EAT02 completed December 2022, valued at $409 million.; Power: 180 MW (substation capacity per Douglas PUD/media reports in research file); QA 2026-07-18: Cleared partial-campus floor area and non-exact investment; known building figures remain in sizeNotes.; Sources: https://apps.ecology.wa.gov/separ/Main/SEPA/Record.aspx?SEPANumber=202400382 https://app.leg.wa.gov/ReportsToTheLegislature/Home/GetPDF?fileName=Innovation+Partnership+Zones+Biennial+Report_afbea4f7-feef-47b5-b61e-ef804d0ac3cf.pdf https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-central-washington/ https://www.datacenterdynamics.com/en/news/microsoft-pays-towards-new-180mw-substation-and-2-million-gallon-reservoir-douglas-county-washington/ https://cbaimage.commercialmls.com/content/upload/photos/pdf/FS/64a7289f17303800013923a4_flyer_2023_07_06t133615.740.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Vantage Data Centers Quincy Campus (WA1)",
    "state": "Washington",
    "city": "Quincy",
    "county": "Grant County",
    "region": "Central Washington",
    "status": "operational",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 775000.0,
    "powerCapacityMW": 89.0,
    "itLoadMW": 89.0,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "68-acre campus with three facilities",
    "announcedDate": "2011",
    "constructionStartDate": null,
    "expectedCompletionDate": "2023-10",
    "actualCompletionDate": "2023-10",
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "WA13 uses a closed-loop air-cooled chiller system; 2016 SEPA record documents an evaporation pond for brine-water discharge from water softeners.",
    "certifications": null,
    "sustainabilityNotes": "Powered by Grant County PUD hydroelectric dams producing 1,050MW of clean renewable energy annually",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 7000000.0,
    "economicImpact_notes": "Company-reported: ~$1.0B+ invested; ~828,000 working hours on latest phase construction (completed 2023); campus represents ~$1.0B assessed value and >$7M annual property tax revenue (not independently verified in public studies located for this review).",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Public-record gaps: no project-specific local land-use approvals, stormwater/SEPA/water permits, interconnection/service agreements, or distribution upgrade cost responsibility identified in public sources during this review; utility policy context notes constraints on additional large-load growth.",
    "notes": "Final facility (WA13) completed October 2023, adding 64MW to bring total to 89MW across 775,000 sq ft. Campus offers lowest power rates in country combined with state tax breaks.; QA 2026-07-18: Retained 89 MW only as reported IT capacity and cleared the duplicate facility-power field.; Sources: https://vantage-dc.com/news/vantage-data-centers-completes-development-of-89mw-1billion-quincy-washington-campus/ https://vantage-dc.com/data-center-locations/north-america/quincy-washington/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Fundamental Data Tucker County Data Center",
    "state": "West Virginia",
    "city": "Between Thomas and Davis",
    "county": "Tucker County; Grant County",
    "region": "Northern West Virginia",
    "status": "planned",
    "sponsors": "Fundamental Data LLC",
    "operators": "Fundamental Data LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 5200.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Facility would include natural gas and diesel power generators producing 1656MW of power. Could span 10,000 acres across Tucker and Grant counties if fully realized. Representatives told WSJ it could be 'among the largest data center campuses in the world.'",
    "announcedDate": "2024-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-01-01",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Off-grid natural gas power plant with diesel backup. Three 10 million gallon diesel storage tanks planned (66 feet tall, 180 feet in diameter each). Air quality permit approved August 15, 2025.",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": 27000000.0,
    "economicImpact_notes": "No official economic impact study, job counts, or tax revenue projections specific to this project were located in the sources reviewed.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Air construction permit issued August 15, 2025 and under appeal to the WV Air Quality Board; significant local opposition citing scale, noise, water use, and diesel air pollution.",
    "notes": "June 2026 reporting on West Virginia Department of Commerce correspondence materially expands the described Ridgeline project scale beyond the earlier 1,656 MW figure: state officials said Fundamental Data described Phase 1 as approximately 800 MW of natural-gas generation, 1.3 GW of solar generation, and 14 data-center buildings using more than 2.0 GW of power, with Phase 2 adding 3.1 GW of gas-fired generation and enough data-center buildings to use that generation. The correspondence said the power plant would be in Tucker County and data-center facilities would be in Tucker and Grant counties. WV MetroNews reported that the state and developer are disputing whether the project triggered mandatory High Impact Data Center certification; Fundamental Data responded that contemplated data centers remain conceptual and that it is a generation developer rather than a data-center operator. Treat the 5.2 GW value as the disputed project-scale power/generation figure described by the state, not as confirmed critical IT load. [Source: https://parsonsadvocate.com/news/pa-local-stories/wv-dept-of-commerce-fundamental-data-exchange-war-of-words-over-ridgeline-project-deadline/ | https://wvmetronews.com/2026/06/21/state-and-developer-dispute-whether-tucker-county-project-hit-deadline-for-data-center-certification/ | https://wvpress.org/breaking-news/wv-data-center-project-pushback-from-state-and-citizens-runs-into-legal-obstacles/; Date: 2026-06-23; 2026-06-21; 2026-06-30]; Sources: https://wvpublic.org/story/energy-environment/proposed-tucker-county-data-center-developer-provides-proof-of-property-ownership/ https://aqb.wv.gov/Pages/Appeal-Details.aspx?title=25-02-AQB https://apnews.com/article/west-virginia-charleston-data-management-and-storage-legislation-general-news-b33c051439bd3694ee3f2b04981f4555 https://fundamentaldata.com/ https://wvpublic.org/story/energy-environment/proposed-tucker-county-data-center-developer-provides-proof-of-property-ownership/amp/ https://dep.wv.gov/daq/permitting/Documents/Fundamental%20Data%20LLC%3B%20Ridgeline%20Facility/combined%20IPR%20for%20web.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Adams Fork Data Center Energy Campus - Harless Site",
    "state": "West Virginia",
    "city": "Holden",
    "county": "Mingo County",
    "region": "Southern West Virginia",
    "status": "planned",
    "sponsors": "TransGas Development Systems LLC",
    "operators": "TransGas Development Systems LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2400.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Site would generate 2,400 megawatts from natural gas or diesel. Would be third-highest power-intensive industrial site in West Virginia.",
    "announcedDate": "2025-03",
    "constructionStartDate": "2026-01-01",
    "expectedCompletionDate": "2027-01-01",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Off-grid natural gas/diesel power plant. Part of project that would create largest natural gas-fueled ammonia plant in the world.",
    "economicImpact_jobs": 150.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "300 permanent jobs total for both sites; ~5,000 construction jobs. CNX withdrew Dec 2023 citing 45V tax credit uncertainty.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": 75000.0,
    "challenges": "Federal lawsuit filed Dec 2025 by 10 Mingo County residents. CNX Resources withdrew as partner Dec 2023.",
    "notes": "Located off 22 Mine Road near Holden, near Mingo-Logan county line at Harless Industrial Park. Would operate as microgrid. Part of larger TransGas development including ammonia production. Community concerns about water access, air quality, and transparency.; QA 2026-07-18: Cleared 2.457 GW from data-center capacity because it is generation for the broader microgrid campus.; Sources: https://www.adamsfork.com/ https://dep.wv.gov/daq/permitting/Documents/Transgas-Adams-Fork-Harless/059-00133_PERM_13-3714%20draft.pdf https://dep.wv.gov/daq/permitting/Documents/Transgas-Adams-Fork-Harless/TransGas_13-3714%20and%2013-3715_Notice.pdf https://dep.wv.gov/daq/permitting/Pages/NSR-Permit-Applications.aspx",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Adams Fork Data Center Energy Campus - Wharncliffe Site",
    "state": "West Virginia",
    "city": "Wharncliffe",
    "county": "Mingo County",
    "region": "Southern West Virginia",
    "status": "planned",
    "sponsors": "TransGas Development Systems LLC",
    "operators": "TransGas Development Systems LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2457.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Site would generate 2,400 megawatts from natural gas or diesel. Would be fourth-highest power-intensive industrial site in West Virginia.",
    "announcedDate": "2025-03",
    "constructionStartDate": "2026-01-01",
    "expectedCompletionDate": "2027-01-01",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Off-grid natural gas/diesel power plant. Part of project that would create largest natural gas-fueled ammonia plant in the world.",
    "economicImpact_jobs": 150.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "300 permanent jobs total for both sites; ~5,000 construction jobs. CNX withdrew Dec 2023 citing 45V tax credit uncertainty.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Federal lawsuit filed Dec 2025 by 10 Mingo County residents. CNX Resources withdrew as partner Dec 2023.",
    "notes": "Located at 2002 Twisted Gun Road at Twisted Gun Golf Course in Wharncliffe. Would operate as microgrid. DEP held public hearing with about 50 local residents attending. Part of TransGas Adams Fork Energy project.; Investment estimated at $7M/MW; Sources: https://dep-auth.wv.gov/daq/permitting/Documents/Transgas-Adams-Fork/059-00134_EVAL_13-3715%20draft.pdf https://dep.wv.gov/daq/permitting/Documents/Transgas-Adams-Fork-Harless/TransGas_13-3714%20and%2013-3715_Notice.pdf https://dep-auth.wv.gov/daq/permitting/Documents/Transgas-Adams-Fork/TransGas%202%20%20059-00134_APPL_13-3715.pdf",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Microsoft Fairwater AI Data Center - Mount Pleasant",
    "state": "Wisconsin",
    "city": "Mount Pleasant",
    "county": "Racine County",
    "region": "Southeastern Wisconsin",
    "status": "operational",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft Cloud; Microsoft AI; Copilot; OpenAI; other leading AI workloads",
    "totalSquareFeet": 1200000.0,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 3300000000.0,
    "sizeNotes": "Three massive buildings totaling 1.2 million square feet, 315-acre campus. Will house hundreds of thousands of Nvidia GB200 and GB300 GPUs. Fiber network long enough to circle the Earth 4.5 times (180,000 km). Construction required 46.6 miles of deep foundation piles, 26.5 million pounds of structural steel, 120 miles of medium-voltage underground cable, and 72.6 miles of mechanical piping.",
    "announcedDate": "2024-05-08",
    "constructionStartDate": "2024-01",
    "expectedCompletionDate": "2026-01",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "ai-ml; hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "More than 90% of facility uses state-of-the-art closed-loop liquid cooling system. Remaining portion uses outside air for cooling. Microsoft funding new 250MW solar project in Portage County to match facility with renewable power purchase agreements.",
    "economicImpact_jobs": 800.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Microsoft official cited typical data center employment of 300\u2013400 people, but no project-specific job commitments were disclosed in the sourced agreements. Development agreement includes a $1.4B assessed value guarantee by the start of 2028 with a $15M-or-shortfall backstop.",
    "incentives_type": "Tif; Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Uncertainty in available local records on whether zoning approvals were by-right/conditional use/rezoning; public records lawsuit and public concerns regarding projected water use; environmental permitting (air and wetland) processes; stormwater permit documentation not located in the cited sources.",
    "notes": "Described as the world's most powerful AI datacenter. At peak construction, employed more than 3,000 construction workers. Once fully operational, will employ around 500 full-time employees. Campus acquired nearly 1,900 acres in Mount Pleasant.; $3.3B by 2026; 315 acres; $1.4B assessed value guarantee; 300-400 jobs; We Energies; TID 5 former Foxconn. April 2026 update: Microsoft CEO Satya Nadella said the Wisconsin Fairwater data center was going live ahead of schedule; Data Center Dynamics reported the update on April 20, 2026. Treat as initial operation/commissioning ramp, with full commissioning details not public. June 2026 Microsoft update: first Mount Pleasant Fairwater datacenter facility completed construction, brought equipment online and conducted startup activities in April, and is fully operational; Microsoft said nearly 10,000 construction workers contributed to the first facility, nearly 550 full-time employees were on site supporting it, and construction of the adjacent second facility was ongoing. [Source: https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/; Date: 2026-06-23]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Microsoft Data Center Expansion Phase 2 - Mount Pleasant",
    "state": "Wisconsin",
    "city": "Mount Pleasant",
    "county": "Racine County",
    "region": "Southeastern Wisconsin",
    "status": "under-construction",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": "Microsoft",
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 4000000000.0,
    "sizeNotes": "Second datacenter of similar scale to the first facility",
    "announcedDate": "2026-01-26",
    "constructionStartDate": "2025-11-01",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "ai-ml; hyperscale; cloud",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Expected to use similar cooling and sustainability features as Phase 1",
    "economicImpact_jobs": 2000.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "State press release cited thousands of union construction jobs and ongoing operations hiring; local economic development summary estimated ~2,000 direct jobs and ~2,300 construction jobs for the broader Mount Pleasant buildout.",
    "incentives_type": "Tif",
    "incentives_value": null,
    "challenges": "Full executed Development Agreement/Implementation Agreement and detailed meeting minutes were not retrieved from the Village archive; interconnection/PPA/PSC filings and full DNR permit files (stormwater/WPDES, water withdrawal approvals) were not located in the summarized sources.",
    "notes": "Microsoft's June 23, 2026 company release says construction of the second Mount Pleasant facility immediately adjacent to the first was ongoing, including foundation installation, steel erection, and underground utility placement. Microsoft said the second facility was scheduled for completion in 2028 and that, when fully operational, full-time employment in the village is expected to grow to around 800, with the expansion to the north representing hundreds more. [Source: https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/; Date: 2026-06-23]; QA 2026-07-19: Cleared investment-derived power capacity while retaining the announced $4 billion expansion.; Sources: https://content.govdelivery.com/accounts/WIGOV/bulletins/3f327b5 https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Vantage Data Centers - Port Washington",
    "state": "Wisconsin",
    "city": "Port Washington",
    "county": "Ozaukee County",
    "region": "Southeastern Wisconsin",
    "status": "under-construction",
    "sponsors": "Vantage Data Centers; OpenAI; Oracle",
    "operators": "Vantage Data Centers",
    "tenants": "Oracle; OpenAI",
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 902.0,
    "itLoadMW": 902.0,
    "investmentUSD": 15000000000.0,
    "sizeNotes": "Four large data centers on 672-acre site. Over 2.5 million square feet of data center space, plus visitor center and warehouse.",
    "announcedDate": "2025-10-22",
    "constructionStartDate": "2025",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Buildings will use 1.3 gigawatts of power, most from clean energy sources. Permitted to use up to 1.2 million gallons of water per day from Port Washington's water plant.",
    "economicImpact_jobs": 1000.0,
    "economicImpact_taxRevenue": 541500000.0,
    "economicImpact_notes": "TID plan projects about $2.11B in incremental value and future tax increment value of about $541.5M over the district life. Media-reported job figures are estimates; operational jobs described as 'hundreds' without a specific count.",
    "incentives_type": "Tif; Sales Tax Exemption; Infrastructure Support",
    "incentives_value": 455400000.0,
    "challenges": "Community opposition to the TID and project scale; reliance on PSC approvals for specialized utility tariffs and transmission interconnection project; WEDC qualified data center certification date left blank in public-facing plan; air permit applications pending DNR analysis and public notice/comment.",
    "notes": "Data Center Dynamics reported on June 26, 2026 that Vantage had topped out the second building at the Lighthouse campus, marking completion of that building's structural framework. The full campus is planned for four buildings, 2.5 million square feet, and 902 MW, with service expected in 2028. Wisconsin DNR's Port Washington project page says the campus is being constructed on 672 acres and that on June 12, 2026 DNR issued minor-source air construction and initial operation permits for 45 diesel emergency generators. [Source: https://www.datacenterdynamics.com/en/news/vantage-tops-out-second-building-at-openais-lighthouse-campus-in-wisconsin/; https://dnr.wisconsin.gov/topic/EIA/Portwashington.html; https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/; Date: 2026-06-26; 2026-06-12; 2025-10-22]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "QTS Data Centers - Vienna (Dane County)",
    "state": "Wisconsin",
    "city": "Vienna",
    "county": "Dane County",
    "region": "South-Central Wisconsin",
    "status": "canceled",
    "sponsors": "QTS Data Centers",
    "operators": "QTS Data Centers",
    "tenants": null,
    "totalSquareFeet": 3700000.0,
    "powerCapacityMW": 429.0,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": "615-acre campus with as many as 15 buildings planned. Each building requires $300-350 million investment.",
    "announcedDate": "2025-07-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "hyperscale; colocation",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Draft materials reference net-positive infiltration, gray-water reuse for irrigation, stormwater/erosion control permitting and plan approvals, wetlands preservation/restoration (at least 40 acres) and natural areas/wetland restoration/stormwater basins.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 12000000.0,
    "economicImpact_notes": "Company statement: thousands of construction jobs, hundreds of full-time positions, and millions in tax revenue (not quantified). Village press release (Jan. 9, 2026) cited minimum $1.2B valuation and ~$12M annual property taxes by 2031; project was withdrawn in late Jan. 2026 so projected benefits did not materialize.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Strong local opposition and political pushback; annexation petitions rejected and consolidation requested; project withdrawn by QTS in late Jan. 2026.",
    "notes": "Located along Highway V west of DeForest, around Patton Road and Hahn Road. Would be QTS's first data center in Wisconsin. Project expected to create 450 permanent jobs and thousands of temporary construction jobs. Total buildout timeline is 5-10 years. Filed request letter July 1, 2025 with local officials.; Power estimated at $7M/MW; Sources: https://www.wpr.org/news/developer-qts-data-centers-looks-build-data-campus-dane-county-vienna https://q.com/news/qts-advances-plans-for-state-of-the-art-data-center-campus-and-announces-50-million-community-commitment-for-dane-county/?nocache=1772426203 https://www.deforestwi.gov/m/newsflash/home/detail/75 https://viennawi.gov/qts-data-center/ https://cdn.townweb.com/viennawi.gov/wp-content/uploads/2025/08/Aug25.pdf",
    "lastUpdated": "2026-02-05"
  },
  {
    "projectName": "Meta Platforms Data Center - Beaver Dam",
    "state": "Wisconsin",
    "city": "Beaver Dam",
    "county": "Dodge County",
    "region": "South-Central Wisconsin",
    "status": "under-construction",
    "sponsors": "Meta Platforms; Alliant Energy",
    "operators": "Meta Platforms",
    "tenants": "Meta Platforms",
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": 220.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": "More than 500-acre site at Beaver Dam Commerce Park",
    "announcedDate": "2025-02",
    "constructionStartDate": "2025-11",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "dry cooling",
    "certifications": "Wisconsin certified qualified data center",
    "sustainabilityNotes": "Meta states the campus will use dry cooling (no operational water demand for cooling), will restore 100% of the water consumed, and will restore 570 acres of wetlands and prairie (about 175 acres to be deeded to Ducks Unlimited).",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": 187000000.0,
    "economicImpact_notes": "Meta/WPR report 100+ operational jobs and 1,000+ peak construction workers. The TID 10 plan projects $187.0M in total tax increment over the life of the TID (not realized as of Feb. 1, 2026).",
    "incentives_type": "Sales Tax Exemption; Tif; Infrastructure Support",
    "incentives_value": 128522000.0,
    "challenges": "Public controversy over NDA-related secrecy and limited disclosure; permit-specific records (WDNR, building, conditional use) and clawback/recapture terms were not found in publicly accessible sources reviewed; detailed power procurement (PPAs) and interconnection agreements not publicly disclosed.",
    "notes": "Wisconsin regulators approved the Alliant-Meta individual power contract in May 2026; amended filings disclosed a 10-year supply arrangement for 220 MW, materially above the prior 143 MW estimate. Wisconsin Watch's May 2026 report described construction as ongoing at the Beaver Dam Commerce Park site. [Source: https://wisconsinwatch.org/2026/05/psc-approves-alliant-meta-data-center-power-deal-while-criticizing-black-box-approach/; https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism; Date: 2026-05-07; 2026-05-07]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Project Tembo (formerly Crusoe/Tallgrass AI Data Center)",
    "state": "Wyoming",
    "city": "Cheyenne",
    "county": "Laramie County",
    "region": "Southeast Wyoming",
    "status": "under-construction",
    "sponsors": "Google; Jupiter Star Holdings, LLC; Tallgrass Energy; Black Hills Energy",
    "operators": "Google (Jupiter Star Holdings, LLC); Black Hills Energy; Tallgrass",
    "tenants": "Google",
    "totalSquareFeet": 3080000.0,
    "powerCapacityMW": 2700.0,
    "itLoadMW": null,
    "investmentUSD": 50000000000.0,
    "sizeNotes": "716-acre campus in Switchgrass Industrial Park; four data center halls plus office hub. First phase 1.8 GW; 2.7 GW configuration, scalable to 10,000 MW (10 GW). Will use 5x more electricity than all Wyoming homes combined at full scale.",
    "announcedDate": "2025-07-24",
    "constructionStartDate": "2026-01-06",
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": true,
    "pueTarget": null,
    "waterCooling": "closed-loop",
    "certifications": null,
    "sustainabilityNotes": "Powered by Wyoming natural gas with carbon capture technology. Proximity to Tallgrass' CO2 sequestration hub for long-term carbon capture solutions.",
    "economicImpact_jobs": 400.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Reported projections in media coverage of the county hearing: >2,500 construction jobs and 400+ permanent jobs for the combined data center and associated power plant. No verified realized tax-revenue or employment outcomes reported as of early 2026.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Primary documentation gaps include any incentive agreements, WY DEQ permit filings for BFC Power LLC, water-well permits, and utility/PSC docket materials for large-load tariff arrangements; community concerns focused on groundwater/aquifer impacts, traffic, noise/light impacts, and environmental effects of associated power generation expansion.",
    "notes": "Laramie County's July 8, 2026 memo says the data center previously known as Project Jade is now Project Tembo, Crusoe Energy has withdrawn, and county representatives have held re-submittal discussions with Google doing business as Jupiter Star Holdings, LLC. The revised submittal scales the project from five buildings and 4,025,500 sq ft to four buildings and 3,080,000 sq ft, reduces peak workforce from 5,000 to 2,500, and includes an associated office-complex CUP. Data Center Dynamics reported on July 14, 2026 that Google is the customer behind the 2.7 GW campus on a 716-acre parcel in Switchgrass Industrial Park, with four data halls and completion slated by 2031; earlier Black Hills filings still describe a 1.8 GW utility service project, so notes should preserve both the utility-service framing and the newer 2.7 GW campus description. [Source: https://www.laramiecountywy.gov/files/sharedassets/public/v/1/county/public-notice/project-tembo-memo-07082026.pdf | https://www.datacenterdynamics.com/en/news/google-is-customer-behind-27gw-data-center-campus-near-cheyenne-wyoming/ | https://www.globenewswire.com/news-release/2026/06/10/3309709/10381/en/black-hills-corp-provides-an-update-on-1-8-gigawatt-project-in-cheyenne.html; Date: 2026-07-08; 2026-07-14; 2026-06-10]; QA 2026-07-18: Added the 3,080,000-square-foot total from Laramie County's revised Project Tembo memo.",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Related Digital Data Center (CoreWeave Campus)",
    "state": "Wyoming",
    "city": "Cheyenne",
    "county": "Laramie County",
    "region": "Cheyenne Business Parkway",
    "status": "under-construction",
    "sponsors": "Related Digital; CoreWeave; Clayco",
    "operators": "Related Digital",
    "tenants": "CoreWeave",
    "totalSquareFeet": 184000.0,
    "powerCapacityMW": 302.0,
    "itLoadMW": 88.0,
    "investmentUSD": 1200000000.0,
    "sizeNotes": "115-acre campus. Phase 1 is 184,000 sq ft providing 88 MW to CoreWeave. Total campus capacity: 302 MW.",
    "announcedDate": "2025-10-07",
    "constructionStartDate": "2025-10-07",
    "expectedCompletionDate": "2026-12",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "colocation; ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "False",
    "certifications": null,
    "sustainabilityNotes": "Air-cooled facility using self-contained cooling systems that do not use water. Water consumption only from six bathrooms.",
    "economicImpact_jobs": 40.0,
    "economicImpact_taxRevenue": 250000000.0,
    "economicImpact_notes": "Phase I projections cited as more than $250M in tax revenue to Wyoming and Cheyenne over the first 15 years of operations; figures are projected (project under construction as of Feb. 1, 2026).",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "No public record found yet for project-specific zoning case/approvals, incentive agreements, or environmental permit records in the reviewed public sources.",
    "notes": "June 2026 reporting from a site tour said work was nearing completion on the first 184,000-square-foot phase of Related Digital's Cheyenne campus and that the first phase was expected to be finished in late 2026. The update confirms continued construction progress and late-2026 first-phase target for the $1.2 billion, 302 MW campus with CoreWeave as anchor tenant. [Source: https://cowboystatedaily.com/2026/06/14/inside-a-1-2-billion-data-center-campus-being-built-in-cheyenne/ | https://www.related.com/press-releases/2025-10-07/related-digital-breaks-ground-302-mw-data-center-campus-cheyenne-wyoming; Date: 2026-06-14; 2025-10-07]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Prometheus Hyperscale - WY-1 (Evanston Campus)",
    "state": "Wyoming",
    "city": "Evanston",
    "county": "Uinta County",
    "region": "Southwest Wyoming",
    "status": "planned",
    "sponsors": "Prometheus Hyperscale",
    "operators": "Prometheus Hyperscale",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1250.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": "640-acre campus. Dedicated 138 kV substation with 120 MW initial capacity, infrastructure for full 1 GW+ build-out. Originally planned at 120 MW, expanded to 1.2 GW+.",
    "announcedDate": "2020",
    "constructionStartDate": "2022",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": true,
    "pueTarget": 1.08,
    "waterCooling": "True",
    "certifications": "LEED Gold (targeted)",
    "sustainabilityNotes": "100% renewable energy including partnership with Oklo for 100 MW carbon-free power. PUE of 1.08, water usage effectiveness of 0.0. Powered by PureWest Energy low-carbon natural gas with Frontier Carbon Solutions carbon removal credits for zero-carbon footprint. First phase utilizing 500,000+ tons per annum of carbon removals. Features immersion cooling, geothermal aquifer heat exchange, waste heat reuse for indoor farming.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 66000000.0,
    "economicImpact_notes": "No public economic impact study or tax revenue projection located in public records.",
    "incentives_type": "Infrastructure Support; Cba; Other",
    "incentives_value": null,
    "challenges": "No local hearing record found in the county's public archive; no petitions, lawsuits, or protest actions located in open sources.",
    "notes": "Prometheus announced on June 17, 2026 that it received unanimous Conditional Use Permit approval from the Uinta County Board of Commissioners for its flagship data center campus near Evanston. The permitted site is 506 acres, designed for 1.25 GW of initial capacity with a development path to 5 GW, using an islanded on-site microgrid and closed-loop liquid cooling. Use planned, not under-construction, because the source describes a permitting milestone rather than a construction start. [Source: https://www.prometheushyperscale.com/news/prometheus-hyperscale-secures-unanimous-conditional-use-permit-approval-from-uinta-county-commissioners | https://www.prnewswire.com/news-releases/prometheus-hyperscale-secures-unanimous-conditional-use-permit-approval-from-uinta-county-commissioners-302803665.html; Date: 2026-06-17; 2026-06-17]; Sources: https://www.prometheushyperscale.com/news/bernard-looney-appointed-chairman https://www.prometheushyperscale.com/projects https://www.lowvoltagenation.com/posts/prometheus-evanston-ai-data-center-construction-watch",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Prometheus Hyperscale - Natrona/Converse County Campus",
    "state": "Wyoming",
    "city": "Casper area",
    "county": "Natrona County / Converse County",
    "region": "Central Wyoming",
    "status": "planned",
    "sponsors": "Prometheus Hyperscale; Spiritus; Casper Carbon Capture",
    "operators": "Prometheus Hyperscale",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1500.0,
    "itLoadMW": 1500.0,
    "investmentUSD": 500000000.0,
    "sizeNotes": "Initial minimum $500 million investment for 200 MW. Scalable to 1.5 GW IT capacity. Overall economic impact projected at $3.1 billion.",
    "announcedDate": "2025-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": 1.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "True",
    "certifications": null,
    "sustainabilityNotes": "Carbon-negative digital infrastructure campus. Powered by natural gas with point-source and direct air carbon capture via Spiritus Orchard Power platform. High-density compute halls with proprietary aquifer, non-consumptive water-cooling systems.",
    "economicImpact_jobs": 600.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Sponsor claims hundreds of construction jobs and dozens of long-term technical roles. Local reporting citing an economic impact study projects ~1,000 construction jobs, ~600 permanent jobs, and up to $3.1B economic impact over 20 years.",
    "incentives_type": "Sales Tax Exemption; Cba; Other",
    "incentives_value": null,
    "challenges": "Project is planned/pre-permitting with formal county permitting not yet started; incentives, zoning path, environmental permitting, and any grid/utility agreements are not disclosed.",
    "notes": "Converse County reversed a fast-track industrial-park resolution in May 2026 after Wyoming Attorney General review, and Cowboy State Daily reported the county had not received a Prometheus application. In June 2026, Natrona County commissioners raised concerns and showed little interest in using a county zoning tool for the project, with one commissioner saying the state industrial-siting process was preferable and another saying the county needed more definitive information. These updates do not cancel the campus, but they make the entitlement path materially less settled than a simple county industrial-park designation. [Source: https://cowboystatedaily.com/2026/05/21/after-ag-says-dont-converse-county-wont-fast-track-data-centers/ | https://cowboystatedaily.com/2026/06/17/eastern-natrona-residents-denounce-data-center-man-camp-as-travesty-and-sin/; Date: 2026-05-21; 2026-06-17]; QA 2026-07-18: Retained 1.5 GW only as operator-described IT capacity and cleared duplicate facility power.; Sources: https://www.prometheushyperscale.com/news/ph-spiritus-casper-carbon-capture-announce-strategic-partnership https://spiritus.com/news/prometheus-hyperscale-spiritus-and-casper-carbon-capture-announce-strategic-partnership-to-build-carbon-negative-data-halls-and-energy-infrastructure-in-wyoming/ https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "CyrusOne / Constellation Freestone Energy Center Data Center Campus",
    "state": "Texas",
    "city": "Fairfield area",
    "county": "Freestone County",
    "region": null,
    "status": "under-construction",
    "sponsors": "CyrusOne; Constellation Energy",
    "operators": "CyrusOne; Constellation Energy",
    "tenants": null,
    "totalSquareFeet": 918650.0,
    "powerCapacityMW": 760.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-09",
    "constructionStartDate": "2026-06-04",
    "expectedCompletionDate": "2027-08",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "enclosed-loop water system; domestic-type water uses estimated at 11,150 gallons per day",
    "certifications": null,
    "sustainabilityNotes": "Developer representatives claimed enclosed-loop water use with only toilets and sinks requiring water; no independent permit verification was located.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 850000.0,
    "economicImpact_notes": "Local reporting described a 10-year PILOT of $850,000 per year for the initial $600 million real-property stage, with real-property improvements potentially exceeding $2 billion depending on tenant personal-property additions.",
    "incentives_type": "Property Tax Abatement; Pilot; Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Open items include unconfirmed square footage, IT load, building count, backup generation, completion dates, environmental permits, Phase 2 entity and abatement outcome, and whether Texas qualified data-center sales/use tax certification applies. Community concerns were raised about water, noise, traffic, pollution, power costs, transparency, and rural character.",
    "notes": "CyrusOne and Constellation announced a Texas data center campus powered from the Freestone Energy Center, with an initial 380 MW and an option for another 380 MW. [Source: https://www.datacenterdynamics.com/en/news/cyrusone-partners-with-constellation-for-760mw-data-center-campus-in-texas/]; Sources: https://www.constellationenergy.com/news/2026/02/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas.html https://www.datacenterdynamics.com/en/news/cyrusone-files-to-develop-three-buildings-for-15bn-data-center-campus-in-fairfield-texas/ https://freestonecountytimesonline.com/breaking-ground-at-new-ai-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Global AI Windsor Data Center",
    "state": "Colorado",
    "city": "Windsor",
    "county": "Weld County",
    "region": null,
    "status": "planned",
    "sponsors": "Global AI",
    "operators": "Global AI",
    "tenants": null,
    "totalSquareFeet": 505000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-02-09",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Global AI company materials emphasize liquid-cooled AI data centers, but no Windsor-specific cooling design was confirmed.",
    "certifications": null,
    "sustainabilityNotes": "No Windsor-specific renewable-energy commitment, PUE target, certification, water-balance model, or closed-loop/dry-cooling commitment was located. Public reporting said the facility was not expected to have a large water demand, but no engineering packet was located.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public reporting separated the $15.6 million site acquisition from possible full buildout investment. DCD reported potential eventual investment ranging from $2 billion to $20 billion depending on final scale, but this was not a committed capital expenditure.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Unresolved permitting and infrastructure risks include lack of a located project-specific USR packet, no confirmed final approval, no public interconnection agreement, uncertain water service and annexation path, potential grid constraints for long-term 1 GW scale, and organized community opposition. No cancellation, formal delay, litigation, or operational status was identified through June 15, 2026.",
    "notes": "Initial phase was reported at roughly 18-24 MW, with future expansion potential up to 1 GW. [Source: https://www.datacenterdynamics.com/en/news/global-ai-to-develop-data-centre-outside-denver-colorado/]; Sources: https://register.windsorgov.com/1452/AI-Data-Center-Project-Information https://www.datacenterdynamics.com/en/news/global-ai-set-to-develop-data-center-outside-denver-colorado/ https://constructionreporter.com/new-ai-data-center-planned-on-site-where-eastman-kodak-once-reigned-supreme/ https://www.kunc.org/news/2025-12-23/globalai-data-center-company-buys-carestream-property https://www.bizjournals.com/denver/news/2026/02/05/data-center-company-buys-land-in-weld-county.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Wonder Valley Utah / Stratos AI Data Center Campus",
    "state": "Utah",
    "city": "Golden Spike area",
    "county": "Box Elder County",
    "region": null,
    "status": "planned",
    "sponsors": "O'Leary Digital; West GenCo; Wonder Valley Utah; MIDA",
    "operators": "O'Leary Digital; West GenCo; Wonder Valley Utah",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 9000.0,
    "itLoadMW": null,
    "investmentUSD": 100000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-17",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; government; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling was described by MIDA's executive director in April 2026 reporting, but no engineering report verifying cooling design or water balance was located.",
    "certifications": null,
    "sustainabilityNotes": "Project sources describe on-site power generation intended to avoid added demand on the existing electric grid. State and public-review issues include water resources, Great Salt Lake impacts, air quality, wildlife, heat capture, and transparency. Utah Clean Energy estimated potential CO2 emissions and gas consumption for a 9 GW gas-fired power system, but those were estimates based on limited public information, not permitted limits.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 30000000.0,
    "economicImpact_notes": "Deseret News reported meeting discussion that a reduced municipal energy tax rate was expected to generate about $30 million annually for Box Elder County in the first phase. MIDA documents describe returning certain increased tax revenues to the master developer for public facilities and a compute-campus LOC payment reimbursement and split structure.",
    "incentives_type": "Property Tax Abatement; Pilot; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Major remaining permits and reviews; withdrawn water-right application after more than 3,700 protests; governor's new data-center framework; June 2026 footprint scale-back commitments; active lawsuit challenging MIDA, county approval, and governance; no confirmed building permit, DAQ air permit, approved water-right change, executed power/gas agreement, tenant announcement, or operational capacity located.",
    "notes": "Box Elder County announced on May 4, 2026 that county commissioners approved a resolution consenting to MIDA creation of the Stratos project area, which may include a state-of-the-art data center in western Box Elder County; the county described a roughly 40,000-acre project area split into three sites and phased development. Subsequent reporting and state discussion describe the Stratos/Wonder Valley proposal at up to 9 GW. On June 4, 2026, the Utah Senate announced that Kevin O'Leary agreed to Senate President Stuart Adams' conditions, including reducing the effective project area by 75% and committing water to the Great Salt Lake. Capacity impact from the footprint reduction was not disclosed. [Source: https://www.boxeldercountyut.gov/m/newsflash/Home/Detail/82 | https://www.businessinsider.com/kevin-oleary-utah-data-center-stratos-wonder-valley-box-elder-2026-6 | https://senate.utah.gov/oleary-concedes-to-president-adams-demands-including-75-reduction-in-proposed-data-center-project-area-and-new-water-for-great-salt-lake/; Date: 2026-05-04; 2026-06-12; 2026-06-04]; Sources: https://www.olearydigital.ai/faq https://www.boxeldercountyut.gov/661/Stratos-Page-FAQ-Page https://fortune.com/2026/05/11/shark-tank-kevin-oleary-millionaire-utah-data-center-american-politics-protests-ai-tech/ https://energyworkforce.org/utah-hyperscale-data-center-facility-approved/ https://www.utah.gov/pmn/files/1423607.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Penzance Bedington Data Center Campus",
    "state": "West Virginia",
    "city": "Falling Waters District",
    "county": "Berkeley County",
    "region": null,
    "status": "planned",
    "sponsors": "Penzance Management",
    "operators": "Penzance",
    "tenants": null,
    "totalSquareFeet": 1900000.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": 600.0,
    "investmentUSD": 4000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-26",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Intended reclaimed-water strategy using treated wastewater for as much as 60% of campus needs, with a reclaimed-water facility and on-site water storage planned; no definitive cooling technology located.",
    "certifications": "West Virginia High Impact Intelligence Center designation",
    "sustainabilityNotes": "Berkeley County and project leaders identified an opportunity to use reclaimed water to lower costs and preserve natural resources. Penzance reportedly plans to rely heavily on reclaimed water rather than potable water.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": 94000000.0,
    "economicImpact_notes": "Penzance reportedly engaged West Virginia University economist John Deskins for a formal economic analysis; early estimates cited at a May 2026 panel projected approximately $94 million annually in tax revenue. No completed public study was located.",
    "incentives_type": "Other",
    "incentives_value": null,
    "challenges": "No construction start, tenant announcement, executed utility agreement, final water arrangement, or operational milestone had been publicly confirmed by June 15, 2026. Community concerns focused on local control, transparency, water, air and quality of life, setbacks, rate impacts, and flood risk.",
    "notes": "The governor's February 26, 2026 release identifies Penzance's Bedington Campus as West Virginia's first High Impact Intelligence Center, located on 548 acres in the Falling Waters District of Berkeley County, with approximately 1.9 million square feet at full buildout and 600 MW of critical IT capacity. This refines the prior location/acreage/buildout description and confirms the $4 billion private investment, roughly 1,000 construction jobs, and 125 permanent positions. The release says no state funding was used and that the project qualified after submitting engineering and environmental plans, utility milestones, water and mitigation strategies, and long-term development commitments. [Source: https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact; Date: 2026-02-26]; Sources: https://westvirginia.gov/4-billion-data-center-campus-planned-for-berkeley-county-positioning-west-virginia-for-the-ai-and-cloud-economy/ https://wvmetronews.com/2026/02/26/governor-announces-a-developer-for-big-west-virginia-data-center-spot/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Ruby",
    "state": "Georgia",
    "city": "Columbus",
    "county": "Muscogee",
    "region": null,
    "status": "planned",
    "sponsors": "Habitat Partners; Development Authority of Columbus; Choose Columbus",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 5180000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-03",
    "constructionStartDate": "2027",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "No public renewable-energy commitment, PUE target, final cooling design, generator specifications, fuel-storage details, or certifications were found through 2026-06-15. Sewer from the data center would have to be pre-treated on site to Columbus Water Works standards before entering the municipal system, and then treated again before discharge to the Chattahoochee River.",
    "economicImpact_jobs": 195.0,
    "economicImpact_taxRevenue": 68700000.0,
    "economicImpact_notes": "Choose Columbus projects 195 permanent jobs with salaries from $80,000 to $120,000 and 1,500+ construction jobs. Choose Columbus projects $605,237,990 in property taxes over 10 years using $5.18B of investment, depreciation, and replacement assumptions; GPB / Ledger-Enquirer reported a projected property-tax ramp to $68.7M per year by 2030 before depreciation.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "The project remained planned / pre-approval as of 2026-06-15, with no project-specific construction approval, tenant announcement, executed utility contract, final permits, DRI filing, or site-specific rezoning / overlay-use approval found. Key issues include strong community opposition, pending technology-overlay rules, uncertainty about power sourcing and cost allocation, water and drought concerns, wastewater chemistry questions, diesel-generator emissions, noise, lighting, rural-character concerns, property impacts, and lack of disclosed operator or end user.",
    "notes": "Recent reporting and Choose Columbus materials identify Habitat Partners/Muscogee Property 1 as the property-side sponsor for Project Ruby and place the proposed campus in northeast Muscogee County near the Harris and Talbot county borders. The project remains proposed/planned, with a reported $5B-plus investment and 600 MW full-build power request; the end user had not been disclosed in the reviewed sources. [Source: https://www.datacenterdynamics.com/en/news/5bn-data-center-project-in-the-works-around-columbus-georgia/; Date: 2026-03-03]; Sources: https://www.choosecolumbusga.com/project-ruby-updates https://www.choosecolumbusga.com/media/userfiles/subsite_79/files/project-ruby/Project%20Ruby%20Site%20Map.pdf https://columbus-ga.municodemeetings.com/sites/default/files/fileattachments/city_council/meeting/2968/cg_meeting_minutes._02-24-2026_1.pdf https://mccmeetingspublic.blob.core.usgovcloudapi.net/columga-meet-73bfc09ea2a448e6a58471c65ae76ca6/ITEM-Attachment-001-eacd99cf46244d27a70d924bb887df17.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Nscale / Microsoft Monarch Compute Campus AI Infrastructure Phase",
    "state": "West Virginia",
    "city": "Point Pleasant area",
    "county": "Mason County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Nscale; Microsoft; NVIDIA; Caterpillar; Fidelis New Energy; American Intelligence & Power Corporation",
    "operators": "Nscale; Microsoft; NVIDIA; Caterpillar; Fidelis New Energy",
    "tenants": "Microsoft",
    "totalSquareFeet": null,
    "powerCapacityMW": 8000.0,
    "itLoadMW": 1350.0,
    "investmentUSD": 20000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-16",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": "State-certified AI microgrid",
    "sustainabilityNotes": "Earlier 2023 Fidelis plan described net-zero hydrogen-powered data centers and H2PowerCool technology, but 2026 Nscale/AIPCorp materials emphasized onsite natural-gas generation and battery storage and did not publish detailed cooling-water quantities or final cooling configuration.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "A local April 2026 interview quoted about 700 workers onsite for the first phase. The earlier 2023 Fidelis-era plan described 800 full-time jobs and 4,200 construction workers for the broader hydrogen/data-center campus, but the 2026 Nscale/Microsoft AI phase did not publish project-specific permanent job figures.",
    "incentives_type": "Sales Tax Exemption; Other",
    "incentives_value": null,
    "challenges": "Schedule uncertainty exists between local early-2027 operation comments and Nscale's early-2028 Phase 1 delivery target. Environmental and permitting issues include pipeline stormwater permitting, a reported air construction permit application, and a May 2026 silt-retention breach associated with flooding in Meadowlands Estates. No cancellation was located.",
    "notes": "WV MetroNews reported on June 29, 2026 that Nscale is taking over and expanding the Monarch Compute Campus, held a Point Pleasant job fair for employers, contractors, and vendors helping build Project Monarch, and expected multiple thousand construction workers in early stages plus hundreds of permanent jobs. Nscale's event page lists the June 30, 2026 Monarch Compute Campus job fair at the former Mason County Armory in Point Pleasant, with participating employers including Ames Construction, Apex, Boyd CAT, ERM, Kiewit, Rettew, Thrasher, and Nscale. These sources add workforce ramp-up/job-fair detail and continue to support under-construction status; no investment amount was disclosed in these sources. [Source: https://wvmetronews.com/2026/06/29/nscale-hosting-job-fair-in-point-pleasant-for-monarch-compute-campus-project/ | https://www.nscale.com/events/monarch-job-fair; Date: 2026-06-29; 2026-06-30]; QA 2026-07-19: Retained 1.35 GW only as disclosed AI compute capacity and added the $20B lower-bound investment.; Sources: https://www.nscale.com/ai-infrastructure/monarch https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/ https://www.datacenterdynamics.com/en/news/caterpillar-to-supply-2gw-of-natural-gas-turbines-for-monarch-compute-campus-in-mason-county-west-virginia/ https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory https://dep-auth.wv.gov/daq/permitting/Pages/NSR-Permit-Applications.aspx https://wvpress.org/breaking-news/point-pleasant-data-center-3-buildings-nearly-1000-natural-gas-diesel-engines/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "SoftBank PORTS Technology Campus",
    "state": "Ohio",
    "city": "Piketon",
    "county": "Pike County",
    "region": null,
    "status": "under-construction",
    "sponsors": "SB Energy; SoftBank Group",
    "operators": "SoftBank; SB Energy",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 10000.0,
    "itLoadMW": null,
    "investmentUSD": 37500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-20",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Campus is tied to DOE cleanup and reuse of the former Portsmouth Gaseous Diffusion Plant. SB Energy committed to paying for accelerated cleanup and remediation, but detailed cleanup-funding terms were not found. Public sources did not disclose cooling technology, water demand, wastewater arrangements, or whether the data center will use air, evaporative, liquid, or hybrid cooling.",
    "economicImpact_jobs": 2500.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Project website states expected local benefits of 35,000 construction jobs and 2,500 operating jobs. DOE Environmental Management separately states 10,000 construction jobs and more than 2,000 permanent positions; the reason for the difference is not explained.",
    "incentives_type": "Infrastructure Support; Cba; Other",
    "incentives_value": 40000000.0,
    "challenges": "Major implementation risks include gas-turbine procurement, fuel supply, pipeline contracting, PJM interconnection review, regulatory approvals, undisclosed water and cooling plans, and uncertainty around whether OpenAI signs a lease. No project-specific litigation, cancellation, or formal delay order was found.",
    "notes": "DOE's April 7, 2026 special report states that SB Energy, a SoftBank Group company, recently announced a public-private partnership to construct the world's largest AI data center on leased land at DOE's Portsmouth Site. Keep any tenant-specific claims separate unless supported by a dated source. [Source: https://www.energy.gov/em/articles/special-report-details-worlds-largest-ai-data-center-portsmouth-site; Date: 2026-04-07]; Sources: https://www.energy.gov/em/articles/partnership-ensures-affordable-energy-powers-ai-future-portsmouth-site https://portscampus.com/ https://sbenergy.com/digital-infrastructure/ https://www.permits.performance.gov/permitting-project/fast-41-covered-projects/ports-technology-campus https://sbenergy.com/nvidia-ai-compute-ports-pike-ohio/ https://apnews.com/article/ai-data-center-ohio-uranium-enrichment-4667fa1442ec1c652228337ab4eb68ee",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Core Scientific Pecos AI/HPC Campus Expansion",
    "state": "Texas",
    "city": "Pecos",
    "county": "Reeves County",
    "region": null,
    "status": "expansion",
    "sponsors": "Core Scientific",
    "operators": "Core Scientific",
    "tenants": null,
    "totalSquareFeet": 125000.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": 1000.0,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-04-27",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Advanced liquid cooling systems discussed for AI GPU cloud workloads in broader Core Scientific HPC expansion context, but no Pecos-specific cooling or water system was disclosed.",
    "certifications": null,
    "sustainabilityNotes": "Core Scientific described a scalable behind-the-meter solution expected to provide significant additional capacity, but did not identify generation owner, fuel source, interconnection configuration, permitting pathway, or commercial terms.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific job counts, tax-revenue projections, or economic-impact study were identified in the reviewed public sources.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Project-specific capex, tenant contracts, local permits, water arrangements, environmental permits, interconnection details, grid upgrade costs, and behind-the-meter generation terms were not located in public sources reviewed. The 2025 CoreWeave acquisition proposal was terminated effective October 30, 2025 after stockholders did not approve it.",
    "notes": "Core Scientific announced plans to scale its Pecos site into an AI/HPC campus with about 1.0 GW of leasable critical IT load and roughly 1.5 GW of gross power capacity. [Source: https://investors.corescientific.com/news-events/press-releases/detail/134/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-pecos-texas-campus]; Sources: https://www.sec.gov/Archives/edgar/data/1839341/000162828026027645/exhibit991-pecosexpansio.htm https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-031246/q1fy26earningsdeck.htm",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "LandBridge / PowerBridge Alpha Digital Data Center Campus",
    "state": "Texas",
    "city": "Waha area",
    "county": "Reeves County",
    "region": null,
    "status": "planned",
    "sponsors": "LandBridge; PowerBridge; Alpha Digital",
    "operators": "LandBridge; PowerBridge; Alpha Digital",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-04-02",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "PowerBridge materials describe integrated land, water, power, high-voltage infrastructure, and fiber. Five Point said PowerBridge would benefit from WaterBridge's produced-water management platform for cooling-water needs, but no Alpha Digital-specific cooling technology, water volume, water-right application, or discharge permit was disclosed.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific jobs, tax revenue, or economic impact estimates were disclosed. Five Point's up-to-$1 billion equity commitment was a platform commitment to PowerBridge, not a dedicated Alpha Digital project budget.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "The principal caveat is execution risk: the lease option may not be exercised, the campus may not be completed, and first power in 2027 and large-scale generation in 2028 remain subject to regulatory processes and commercial discussions. No cancellation, withdrawal, suspension, or delay notice was found.",
    "notes": "LandBridge and PowerBridge announced a West Texas joint venture to develop a 2 GW data center campus. [Source: https://www.landbridgeco.com/news-events/landbridge-and-powerbridge-announce-joint-venture-to-develop-2-gw-data-center-campus-in-west-texas/]; Sources: https://www.landbridgeco.com/investor-relations/news/news-details/2026/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus/default.aspx https://ir.landbridgeco.com/investor-relations/news/news-details/2026/LandBridge-Announces-First-Quarter-2026-Results/default.aspx https://www.sec.gov/Archives/edgar/data/1995807/000119312526209491/lb-20260331.htm https://investors.libertyfrac.com/news-and-events/press-releases/2026/07-22-2026-230509078",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Comal",
    "state": "Texas",
    "city": "Taylor area",
    "county": "Williamson County",
    "region": null,
    "status": "planned",
    "sponsors": "KDC; Project Comal developer affiliates",
    "operators": "KDC; Project Comal developer affiliates",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 360.0,
    "itLoadMW": null,
    "investmentUSD": 2500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-02",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Air-cooled chillers with a closed-loop water system if KDC seeks city water; initial closed-loop fill reportedly capped at 5 million gallons per building and 30 million gallons across six buildings.",
    "certifications": null,
    "sustainabilityNotes": "Negotiated controls include dark-sky lighting, buffers, nighttime noise limits, generator exhaust orientation away from residential zoning, Tier 4 generators, stormwater detention, right-of-way dedication, and water-use approval thresholds.",
    "economicImpact_jobs": 175.0,
    "economicImpact_taxRevenue": 145900000.0,
    "economicImpact_notes": "City fiscal-impact report estimated $148.58 million in benefits, $2.69 million in costs, and $145.90 million in net city benefits over 10 years, with 361.8 total jobs including 175 direct jobs. Taylor ISD report estimated $70.74 million in net school-district benefits over 10 years, county net benefits of $80.22 million, and other-jurisdiction net benefits of $13.76 million.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Remaining risks and open gaps include water-source/service resolution, site-plan approval, permit issuance, utility interconnection details, final construction authorization, continuing community pressure for digital-infrastructure zoning, no named tenant/operator, no exact IT-load figure, no gross building square footage, and no public construction-start or completion date.",
    "notes": "Project Comal was reported as a 360 MW data center proposal outside Austin/Taylor after local approval. [Source: https://dataxconnect.com/weekly-data-centre-news-3rd-april-2026/]; Sources: https://taylortx.gov/1383/KDC-Project-Comal https://taylortx.gov/DocumentCenter/View/16274/Project-Comal-City-Council-Slide-Deck https://www.datacenterdynamics.com/en/news/360mw-data-center-to-be-built-outside-austin-texas/ https://www.taylorpress.net/article/11514%2Ccity-approves-project-comal https://www.taylortx.gov/1383/KDC-Project-Comal https://www.taylortx.gov/DocumentCenter/View/16274/Project-Comal-City-Council-Slide-Deck",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Aligned Project Caprock",
    "state": "Texas",
    "city": "Abernathy area",
    "county": "Hale County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Aligned Data Centers",
    "operators": "Aligned Data Centers",
    "tenants": null,
    "totalSquareFeet": 1650000.0,
    "powerCapacityMW": 540.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-09",
    "constructionStartDate": "2026-04-09",
    "expectedCompletionDate": "2027-Q1",
    "actualCompletionDate": null,
    "numberOfPhases": 6.0,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "DeltaFlow liquid cooling with advanced air-cooled heat rejection and closed-loop chilled-water design.",
    "certifications": null,
    "sustainabilityNotes": "Closed-loop system recirculates water, is described as protecting the Ogallala Aquifer, and the LBB-01 page lists near-zero Water Utilization Efficiency.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Aligned says the project is expected to infuse $5 billion into the regional economy, create thousands of high-paying construction jobs and localized vendor contracts, provide permanent technology jobs once operational, and generate long-term commercial tax revenue; no precise job counts or tax-revenue figures were found.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Community concerns about infrastructure, electricity use, water consumption, jobs, accountability, drinking water, home values, and broader regional data-center siting impacts. No lawsuit, injunction, cancellation, or schedule delay specific to Project Caprock was identified.",
    "notes": "Aligned announced groundbreaking for Project Caprock, a 540 MW next-generation data center campus in Northwest Texas; the company cited a $5B regional economic impact, not recorded here as capex investment. [Source: https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/]; Sources: https://aligneddc.com/abernathy-tx-data-center/ https://www.globenewswire.com/news-release/2026/04/09/3271435/0/en/Aligned-Data-Centers-Breaks-Ground-on-Project-Caprock-a-Sustainable-540-MW-Next-Generation-Data-Center-Campus-in-Northwest-Texas.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AWS Clinton Data Center Project",
    "state": "Mississippi",
    "city": "Clinton",
    "county": "Hinds County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 730000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-09",
    "constructionStartDate": "2026-01-21",
    "expectedCompletionDate": "2028-10",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Air-cooled chillers; minimal ongoing cooling-water footprint and no standard water-cooled approach.",
    "certifications": null,
    "sustainabilityNotes": "Amazon said the Clinton retrofit will use air-cooled chillers because the existing building made a standard water-cooled approach structurally impractical. Public statements describe no ongoing cooling-water requirement, with water limited to domestic uses.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": 5000000.0,
    "economicImpact_notes": "Local officials projected about $2M in first-year revenue for Clinton and about $3M for the Clinton Public School District under the FILOT. These are projections, not realized revenue.",
    "incentives_type": "Pilot; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Public concerns focused on water usage, electricity costs, energy rates, and limited public disclosure. No cancellation, suspension, downsizing, or formal delay was located.",
    "notes": "MDA announced on April 9, 2026 that Amazon's latest Mississippi investment includes a planned $1 billion Clinton project creating 100 jobs and retrofitting the former Delphi Corporation plant. Mississippi Today reported on June 9, 2026 that Amazon said the Clinton facility is in the site-prep and pre-construction phase. Status remains planned because the company characterized the phase as pre-construction rather than active vertical construction. [Source: https://mississippi.org/news/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/ | https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/; Date: 2026-04-09; 2026-06-09]; Sources: https://www.entergy.com/blog/amazons-1-billion-investment-in-clinton-celebrated-with-ribbon-cutting https://www.datacenterdynamics.com/en/news/aws-likely-behind-plans-for-750m-data-center-in-clinton-mississippi/ https://clintonms.org/awsdatacenter/ https://www.entergy.com/blog/amazon-expands-and-entergy-mississippi-stands-ready-to-deliver-benefits-for-all-our-customers https://mississippitoday.org/2026/06/09/data-center-clinton-mississippi-2/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Arrowhead",
    "state": "Georgia",
    "city": "Ocilla area",
    "county": "Irwin County",
    "region": null,
    "status": "planned",
    "sponsors": "Premier Data Center Development, LLC",
    "operators": "Project Arrowhead developer not publicly disclosed",
    "tenants": null,
    "totalSquareFeet": 4220000.0,
    "powerCapacityMW": 1250.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2034",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "County ordinance materials indicated only closed-loop cooling systems would be permitted, but project-specific engineering specifications were not located.",
    "certifications": null,
    "sustainabilityNotes": "Wetland impacts would be avoided where practicable, with unavoidable impacts permitted through the U.S. Army Corps of Engineers and required mitigation. Stormwater impacts would be mitigated with detention and/or retention ponds.",
    "economicImpact_jobs": 200.0,
    "economicImpact_taxRevenue": 20000000.0,
    "economicImpact_notes": "Developer had initial discussions with Wiregrass Georgia Technical College.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Community opposition and open issues around water withdrawals from the Floridan Aquifer, surface-water discharge, wetlands, power demand, grid/ratepayer pressure, land-use compatibility, habitat fragmentation, and undisclosed ultimate operator or tenant.",
    "notes": "DCA DRI #4689 identifies Premier Data Center Development, LLC as developer for Project Arrowhead in Irwin County, Georgia. The filing reports 4,220,000 square feet on about 1,066 acres, $6B estimated value at build-out, $20M estimated annual local tax revenues, 200 FTEs, Georgia Power service, and 1,250 MW peak connected electrical load. The DRI was completed with an RDC finding dated May 14, 2026. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4689; Date: 2026-05-14]; QA 2026-07-19: Normalized Irwin County.; Sources: https://www.datacenterdynamics.com/en/news/12gw-data-center-campus-proposed-in-irwin-county-georgia/ https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4689 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4689",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Socorro Green Data Campus",
    "state": "New Mexico",
    "city": "Socorro",
    "county": "Socorro County",
    "region": null,
    "status": "canceled",
    "sponsors": "Green Data; New Mexico Institute of Mining and Technology",
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-03",
    "constructionStartDate": "2026",
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "No verified cooling design; developer said the vast majority of water would come from atmospheric water generation.",
    "certifications": null,
    "sustainabilityNotes": "Concept paired a 2 GW data center with 10 GW solar, battery storage, possible small modular reactors, geothermal or other renewable additions, and atmospheric water generation, but NMT said solar design, alternative energy sources, due diligence, and independent review remained unresolved.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Developer Jason Bak reportedly claimed the project at full operation would generate $50 million in annual local economic impact; no verified economic-impact study was identified.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "The initial framework was halted because the concept needed roughly 16 square miles of contiguous land, NMT held less than half the needed unencumbered acreage, and major questions remained about solar design, alternative energy sources, due diligence, independent review, water, grid impacts, permitting, outside approvals, and community opposition. Socorro County then adopted a one-year data-center moratorium.",
    "notes": "Plans for a 2 GW, 10,000-acre Green Data campus in Socorro were scrapped after backlash. Data Center Dynamics reported that New Mexico Tech President Michael Jackson said on June 2 that the parties would not proceed under the current framework and would not renew or extend the Green Data agreement, citing available acreage, renewable-energy integration challenges, and due-diligence difficulty for a project of this size. [Source: https://www.datacenterdynamics.com/en/news/plans-for-10000-acre-data-center-scrapped-in-socorro-new-mexico/; Date: 2026-06-04]; Sources: https://www.datacenterdynamics.com/en/news/2gw-data-center-could-come-to-socorro-new-mexico/ https://www.greendatacenters.com/projects/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Riverview Innovation and Technology Campus",
    "state": "New York",
    "city": "Tonawanda",
    "county": "Erie County",
    "region": null,
    "status": "planned",
    "sponsors": "Riverview Innovation & Technology Campus",
    "operators": "Riverview Innovation and Technology Campus developer group",
    "tenants": null,
    "totalSquareFeet": 500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-14",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Large-scale AI / data-storage redevelopment on remediated brownfield; cleanup ongoing under New York Brownfield Cleanup Program site C915353. Exact cooling system, water use, backup generation, PUE, and renewable-energy procurement remain undisclosed.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Public sources report a $1.8B to $2.0B construction-cost range or up to $2B in potential investment. No permanent-job, construction-job, or tax-revenue projections were located in the source text.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Local SEQRA and site-plan review temporarily delayed pending NYISO and National Grid power-system information and a revised site plan; organized community opposition; ongoing brownfield remediation; unknown operator, tenant, financing, cooling design, water use, IT load, generator details, utility upgrade cost allocation, and incentives.",
    "notes": "Current 2026 reporting identifies the former Tonawanda Coke site proposal as a roughly $2 billion, 500,000-square-foot AI/data-center project requiring about 300 MW and a planned $50 million electrical substation. NYISO's interconnection queue lists Riverview Innovation & Technology Campus, Inc. / Data & Technology Campus as a 300 MW load interconnection in Erie County. Local officials described the town review as on hold because of NYISO review/backlog, while Riverview said the project is not abandoned and that it has temporarily delayed SEQRA and site-plan review while awaiting NYISO and National Grid information. [Source: https://www.wkbw.com/niagara-county/proposed-2b-ai-data-center-at-former-industrial-site-raises-questions-in-town-of-tonawnada | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx | https://www.btpm.org/local/2026-06-03/data-center-project-at-former-tonawanda-coke-site-on-hold | https://www.wkbw.com/news/local-news/northtowns/developer-proposed-2b-ai-data-center-on-river-road-not-on-hold-process-temporarily-delayed; Date: 2026-05-23; 2026-06-15; 2026-06-03; 2026-06-04]; Sources: https://www.wkbw.com/news/local-news/northtowns/proposed-2b-ai-data-center-at-former-industrial-site-raises-questions-in-town-of-tonawnada https://www.epa.gov/ny/tonawanda-coke-corporation-tcc-site https://www.datacenterdynamics.com/en/news/former-coke-plant-near-buffalo-eyed-for-300mw-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "EdgeCore AS01 and AS02 Sterling Data Centers",
    "state": "Virginia",
    "city": "Sterling",
    "county": "Loudoun County",
    "region": null,
    "status": "under-construction",
    "sponsors": "EdgeCore Digital Infrastructure",
    "operators": "EdgeCore Digital Infrastructure",
    "tenants": "Undisclosed single tenants",
    "totalSquareFeet": 685000.0,
    "powerCapacityMW": 114.0,
    "itLoadMW": 114.0,
    "investmentUSD": 1500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-07",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Low- to no-water cooling solutions and air-cooled chillers.",
    "certifications": "Designed to meet LEED specifications",
    "sustainabilityNotes": "AS01 loan structured as a Green Loan under market Green Loan Principles and EdgeCore's 2025 Green Finance Framework. EdgeCore says both Ashburn-market sites use low- to no-water cooling solutions, air-cooled chillers, and zoned lighting controls to minimize water and power use.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific permanent job, construction job, or tax-revenue projections were located in the reviewed public sources.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Evidence gaps include Loudoun County e-permits and land-development files, executed Dominion Energy service and interconnection documents, Virginia VEDP certification records, tenant identity, AS01-specific air permits, and water, wastewater, stormwater, wetland, and local erosion-control records. No cancellation was found; public schedule language changed from expected 2026 delivery to AS01 initial occupancy in November 2026 and AS02 initial occupancy in July 2027, but sources do not state whether this is a delay or a more precise phasing schedule.",
    "notes": "EdgeCore announced $1.5B of construction financing for two fully leased Northern Virginia data centers totaling 114 MW of critical capacity; qualifies by investment/financing, not by power threshold. July 2, 2026 reporting says EdgeCore topped out the second data center building on the Virginia campus, following the first building topping out in September and advancing the campus toward 114 MW of planned capacity. [Source: https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia; https://www.datacenterdynamics.com/en/tags/northern-virginia/; https://www.linkedin.com/posts/george-midgley-52390617b_another-milestone-for-edgecore-as-the-company-activity-7478773101309194241-MESt; Date: 2026-04-21; 2026-07-02]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "South Annville Township Data Center",
    "state": "Pennsylvania",
    "city": "South Annville Township",
    "county": "Lebanon County",
    "region": null,
    "status": "canceled",
    "sponsors": "South Annville data center developer not publicly disclosed",
    "operators": "South Annville data center developer not publicly disclosed",
    "tenants": null,
    "totalSquareFeet": 640000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1700000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Closed-loop system; developer said it was exploring treated wastewater from a nearby plant and would not draw from local wells or streams.",
    "certifications": null,
    "sustainabilityNotes": "Developer proposed landscaped berms and structural barriers for noise buffering. Opponents and county officials raised concerns about bald eagle nests near the site.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": 17000000.0,
    "economicImpact_notes": "Early projections included about $3.4 million annually for Lebanon County, $13.4 million for Annville-Cleona School District, and about $747,000 for South Annville Township. Jobs estimates were preliminary developer claims described as more than 100 jobs in April 2026 and 50-100 jobs after withdrawal.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Substantial organized community opposition, unanimous Planning Commission recommendation against rezoning, unresolved power and environmental details, bald eagle nest concerns, and eventual withdrawal of the zoning-amendment request on May 12, 2026.",
    "notes": "A $1.7B Lebanon County proposal surfaced in April and was withdrawn in May after local pushback. [Source: https://www.datacenterdynamics.com/en/news/proposed-17bn-data-center-in-lebanon-county-pennsylvania-withdrawn/]; Sources: https://www.southannville.com/ https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/ https://www.datacenterdynamics.com/en/news/17bn-data-center-could-be-built-in-lebanon-county-pennsylvania/ https://lebtown.com/2026/04/16/county-commissioners-learn-about-proposed-s-annville-twp-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Joliet Technology Center",
    "state": "Illinois",
    "city": "Joliet",
    "county": "Will County",
    "region": null,
    "status": "planned",
    "sponsors": "Hillwood; PowerHouse Data Centers; Joliet Technology Center LLC",
    "operators": "Joliet Technology Center LLC",
    "tenants": null,
    "totalSquareFeet": 3600000.0,
    "powerCapacityMW": 1800.0,
    "itLoadMW": null,
    "investmentUSD": 20000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-19",
    "constructionStartDate": "2027",
    "expectedCompletionDate": "2033",
    "actualCompletionDate": null,
    "numberOfPhases": 4.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling; evaporative cooling prohibited for city potable water",
    "certifications": null,
    "sustainabilityNotes": "Project site claims minimal environmental impact and no wetland mitigation required; potable water use capped at 150,000 gallons per day average and 300,000 gallons per day peak; cooling-system discharge to be trucked off-site for treatment.",
    "economicImpact_jobs": 700.0,
    "economicImpact_taxRevenue": 2100000000.0,
    "economicImpact_notes": "Joliet projected about $309.9 million of city property taxes and $10.0 million of city utility taxes over 2028-2057; project site claims about $2.1 billion in local tax revenue over 30 years, including about $1.3 billion for local schools and about $462 million for Joliet.",
    "incentives_type": "Cba; Other",
    "incentives_value": 100000000.0,
    "challenges": "Project remains subject to acquisition/closing notice, final engineering/final PUD approvals, building permits, utility commitments, environmental permits, and pending litigation. No closing notice, final permits, construction, operation, cancellation, or formal delay was located as of 2026-06-15.",
    "notes": "The City of Joliet announced on March 19, 2026 that it approved conditional annexation of about 795 acres for the proposed Joliet Technology Center; the project website describes a $20 billion investment by Hillwood and PowerHouse. Later May reporting identified litigation challenging the zoning and approval process, so the row remains planned with litigation noted rather than marked under construction. [Source: https://www.joliet.gov/Home/Components/News/News/5666/41; Date: 2026-03-19]; Sources: https://content.govdelivery.com/bulletins/gd/ILJOLIET-40f2361?wgt_ref=ILJOLIET_WIDGET_17-18-19-40-38 https://www.joliet.gov/home/showpublisheddocument/36856/639089066745700000 https://joliettechnologycenter.com/at-a-glance/ https://www.datacenterfrontier.com/site-selection/article/55367747/hillwood-powerhouse-advance-20b-joliet-data-campus-as-midwest-ai-buildout-accelerates",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Next Frontier / Fluidstack New Lebanon Data Center",
    "state": "Indiana",
    "city": "New Lebanon",
    "county": "Sullivan County",
    "region": null,
    "status": "planned",
    "sponsors": "Next Frontier; Fluidstack; Coatue",
    "operators": "Next Frontier; Fluidstack; Coatue",
    "tenants": "Fluidstack USA V Inc.; Fluidstack",
    "totalSquareFeet": null,
    "powerCapacityMW": 430.0,
    "itLoadMW": 430.0,
    "investmentUSD": 5700000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-05",
    "constructionStartDate": "2026-04-23",
    "expectedCompletionDate": "2027-07",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling that continuously recycles water",
    "certifications": null,
    "sustainabilityNotes": "Potentia says the broader Heartland Industrial Park campus will use closed-loop cooling, limit total freshwater use to about 60,000 gallons per day, include engineered drainage and retention systems, protect wetlands, wildlife corridors, and the Turtle Creek watershed, and operate without conventional backup diesel generators.",
    "economicImpact_jobs": 500.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Job figures are for the broader Heartland project. Indiana Public Media reported phase-one estimates of about 750 construction jobs and 125 permanent jobs and phase-two estimates of about 2,000 construction jobs and 325 permanent jobs. Potentia announced more than $54M in direct community payments, including $50M for Sullivan County infrastructure, $4.5M in charitable contributions, and 15 acres donated for a new fire station.",
    "incentives_type": "Infrastructure Support; Cba; Other",
    "incentives_value": 54000000.0,
    "challenges": "Main public risks are execution risk, labor/local-benefit concerns, limited public permitting detail, and lack of public confirmation of the ultimate AI workload or end customer.",
    "notes": "Coatue-backed Next Frontier issued about $5.7B of bonds for a 430 MW Indiana data center planned for lease to Fluidstack. [Source: https://www.datacenterdynamics.com/en/news/coatue-backed-next-frontier-issues-57bn-in-bonds-to-build-430mw-indiana-data-center-for-fluidstack/]; QA 2026-07-19: Retained 430 MW only as source-labeled critical IT capacity.; Sources: https://www.datacenterdynamics.com/en/news/coreweave-and-google-raise-67bn-in-junk-bond-offering-report/ https://www.datacenterdynamics.com/en/news/fluidstack-shares-details-of-planned-data-center-in-sullivan-county-indiana/ https://www.lw.com/en/news/latham-advises-on-meridian-arc-holdco-senior-secured-notes-offering-to-finance-ai-data-center https://www.datacenterdynamics.com/en/news/coatue-sets-up-data-center-venture-partners-with-fluidstack-for-430mw-campus-in-indiana/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Lakeland Slavic Village Data Center",
    "state": "Ohio",
    "city": "Cleveland",
    "county": "Cuyahoga County",
    "region": null,
    "status": "canceled",
    "sponsors": "Lakeland Equity Group; Morabito Enterprises",
    "operators": "Lakeland Equity Group; Morabito Enterprises",
    "tenants": null,
    "totalSquareFeet": 300000.0,
    "powerCapacityMW": 150.0,
    "itLoadMW": null,
    "investmentUSD": 1600000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; enterprise; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling; developer said the system would recirculate water without a constant feed and reduce water consumption 80-90% compared with older systems.",
    "certifications": null,
    "sustainabilityNotes": "Developer said the facility would produce no smoke or fumes and avoid truck traffic; no binding water-supply agreement, sewer-capacity approval, cooling-water design, stormwater permit, air permit, or environmental permit was located in reviewed public sources.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Lakeland emphasized investment and long-term technical jobs, but reviewed sources did not quantify employment or document a binding job-creation commitment; Cleveland officials cited limited job creation as a concern for data centers generally.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Cleveland closed/discarded the initial project record on May 14, 2026 after zoning review found additional information was required; reporting described the application as incomplete and lacking site plans. The project faced community opposition, grid and utility concerns, environmental concerns, and a proposed citywide data-center permitting moratorium. No resubmitted application, lawsuit, administrative appeal, approved permit, construction start, or cancellation agreement was found through June 15, 2026.",
    "notes": "A $1.6B, 150 MW Slavic Village proposal was reported in May and later rejected by Cleveland City Council; qualifies by investment, not by power threshold. [Source: https://www.datacenterdynamics.com/en/news/cleveland-ohio-rejects-16bn-data-center-plan/]; Sources: https://neo-trans.blog/2026/05/07/more-details-emerge-on-cleveland-data-center/ https://www.datacenterdynamics.com/en/news/16bn-data-center-plan-rejected-in-cleveland-ohio/ https://www.cleveland19.com/2026/05/14/city-rejects-permit-application-proposed-data-center-clevelands-slavic-village-neighborhood/ https://www.cleveland19.com/2026/05/07/neighbors-raise-concerns-about-proposed-cleveland-data-center/?outputType=amp https://www.news5cleveland.com/news/local-news/oh-cuyahoga/city-of-cleveland-says-no-to-data-center-in-slavic-village",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Nebius Pennsylvania AI Factory Campus",
    "state": "Pennsylvania",
    "city": "Unknown",
    "county": "Unknown",
    "region": null,
    "status": "planned",
    "sponsors": "Nebius",
    "operators": "Nebius",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-13",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Pennsylvania GRID standards would require projects seeking Commonwealth support to address energy affordability, transparency/community engagement, workforce/economic development, environmental protection, estimated peak electric demand, annual water consumption and source, treated-water discharges, expected PUE, and expected WUE. No Nebius-specific GRID Certificate, GRID Ready Report, or footprint report was found.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No Pennsylvania-specific construction jobs, permanent jobs, tax revenue, community-benefits payments, or school-district revenue projections were disclosed. Nebius company-level financing and capex figures should not be attributed to the Pennsylvania project.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Major unresolved fields include host locality, utility, interconnection record, permitting path, acreage, buildings, square footage, water source, cooling design, incentives, jobs, tax revenue, and site-specific customer allocation. No cancellation or delay was identified; Pennsylvania legislative proposals introduced in 2026 could affect future hyperscale data centers if enacted.",
    "notes": "Nebius announced it had secured a Pennsylvania site for a second U.S. gigawatt-scale AI factory campus, targeting up to 1.2 GW; precise city/county were not disclosed. [Source: https://www.datacenterdynamics.com/en/news/nebius-secures-12gw-pennsylvania-site-for-second-us-gigawatt-campus/]; Sources: https://nebius.com/newsroom/nebius-reports-first-quarter-2026-financial-results https://assets.nebius.com/assets/aa1bc2e6-df83-40cd-a6a2-95e7cda3d16c/Nebius%20SHL_Q1%202026.pdf?cache-buster=2026-05-13T14%3A00%3A35.352Z https://www.datacenterdynamics.com/en/news/nebius-details-plans-for-12gw-data-center-campus-in-pennsylvania/ https://www.wvia.org/news/local/2026-08-15/tech-company-discusses-plans-for-ai-factory-in-schuylkill-county-amid-residents-concerns",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "TeraWulf Muskie Data Campus",
    "state": "Kentucky",
    "city": "Wurtland area",
    "county": "Greenup County",
    "region": null,
    "status": "planned",
    "sponsors": "TeraWulf; Industrial Equity Partners",
    "operators": "TeraWulf",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-26",
    "constructionStartDate": "2027",
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "TeraWulf did not disclose cooling architecture, water use, wastewater approach, backup generation, stormwater design, renewable energy commitments, PUE target, or certifications in reviewed sources. Governor's office spokesperson reportedly said TeraWulf agreed to pay for its own power to avoid negative impacts on ratepayers and the environment.",
    "economicImpact_jobs": 300.0,
    "economicImpact_taxRevenue": 5500000.0,
    "economicImpact_notes": "WCHS reported local expectations of hundreds of construction jobs and about 300 long-term positions once operating. WCHS also reported an estimated $5-6 million per year in tax revenue for the Boyd County School System from a locally described $4 billion investment.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Key open issues include permitting, final construction documentation, water supply and cooling details, transparency of local negotiations, power-cost allocation, ratepayer protection, and verification of utility infrastructure approvals and incentive records.",
    "notes": "TeraWulf acquired the Eastern Kentucky Muskie Data Campus from Industrial Equity Partners. The site is within the 1,000-acre EastPark Industrial Park and includes approximately 285 acres of owned and controlled land, with optional adjacent acreage. TeraWulf expects more than 1 GW of data center capacity over time, with an initial 500 MW ramp beginning in the second half of 2028 and an additional 500 MW targeted for the second half of 2030. Kentucky Power is constructing a 345 kV substation connected to the 765 kV transmission network; energy service agreements were executed concurrently with the acquisition, zoning is already in place, permitting is underway, and limited site work is required before data center construction. [Source: https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus]; QA 2026-07-18: Cleared the unsupported $4 billion investment value; the operator announcement discloses capacity but not project cost.; Sources: https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000109/0001083301-26-000109.pdf https://www.muskiedatacampus.com/project-overview https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Google New Florence Data Center Campus",
    "state": "Missouri",
    "city": "New Florence area",
    "county": "Montgomery County",
    "region": null,
    "status": "planned",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": "Google",
    "totalSquareFeet": 800000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 15000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-20",
    "constructionStartDate": "2026",
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Advanced air-cooling technology; DCD described a closed-loop, air-cooled system with water limited to domestic needs.",
    "certifications": null,
    "sustainabilityNotes": "Google tied the project to water-stewardship work including Missouri SWAN Smart Irrigation Initiative support. No PUE target, certification, final water-service agreement, wastewater permit, SWPPP, air permit file, or state environmental review package was located.",
    "economicImpact_jobs": 300.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Google and Missouri officials described thousands of construction jobs and hundreds of direct long-term operational roles. KBIA reported around 300 workers with pay around 150% of county average annual wage. Google also announced a $20 million Energy Impact Fund for Montgomery, Clay, Platte, and surrounding counties.",
    "incentives_type": "Property Tax Abatement; Pilot; Infrastructure Support; Other",
    "incentives_value": 1600000000.0,
    "challenges": "Public-record discrepancies remain around buildings and square footage, with early reports describing three primary buildings each exceeding 1 million square feet and later reports describing two buildings totaling about 800,000 square feet. Other open issues include community opposition, Sunshine Law litigation, road and utility relocation, unavailable final site-plan/building-permit packages, incomplete public utility agreements, and missing water, wastewater, stormwater, air, and environmental permit records.",
    "notes": "Google announced plans for a $15B data center campus in Montgomery County, Missouri. [Source: https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county]; QA 2026-07-19: Retained reported area and $15B investment while clearing unsupported exact power.; Sources: https://ded.mo.gov/press-room/google-deepens-missouri-roots-15-billion-community-investment-montgomery-county https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/missouri-programs/ https://www.datacenters.google/locations/ https://www.datacenterdynamics.com/en/news/google-pledges-15bn-investment-in-new-florence-missouri/ https://storage.googleapis.com/gweb-uniblog-publish-prod/documents/Press_Release__Google_Deepens_Missouri_Roots.pdf https://www.projectspade-missouri.com/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Fleet Reno / Storey County Hyperscale Campus",
    "state": "Nevada",
    "city": "Reno-Sparks area",
    "county": "Storey County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Fleet Data Centers; Tract Capital Management",
    "operators": "Fleet Data Centers",
    "tenants": "unnamed AA- investment-grade tenant with market capitalization above $3 trillion",
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": 200.0,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-24",
    "constructionStartDate": "2026-05",
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "\"evolved cooling solution\" to control water use",
    "certifications": null,
    "sustainabilityNotes": "Facility design described in GOED minutes as energy efficient and including an evolved cooling solution to control water use; no project-specific water-withdrawal volume was located.",
    "economicImpact_jobs": 100.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "KOLO reported 1,500 construction jobs at peak and 100 long-term tech staff; News 4 reported over 1,000 construction jobs at each site and 100 full-time jobs; GOED minutes for SV RNO state 14 FTE within five years at an average hourly wage of $54.29.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "Utility service timing is a key dependency; public reporting stated that without temporary power facilities, the data centers would be delayed because NV Energy could not immediately provide enough power. Public concerns also include water use, temporary gas generation, emissions, transparency, and ratepayer impacts.",
    "notes": "Northern Nevada Business Weekly reported on 2026-06-02 that Fleet had broken ground on two Tahoe Reno Industrial Center campuses, South Valley and Peru Ridge, with $10 billion in construction costs, 400 MW of combined critical compute power, and 30 MW per campus of utility computing power. Expected operations are Q3 2027 at Peru Ridge and Q4 2027 at South Valley. The same report says total investment could approach $40 billion after mechanical/electrical equipment, servers, networking, racking, and fit-out are included. [Source: https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/; Date: 2026-06-02]; Sources: https://www.linkedin.com/posts/fleet-data-centers_fleetdatacenters-tractcapitalmanagement-activity-7463222699499307009-ozGx https://tractcapital.com/news/fleet-data-centers-announces-closing-of-upsized-4-6-billion-6-500-senior-secured-notes-offering-to-fund-hyperscale-facility-in-rapidly-growing-reno-hub/ https://www.spglobal.com/ratings/en/regulatory/article/-/view/type/HTML/id/3555431",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Amazon Boardman Exascale Data Center Site",
    "state": "Oregon",
    "city": "Boardman",
    "county": "Morrow County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon; Amazon Web Services",
    "operators": "Amazon; Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 8000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-30",
    "constructionStartDate": null,
    "expectedCompletionDate": "2033",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale; ai-ml",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": "Public materials describe access to 35 million gallons of water annually from the Port of Morrow with peak demand up to 1,300 gallons per minute; no final cooling design, wastewater permit, or project-specific renewable-energy commitment was located.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Johnson Economics modeled an $8 billion, roughly 1,264-acre, 1-gigawatt campus over an assumed eight-year development/construction period, but the excerpt does not provide extracted permanent-job, construction-job, or tax-revenue totals for this exascale site.",
    "incentives_type": "Property Tax Abatement; Other",
    "incentives_value": null,
    "challenges": "Amazon has not confirmed final development plans or construction. Open issues include final build decision, Board of Commissioners final zoning action and appeals, executed incentives, project-specific interconnection and power-service agreements, final water/wastewater/environmental permits, and court approval or implementation of the proposed nitrate settlement.",
    "notes": "Amazon acquired a large Boardman-area site tied in public records and reporting to a potential exascale project; reported estimates ranged from about $8B-$12B and roughly 1 GW. Treated as a potential-site record rather than a confirmed AWS construction announcement.; Sources: https://www.morrowcountyor.gov/sites/default/files/fileattachments/planning_commission/meeting/packets/16997/june_18th_2025_boc_packet.pdf https://www.geekwire.com/2026/report-amazon-buys-1300-acres-near-columbia-river-that-could-become-a-giant-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AWS Madison County Expansion Phase",
    "state": "Mississippi",
    "city": "Canton and Ridgeland",
    "county": "Madison County",
    "region": null,
    "status": "expansion",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1034.0,
    "itLoadMW": null,
    "investmentUSD": 11000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Canton was using Canton Municipal Utilities water for cooling and planned in 2027, with Veolia, to transition to recycled wastewater from the Madison County Wastewater Authority for all cooling needs; Ridgeland will use City of Ridgeland water exclusively.",
    "certifications": null,
    "sustainabilityNotes": "Amazon said Canton would transition to about 83 million gallons per year of recycled wastewater for cooling, and that it is investing in upgrades to increase Canton Municipal Utilities water-system capacity by 39% and Madison County Wastewater Authority's Beatties Bluff Wastewater Treatment Plant capacity by 50%. For Ridgeland, Amazon said it will use about 93 million gallons per year of city water and invest $37 million to increase the city's water-system capacity by 10%.",
    "economicImpact_jobs": 700.0,
    "economicImpact_taxRevenue": 195000000.0,
    "economicImpact_notes": "The April 2026 expansion phase was announced at 700 new jobs. The 2024 Madison County project was announced at at least 1,000 jobs, and Amazon's statewide Mississippi data center program is described as more than 2,000 expected jobs. University Research Center fiscal analysis estimated $195 million in state tax revenue over construction plus the first 15 years of operation for Project Atlas.",
    "incentives_type": "Grant; Infrastructure Support; Pilot; Property Tax Abatement; Other",
    "incentives_value": 70400000.0,
    "challenges": "Open evidence gaps include official MW, IT load, substation/interconnection capacity, square footage, final building/phase count, executed local development and fee-in-lieu agreements, service, water, sewer, and infrastructure reimbursement agreements, AWS-Entergy service/interconnection agreements, public cost-allocation details, full MDEQ administrative files, building permits, certificates of occupancy, and phase-level in-service dates. Community concerns include traffic, dust, noise, air quality, secrecy, property values, backup generators, water demand, electric-rate impacts, and transparency.",
    "notes": "Mississippi officials said AWS's April 2026 expansion included about $11B of additional Madison County investment; distinct post-February expansion phase of an already tracked AWS campus.; Sources: https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/ https://cdn.misoenergy.org/20240626%20AC%20Item%2002a%20New%20Load%20Addition%20in%20MISO%20Footprint635354.pdf https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Project Spring Sand Springs Data Center",
    "state": "Oklahoma",
    "city": "Sand Springs",
    "county": "Tulsa County",
    "region": null,
    "status": "planned",
    "sponsors": "Google; White Rose Partners",
    "operators": "Google; White Rose Partners",
    "tenants": "Google LLC",
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-03",
    "constructionStartDate": "2027",
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Not expected to use evaporative cooling for initial operations, but evaporative cooling is not prohibited if later elected subject to additional water and wastewater agreement terms.",
    "certifications": null,
    "sustainabilityNotes": "Buildings expected to occupy less than 10% of the 827-acre site; 30-40% planned as vegetative or green open space with landscaped perimeter buffers. Building-perimeter lights will be downward aimed and shielded, security fence will sit several hundred feet inward from the property line for most of the property, and warranted road improvements from the traffic study are to be funded by the developer.",
    "economicImpact_jobs": 50.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Project-plan draft anticipates directly or indirectly creating 50 high-quality jobs with an average annual salary of $75,000 exclusive of benefits. Project website says the campus could create up to 1,000 temporary construction jobs at peak. PILOT schedule ranges from $1,342,800 for up to 300,000 square feet to $3,888,506 for 950,001-1,000,000 square feet, increasing 2% annually after the first payment; Osage County resident support payments are $450,000 per data center.",
    "incentives_type": "Property Tax Abatement; Pilot; Tif; Infrastructure Support; Other",
    "incentives_value": null,
    "challenges": "Active lawsuits and significant community opposition; further permitting, utility arrangements, water/wastewater agreement, interconnection records, final site plan, construction start, and operational date remain unresolved. No cancellation was found.",
    "notes": "Sand Springs City Council approved Project Spring, a Google-backed campus planned on an 827-acre property at 5615 OK-97; construction was hoped to begin in 2027 and finish in 2029. The canonical CSV does not contain a Sand Springs or Project Spring row. [Source: https://www.datacenterdynamics.com/en/news/google-gets-greenlight-for-data-center-in-tulsa-oklahoma/; Date: 2026-02-05]; Sources: https://www.sandspringsok.gov/DocumentCenter/View/6017/Project-Spring-Project-Plan https://www.projectspringok.com/ https://www.sandspringsok.gov/AgendaCenter/ViewFile/Minutes/_02032026-2295 https://tulsaflyer.org/2026/01/15/government/post/google-connected-sand-springs-data-center-project/ https://osagenews.org/proposed-sand-springs-data-center-raises-water-and-sovereignty-concerns/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Alcove Osawatomie Northland Data Center",
    "state": "Kansas",
    "city": "Osawatomie",
    "county": "Miami County",
    "region": null,
    "status": "planned",
    "sponsors": "Alcove Development",
    "operators": "Alcove Development",
    "tenants": null,
    "totalSquareFeet": 600000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-29",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Fully air-cooled design with high-density cooling technology; day-to-day water use after initial closed-loop fill largely limited to restrooms and handwashing.",
    "certifications": null,
    "sustainabilityNotes": "Original terms contemplated up to 1 MGD of water capacity, but the May 29, 2026 update described an air-cooled design. Prior site preparation included KDHE Brownfields Phase I assessments and one Phase II assessment.",
    "economicImpact_jobs": 90.0,
    "economicImpact_taxRevenue": 50000000.0,
    "economicImpact_notes": "Original materials estimated 60-90 permanent full-time jobs and 250-350 construction jobs. May 29, 2026 full-buildout claims projected more than $30 million annually to Osawatomie, more than $10 million annually to Miami County, and more than $10 million annually to USD 367 from property tax, franchise fees, and other local revenues, subject to full development and incentives.",
    "incentives_type": "Property Tax Abatement; Other; Infrastructure Support",
    "incentives_value": null,
    "challenges": "Project scope changed materially from a 115-116-acre, 600,000-square-foot, 50-150 MW, $900 million-$1.1 billion concept to a proposed 283-acre, multi-phase, 500+ MW campus. Key unresolved issues include no confirmed operator or tenant, no final approvals or permits, expected KCC service-territory process, resident opposition, water concerns, utility service transition, and lack of a confirmed construction or completion schedule.",
    "notes": "Alcove/Osawatomie now describe Project Catalyst as moving forward on a larger 283-acre site within Osawatomie city limits with 500+ MW planned capacity and about $1 billion of investment, materially changing the earlier 116-acre, 50-150 MW, $900 million-$1.1 billion predevelopment description. The project remains subject to entitlement/development framework work and community engagement. [Source: https://www.kshb.com/news/local-news/kansas/miami-county/project-catalyst-data-center-developer-in-osawatomie-offers-update-touting-economic-opportunity; Date: 2026-05-29]; Sources: https://www.osawatomieks.org/sites/g/files/vyhlif7581/f/uploads/project_catalyst_press_release_5.29.2026.pdf https://www.kshb.com/news/local-news/kansas/miami-county/preliminary-renderings-revealed-for-potential-1b-miami-county-data-center-project https://www.kshb.com/news/local-news/kansas/miami-county/yellowstone-actor-mo-brings-plenty-fights-project-catalyst-data-center-in-miami-county",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Wilbarger County Data Center",
    "state": "Texas",
    "city": "Vernon area",
    "county": "Wilbarger County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Google; AES",
    "operators": "Google; AES",
    "tenants": null,
    "totalSquareFeet": 1982000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-24",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-03",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "advanced air-cooling technology",
    "certifications": null,
    "sustainabilityNotes": "Google said the facility will limit water consumption to critical campus operations such as kitchens once complete, and said it aims to replenish more water than it consumes. AES will own and operate co-located generation assets and provide retail, cost optimization, and related services under a long-term energy-management agreement.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific jobs, tax revenue, or Wilbarger-only investment amount was disclosed in the public sources reviewed. Google referenced a broader $40 billion Texas investment through 2027, but did not allocate a project-specific share to Wilbarger County.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Major public data gaps remain: exact site, parcel, address, building permits, TDLR records, utility interconnection details, environmental permits, incentive agreements, square footage, MW capacity, IT load, jobs, and project-specific investment were not disclosed in reviewed public sources.",
    "notes": "Google announced a new Wilbarger County data center co-located with AES clean power plants and advanced air cooling; the canonical CSV does not contain a Wilbarger County Google row. [Source: https://storage.googleapis.com/gweb-uniblog-publish-prod/documents/wilbarger_county_PR.pdf; Date: 2026-02-24]; Sources: https://www.datacenterdynamics.com/en/news/google-to-develop-clean-energy-colocated-data-center-in-wilbarger-county-texas/ https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026025053 https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026025297 https://www.datacenterdynamics.com/en/news/google-files-for-two-data-centers-in-vernon-texas/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Van Buren Township Data Center Campus (Project Cannoli)",
    "state": "Michigan",
    "city": "Van Buren Township",
    "county": "Wayne County",
    "region": null,
    "status": "planned",
    "sponsors": "Google; Panattoni Development; DTE Energy; ITC Holdings",
    "operators": "Google; DTE Energy; Panattoni",
    "tenants": "Google LLC",
    "totalSquareFeet": 800000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-18",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12",
    "actualCompletionDate": null,
    "numberOfPhases": 4.0,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "One proposed data-center building using open-loop cooling and two using closed-loop and/or forced-air methods.",
    "certifications": null,
    "sustainabilityNotes": "The project would preserve about 130 acres of open space, preserve 8,117 trees, plant 2,140 trees, use no groundwater for ongoing operations, replace filled wetlands at a minimum 2:1 ratio, and use EPA Tier 4 Final backup diesel generators.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Panattoni and township materials describe expected property-tax benefits but no binding tax-revenue schedule or project-specific fiscal-impact model was located. The development agreement requires at least one local hiring fair and best efforts to hire local contractors/skilled trades for work equivalent to at least 5% of total construction value, estimated at about $100 million.",
    "incentives_type": "Sales Tax Exemption; Infrastructure Support; Cba; Other",
    "incentives_value": 10500000.0,
    "challenges": "Final local site-plan approval, building permits, EGLE wetland approval, Wayne County approvals, DTE/ITC infrastructure work, and MPSC approval of DTE-Google special contracts remained gating items as of June 15, 2026. Community opposition focused on grid impacts, water use, utility bills, wetlands, emissions, noise, property values, traffic, and utility-infrastructure concerns.",
    "notes": "Google was publicly identified in March 2026 as the Fortune 50 end user behind Project Cannoli. Van Buren Township materials show Project Cannoli utility-infrastructure plans presented April 22, 2026 and development-agreement materials in May. Planet Detroit reported May 14, 2026 that the planning commission gave preliminary approval to a substation and switching station within the project boundary. The Gander reported July 16, 2026 that the Board of Trustees approved the project and a property-tax incentive package estimated to reduce Google's projected local tax bill by roughly $125 million over 12 years, while state wetland permitting remained pending after a June public-comment period. [Source: https://www.michiganpublic.org/transportation-infrastructure/2026-03-18/google-revealed-as-company-behind-hyperscale-data-center-project-cannoli; https://vbtmi.gov/_T6_R1239.php; https://planetdetroit.org/2026/05/google-data-center-substation/; https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/; Date: 2026-03-18; 2026-05-14; 2026-07-16]; Sources: https://www.panattoni.com/vanburen/ https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/clean-energy-reliability-michigan/ https://cms9files.revize.com/vanburentwp/Document_Center/Agendas%20%26%20Minutes/Planning%20Commission/2024/Packets/P%20C%20Packet%202%2011%2026%20.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Meta El Paso Data Center",
    "state": "Texas",
    "city": "El Paso",
    "county": "El Paso County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Meta",
    "operators": "Meta",
    "tenants": null,
    "totalSquareFeet": 3700000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-26",
    "constructionStartDate": "2025-11-01",
    "expectedCompletionDate": "2029-02-28",
    "actualCompletionDate": null,
    "numberOfPhases": 5.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "closed-loop liquid-cooled system that recirculates water and uses zero water for most of the year",
    "certifications": null,
    "sustainabilityNotes": "Meta says it will restore 200% of water consumed by the El Paso data center to local watersheds and has partnered with El Paso Water to use treated wastewater for some construction activities.",
    "economicImpact_jobs": 300.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Initial city/county agreements required at least 50 full-time jobs. Meta's October 2025 announcement cited about 100 operational jobs and more than 1,800 peak construction workers for the initial phase; March 2026 update increased the commitment to more than 300 operational jobs and more than 4,000 peak construction workers.",
    "incentives_type": "Property Tax Abatement; Grant; Infrastructure Support; Other",
    "incentives_value": 550000000.0,
    "challenges": "Sustained public opposition and scrutiny over incentives, water use, air emissions, power demand, ratepayer risk, and transparency; unresolved PUCT/TCEQ approvals for McCloud; remaining 525 MW generation option not public; no operational opening found through 2026-06-15.",
    "notes": "Meta confirmed the El Paso Data Center will grow to 1 GW and more than $10B of investment after breaking ground in 2025. [Source: https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/; Date: 2026-03-26]; QA 2026-07-19: Cleared an unsupported 25.9M-square-foot area while retaining Meta's disclosed 1 GW and $10B lower bounds.; QA note reconciliation 2026-07-19: Removed a stale pre-import statement claiming this canonical row was absent.; Sources: https://datacenters.atmeta.com/2025/10/hello-el-paso/ https://www.elpasotexas.gov/data-centers https://bluewaterhealthyliving.com/news/national-news/texas/meta-el-paso-data-center-plan-grows-to-10-billion-1gigawatt-complex/ https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026017750",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "AWS Calvert Cliffs Data Center Campus",
    "state": "Maryland",
    "city": "Lusby area",
    "county": "Calvert County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services; Constellation Energy",
    "operators": "Amazon Web Services; Constellation Energy",
    "tenants": "Amazon Web Services",
    "totalSquareFeet": 2464000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-04-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "AWS stated its data centers use outside-air cooling more than 96% of the year and water less than 4% of the year for supplemental cooling; Constellation said a hosted data-center customer would tap the plant's existing cooling-water system and reuse Chesapeake Bay water already drawn for the nuclear plant.",
    "certifications": null,
    "sustainabilityNotes": "AWS characterized the proposal as requiring no new water for cooling. Concept stormwater design reportedly proposes six wet extended-detention ponds and five bioretention facilities, with review under Calvert County and Maryland Department of the Environment standards. No PUE target, LEED target, or other certification was identified.",
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "No project-specific Calvert Cliffs capital investment, job count, annual tax revenue, or lifetime tax revenue estimate was located. AWS open-house materials cited statewide Amazon figures of $19.4 billion invested since 2010, $17.3 billion contributed to state GDP, about 23,000 jobs supported, and an estimated 9,000 indirect jobs, but those were not project-specific commitments.",
    "incentives_type": "Sales Tax Exemption",
    "incentives_value": null,
    "challenges": "Key unresolved issues include no project-specific investment amount, MW capacity, IT load, construction start date, completion schedule, signed power agreement, interconnection filing, project-specific incentive certification, construction permits, final site-plan approval, or environmental-review determination. Public conflict remains political and administrative through moratorium proposals, zoning text amendments, agency review, and resident opposition.",
    "notes": "Calvert County says AWS submitted initial application documents for the Calvert Technology Center site plan on May 4, 2026, paid application fees on May 18, paid Environmental Health fees on May 26, and the application was formally accepted for processing on May 27, 2026. Departments and reviewing agencies completed first-round Concept Site Plan review and sent comments to AWS on July 13, 2026; the next step is for AWS to resubmit a revised Concept Site Plan. No project-specific MW or investment amount was identified. [Source: https://www.choosecalvert.com/4059/Amazon | https://southernmarylandchronicle.com/2026/05/27/aws-calvert-technology-center-site-plan-filed/ | https://www.datacenterdynamics.com/en/news/aws-proposes-data-center-campus-next-to-nuclear-plant-in-calvert-county-maryland/; Date: 2026-07-17 accessed; 2026-05-27; 2026-04-01]; Sources: https://www.calvertcountymd.gov/4059/Amazon-Web-Services https://www.datacenterdynamics.com/en/news/aws-pulls-out-of-planned-data-center-campus-next-to-maryland-nuclear-plant/ https://www.choosecalvert.com/4059/Amazon-Web-Services https://www.calvertcountymd.gov/DocumentCenter/View/54079/AWS-Community-Open-House-Presentation",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Hut 8 Beacon Point AI Data Center Campus",
    "state": "Texas",
    "city": "Unknown",
    "county": "Nueces County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Hut 8; Beacon Point DC LLC",
    "operators": "Hut 8; Beacon Point DC LLC",
    "tenants": "Confidential high-investment-grade / AA- or higher tenant",
    "totalSquareFeet": null,
    "powerCapacityMW": 352.0,
    "itLoadMW": 352.0,
    "investmentUSD": 4250000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-Q3",
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "closed-loop cooling; no municipal water used for cooling during facility life; initial fill sourced from outside Nueces County and reused for roughly four to seven years",
    "certifications": null,
    "sustainabilityNotes": "Closed-loop cooling system expected to hold about 1.8 million gallons; local water use limited to sinks and toilets at less than 10,000 gallons per day according to Hut 8 statements reported by KRIS.",
    "economicImpact_jobs": 230.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "Hut 8 estimates the first two phases will support about 1,900 construction jobs and about 230 permanent operations roles, with each phase accounting for about 945 construction jobs and 115 permanent jobs. Local reporting quoted projected local tax revenue in the hundreds of millions of dollars, but no independent fiscal-impact study was located.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Community questions include water supply during local drought restrictions, electricity reliability, ratepayer impacts, tax abatements, noise, and absence of publicly located environmental permits. No cancellation or delay news was located.",
    "notes": "Hut 8 priced $4.25B of senior secured notes for Beacon Point, with proceeds intended to finance construction of a six-data-hall, 352 MW critical IT capacity data center and substation on roughly 521 acres in Nueces County. The canonical CSV does not contain Beacon Point or Nueces County Hut 8 rows. [Source: https://www.prnewswire.com/news-releases/hut-8-announces-pricing-of-4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data-center-project-302792238.html; Date: 2026-06-04]; Sources: https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html https://s205.q4cdn.com/384284279/files/doc_news/Jacobs-awarded-EPCM-contract-to-deliver-second-Hut-8-AI-data-center-in-Texas-2026.pdf https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Meitner Energy Center Data Center",
    "state": "Texas",
    "city": "Unknown",
    "county": "Gray County and Roberts County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Google; Intersect Power",
    "operators": "Google; Intersect Power",
    "tenants": "Google LLC",
    "totalSquareFeet": 2283000.0,
    "powerCapacityMW": 1260.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-04",
    "constructionStartDate": "2025-12-19",
    "expectedCompletionDate": "2028-04-18",
    "actualCompletionDate": null,
    "numberOfPhases": 3.0,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Advanced air-cooling; local reporting also described a closed-loop cooling system filled once.",
    "certifications": null,
    "sustainabilityNotes": "Google linked the project to a $10 million Texas Water Impact Fund for community water infrastructure and access projects. Google and Intersect state operational water use at the Gray County facility will be limited to small-scale domestic uses such as restrooms.",
    "economicImpact_jobs": 40.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "NPM reported the three-phase plan could create about 40 full-time jobs. Google is establishing the Caprock Workforce Hub, an 800-acre managed residential facility in Wheeler County for up to 3,500 workers.",
    "incentives_type": "Sales Tax Exemption; Property Tax Abatement",
    "incentives_value": null,
    "challenges": "The project shifted from a renewable-powered hydrogen/fuels concept to a Google data-center campus with co-located generation. Reported issues include water concerns, transparency and land-use concerns, and postponement of a Gray County data-center abatement vote until September 2, 2025.",
    "notes": "Google and Intersect announced construction of the Meitner Energy Center, a new data center co-located with more than 1 GW of wind, solar, and battery storage in Gray and Roberts Counties. The canonical CSV does not contain Meitner, Gray County, or Roberts County Google rows. [Source: https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/; Date: 2026-06-04]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Microsoft Mecklenburg County Data Center Expansion",
    "state": "Virginia",
    "city": "Boydton area",
    "county": "Mecklenburg County",
    "region": null,
    "status": "expansion",
    "sponsors": "Microsoft",
    "operators": "Microsoft",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1990000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-04",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": 2.0,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": false,
    "pueTarget": null,
    "waterCooling": "Direct evaporative cooling used at existing Virginia facilities; water used for cooling less than 15% of the year.",
    "certifications": "Built to LEED Gold standards",
    "sustainabilityNotes": "Virginia backup generators were transitioning to renewable biofuel; AVC 22 proposes wetland and stream mitigation through a permittee-responsible mitigation project.",
    "economicImpact_jobs": 250.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "VEDP stated Microsoft had invested $1.99 billion and created more than 250 jobs before the January 2019 sixth expansion. Microsoft's 2025 Virginia fact sheet reported about 1,180 operational Virginia datacenter employees and about 5,190 expected construction jobs for new Virginia datacenters. Mecklenburg County administrator estimated direct datacenter tax revenue accounted for 35% to 40% of the county general fund.",
    "incentives_type": "Sales Tax Exemption; Grant",
    "incentives_value": 3540000.0,
    "challenges": "AVC 22 remained in federal wetland-stream permitting with comments open until July 4, 2026. Public sources did not disclose MW, IT load, square footage, utility cost allocation, project-specific water demand, or a target operational completion date. No cancellation or formal delay was found through June 15, 2026.",
    "notes": "Microsoft filed with the US Army Corps of Engineers to develop a 490-acre campus adjacent to its AVC17 campus, including three one-story data center buildings, roads, a substation, and water storage. [Source: https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-data-center-campus-in-mecklenburg-county-virginia/; Date: 2026-06-04]; Sources: https://www.nao.usace.army.mil/Media/Public-Notices/Article/4487144/nao-2024-02970-avc-22-mecklenburg-county-virginia/ https://www.nao.usace.army.mil/Media/News-Stories/Article/4487144/nao-2024-02970-avc-22-mecklenburg-county-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Antelope Data Center",
    "state": "Utah",
    "city": "Cedar City area",
    "county": "Iron County",
    "region": null,
    "status": "planned",
    "sponsors": "Pronghorn Development LLC",
    "operators": "Pronghorn Development LLC",
    "tenants": null,
    "totalSquareFeet": 6750000.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 30000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-04",
    "constructionStartDate": null,
    "expectedCompletionDate": "2033",
    "actualCompletionDate": null,
    "numberOfPhases": 5.0,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": "Closed-loop cooling system intended to limit ongoing water consumption relative to evaporative cooling.",
    "certifications": null,
    "sustainabilityNotes": "Project materials state an initial closed-loop cooling-system fill of about 8 acre-feet, estimated annual construction water demand of 10 to 20 acre-feet, and 12.75 acre-feet per year for domestic use by approximately 670 employees. Materials also describe shielded downward-directed lighting, noise controls, wildfire fuel-management buffers, hazardous-material controls, and wildlife coordination.",
    "economicImpact_jobs": 1800.0,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": "County Q&A projects approximately 670 direct on-site jobs and about 1,800 permanent full-time-equivalent positions within Iron County when fully operational. KUTV reported alternative discussion of 40 to 50 facility jobs plus hundreds of contract employees, creating a definition discrepancy. KUTV also reported a county commissioner statement that the project could lower property-tax rates by about 55%, but no independent fiscal-impact study was located.",
    "incentives_type": null,
    "incentives_value": null,
    "challenges": "Additional permits and regulatory approvals remain before construction can begin, including Utah Division of Air Quality approval for the on-site generation plant and water-right or water-system approvals. Public concerns include water, air quality, noise, safety, transparency, unnamed operator/end user, natural-gas infrastructure, roads, wildfire/geologic risk, AI impacts, and rural character. No construction start, operator disclosure, executed incentive agreement, litigation, or final state air permit was identified as of 2026-06-15.",
    "notes": "Iron County Planning Commission voted in favor of a 640-acre Antelope Data Center proposal from Pronghorn Development; the campus would include five buildings totaling about 1.35M sq ft and a natural gas power plant up to 1.5 GW. [Source: https://www.datacenterdynamics.com/en/news/proposal-to-build-640-acre-data-center-in-iron-county-utah-gets-the-go-ahead/; Date: 2026-06-12]; Sources: https://www.utah.gov/pmn/files/1399945.pdf https://www.ksl.com/article/51463149/planning-commission-considers-ai-data-center-near-cedar-city https://www.upr.org/utah-news/2026-06-05/iron-county-cedar-city-data-center https://www.sltrib.com/news/2026/06/06/iron-county-planning-commission/ https://www.utah.gov/pmn/files/1442799.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Nebius Birmingham AI Factory",
    "state": "Alabama",
    "city": "Birmingham",
    "county": "Jefferson County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Nebius",
    "operators": "Nebius",
    "tenants": null,
    "totalSquareFeet": 500000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 35890000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-02",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Nebius says it is evaluating the former Regions Bank back-office site at 201 Milan Parkway in Birmingham's Oxmoor neighborhood for an AI factory and anticipates Q2 2026 construction and Q4 2026 initial commissioning, subject to approvals. WBHM/BirminghamWatch reported on April 25, 2026 that Birmingham officials concluded special exceptions were not required for associated Alabama Power switching/substation infrastructure for the 300 MW BHM01 data center, clearing the project to move to its next development phase; the same report said Nebius affiliate Alabama ADC Holdings acquired 201, 250, and 260 Milan Parkway and 2500 Venice Road for approximately $90 million. [Source: https://nebius.com/birminghamal | https://www.wbhm.org/local-news/2026-04-25/battle-against-oxmoor-valley-data-center-fizzles-but-residents-left-with-concerns; Date: 2026; 2026-04-25]; Sources: https://assets.nebius.com/assets/aa1bc2e6-df83-40cd-a6a2-95e7cda3d16c/Nebius%20SHL_Q1%202026.pdf?cache-buster=2026-05-13T14%3A00%3A35.352Z https://www.wbhm.org/local-news/2026-07-17/court-hearing-in-case-challenging-birmingham-data-center-to-resume-next-month https://www.scribd.com/document/1055600957/Birmingham-IDB-Nebius-Resolution-5-29-26",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Red Clay",
    "state": "Alabama",
    "city": "Unknown",
    "county": "Lowndes County",
    "region": null,
    "status": "planned",
    "sponsors": "Cloverleaf Infrastructure",
    "operators": "Cloverleaf Infrastructure",
    "tenants": null,
    "totalSquareFeet": 3010000.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Cloverleaf's project website describes Project Red Clay as a proposed data center in Lowndes County about six miles southwest of Montgomery and says it represents over $1 billion in taxable investment. WSFA reported on May 26, 2026 that residents continued to debate and oppose the proposed $1.5 billion Project Red Clay data center at a county commission meeting. [Source: https://redclaydatacenter.com/ | https://www.wsfa.com/2026/05/27/more-than-1000-sign-petition-opposing-proposed-lowndes-county-data-center-debate-intensifies/; Date: 2026; 2026-05-26]; Sources: https://www.wsfa.com/2026/06/04/cloverleaf-responds-lowndes-county-data-center-concerns-after-weeks-resident-pushback/ https://insideclimatenews.org/news/10062026/rural-alabama-community-opposes-hyperscale-data-center/ https://yellowhammernews.com/an-800-acre-data-center-is-being-quietly-pushed-in-lowndes-county-its-neighbors-are-just-finding-out/ https://www.wbhm.org/local-news/2026-06-11/on-the-historic-route-from-selma-to-montgomery-an-ai-cloud-looms",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Western Hospitality Childersburg Data Center",
    "state": "Alabama",
    "city": "Childersburg",
    "county": "Talladega County",
    "region": null,
    "status": "planned",
    "sponsors": "WHP Development; Western Hospitality Partners",
    "operators": "WHP Development; Western Hospitality Partners",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-23",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Inside Climate News reported Childersburg Mayor Ken Wesson's statement that the proposal would include a $6 billion, 500 MW data center on 486 acres in the Childersburg Industrial Park using a glycol-based cooling system. The mayor identified the developer as WHP Development, and the article noted WHP may refer to Western Hospitality Partners; the land sale was described as an agreement in principle pending site assessment and other factors. [Source: https://insideclimatenews.org/news/23012026/this-small-alabama-town-was-part-of-the-manhattan-project-now-it-may-host-a-hyperscale-data-center/; Date: 2026-01-23]; Sources: https://www.datacenterdynamics.com/en/news/planned-data-center-project-outside-chicago-illinois-paused-due-to-energy-infrastructure/ https://tceda.com/property-search/childersburg-industrial-park/ https://www.datacenterdynamics.com/en/news/western-hospitality-partners-eyes-320-acre-data-center-campus-outside-peoria-illinois/ https://baxtel.com/data-center/western-hospitality-childersburg-campus",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "STAK Energy Campus",
    "state": "Alaska",
    "city": "Deadhorse area",
    "county": "North Slope Borough",
    "region": null,
    "status": "planned",
    "sponsors": "STAK Energy Corporation",
    "operators": "STAK Energy Corporation",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; research",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Alaska DNR issued a May 12, 2026 preliminary decision proposing a 50-year negotiated lease for STAK's commercial natural gas-powered high-performance computing campus near Dalton Highway Milepost 390, after no competitive-interest expressions were received. The revised application/development plan describes about 715.4 acres, approximately 1 GW of on-site natural-gas generation, construction and major permitting planned to begin in summer 2026, initial operations targeted for late 2028, a peak construction workforce up to 1,500, about 60 permanent operating staff, and approximately $500 million for site evaluation/preparation, engineering, gravel road and pad construction, and initial camp/support infrastructure. [Source: https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957; https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=162057; Date: 2026-05-12]; Sources: https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161961 https://www.datacenterdynamics.com/en/news/stak-energy-proposes-3gw-natural-gas-powered-data-center-in-alaskas-north-slope/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Baccara",
    "state": "Arizona",
    "city": "Glendale area / near Surprise",
    "county": "Maricopa County",
    "region": null,
    "status": "planned",
    "sponsors": "Takanock, LLC; Baccara Power, LLC; Baccara Eagle Land, LLC",
    "operators": "Takanock, LLC; Baccara Power, LLC; Baccara Eagle Land, LLC",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 700.2,
    "itLoadMW": null,
    "investmentUSD": 8570000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-04",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030-01",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New West Valley data center complex. Arizona Corporation Commission said on 2026-02-06 that it voted 5-0 on 2026-02-04 to approve a Certificate of Environmental Compatibility for Baccara Power's proposed 700.2 MW gas-fired generating plant to supply Takanock's planned data center complex near Luke Air Force Base. Maricopa County's 2026-05-06 planning agenda for case MCP250007 describes a Military Compatibility Permit request for utility land uses including a gas power generation facility and data center generally north of Olive Road and one-half mile west of Litchfield Road. [Source: https://www.azcc.gov/news/home/2026/02/06/vice-chair-walden-releases-statement-on-project-baccara; Date: 2026-02-06]; Sources: https://www.projectbaccara.com/ https://www.projectbaccara.com/_files/ugd/f02f35_fa1268eb889e461f9d5b53e940c92cf5.pdf https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10240?fileID=100106 https://www.maricopa.gov/AgendaCenter/ViewFile/Minutes/_04092026-3711",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Hassayampa Ranch Data Center",
    "state": "Arizona",
    "city": "Tonopah",
    "county": "Maricopa County",
    "region": null,
    "status": "planned",
    "sponsors": "Arizona Land Consulting; investment group including Chamath Palihapitiya",
    "operators": "Arizona Land Consulting; investment group including Chamath Palihapitiya",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 25000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-05-30",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported on 2025-05-30 that Arizona Land Consulting acquired about 2,000 acres west of Phoenix from Hassayampa Ranch for a potential 1.5 GW, $25 billion data center backed by Chamath Palihapitiya. AZ Big Media reported on 2026-06-13 that the Maricopa County Board of Supervisors approved a data center infrastructure project at the Hassayampa Ranch site in Tonopah on 2026-04-08. [Source: https://azbigmedia.com/real-estate/game-changing-development-projects-in-casa-grande-and-tonopah-earn-approvals/; Date: 2026-06-13]; Sources: https://ready.maricopa.gov/DocumentCenter/View/117683/08Z250047-PZ-Staff-Report?bidId= https://www.datacenterdynamics.com/en/news/arizona-land-consulting-buys-land-for-potential-15gw-data-center/ https://news.bloomberglaw.com/mergers-and-acquisitions/palihapitiya-buys-stake-in-arizona-property-for-data-center-bet https://pets.maricopa.gov/DocumentCenter/View/117683",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AVAIO Digital Leo",
    "state": "Arkansas",
    "city": "Little Rock",
    "county": "Pulaski County",
    "region": null,
    "status": "under-construction",
    "sponsors": "AVAIO Digital Partners; Entergy Arkansas",
    "operators": "AVAIO Digital Partners; Entergy Arkansas",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1070.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-06",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "AVAIO announced a 760-acre AI-ready data center and power campus near 145th Street in Pulaski County with an initial $6 billion investment, more than $21 billion at full development, an initial 150 MW Entergy Arkansas grid contract, and a path to roughly 1.07 GW total baseload power. AVAIO's campus page states the project has broken ground and targets first occupancy in June 2027. [Source: https://www.avaiodigital.com/updates/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock-arkansas; https://www.avaiodigital.com/developments/little-rock-arkansas; Date: 2026-01-12; campus page undated, accessed 2026-06-15]; Sources: https://www.arkansasedc.com/news-events/newsroom/detail/2026/01/12/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock--arkansas https://www.globenewswire.com/news-release/2026/01/12/3217049/0/en/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock-arkansas.html https://www.equipmentworld.com/market-pulse/article/15816534/data-center-construction-boom-to-grow-in-2026",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Pulse - Gum Springs Data Center",
    "state": "Arkansas",
    "city": "Gum Springs",
    "county": "Clark County",
    "region": null,
    "status": "canceled",
    "sponsors": "DC Devco LLC; unnamed end buyer",
    "operators": "DC Devco LLC; unnamed end buyer",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-16",
    "constructionStartDate": null,
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The Economic Development Corp. of Clark County voted on April 16, 2026 to sell the 991-acre Southwest Arkansas Mega Site in Gum Springs to DC Devco LLC for a proposed data center campus with at least $1 billion investment and 150 primary jobs. The agreement was terminated by May 1, 2026 after the purchaser failed to make the required earnest-money deposit, and the planned community meeting was canceled. [Source: https://arkadelphian.com/2026/04/22/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/; https://arkadelphian.com/2026/05/01/edccc-formalizes-contract-termination-with-data-center-project/; Date: 2026-04-22; 2026-05-01]; Sources: https://arkadelphian.com/2026/04/22/data-center-eyes-clark-county-set-to-buy-mega-site-in-11m-deal/?amp=1 https://arkadelphian.com/2026/04/25/shelley-short-answers-data-center-questions/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Imperial Valley Data Center Campus",
    "state": "California",
    "city": "Imperial",
    "county": "Imperial County",
    "region": null,
    "status": "planned",
    "sponsors": "Imperial Valley Computer Manufacturing",
    "operators": "Imperial Valley Computer Manufacturing",
    "tenants": null,
    "totalSquareFeet": 950000.0,
    "powerCapacityMW": 330.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-01",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Imperial County's Board of Supervisors extended its data-center moratorium on July 14, 2026 for an additional 10 months and 15 days, halting data-center permit issuance in unincorporated county areas until June 2027. Calexico Chronicle reported county counsel stating that no past or present data-center project would move forward under the moratorium and that the moratorium is in active litigation. The project remains planned rather than canceled. [Source: https://calexicochronicle.com/2026/07/15/imperial-county-extends-data-center-moratorium/; Date: 2026-07-15]; QA 2026-07-18: Added the publicly disclosed 950,000-square-foot facility area.; Sources: https://www.imperialdatacenter.com/ https://www.imperialdatacenter.com/about https://ceqanet.lci.ca.gov/2025110216 https://www.datacenterdynamics.com/en/news/330mw-google-linked-data-center-proposed-in-southern-california/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Cielo Hudson Data Center",
    "state": "Colorado",
    "city": "Hudson",
    "county": "Weld",
    "region": null,
    "status": "planned",
    "sponsors": "Cielo Digital Infrastructure",
    "operators": "Cielo Digital Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 750.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported, citing Cielo's website, that Cielo had active projects in several states and aimed to develop a 500-acre site in Hudson, Colorado offering 750 MW. No public investment amount or construction-start date was identified in the cited source. [Source: https://www.datacenterdynamics.com/en/news/cielo-digital-infrastructure-plans-300mw-data-center-campus-in-south-carolina/; Date: 2025-06-24]; Sources: https://www.rmpbs.org/news/government/lochbuie-approves-five-year-data-center-moratorium",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Fort Meade Data Center Campus",
    "state": "Florida",
    "city": "Fort Meade",
    "county": "Polk County",
    "region": null,
    "status": "planned",
    "sponsors": "Stonebridge; Bohler Places LLC",
    "operators": "Stonebridge; Bohler Places LLC",
    "tenants": null,
    "totalSquareFeet": 4400000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 2600000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Fort Meade commissioners approved a developer agreement in April 2026 for a hyperscale campus on a former phosphate mine; local reporting describes a 4.4 million square foot, 1,300-acre project, with permits including water-use approvals still outstanding. [Source: https://www.fox13news.com/news/fort-meade-data-center-project-community-opposition; Date: 2026-04-14]; Sources: https://siteselection.com/i-4-corridor-the-land-rush-on-interstate-4/ https://fortmeadedatacenter.wixsite.com/fort-meade-data-cent https://www.datacenterdynamics.com/en/news/44-million-sq-ft-data-center-campus-gets-zoning-approval-in-fort-meade-florida/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Tango",
    "state": "Florida",
    "city": "Loxahatchee",
    "county": "Palm Beach County",
    "region": null,
    "status": "canceled",
    "sponsors": "PBA Holdings; WPB Logistics Owner LLC; Central Park Commerce Center Master Association Inc.",
    "operators": "PBA Holdings; TPA Group / WPB Logistics Owner LLC",
    "tenants": null,
    "totalSquareFeet": 3594560.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 2600000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2033",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Palm Beach County commissioners voted 5-1 on July 15, 2026 to deny without prejudice the Project Tango hyperscale AI data-center expansion, halting the proposed 3.5-3.6 million-square-foot amendment that included about 1.03 million square feet of data-center space and a projected 600 MW draw. The vote did not extinguish the older underlying approval, under which developers still have rights to build 1.2 million square feet of warehouses and a 206,000-square-foot data center on the Central Park Commerce Center site. [Source: https://www.wlrn.org/government-politics/2026-07-16/project-tango-ai-data-center-palm-beach-rejected; Date: 2026-07-16]; Sources: https://discover.pbc.gov/pzb/zoning/PDF/PublicHearing/DOA-ZV-2025-01602%20Project%20Tango%20Webnotice.pdf https://www.wlrn.org/light/education/2026-06-10/project-tango-data-center-palm-beach-school-saddle-view https://constructionreviewonline.com/proposed-2bn-project-tango-data-center-in-loxahatchee-florida-advances-to-commission-voting/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Sentinel Grove Technology Park (Project Jarvis)",
    "state": "Florida",
    "city": "Fort Pierce",
    "county": "St. Lucie County",
    "region": null,
    "status": "canceled",
    "sponsors": "Epic Estates 68 LLC; Timberline Real Estate Partners; HJA Design Studios",
    "operators": "Epic Estates 68 LLC; Timberline Real Estate Partners; HJA Design Studios",
    "tenants": null,
    "totalSquareFeet": 15000000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 13500000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The Sentinel Grove / Project Jarvis land-use application for a more than 1,200-acre AI data-center campus off Orange Avenue was withdrawn in February 2026 while developers waited on state legislation; county officials said the withdrawal did not necessarily rule out a later refiling. [Source: https://www.wpbf.com/article/developers-hit-pause-on-st-lucie-county-data-center-plans/70483481; Date: 2026-02-25]; Sources: https://www.wptv.com/news/treasure-coast/region-st-lucie-county/proposed-15-million-square-feet-ai-data-center-in-st-lucie-county-faces-push-back https://www.datacenterdynamics.com/en/news/officials-fail-to-back-plans-for-1gw-data-center-campus-in-florida/ https://www.datacenterdynamics.com/en/news/data-center-developer-withdraws-application-in-florida-in-response-to-proposed-regulations/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "DCIP DeSoto County AI Data Center",
    "state": "Florida",
    "city": "Arcadia",
    "county": "DeSoto County",
    "region": null,
    "status": "planned",
    "sponsors": "DCIP Group",
    "operators": "DCIP Group",
    "tenants": null,
    "totalSquareFeet": 35134.0,
    "powerCapacityMW": 4000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Initial rezoning covers 34 acres at a former power-plant site; the developer has discussed a possible long-term site of roughly 1,300 acres",
    "announcedDate": "2026-03",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale; other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DeSoto County voted in March 2026 to rezone 34 acres at a decommissioned power-plant site so DCIP Group could begin a gas-powered AI data-center project; May 2026 reporting says the developer advertised an ultimate scale of thousands of megawatts to investors and Cleanview lists 4,000 MW planned capacity. [Source: https://www.mysuncoast.com/2026/05/26/developers-push-massive-data-center-complex-desoto-county-amid-backlash/ | https://cleanview.co/data-centers/florida/2324/dcip-desoto-county-ai-data-center; Date: 2026-05-26; 2026]; QA 2026-07-19: Cleared the promotional 4 GW ultimate figure from canonical facility power.; Sources: https://desotobocc.com/431/Data-Center-Applications https://desotobocc.legistar.com/View.ashx?GUID=A864D16A-1DF7-45BD-834D-571B5B2AA8FB&ID=1349663&M=M https://www.dcipgroup.tech/ https://www.businessobserverfl.com/news/2026/jun/26/developer-proposes-data-center/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Bridgeport (Revised)",
    "state": "Georgia",
    "city": "Unknown",
    "county": "Coweta County",
    "region": null,
    "status": "planned",
    "sponsors": "McKagen Jones Law Firm; owners' legal counsel",
    "operators": "McKagen Jones Law Firm; owners' legal counsel",
    "tenants": null,
    "totalSquareFeet": 8250000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-28",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4727 describes an existing industrial park at 0 Bridgeport Parkway adding a technological-facility/data-center component totaling 8,250,000 square feet, with overall completion listed as 2034. The Part 2 form reports an estimated build-out value range of about $3B-$5B, estimated annual local tax revenue of about $30M-$50M, 200 FTEs, Georgia Power as energy provider, and electrical load marked TBD. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4727; Date: 2026-04-29]; QA 2026-07-19: Normalized Coweta County and added the official 8.25M-square-foot project total.; Sources: https://trrc-ga.com/planning/ https://isadatacentercoming.com/ga/coweta-county",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Hampton Technology Park",
    "state": "Georgia",
    "city": "Hampton",
    "county": "Henry County",
    "region": null,
    "status": "planned",
    "sponsors": "Hampton Technology Park Owner, LLC; Dillard Sellers",
    "operators": "Hampton Technology Park Owner, LLC; Dillard Sellers",
    "tenants": null,
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-13",
    "constructionStartDate": null,
    "expectedCompletionDate": "2033",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4624 has reached request-for-comments status. The Part 2 form reports $12B estimated value at build-out, $1.2B estimated annual local tax revenues, 150 FTEs, 0.04 MGD water and sewer demand, Georgia Power service, 1,500 MW peak load, on-site substation infrastructure, and wetlands/floodplains crossed by proposed roads. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4624; Date: 2026-06-02]; QA 2026-07-19: Normalized Henry County.; Sources: https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4624 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4624 https://www.bisnow.com/news/atlanta/data-center-development/developer-proposes-4m-sf-data-center-campus-near-atlanta-133265",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "QTS - Blakely",
    "state": "Georgia",
    "city": "Blakely",
    "county": "Early",
    "region": null,
    "status": "planned",
    "sponsors": "QTS Technology Services, LLC",
    "operators": "QTS Technology Services, LLC",
    "tenants": null,
    "totalSquareFeet": 12000000.0,
    "powerCapacityMW": 1400.0,
    "itLoadMW": null,
    "investmentUSD": 700000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2035",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4651 lists QTS Technology Services as developer for a data center-type project at coordinates 31.406296, -84.912908. The initial form reports 12,000,000 square feet and a Q4 2035 completion target; the DRI remained at initial-form-submitted status in the DCA table as of the June 15, 2026 sweep. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4651; Date: 2026-03-10]; Sources: https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4651 https://q.com/data-centers/blakely/ https://www.yahoo.com/news/articles/proposed-data-center-could-bring-235646691.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Squash",
    "state": "Georgia",
    "city": "Harlem",
    "county": "Columbia",
    "region": null,
    "status": "planned",
    "sponsors": "The Whiting-Turner Contracting Company; Kinetic Infrastructure Solutions, LLC",
    "operators": "The Whiting-Turner Contracting Company; Kinetic Infrastructure Solutions, LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-05",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4735 covers a land-disturbance permit for data center development at 6423 Wrightsboro Road on 325 acres. The Part 2 form reports $1B estimated value at build-out, $20M estimated annual local tax revenue, 30 FTEs, Columbia County Water Utility service, Georgia Power as energy provider, and a 2027 phase completion target. Peak electrical load is not publicly populated in the accessible form. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4735; Date: 2026-05-27]; Sources: https://www.aol.com/articles/land-disturbance-permits-filed-columbia-080058000.html https://www.wrdw.com/2025/12/17/2-more-data-centers-now-being-proposed-columbia-county/ https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "75 South Data Center Campus",
    "state": "Georgia",
    "city": "Unknown",
    "county": "Spalding",
    "region": null,
    "status": "planned",
    "sponsors": "Industrial VI Enterprises, LLC",
    "operators": "Industrial VI Enterprises, LLC",
    "tenants": null,
    "totalSquareFeet": 2240000.0,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-27",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4607 was completed after February 1, 2026. The Part 2 form reports $6B estimated value at build-out, $86.3M estimated annual local tax revenues, 200 FTEs, 0.030 MGD water demand, 0.0225 MGD sewage flow, Central Georgia EMC service, 450 MW peak connected electrical load, and 21.2% projected impervious surface. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4607; Date: 2026-02-19]; Sources: https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4607 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4607",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Bus",
    "state": "Georgia",
    "city": "Temple",
    "county": "Carroll",
    "region": null,
    "status": "canceled",
    "sponsors": "Atlas Development, LLC",
    "operators": "Atlas Development, LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 11000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-26",
    "constructionStartDate": null,
    "expectedCompletionDate": "2036",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4606 describes a 350.73-acre data center proposal with 12 buildings and two substations, a 2036 completion target, $11B estimated value at build-out, $42.56M estimated annual ad valorem revenue to Carroll County, and 275 FTEs. The DCA summary records the DRI determination as withdrawn on February 6, 2026. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4606; Date: 2026-02-06]; Sources: https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4606 https://www.datacenterdynamics.com/en/news/atlas-development-files-for-12-building-data-center-campus-in-temple-georgia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Azelea",
    "state": "Georgia",
    "city": "Thomson",
    "county": "McDuffie",
    "region": null,
    "status": "planned",
    "sponsors": "Camreon Grogan; Project Turbo LLC",
    "operators": "Camreon Grogan; Project Turbo LLC",
    "tenants": null,
    "totalSquareFeet": 950000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4602 was completed after February 1, 2026. The initial form describes six data center buildings on 200 acres at 2660-2358 Randall Hunt Road, with special-exception action and 2029 completion. The Part 2 form reports $1B estimated value at build-out, $25M estimated annual local tax revenue, 125 FTEs, Jefferson Energy service, and 400 MW peak connected load. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4602; Date: 2026-02-13]; Sources: https://www.thomson-mcduffie.gov/DocumentCenter/View/935/DRI--4602-Project-Azelea_-Final-Report https://www.thomson-mcduffie.gov/DocumentCenter/View/911/DRI-Information-Form-Part-2 https://www.datacenterdynamics.com/en/news/plans-filed-for-six-building-data-center-campus-outside-augusta-georgia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Wallace Jackson Data Center Campus",
    "state": "Georgia",
    "city": "Unknown",
    "county": "Spalding",
    "region": null,
    "status": "planned",
    "sponsors": "Wallace Jackson, LLC; McKagen Jones",
    "operators": "Wallace Jackson, LLC; McKagen Jones",
    "tenants": null,
    "totalSquareFeet": 4986000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3650000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2035",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCA DRI #4599 process completion date was February 6, 2026. The filing describes a 10-building, 4,986,000-square-foot data center campus on about 189.64 acres in Land Lots 25 and 40 of the 2nd District, with a 2035 phase completion target. The Part 2 form reports $3.65B estimated value at build-out and $51.66M estimated annual local tax revenues; the accessible form does not provide a populated MW value. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4599; Date: 2026-02-06]; Sources: https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4599 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4599 https://www.datacenterdynamics.com/en/news/application-filed-for-5-million-sq-ft-data-center-campus-outside-atlanta-georgia/ https://www.ajc.com/business/2026/01/whats-37b-and-larger-than-3-malls-georgias-next-potential-data-center/ https://www.datacentermap.com/usa/georgia/atlanta/wallace-jackson-data-center-campus/specs/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google - LaGrange Campus",
    "state": "Georgia",
    "city": "LaGrange",
    "county": "Troup",
    "region": null,
    "status": "under-construction",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 350.0,
    "itLoadMW": null,
    "investmentUSD": 8000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Google announced plans to develop a new data center in LaGrange at 411 Pegasus Parkway. Local reporting says the center was already under construction when announced and will be Google's second Georgia data center, after Lithia Springs. Published reports did not provide a project investment or MW figure. [Source: https://www.atlantanewsfirst.com/2026/04/21/google-build-new-data-center-lagrange/; Date: 2026-04-21]; Sources: https://www.datacenters.google/locations/georgia/ https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4797 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4797 https://www.ajc.com/business/2026/04/what-is-georgias-project-pegasus-tech-giant-unveils-8-billion-answer/ https://www.datacenterdynamics.com/en/news/google-files-to-expand-data-center-campus-in-lagrange-georgia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Lex Developments Pocatello AI Data Center",
    "state": "Idaho",
    "city": "Pocatello",
    "county": "Bannock County",
    "region": null,
    "status": "canceled",
    "sponsors": "Lex Developments LLC; Portneuf Capital LLC",
    "operators": "Lex Developments LLC; Portneuf Capital LLC",
    "tenants": null,
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": 100.0,
    "itLoadMW": null,
    "investmentUSD": 2600000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-14",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Lex Developments applied for a conditional use permit to convert the former Hoku Materials site at 1800 River Park Way / Philbin Road and Hoku Way into an AI data center. City agenda materials described the proposal as needing up to 100 MW of power; BoiseDev reported the project was valued at $2.6 billion. The Pocatello hearing examiner denied the CUP in May 2026, Lex appealed on June 1, 2026, and on July 16, 2026 the Pocatello City Council voted 4-1 to uphold the denial of the conditional use permit appeal. Local News 8 reported the applicant may still pursue another appeal or litigation, so the denial may not be fully final. [Source: https://www.eastidahonews.com/2026/07/pocatello-city-council-upholds-decision-to-deny-ai-data-center/ | https://localnews8.com/news/2026/07/16/pocatello-city-council-upholds-hearing-examiners-decision-says-no-to-proposed-ai-data-center/; Date: 2026-07-16; 2026-07-16]; Sources: https://www.idahostatejournal.com/news/local/defunct-hoku-plant-could-become-ai-data-center-under-new-proposal/article_0e7c1dfb-abea-4557-9c9f-b6149f7292fe.html https://pocatello.gov/AgendaCenter/ViewFile/ArchivedAgenda/_06032026-2618 https://www.datacenterdynamics.com/en/news/officials-in-pocatello-idaho-deny-data-center-application-appeal/ https://pda.pocatello.gov/agendas/2026/052026.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Tract - Morris Technology Park",
    "state": "Illinois",
    "city": "Morris",
    "county": "Grundy County",
    "region": null,
    "status": "planned",
    "sponsors": "Tract; Commonwealth Edison Company",
    "operators": "Tract; Commonwealth Edison Company",
    "tenants": null,
    "totalSquareFeet": 2900000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "343-acre, fully zoned and entitled campus; 2.9 million square feet and 1 GW at full buildout.",
    "announcedDate": "2026-01-15",
    "constructionStartDate": null,
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Tract's April 15, 2026 release says FERC approved the ComEd-Tract Transmission Security Agreement for the 343-acre Morris Technology Park, a fully zoned and entitled campus designed for 2.9 million square feet and 1 GW at full buildout, with initial energization targeted for June 2028 and a full ramp by 2032. [Source: https://www.einpresswire.com/article/905748272/ferc-approves-tsa-between-comed-tract-advancing-1gw-of-responsible-data-center-growth-in-greater-chicago; Date: 2026-04-15]; QA 2026-07-18: Added operator-disclosed full-build floor area.; Sources: https://www.einpresswire.com/article/883537471/tract-enters-greater-chicago-market-with-the-acquisition-of-343-acres-to-be-developed-as-a-1gw-data-center-campus https://www.tract.com/project/morris-technology-park/ https://www.datacenterdynamics.com/en/news/tract-expands-into-illinois-with-plans-for-1gw-data-center-park-outside-chicago/ https://morrisil.org/data-center-resources/ https://morrisil.org/wp-content/uploads/2026_General-FAQs_Morris-Tract.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "CyrusOne - Sangamon County Waverly Data Center",
    "state": "Illinois",
    "city": "Waverly",
    "county": "Sangamon County",
    "region": null,
    "status": "planned",
    "sponsors": "CyrusOne",
    "operators": "CyrusOne",
    "tenants": null,
    "totalSquareFeet": 1800000.0,
    "powerCapacityMW": 634.0,
    "itLoadMW": null,
    "investmentUSD": 500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-07",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "On April 7, 2026, the Sangamon County Board approved a conditional permitted use for a CyrusOne data center near Waverly/Talkington Township; contemporaneous reporting described the project as a $500 million, roughly 600 MW facility; later project reporting gives 634 MW at full build. MyJournalCourier reported on July 17, 2026 that opponents filed a Sangamon Circuit Court lawsuit seeking to invalidate the conditional-use approval and block the project; the project remains planned pending the challenge. [Source: https://www.myjournalcourier.com/news/article/morgan-county-data-center-referendum-22340222.php; Date: 2026-07-17]; QA 2026-07-19: Updated full-build capacity to the reported 634 MW.; QA note reconciliation 2026-07-19: Clarified the rounded earlier capacity description against the 634 MW full-build field.; Sources: https://www.wandtv.com/news/illinois/sangamon-county-residents-sue-over-data-center-approval-near-waverly/article_5b6b89a5-74a6-4c5e-b608-9d4579bcdf8d.html https://www.thetelegraph.com/news/article/morgan-county-data-center-referendum-22340222.php https://www.illinoistimes.com/wp-content/uploads/2026/03/032626.pdf https://www.illinoistimes.com/news/residents-sue-sangamon-county-cyrusone/ https://sangamonil.gov/Portals/0/Departments/County%20Board/Docs/DataCenter/Merged%20Staff%20Report.pdf https://www.cyrusone.com/sangamon-county-community-faq?utm_source=chatgpt.com https://www.datacenterdynamics.com/en/news/cyrusone-gets-go-ahead-for-data-center-in-sangamon-illinois/ https://www.myjournalcourier.com/news/article/sangamon-county-data-center-vote-tabled-board-22079356.php",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Hut 8 - Logan Prairie Data Center",
    "state": "Illinois",
    "city": "Latham",
    "county": "Logan County",
    "region": null,
    "status": "planned",
    "sponsors": "Hut 8",
    "operators": "Hut 8",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-05",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Hut 8 describes Logan Prairie as an early-development proposal subject to local approvals, with 500 MW capacity, $5B+ capital investment, 1,500+ construction jobs, about 200 permanent jobs, and a Feb. 4, 2026 community open house listed in project updates. [Source: https://www.hut8.com/data-centers/logan-prairie; Date: 2026-02-04]; Sources: https://www.illinoistimes.com/wp-content/uploads/2026/05/050726.pdf https://www.illinoistimes.com/news/data-center-moratorium-declared-invalid/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Cloverleaf Infrastructure - Troy Data Center",
    "state": "Illinois",
    "city": "Troy",
    "county": "Madison County",
    "region": null,
    "status": "canceled",
    "sponsors": "Cloverleaf Infrastructure",
    "operators": "Cloverleaf Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-01-08",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Cloverleaf explored a 500 MW data center near Troy, but had not filed a formal proposal as of March 2026; Troy's planning commission recommended a six-month moratorium while city officials rewrote data-center rules, and a Cloverleaf principal said there was no approval path without community and official support. [Source: https://www.bnd.com/news/local/article315037095.html; Date: 2026-03-13]; Sources: https://www.troyil.us/AgendaCenter/ViewFile/Minutes/_01082026-941 https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/ https://www.troyil.us/DocumentCenter/View/2026/20260107-Troy-Informative-Slides---No-Site https://www.troyil.us/AgendaCenter/ViewFile/Minutes/_02022026-958",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services (AWS) Wheatfield/Jasper County Campus",
    "state": "Indiana",
    "city": "Wheatfield",
    "county": "Jasper County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services; NIPSCO",
    "operators": "Amazon Web Services; NIPSCO",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 7000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-28",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "AWS is proposing a roughly $7 billion data center campus on a 304-acre NIPSCO-owned site near the R.M. Schahfer Generating Station, with up to nine buildings; Jasper County approvals are still required. DCD reported AWS expectations for more than $420 million in county tax revenue over 15 years and outside-air cooling for most of the year. [Source: https://www.datacenterdynamics.com/en/news/amazon-plans-nine-building-data-center-campus-in-wheatfield-indiana/; Date: 2026-06-06]; Sources: https://www.nwiforum.org/press/2026/6/17/northwest-indiana-forum-announces-amazon-data-center-in-jasper-county https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers https://jasper.nwidatafacts.com/ https://www.jaspercountyin.gov/agenda-library/planning-and-development/plan-commission/2026-plan-commission-meetings/2026-plan-commission-meetings-agendas/620-06-15-2026-plan-commission-meeting-agenda/file",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Web Services (AWS) Hobart Tech Park",
    "state": "Indiana",
    "city": "Hobart",
    "county": "Lake County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2400.0,
    "itLoadMW": null,
    "investmentUSD": 15000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-11-25",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Amazon's broader November 2025 Northern Indiana announcement described an additional $15 billion data center buildout and 2.4 GW of regional capacity; Hobart officials confirmed a Hobart data center deal. On Feb. 6, 2026, ABC7 reported the Hobart Plan Commission approved a fill permit for the proposed Amazon data center near Colorado Street and 61st Avenue. The project remains controversial, with residents reporting a lack of site plan and impact assessments.(2025-11-24); https://abc7chicago.com/post/city-hobart-indiana-votes-approve-fill-permit-controversial-amazon-data-center-proposal/18550806/ (2026-02-06).; Sources: https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers https://www.datacenterdynamics.com/en/news/aws-data-center-coming-to-hobart-indiana/ https://www.fox32chicago.com/news/hobart-approves-11b-amazon-data-center-details-still-unclear https://www.cityofhobart.org/AgendaCenter/ViewFile/Agenda/_06042026-2588?MOBILE=ON",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Sentinel Data Centers Project Shirley Eagle Creek Township Campus",
    "state": "Indiana",
    "city": "Hebron",
    "county": "Lake County",
    "region": null,
    "status": "planned",
    "sponsors": "Sentinel Data Centers; Johnson Sunnybrook Farm LLC; Foundry Works Energy Storage LLC",
    "operators": "Sentinel Data Centers; Johnson Sunnybrook Farm LLC; Foundry Works Energy Storage LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-20",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Lake County Council approved zoning changes on June 9, 2026 for a data center east of Clay Street on the south side of E. 181st Avenue in Eagle Creek Township, plus a nearby battery energy storage facility. Earlier reporting identified Sentinel's proposal as Project Shirley, a roughly $5 billion, 500 MW project in unincorporated Eagle Creek Township.(2026-06-09); https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/ (2026-05).; Sources: https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Lake-County-Council-approves-zoning-changes-for-Eagle-Creek-Township-data-center-amid-opposition/-3/5308/121576 https://lakecountyin.gov/departments/planning-commission/agendas-c/2026/may%2020%202026%20plan%20commission%20agenda%20and%20meeting%20memoranda.pdf https://projectshirleylakecounty.com/ https://projectshirleylakecounty.com/faq/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "DC BLOX Thunderbird Commerce Center Data Center",
    "state": "Indiana",
    "city": "Indianapolis",
    "county": "Marion County",
    "region": null,
    "status": "planned",
    "sponsors": "DC BLOX",
    "operators": "DC BLOX",
    "tenants": null,
    "totalSquareFeet": 320000.0,
    "powerCapacityMW": 78.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-22",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DC BLOX is pursuing a data center campus at Thunderbird Commerce Center, a former Ford factory site at 305 Fintail Drive near South Kitley Avenue and the Pennsy Trail in Warren Township. WFYI reported the initial proposal as a $2 billion data center campus with up to 78 MW of electricity use. On July 15, 2026, the Metropolitan Development Commission approved the use variance as the final local decision. July reporting says DC BLOX scaled the plan from three buildings to two, with a one-story 70,000-square-foot building followed by a two-story 250,000-square-foot building, and reduced backup diesel generators by 25. [Source: https://www.wfyi.org/wfyi-news/2026-07-15/east-side-data-center-wins-approval-despite-community-opposition; Date: 2026-07-15]; Sources: https://www.dcblox.com/indianapolisdatacenter/ https://www.wfyi.org/wfyi-news/2026-07-09/dc-blox-shrinks-indianapolis-east-side-data-center-proposal",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Sabey Decatur Township Data Center",
    "state": "Indiana",
    "city": "Indianapolis",
    "county": "Marion County",
    "region": null,
    "status": "planned",
    "sponsors": "Sabey",
    "operators": "Sabey",
    "tenants": null,
    "totalSquareFeet": 1062500.0,
    "powerCapacityMW": 250.0,
    "itLoadMW": null,
    "investmentUSD": 4000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-19",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The Indianapolis Metropolitan Development Commission approved Sabey's proposed $4 billion, 130-acre data center in Decatur Township on March 18, 2026. WFYI later reported residents filed for judicial review on April 17, 2026, seeking to overturn the approval and block construction before it begins. [Source: https://www.wfyi.org/wfyi-news/2026-04-20/decatur-township-residents-sue-to-block-sabey-data-center; Date: 2026-04-20]; Sources: https://sabeydecaturdatacenter.com/2025-CMP-856%20_Plan%20of%20Operation%20%283.11.26%29%20updated.pdf https://sabeydecaturdatacenter.com/ https://www.datacenterdynamics.com/en/news/4bn-data-center-in-indianapolis-indiana-gets-go-ahead/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract - Norwalk Project West Data Center Campus",
    "state": "Iowa",
    "city": "Norwalk",
    "county": "Warren County",
    "region": null,
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-05",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Norwalk City Council approved a development agreement with Tract on March 5, 2026 for a 282-acre site west of Highway 28 and south of Delaware Street, previously described as Project West and a future data center project. DCD reported city expectations of about $12B total investment, no tax incentives requested, about 600 construction jobs, and 80 high-quality permanent jobs. The city emphasized that the vote does not itself approve a data center and that any future data center would need separate city-level, state, federal, and public-review steps. [Source: https://www.datacenterdynamics.com/en/news/city-council-in-norwalk-iowa-approves-potential-data-center-development-agreement-despite-public-concerns/ | https://www.norwalk.iowa.gov/news_detail_T5_R273.php; Date: 2026-03-16; 2026-03-05]; QA 2026-07-18: Normalized Warren County.; Sources: https://norwalkiaswdevelopment.com/datacenter https://www.kniakrls.com/norwalk-continues-infrastructure-work-to-support-possible-data-center-development/ https://cms5.revize.com/revize/norwalk/government/boards_commissions_committees/Planning%20Commission/2025/01.13.2025%20P%26Z%20Minutes.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Tract - Altoona Technology Park",
    "state": "Iowa",
    "city": "Altoona",
    "county": "Polk",
    "region": null,
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-09-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Tract announced acquisition of a fully entitled Altoona site in September 2025; its current project page lists the Altoona Technology Park as owned and in development with 468 total acres, 1,000 MW capacity, a development agreement in place, and a 588,000-gallon-per-day water reservation. The announcement described the site as positioned on existing 345 kV transmission lines and capable of supporting over 1 GW over time. [Source: https://www.tract.com/project/altoona/ | https://www.tract.com/news/tract-enters-the-des-moines-market-with-the-acquisition-of-453-acres-following-successful-collaboration-with-the-city-of-altoona-ia/; Date: 2026; 2025-09-09]; Sources: https://cms2.revize.com/revize/altoona/Government/agendas_minutes/city%20council/2025/06-02-2025%20Council%20Minutes.pdf?t=202506131526000",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Bluestem Leavenworth County Data Center",
    "state": "Kansas",
    "city": "Tonganoxie",
    "county": "Leavenworth County",
    "region": null,
    "status": "announced",
    "sponsors": "Cloverleaf Infrastructure",
    "operators": "Cloverleaf Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-03-25",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New project: Cloverleaf presented early plans for Project Bluestem, a proposed hyperscale data center near Tonganoxie Business Park off 24 Highway and Kansas Avenue, with possible capacity of at least 600 MW. Cloverleaf's project materials describe the development as conceptual with no formal local approvals or permit requests submitted as of publication. [Source: https://www.cloverleafinfra.com/newsroom/new-kansas-law-opens-door-to-more-data-centers-including-another-one-near-kc-read-more-at-https-www-kansascity-com-news-business-development-article315173418-html-storylink-cpy; Date: 2026-03-25]; Sources: https://bluestemdatacenter.com/ https://bluestemdatacenter.com/faqs/ https://amp.kansascity.com/news/business/development/article315173418.html https://www.tonganoxiemirror.com/top-news/2026/may/07/proposed-data-centers-near-tonganoxie-de-soto-raise-slew-of-questions/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Barber County Data Center (Project Helium)",
    "state": "Kansas",
    "city": "Sharon",
    "county": "Barber County",
    "region": null,
    "status": "planned",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 1700000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New project: Google representatives described a proposed air-cooled AI data center northwest of Sharon on about 900 acres within a roughly 2,300-acre assembled area. Reported timeline was continued approvals through 2026, construction beginning in early 2027, and Building One operational by 2030; Barber County materials identify the project as Project Helium and describe two data center buildings scheduled for completion in 2029 and 2030 in incentive projections. [Source: https://www.alvareviewcourier.com/story/2026/04/01/local/google-experts-explain-details-and-answer-questions-about-proposed-ai-data-center-near-sharon-kansas/96377.html; Date: 2026-04-01]; Sources: https://barber.ks.gov/uploads/5/6/1/9/56198487/project_helium_-_valuation_tax_and_pilot_projections_summary_comparison__4.8.26_-c-c.pdf https://www.barbercountydevelopment.com/new-page-1 https://kspublicnotices.newzgroup.com/KSLegals/2026/31273-2026-01-15_1002.pdf https://barber.ks.gov/uploads/5/6/1/9/56198487/2026-01-12_barber_county_public_hearing_intro.pdf https://kspublicnotices.newzgroup.com/KSLegals/2026/31273-2026-02-19_1001.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Justified Data Campus",
    "state": "Kentucky",
    "city": "Hawesville",
    "county": "Hancock County",
    "region": null,
    "status": "planned",
    "sponsors": "TeraWulf; Justified DataPower LLC",
    "operators": "TeraWulf; Justified DataPower LLC",
    "tenants": "Anthropic",
    "totalSquareFeet": null,
    "powerCapacityMW": 482.0,
    "itLoadMW": 401.0,
    "investmentUSD": 13500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Kentucky PSC materials describe a 482 MW gross campus. On July 6, 2026, TeraWulf announced a 20-year Anthropic lease covering approximately 401 MW of critical IT load, with initial capacity expected in the second half of 2027 and a ramp to full capacity by early 2028. The approximately $19 billion figure in the announcement is contracted lease revenue over the initial term, not project capital investment. [Source: https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack; Date: 2026-07-06]; Sources: https://www.sec.gov/Archives/edgar/data/949157/000110465926009212/tm264772d1_8k.htm https://psc.ky.gov/trf4/uploadedFiles/900_Big_Rivers_Electric_Corporation/04142026121035/RESA_for_Century_Hawesville_FINAL__Redacted.pdf https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Amazon/STACK Northwest Louisiana Data Center Campuses",
    "state": "Louisiana",
    "city": "Blanchard/Benton",
    "county": "Caddo Parish; Bossier Parish",
    "region": null,
    "status": "under-construction",
    "sponsors": "Amazon Web Services; STACK Infrastructure",
    "operators": "Amazon Web Services; STACK Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-23",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Bossier City's June 23, 2026 council minutes show adoption of Ordinance No. 74 of 2026, establishing an Infrastructure Capital Fund tied to anticipated sales-tax revenue from installation and construction of the Amazon Data Center in Bossier Parish. The ordinance designates 0.5% of all sales-tax collections for future infrastructure needs beginning January 1, 2027 for five years or until the Amazon Data Center is complete, whichever is sooner. KSLA reported on July 7, 2026 that construction on one data center site in Caddo Parish was already underway and that the projects were expected to take three to five years to build, while Caddo Parish was considering temporary worker-housing rules and rainwater-capture ideas near data center sites. These are local fiscal/infrastructure and construction-context updates, not new project rows or disclosed MW changes. [Source: https://www.bossiercity.org/AgendaCenter/ViewFile/Minutes/_06232026-788 | https://www.ksla.com/2026/07/07/caddo-parish-considers-rules-temporary-worker-housing-near-data-center-sites/; Date: 2026-06-23; 2026-07-07]; Sources: https://www.stackinfra.com/wp-content/uploads/2026/02/PR-STACK-Infrastructure-Announces-Data-Center-Developments-Supporting-Economic-Growth-in-Louisiana.pdf https://www.aboutamazon.com/news/company-news/amazon-data-center-louisiana-new-jobs https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion https://www.sec.gov/Archives/edgar/data/1071236/000107123626000045/rrbi1q26investorpresenta.htm https://www.commercialsearch.com/news/amazon-stack-to-build-12b-louisiana-data-center-campuses/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Applied Digital Delta Forge 1 AI Factory Campus",
    "state": "Louisiana",
    "city": "Boyce",
    "county": "Rapides Parish",
    "region": null,
    "status": "under-construction",
    "sponsors": "Applied Digital Corporation; Cleco; England Economic and Industrial Development District",
    "operators": "Applied Digital Corporation; Cleco",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 430.0,
    "itLoadMW": 300.0,
    "investmentUSD": 3600000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-26",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-06",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "KALB's June 25, 2026 records-review article, updated July 15, reported Applied Digital responses and local documents for Delta Forge 1: Applied Digital said only two buildings are currently planned over four overlapping phases, though KALB said construction plans show additional future-building schematics. The article reported 672.52 acres allotted for the campus, about 300 acres announced for the two-building construction plan, a 300 MW critical IT load, and LDEQ records for air and water permitting. Applied Digital estimated initial closed-loop cooling fill at 866,000 gallons per building, a little over 1.7 million gallons total, with a committed routine water range of 1,200 to 4,800 gallons per day and a 50 gallon-per-minute limit. KALB also reported an LDEQ May 27 citation for failure to control particulate emissions after dust complaints. This update does not change the canonical $3.6B or 300 MW fields, but it adds permitting, water, phasing, and construction-compliance context. [Source: https://www.kalb.com/2026/06/25/fact-check-what-early-documents-confirm-about-applied-digitals-data-center-coming-rapides-parish/; Date: 2026-06-25; updated 2026-07-15]; QA 2026-07-18: Moved 300 MW from facility power to the source-labeled critical IT-load field.; Sources: https://ir.applieddigital.com/_assets/_dac17306f143830900eb8cb788feab83/appliedblockchaininc/news/2026-01-22_Applied_Digital_Breaks_Ground_on_Delta_Forge_1_a_144.pdf https://englandairpark.org/wp-content/uploads/2026/06/LED-News-Release_Applied-Digital.pdf https://www.wafb.com/2026/05/26/live-2-gov-landry-announces-new-multi-billion-dollar-ai-data-center-rapides-parish/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Sanford Woods Industrial and Technical Campus",
    "state": "Maine",
    "city": "Sanford",
    "county": "York County",
    "region": null,
    "status": "planned",
    "sponsors": "Randy Gibbs; Walt Bussells; New England Energy",
    "operators": "Randy Gibbs; Walt Bussells; New England Energy",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 2160000000.0,
    "sizeNotes": "Roughly 1,000-acre mixed-use concept; reporting describes a 100-300 MW data-center range plus separate power, greenhouse, and cold-storage components",
    "announcedDate": "2026-02-19",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Proposed Sanford Woods Industrial and Technical Campus in Sanford/York County. The Portland Press Herald reported that on May 19, 2026, the Sanford City Council unanimously approved a 91-day emergency data center moratorium temporarily stopping acceptance, approval, or issuance of permits for large-scale data center proposals until August 12, 2026. The pause affects the roughly 1,000-acre Sanford Woods proposal along the Mousam River; developer Randy Gibbs said he supported the moratorium and preferred defined standards over an undefined regulatory setting. [Source: https://www.pressherald.com/2026/05/19/sanford-imposes-emergency-data-center-moratorium-halting-mousam-river-project/; Date: 2026-05-19]; QA 2026-07-19: Cleared whole-campus power and budget from exact data-center fields.; Sources: https://sanfordspringvalenews.com/data-center-could-pump-2-billion-into-city/ https://www.pressherald.com/2026/02/19/sanford-isnt-just-getting-a-data-center-developer-says/ https://sanfordspringvalenews.com/data-center-developer-makes-pitch-to-local-groups/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "TeraWulf - Chesapeake Data & Energy",
    "state": "Maryland",
    "city": "Newburg",
    "county": "Charles County",
    "region": null,
    "status": "planned",
    "sponsors": "TeraWulf",
    "operators": "TeraWulf",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 800.0,
    "itLoadMW": 800.0,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-02-02",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "TeraWulf announced the acquisition of the Morgantown Generating Station in Charles County on February 2, 2026, describing a former generation site with about 210 MW of operational generation capacity, about 250 buildable acres, and a pathway to support 1 GW of load with an initial approximately 500 MW phase. TeraWulf's site page lists Chesapeake Data & Energy in Charles County, MD as in permitting, with 800 MW total critical IT capacity, zero contracted capacity, and on-site generation and battery storage. [Source: https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland | https://www.terawulf.com/our-sites; Date: 2026-02-02; 2026]; QA 2026-07-19: Moved the source-labeled 800 MW from facility power to critical IT capacity.; Sources: https://www.chesapeakedatacampus.com/project-overview https://www.sec.gov/Archives/edgar/data/1083301/000108330126000023/wulfkyandmdacquisitionpr.htm https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000162/terawulfq22026investorpr.htm",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Brightseat Tech Park",
    "state": "Maryland",
    "city": "Landover",
    "county": "Prince George's County",
    "region": null,
    "status": "planned",
    "sponsors": "Lerner Enterprises; The Tower Companies; Brightseat Associates LLC",
    "operators": "Lerner Enterprises; The Tower Companies; Brightseat Associates LLC",
    "tenants": null,
    "totalSquareFeet": 4100000.0,
    "powerCapacityMW": 820.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": "Approximately 4.1 million square feet across five facilities on 87 acres",
    "announcedDate": "2024-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Prince George's County adopted CR-066-2026 on July 7, 2026, establishing a two-year moratorium on acceptance, processing, review, and approval of applications for preliminary plans of subdivision and detailed site plans that include qualified data center uses. Contemporary reporting says the moratorium grew from the Qualified Data Center Task Force process that followed protests over the Landover Mall/Brightseat proposal. The project remains tracked as planned, but permitting and approvals are materially paused unless the county changes course. [Source: https://princegeorgescountymd.legistar.com/LegislationDetail.aspx?GUID=4DA0E757-A8B6-4BFD-A7E5-E83AD62A0B1F&ID=8122087&Options=ID%7CText%7C&Search= | https://www.spotlightpa.org/news/2026/07/maryland-prince-georges-data-center-moratorium-environment/; Date: 2026-07-07; 2026-07-10]; QA 2026-07-19: Added the reported five-facility campus area.; Sources: https://www.datacenterdynamics.com/en/news/lerners-maryland-data-center-campus-could-total-820mw/ https://naacp.org/resources/peoples-report-data-centers-prince-georges-county-md https://www.mncppcapps.org/planning/DAMSWEB/Case_Detail.cfm?CaseNumber=ADQ-2023-045 https://www.mncppcapps.org/planning/damsweb/Case_Detail.cfm?CaseNumber=4-23024 https://www.mncppcapps.org/planning/CA/ADQ-2023-045.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Natelli Holdings - Appeal Digital Park",
    "state": "Maryland",
    "city": "Lusby",
    "county": "Calvert County",
    "region": null,
    "status": "planned",
    "sponsors": "Natelli Holdings",
    "operators": "Natelli Holdings",
    "tenants": null,
    "totalSquareFeet": 880000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-24",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Natelli Holdings presented Appeal Digital Park to Calvert County on March 24, 2026 as a proposed redevelopment of about 133 acres of county-owned property at 10475, 10485, and 10495 Solomons Island Road. Project materials describe four approximately 200,000-square-foot data center buildings, an 880,000-square-foot campus, 300 MW peak-efficiency capacity, treated-wastewater cooling, and expected development/construction costs exceeding $3B. The proposal includes a secured $30M commitment to construct a replacement regional park, but remains conceptual and subject to approvals. [Source: https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/3994410/Calvert_County___Work_Session_3_24_26_v2Final.pdf | https://www.appealdigitalparkcalvertmd.com/ | https://www.appealdigitalparkcalvertmd.com/wp-content/uploads/go-x/u/1bfc7283-c8b3-4b13-9306-43c958f97120/Calvert-County-Sage-Report-Update-2026-1.pdf; Date: 2026-03-24; 2026; 2026-03]; Sources: https://www.appealdigitalparkcalvertmd.com/fa-qs-and-fact-sheet/ https://www.choosecalvert.com/4058/Natelli-Holdings https://thebaynet.com/wp-content/uploads/2026/03/Calvert_County___Work_Session_3_24_26_v2Final.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Mountain Branch AI Energy Campus",
    "state": "Maryland",
    "city": "Joppa",
    "county": "Harford County",
    "region": null,
    "status": "canceled",
    "sponsors": "Mountain Branch Golf Club; unknown data center developer",
    "operators": "Mountain Branch Golf Club; unknown data center developer",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 20000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-23",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Local reporting in April and May 2026 described an unidentified developer's plan for a data center or AI infrastructure campus at Mountain Branch Golf Course; DCD noted that no formal planning application appeared to have been submitted and that CloudHQ involvement was unverified. On June 10, 2026, Harford County announced County Executive Bob Cassilly signed legislation banning data centers countywide after unanimous council approval, effectively blocking the Mountain Branch concept unless the law changes. [Source: https://www.datacenterdynamics.com/en/news/harford-county-maryland-could-impose-90-day-moratorium-on-data-centers/ | https://www.harfordcountymd.gov/CivicAlerts.aspx?AID=1700; Date: 2026-04-23; 2026-06-10]; Sources: https://harfordenergy.com/the-project.html https://harfordenergy.com/economic-impact.html https://nottinghammd.com/2026/06/10/harford-county-council-unanimously-approves-legislation-banning-data-centers/ https://nottinghammd.com/2026/04/23/proposed-data-center-at-mountain-branch-golf-club-draws-public-pushback-over-regional-infrastructure-concerns/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Alterra Marshall Technology Center",
    "state": "Michigan",
    "city": "Marshall",
    "county": "Calhoun County",
    "region": null,
    "status": "on-hold",
    "sponsors": "Alterra Development",
    "operators": "Alterra Development",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-12-18",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Alterra Development entered due diligence for a technology park in Brooks Industrial Park that local reporting says would include a data center and integrated natural-gas generation plant. The Marshall LDFA authorized sale of 270 acres for $1.12 million, including about 112 buildable acres; construction was not expected until due diligence completion around Q3 2026. [Source: https://wwmt.com/news/local/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water; Date: 2025-12-18]; Sources: https://www.cityofmarshall.com/DocumentCenter/View/2300/Statement-Regarding-MTEC-Update-May-2026 https://www.idcnova.com/html/1/59/153/4663.html https://wtvbam.com/2025/12/18/new-technology-park-planned-for-marshall/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Prologis 32 Mile Technical Campus",
    "state": "Michigan",
    "city": "Washington Township",
    "county": "Macomb County",
    "region": null,
    "status": "canceled",
    "sponsors": "Prologis",
    "operators": "Prologis",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 800.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Prologis submitted a conditional rezoning application for a 312-acre technical campus/data center site on 32 Mile Road, then withdrew the application in a May 19, 2026 letter while the township works on a data center ordinance. The developer said it would wait until ordinance work is complete before proceeding. [Source: https://planetdetroit.org/2026/05/washington-township-data-center-withdrawn/; Date: 2026-05-19]; Sources: https://www.clickondetroit.com/news/investigations/2026/06/25/washington-township-residents-demand-transparency-after-data-center-emails-exposed/ https://cms2.revize.com/revize/washingtonmi/32%20Mile%20Road%20Technical%20Campus%20FAQ%20-%20Spalding%20DeDecker.pdf?t=20251205121340615 https://www.cbsnews.com/detroit/news/washington-township-proposed-data-center-protest/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Mason Data Center at 3388 W Columbia Road",
    "state": "Michigan",
    "city": "Mason",
    "county": "Ingham County",
    "region": null,
    "status": "planned",
    "sponsors": "Unknown developer",
    "operators": "Unknown developer",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-03",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Mason City Manager Deb Stuart said a utility request for property at 3388 W Columbia Road was for a data center; WILX reported the developer had not been publicly identified and described a promised $1 billion investment. Treat as planned/early-stage because the public record is a utility request, not final site approval. [Source: https://www.wilx.com/2026/06/03/data-center-developer-requests-mason-utilities-promises-1b-investment/; Date: 2026-06-03]; Sources: https://www.wkar.org/michigans-data-center-divide/2026-06-09/mason-data-center-proposal-seeks-conditional-land-transfer-from-vevay-township https://www.wkar.org/michigans-data-center-divide/2026-06-02/mason-data-center-proposal-would-more-than-double-citys-tax-revenue https://www.wkar.org/wkar-news/2026-06-16/mason-supports-annexation-of-vevay-township-land-for-data-center https://www.wilx.com/2026/08/20/vevay-township-landowners-seeking-mason-annexation-data-center/?outputType=amp",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Rocklocker Kalkaska County Data Center",
    "state": "Michigan",
    "city": "Unknown",
    "county": "Kalkaska County",
    "region": null,
    "status": "canceled",
    "sponsors": "Rocklocker LLC; ReefWorks",
    "operators": "Rocklocker LLC; ReefWorks",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-09-19",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Rocklocker proposed a large data center and natural-gas power concept on state land in Kalkaska County. Opposition led the developer to withdraw; local reporting described the concept as a 1 GW facility on roughly 1,440 acres near Island Lake and South River roads. [Source: https://www.datacenterdynamics.com/en/news/opposition-leads-developer-to-withdraw-data-center-proposal-in-kalkaska-county-michigan/; Date: 2025-11-25]; Sources: https://kalkaskadatacenter.com/wp-content/uploads/2025/11/2483862549192708112.pdf https://www.9and10news.com/2025/11/11/kalkaska-county-courts-new-data-center-to-drive-ai-future/ https://www.interlochenpublicradio.org/ipr-news/2025-11-12/community-input-sought-next-week-on-idea-for-kalkaska-data-center https://www.interlochenpublicradio.org/2025-09-19/kalkaska-considering-data-center-development https://cms6.revize.com/revize/kalkaskacountymi/Committee%20Meetings%205-14-2025.pdf https://www.9and10news.com/2025/11/20/kalkaska-county-data-center-project-halted-after-public-opposition/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Monticello Tech/Monticello Industrial Park",
    "state": "Minnesota",
    "city": "Monticello",
    "county": "Wright County",
    "region": null,
    "status": "planned",
    "sponsors": "Monticello Tech, LLC; Frattalone Companies",
    "operators": "Monticello Tech, LLC; Frattalone Companies",
    "tenants": null,
    "totalSquareFeet": 3000000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-10-27",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "City materials describe a proposed private technology campus/data center totaling about 3 million square feet on approximately 550 acres south of 85th Street and east of Highway 25 in the Monticello Orderly Annexation Area. DCD reported the Frattalone/Monticello Tech project could see up to $5 billion invested. The City Council adopted the Final AUAR and Mitigation Plan for Monticello Industrial on January 26, 2026. Monticello's data-center page later said the city received a set of data-center development applications on July 6, 2026, including CUP, land-use, preliminary/final plat, rezone, project narrative, water, sanitary, noise, traffic, and other application materials; the materials were still being reviewed for completeness and public hearing/Planning Commission dates had not been set, so the project remains planned. [Source: https://www.monticellomn.gov/728/Data-Centers | https://www.datacenterdynamics.com/en/news/two-data-center-projects-planned-for-monticello-minnesota/; Date: 2026-07-06; 2025-10-27] [Source: https://monticellomn.gov/728/Data-Centers; Date: 2026-07-06]; Sources: https://www.monticellomn.gov/753/Monticello-Tech https://finance-commerce.com/2025/10/monticello-data-center-developments/ https://www.monticellomn.gov/DocumentCenter/View/9652/2026-0803_Monticello-DCPUD_Project-Narrative_V2-PDF",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Nobles County Powered Data Park",
    "state": "Minnesota",
    "city": "Unknown",
    "county": "Nobles County",
    "region": null,
    "status": "canceled",
    "sponsors": "Geronimo Power",
    "operators": "Geronimo Power",
    "tenants": null,
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 4000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-20",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Geronimo Power described a Nobles County Powered Data Park and commissioned an economic analysis based on a 400 MW data center. Public project materials listed 2026 hearings and AUAR comment steps for a text amendment to include data centers as a conditional use in Agricultural Preservation areas. Nobles County agenda materials later stated that the text amendment was defeated at the April 21, 2026 Board meeting and proposed terminating the AUAR process and related cost-reimbursement agreement. DCD reported the rejected $4 billion proposal targeted a 959-acre parcel between 200th Street and 190th Street for eight buildings totaling 2.5 million square feet, with 400 MW to 1 GW potential power use; this row records the lower 400 MW project-analysis figure and treats the current-location path as canceled. [Source: https://geronimopower.com/in-development/nobles-county-powered-data-park/ | https://www.co.nobles.mn.us/wp-content/uploads/2026/05/260519a.pdf | https://www.datacenterdynamics.com/en/news/4bn-data-center-rejected-by-nobles-county-minnesota/; Date: 2026-02-26; 2026-05-19; 2026-04-24]; QA 2026-07-18: Added the 2.5M-square-foot proposal area and aligned power with the 400 MW analyzed project case rather than the 1 GW upper range.; Sources: https://geronimopower.com/wp-content/uploads/2026/02/SRDC_Nobles-County-Data-Center-Economic-Impact-Study_02_2026.pdf https://www.datacenterdynamics.com/en/news/geronimo-power-proposes-data-center-in-nobles-county-minnesota/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "AWS Vicksburg Data Center Campus",
    "state": "Mississippi",
    "city": "Vicksburg",
    "county": "Warren County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-11-20",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Amazon and Mississippi officials announced a planned $3B Warren County data center campus in Vicksburg on November 20, 2025, described as the largest private investment in Warren County history and expected to create at least 200 full-time data center jobs plus more than 300 additional regional positions. The MDA/Governor announcement said construction of the Vicksburg data center complex is expected to begin in 2026. Amazon's April 9, 2026 statewide expansion announcement again listed Vicksburg as a planned $3B project creating at least 200 high-paying full-time positions, separate from the already tracked Madison County expansion and Clinton project. Mississippi Today reported on June 9, 2026 that Amazon said the Vicksburg facility is in the site-prep and pre-construction phase; status remains planned because the company characterized the phase as pre-construction. [Source: https://mississippi.org/news/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/ | https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment | https://mississippi.org/news/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/ | https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/; Date: 2025-11-20; 2025-11-20; 2026-04-09; 2026-06-09]; Sources: https://www.datacenterdynamics.com/en/news/amazon-to-build-3bn-data-center-campus-in-vicksburg-mississippi/ https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "xAI Southaven MACROHARDRR Data Center",
    "state": "Mississippi",
    "city": "Southaven",
    "county": "DeSoto County",
    "region": null,
    "status": "under-construction",
    "sponsors": "xAI; MZX Tech LLC",
    "operators": "xAI",
    "tenants": null,
    "totalSquareFeet": 810000.0,
    "powerCapacityMW": 2000.0,
    "itLoadMW": null,
    "investmentUSD": 20000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-08",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026-02",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Mississippi Today reported on March 10, 2026 that the Mississippi permit board approved xAI/MZX Tech's application for 41 permanent gas turbines in Southaven to power xAI's data center operation across the state line and a recently announced Southaven center. Mississippi Today later reported on June 16, 2026 that xAI and the Justice Department asked the court to dismiss the NAACP lawsuit over unpermitted mobile turbines; recent court filings put the temporary turbine count at 57, and xAI was using the mobile turbines until a permanent power plant is finished, expected early next year according to court documents. Reuters Connect reported on July 13, 2026 that newly installed power lines from xAI's Southaven turbine facility were photographed on May 30, 2026 and described xAI as running nearly 60 turbines without permits. This is a permitting, power-infrastructure, and litigation update; it does not change the reported $20B or nearly 2 GW project scale. [Source: https://mississippitoday.org/2026/03/10/xai-permit-approved-southaven/ | https://mississippitoday.org/2026/06/16/department-of-justice-elon-musk-mississippi/ | https://www.reutersconnect.com/item/xai-runs-nearly-60-gas-turbines-at-colossus-2-data-center-without-permits-documents-show/dGFnOnJldXRlcnMuY29tLDIwMjY6bmV3c21sX1JDMllKTEEwQTdDUg; Date: 2026-03-10; 2026-06-16; 2026-07-13]; Sources: https://mississippi.org/news/tech-leader-xai-investing-more-than-20-billion-in-southaven/ https://southaven.org/Blog.aspx?IID=227",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Metrobloks Liberty Data Center Campus",
    "state": "Missouri",
    "city": "Liberty",
    "county": "Clay County",
    "region": null,
    "status": "planned",
    "sponsors": "Metrobloks",
    "operators": "Metrobloks",
    "tenants": null,
    "totalSquareFeet": 568800.0,
    "powerCapacityMW": 150.0,
    "itLoadMW": null,
    "investmentUSD": 1400000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-24",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; enterprise; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Metrobloks announced a high-density, AI-ready Liberty campus with up to $1.4 billion of investment, 150 MW of power, and approximately 568,800 square feet across three buildings. The company said the project will create at least 30 full-time jobs plus construction, security, and maintenance work. [Source: https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri; Date: 2026-03-24]; Sources: https://www.metrobloks.com/press-release/metrobloks-and-lincoln-property-company-announce-joint-venture-to-develop-ai-ready-data-centers-launching-in-kansas-city-metro https://www.libertymissouri.gov/m/newsflash/home/detail/5426 https://www.datacenterdynamics.com/en/news/lincoln-property-partners-with-data-center-firm-metrobloks-for-kansas-city-data-center/ https://www.commercialsearch.com/news/metrobloks-lpc-form-data-center-jv/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Nebius Independence Data Center Campus",
    "state": "Missouri",
    "city": "Independence",
    "county": "Jackson County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Nebius",
    "operators": "Nebius",
    "tenants": null,
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 800.0,
    "itLoadMW": null,
    "investmentUSD": 6600000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-03",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Independence approved Chapter 100 incentives for Nebius after a March 2, 2026 city council vote. Reporting describes a nearly 400-acre flagship U.S. AI factory campus off Route 78 and Little Blue Parkway, about 2.1 million square feet, 800 MW planned operating capacity, possible total capacity up to 1.2 GW including reserves, and up to $150.6 billion in property and equipment subject to the incentive structure. [Source: https://www.kcur.org/politics-elections-and-government/2026-03-03/independence-gives-billions-in-tax-breaks-for-a-massive-data-center-despite-outcry-from-residents; Date: 2026-03-03]; Sources: https://www.independencemo.gov/sites/default/files/2025-12/EASTGATE%20UPDATE%20Presentation%2012-8.pdf https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri https://www.arconational.com/nebius-independence-mo/ https://nebius.com/independencemo https://www.kctv5.com/2026/05/12/controversial-data-center-moves-forward-independence-construction-expected-create-1300-jobs/?outputType=amp",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CRG Festus Data Center",
    "state": "Missouri",
    "city": "Festus",
    "county": "Jefferson County",
    "region": null,
    "status": "planned",
    "sponsors": "CRG",
    "operators": "CRG",
    "tenants": null,
    "totalSquareFeet": 3150000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-20",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; enterprise",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Festus mayoral materials said a development-agreement framework had been reached with CRG for a data center project, with about 150 jobs, no real-property tax abatement, and developer responsibility for required infrastructure upgrades. The financial model identifies an initial 300 MW power load in 2028 and full 1 GW load in 2031. [Source: https://www.festusmo.gov/DocumentCenter/View/2395; Date: 2026-03-20]; Sources: https://www.realcrg.com/project/festus-data-center https://www.festusforward.com/ https://spectrumlocalnews.com/mo/st-louis/news/2026/04/13/st-louis-festus-data-center-crg-bob-clark https://festusmo.gov/DocumentCenter/View/2395/City-of-Festus---Public-Statement-from-Mayor-Richards-3202026-with-attachments?bidId= https://www.festusmo.gov/DocumentCenter/View/2400/Item-10---Doenges-request-32126?bidId=",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Armory Innovation Data Center (Famous-Barr Warehouse)",
    "state": "Missouri",
    "city": "St. Louis",
    "county": "St. Louis City",
    "region": null,
    "status": "planned",
    "sponsors": "Armory Project team; David Daneshforooz; Steadfast City Economic and Community Partners",
    "operators": "Armory Project team; David Daneshforooz; Steadfast City Economic and Community Partners",
    "tenants": null,
    "totalSquareFeet": 525000.0,
    "powerCapacityMW": 120.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "enterprise",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "St. Louis Board of Public Service approved conditional-use permits for a Midtown data center at the former Famous-Barr warehouse and related Armory office redevelopment. Later reporting described the proposal as a $3 billion project with a 120 MW data center in the first-floor warehouse space; the city agreement targets data-center operation by the end of 2028 and includes conditions on cooling, water rates, renewable energy share, PUE, generator use, noise, and community benefits. [Source: https://www.firstalert4.com/2026/05/20/developer-unveils-renderings-proposed-3-billion-midtown-data-center-project/; Date: 2026-05-20]; Sources: https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/Details-on-Project-Conditions-Components-and-Benefits.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Crusoe Warrenton Campus",
    "state": "Missouri",
    "city": "Warrenton",
    "county": "Warren County",
    "region": null,
    "status": "planned",
    "sponsors": "Warrenton DC Owner 1 LLC; Crusoe Inc.",
    "operators": "Warrenton DC Owner 1 LLC; Crusoe Inc.",
    "tenants": null,
    "totalSquareFeet": 1650000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 25506775138.0,
    "sizeNotes": null,
    "announcedDate": "2026-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New project: Warrenton's cost-benefit analysis identifies Warrenton DC Owner 1 LLC as a Crusoe affiliate and describes a data center on about 336 acres at 22151 NW Service Road. The plan assumes Phase 1 in 2027 with an approximately 800,000-square-foot data center building and 40,000-square-foot administration building, and Phase 2 in 2028 with a second approximately 800,000-square-foot data center building. The investment figure sums stated initial Phase 1 and Phase 2 equipment costs plus real-property improvement assumptions, while noting the bond documents do not obligate completion of both phases. [Source: https://www.warrenton-mo.org/wp-content/uploads/2026/03/Plan-Cost-Benefit-Analysis-Crusoe-Data-Center.pdf; Date: 2026-03]; QA 2026-07-19: Added the 1.65M-square-foot two-phase building total.; Sources: https://www.crusoe.ai/resources/newsroom/crusoes-contracted-ai-infrastructure-capacity-approaches-5-gigawatts-across-data-centers-and-cloud https://www.firstalert4.com/2026/04/15/warrenton-officials-approve-75-personal-property-tax-abatement-multi-billion-dollar-data-center-project/ https://www.datacenterdynamics.com/en/news/crusoe-data-center-could-be-built-west-of-st-louis-missouri/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Beltline Energy Meramec Valley Technology Park",
    "state": "Missouri",
    "city": "Pacific area",
    "county": "Franklin County",
    "region": null,
    "status": "planned",
    "sponsors": "BLE Landholdings; Beltline Energy",
    "operators": "BLE Landholdings; Beltline Energy",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1300.0,
    "itLoadMW": null,
    "investmentUSD": 16000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-23",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New project with adverse planning recommendation: Franklin County Planning and Zoning Commission did not recommend approval for BLE Landholdings/Beltline's rezoning request for 12 parcels totaling about 490 acres around 684 Phelan Road. The proposal still needed County Commission review as of the April 23, 2026 report, so the status is kept as planned rather than canceled. [Source: https://www.datacenterdynamics.com/en/news/planning-commission-in-franklin-county-missouri-recommends-approval-of-one-data-center-denies-another/; Date: 2026-04-23]; Sources: https://www.pacificmo.gov/AgendaCenter/ViewFile/Agenda/_02252026-758 https://www.datacenterdynamics.com/en/news/beltline-energy-withdraws-data-center-proposal-in-pacific-missouri/ https://www.heartlandnewsfeed.com/2026/08/10/data-center-proposal-pacific-officially-dead/ https://hometownmatters.com/data-center-meeting-draws-crowd-reveals-disconnect-between-mayor-and-aldermen/ https://www.firstalert4.com/2026/02/20/data-center-projects-spark-community-debates-both-sides-mississippi-river/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Amazon Project Green New Florence Data Center Campus",
    "state": "Missouri",
    "city": "New Florence",
    "county": "Montgomery County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 3740000.0,
    "powerCapacityMW": 1316.3,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-20",
    "constructionStartDate": null,
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "May 2026 reporting on Google's adjacent New Florence announcement described an already approved $35 billion Amazon-run data center in Montgomery County near New Florence. The same report said the Google and Amazon data centers together would occupy nearly 2,000 acres along Interstate 70. [Source: https://www.firstalert4.com/2026/05/20/google-announces-15-billion-data-center-mid-missouri/; Date: 2026-05-20]; Sources: https://dnr.mo.gov/sites/dnr/files/vfc/2026/05/main/amazon-data-center-new-florence-complete-application-may-2026.pdf https://amazonstlwest.com/ https://www.newstribune.com/news/2026/jun/24/new-florence-balances-data-center-concerns/ https://datacenterbuildout.com/site/project-green-amazon/ https://dnr.mo.gov/calendar/event/307591 https://spectrumlocalnews.com/mo/st-louis/news/2026/06/15/amazon--10-billion-data-center-montgomery-county-missouri",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Townsite Solar 2 Boulder City Data Center",
    "state": "Nevada",
    "city": "Boulder City",
    "county": "Clark County",
    "region": null,
    "status": "planned",
    "sponsors": "Townsite Solar 2 LLC; Skylar Capital Management; Arevon Energy; Overwatch Capital",
    "operators": "Townsite Solar 2 LLC; Skylar Capital Management; Arevon Energy; Overwatch Capital",
    "tenants": null,
    "totalSquareFeet": 300000.0,
    "powerCapacityMW": 170.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported on 2026-03-30 that Townsite Solar 2 LLC proposed a 150-170 MW high-density AI data center campus on 88.5 acres of city-owned land west of US Highway 95 and south of I-11, with construction potentially starting in 2026 and first phase as soon as 2027. NVBEX reported on 2026-05-27 that the Boulder City Planning Commission recommended denial after public opposition, but the project was still expected to proceed to City Council for final consideration. [Source: https://nevbex.com/2026/05/27/boulder-city-recommends-data-center-denial/; Date: 2026-05-27]; Sources: https://storage.googleapis.com/cdn.thenevadaindependent.com/2026/04/49dbcbfa-townsite-2-app_city-council-meeting_20260403222013558.pdf https://www.ts2project.com/about-us https://www.flybouldercity.com/1174/TS2-Data-Center-Proposal-Withdrawn-76202 https://www.datacenterdynamics.com/en/news/170mw-data-center-campus-proposed-in-boulder-nevada/ https://thetownhall.news/federal-news/ai-data-center-public-land-boulder-city-blm/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "New Era Lea Data Center",
    "state": "New Mexico",
    "city": "Unknown",
    "county": "Lea County",
    "region": null,
    "status": "planned",
    "sponsors": "New Era Energy & Digital",
    "operators": "New Era Energy & Digital",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 7000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-11-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New Era announced a land option purchase agreement for approximately 3,500 acres in Lea County for a large-scale AI data center campus, described as a multi-gigawatt hub with more than 2 GW of natural gas generation and a planned 5+ GW nuclear installation. Initial power delivery was expected in 2028, with engineering expected to begin within 30 days of the announcement. [Source: https://www.newerainfra.ai/news/new-era-energy--digital-enters-into-land-option-purchase-agreement-for-3500-acres-in-new-mexico-for-7gw-ai-data-center-hub-marks-first-wholly-owned-development-separate-from-tcdc-joint-venture; Date: 2025-11-06]; Sources: https://investors.newerainfra.ai/news/news-details/2025/New-Era-Energy--Digital-Enters-into-Land-Option-Purchase-Agreement-for-3500-Acres-in-New-Mexico-for-7GW-AI-Data-Center-Hub-Marks-first-Wholly-Owned-Development-Separate-from-TCDC-Joint-Venture/default.aspx https://www.sec.gov/Archives/edgar/data/2028336/000121390025108747/ea0264435-8k_newera.htm https://www.datacenterdynamics.com/en/news/new-era-plans-7gw-ai-data-center-in-lea-county-new-mexico-powered-by-gas-and-nuclear/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "JPMC Datacenter II Orangeburg Expansion",
    "state": "New York",
    "city": "Orangeburg",
    "county": "Rockland County",
    "region": null,
    "status": "under-construction",
    "sponsors": "JPMorgan Chase Bank, N.A.",
    "operators": "JPMorgan Chase Bank, N.A.",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 31.74,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2024-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "enterprise",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "JPMorganChase's Orangeburg data center expansion is under construction and expected to be complete by 2028. Reinvent Albany's analysis of Rockland IDA records identifies the deal as JPMC Datacenter II at 140 Old Orangeburg Road, with up to $76.715 million in sales tax abatements on $916 million of computers and equipment; total project investment and MW were not found in the reviewed sources. [Source: https://nysfocus.com/2026/04/20/data-center-tax-break-jpmorgan-chase | https://reinventalbany.org/2026/04/ny-taxpayers-spend-77m-for-one-jp-morgan-data-center-job-by-far-largest-subsidy-per-job-in-history/; Date: 2026-04-20; 2026-04-20]; QA 2026-07-19: Cleared unsupported MW and equipment-assessment value from project capex.; Sources: https://rocklandida.com/active-projects/ https://rocklandida.com/wp-content/uploads/2024/04/FINAL-FINALInducement-Resolution-4-23-24-002.pdf https://rocklandida.com/wp-content/uploads/2025/01/Project-Agreement-JPMC.pdf https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b https://www.orangetown.com/document/project-sycamore-phase-3/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "North Country Collocation Services Massena Expansion",
    "state": "New York",
    "city": "Massena",
    "county": "St. Lawrence County",
    "region": null,
    "status": "expansion",
    "sponsors": "North Country Collocation Services; NYDIG",
    "operators": "North Country Collocation Services",
    "tenants": null,
    "totalSquareFeet": 1100000.0,
    "powerCapacityMW": 635.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-22",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCD reported that NCCS, an affiliate of NYDIG, brought a June 26 presubmission to the Massena Town Planning Board for the old Reynolds plant site and has revised the plan from the earlier three-building, nearly 1.5 million-square-foot, roughly 635 MW version to two new data halls on about 355 developable acres next to its existing 110-acre site. The revised plan would phase out on-site Bitcoin mining, reduce the building footprint by about 400,000 square feet, cut standby generators from 316 to 124, use closed-loop cooling, and retain an expected two-year phased construction schedule with 1,800 to 2,500 peak construction jobs and about 200 permanent jobs. [Source: https://www.datacenterdynamics.com/en/news/nydig-looks-to-expand-data-center-at-massena-site-new-york/; Date: 2026-07-07]; Sources: https://www.nccs.one/massena https://lowvoltagenewyork.com/news/nydig-massena-data-center-review-low-voltage/ https://www.northcountrypublicradio.org/news/story/53469/massena-town-planning-board-takes-no-action-at-data-center-meeting",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Remington Factory Redevelopment AI Data Center",
    "state": "New York",
    "city": "Ilion",
    "county": "Herkimer County",
    "region": null,
    "status": "planned",
    "sponsors": "Turin Hoefler Avenue LLC; Turin Management LLC",
    "operators": "Turin Hoefler Avenue LLC; Turin Management LLC",
    "tenants": null,
    "totalSquareFeet": 500000.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DEC received Brownfield Cleanup Program applications from Turin Hoefler Avenue LLC for five Remington sites at 14 Hoefler Avenue in German Flatts / Village of Ilion. Reporting citing DEC filings says Sites C and E are planned as data center developments, with a substation on Site D, approximately 200 MW total and $2B-$3B investment. NYISO queue lists Turin Management LLC load requests for Remington Factory Redevelopment, including 100 MW initial and 400 MW incremental requests, so later interconnection sizing may exceed 200 MW. [Source: https://content.govdelivery.com/accounts/NYSDEC/bulletins/410ae6a | https://www.datacenterdynamics.com/en/news/former-remington-gun-factory-in-new-york-set-to-become-200mw-data-center/ | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx; Date: 2026-04-01; 2026-04-20; 2026-06-15]; Sources: https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/ https://extapps.dec.ny.gov/data/DecDocs/C622036C/ https://dcpulse.com/projects/companyprofiles/turin-management-data-center https://ny1.com/nyc/bronx/business/2026/04/17/developer-eyes-ai-data-center-at-former-remington-arms-site",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Kenwood Tech Center",
    "state": "New York",
    "city": "Albany",
    "county": "Albany County",
    "region": null,
    "status": "planned",
    "sponsors": "EKG Group LLC; Guild Ventures",
    "operators": "EKG Group LLC; Guild Ventures",
    "tenants": null,
    "totalSquareFeet": 500000.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": null,
    "investmentUSD": 2800000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-21",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; edge; enterprise; government",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Guild Ventures, owner of the former Kenwood Commons / Doane Stuart property, filed an NYISO application to use 180 MW for a mixed-use proposal that now includes a data center. The developer characterized 180 MW as a theoretical ceiling for the entire development and described the tech-center component as a boutique edge-scale colocation center serving local institutions and employers. Rockefeller Institute reported in June 2026 that no city permit applications had been submitted as of the first week of June and that data-center use would face local approval and zoning issues. NYISO's current queue lists EKG Group LLC / Kenwood Tech Center as a 180 MW load interconnection in Albany County with proposed initial backfeed in December 2028. [Source: https://cbs6albany.com/news/local/kenwood-commons-owner-asks-for-180mw-as-part-of-propertys-pitch-now-includes-data-center-doane-stuart-school-guild-datacenter-mixeduse-hyperscale-colocation-technology-sustainability-cooling-grid-redevelopment-nanotech-infrastructure-emissions | https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/ | https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx; Date: 2026-05-21; 2026-06-10; 2026-06-15]; QA 2026-07-19: Cleared the mixed-use development's theoretical 180 MW ceiling from data-center capacity.; Sources: https://www.timesunion.com/business/article/kenwood-owners-propose-2-8-billion-tech-campus-22289589.php https://www.timesunion.com/business/article/kenwood-commons-developer-says-data-center-22345098.php https://www.nysrc.org/wp-content/uploads/2026/01/8.1-DER-Report-for-Jan-2026-for-NYSRC-Exec-Committee-Attachment-8.1.pdf",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Drox Rural Hall Data Center (Project Iron Spur)",
    "state": "North Carolina",
    "city": "Rural Hall",
    "county": "Forsyth County",
    "region": null,
    "status": "planned",
    "sponsors": "The Drox Group",
    "operators": "The Drox Group",
    "tenants": null,
    "totalSquareFeet": 1122300.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-25",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The Drox Group requested rezoning for a hyperscale data center on 129 acres across from Rural Hall Town Hall; on June 11, 2026, the Winston-Salem/Forsyth County Planning Board recommended denial after a public hearing. The developer described revisions including lower building height for one building, a public recreation area, noise below 60 decibels, and minimized water consumption; final county action was still pending in the cited report. [Source: https://www.wunc.org/2026-06-11/planning-board-recommends-denying-rezoning-for-proposed-rural-hall-data-center; Date: 2026-06-11]; Sources: https://www.cityofws.org/3659/2026-City-County-Planning-Board-Items https://www.ruralhallinfo.com/project-iron-spur/ https://supportironspur.com/ https://www.cityofws.org/DocumentCenter/View/41920/F-1669-PDF https://www.datacenterdynamics.com/en/news/property-developer-drox-looking-to-build-129-acre-data-center-near-greensboro-north-carolina/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Eco TIP West Moncure Data Center",
    "state": "North Carolina",
    "city": "Moncure",
    "county": "Chatham County",
    "region": null,
    "status": "planned",
    "sponsors": "Eco TIP West LLC; Lee-Moore Capital",
    "operators": "Eco TIP West LLC; Lee-Moore Capital",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 750.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": null,
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "crypto",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Eco TIP West sued Chatham County after the county adopted a one-year data center moratorium, arguing that its planned 750 MW data center for cryptocurrency mining at the Moncure megasite was allowed by existing heavy-industrial zoning and that the company had spent about $11.3 million before the moratorium dispute. [Source: https://businessnc.com/bradley-led-firm-sues-over-chatham-data-center-moratorium/; Date: 2026-04-27]; Sources: https://nsjonline.com/wp-content/uploads/2026/04/26CV000456-180_COMPLAINT_without-exhibits.pdf https://www.datacenterdynamics.com/en/news/data-center-developer-sues-north-carolina-county-after-it-passes-one-year-moratorium/ https://baxtel.com/data-center/eco-tip-west-new-hill-nc https://www.wunc.org/environment/2026-08-18/chatham-county-enbridge-pipeline-gas-data-center https://www.newsobserver.com/news/business/article315547697.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "River Run Energy Center Data Center Campus",
    "state": "North Dakota",
    "city": "Stanton area",
    "county": "Mercer County",
    "region": null,
    "status": "planned",
    "sponsors": "Basin Electric Power Cooperative; NextEra Energy Resources; Roughrider Electric Cooperative; Upper Missouri Power Cooperative",
    "operators": "Basin Electric Power Cooperative; NextEra Energy Resources; Roughrider Electric Cooperative; Upper Missouri Power Cooperative",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1450.0,
    "itLoadMW": null,
    "investmentUSD": 18000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Basin Electric reported on 2026-04-09 that it and NextEra Energy Resources are exploring River Run Energy Center, a 1,450 MW combined-cycle natural gas generation facility and associated multi-gigawatt data center campus in Mercer County. The project includes both the gas generator and data center and is expected to bring over $18 billion in new investment, about 230 permanent full-time jobs, and an estimated $15 million in annual property tax revenue for Mercer County. Because the data center campus is described only as multi-gigawatt, powerCapacityMW is left null rather than recording the 1,450 MW generation plant as data center capacity. [Source: https://www.basinelectric.com/news-center/news-briefs/Basin-Electric-and-NextEra-Energy-Resources-hold-an-open-house-for-proposed-River-Run-Energy-Center; Date: 2026-04-09]; Sources: https://www.nexteraenergyresources.com/river-run-energy-center/faq.html https://www.basinelectric.com/News-Center/news-releases/Basin-Electric-Power-Cooperative-and-NextEra-Energy-Resources-announce-collaboration-to-bring-responsible-growth-jobs-and-economic-benefits-to-North-Dakota-through-development-of-the-River-Run-Energy-Center https://dakotagas.com/News-Center/news-briefs/Basin-Electric-and-NextEra-Energy-Resources-hold-an-open-house-for-proposed-River-Run-Energy-Center https://newsroom.nexteraenergy.com/2025-12-08-NextEra-Energy-Resources-and-Basin-Electric-Power-Cooperative-announce-collaboration-to-bring-responsible-growth%2C-jobs-and-economic-benefits-to-North-Dakota-through-development-of-the-River-Run-Energy-Center?l=12",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Fighting Pike",
    "state": "North Dakota",
    "city": "Williston",
    "county": "Williams County",
    "region": null,
    "status": "planned",
    "sponsors": "Critical Data House; Intermountain IG",
    "operators": "Critical Data House; Intermountain IG",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 455.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-03-17",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported on 2025-03-28 that Critical Data House submitted plans for Project Fighting Pike, a 300-acre Williston campus totaling seven 65 MW buildings, or 455 MW, with closed-loop direct-to-chip liquid cooling. KFYR reported on 2025-03-26 that Williston city commissioners approved plans for the Fighting Pike Data Center north of town, with phase one expected by the end of 2026 and full buildout by 2031. Minot Daily News again identified Critical Data House's Williston proposal in a 2026-05-07 North Dakota data-center roundup. [Source: https://www.datacenterdynamics.com/en/news/455mw-data-center-campus-proposed-in-north-dakota/; Date: 2025-03-28]; QA 2026-07-18: Set project investment to the reported $5B development component; a separate estimated $5B of tenant IT hardware is excluded.; Sources: https://cms3.revize.com/revize/williston/Staff%20Report_FP_20250310_Final.pdf https://cms3.revize.com/revize/williston/Pike%20Fiber%20Narrative.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Bitdeer Shalersville Data Center Campus",
    "state": "Ohio",
    "city": "Shalersville Township",
    "county": "Portage County",
    "region": null,
    "status": "planned",
    "sponsors": "Bitdeer; Geis Development",
    "operators": "Bitdeer; Geis Development",
    "tenants": null,
    "totalSquareFeet": 793500.0,
    "powerCapacityMW": 750.0,
    "itLoadMW": null,
    "investmentUSD": 300000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-27",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "News 5 reported Bitdeer has a contract to buy about 257 acres at Turnpike Commerce Center for a 15-building AI computing hub in partnership with Geis. The first phase would have 150 MW of capacity, with potential expansion to 750 MW if fully built. Reported construction cost is more than $300 million, excluding equipment. Shalersville's data center moratorium runs until early November 2026 and would need to expire or be lifted before the project can proceed. [Source: https://www.news5cleveland.com/news/local-news/local-developer-global-tech-firm-plan-major-data-center-project-in-portage-county; Date: 2026-05-27]; Sources: https://theportager.com/standing-room-crowd-lashes-out-at-ai-data-center-reps-in-town-hall-meeting https://www.datacenterdynamics.com/en/news/bitdeer-looks-to-develop-750mw-data-center-campus-in-ohio/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Panattoni Perry Township Data Center",
    "state": "Ohio",
    "city": "Perry Township",
    "county": "Stark County",
    "region": null,
    "status": "planned",
    "sponsors": "Panattoni Development Company; Amazon",
    "operators": "Panattoni Development Company; Amazon",
    "tenants": null,
    "totalSquareFeet": 756000.0,
    "powerCapacityMW": 240.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-15",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-04",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Ideastream reported Panattoni's plan for a 240 MW data center on more than 100 acres at Faircrest Street SW and Kropf Avenue in Perry Township. WHBC reported on June 11, 2026, that the Stark County Board of Commissioners approved the project 2-0, after Perry Township trustees and Canton had approved related JEDD terms, and that local officials identified it as an Amazon data center. [Source: https://www.ideastream.org/environment-energy/2026-04-15/some-stark-county-residents-skeptical-of-developers-answers-on-data-center-project; https://www.whbc.com/perry-data-center-gets-county-ok/; Date: 2026-04-15; 2026-06-11]; Sources: https://www.perrytwp.com/Documents/Departments/Administration/FAQs%20Data%20Center%20April%202026.pdf?t=202604211620460 https://bluewaterhealthyliving.com/news/national-news/ohio/open-house-for-perry-township-data-center-sheds-light-on-incoming-user/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "AWS Wilmington Data Center Campus",
    "state": "Ohio",
    "city": "Wilmington",
    "county": "Clinton County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 1920299.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 4000000000.0,
    "sizeNotes": "Nine principal data center buildings totaling 1,920,299 square feet on a 471-acre parcel.",
    "announcedDate": "2025-11-25",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Clinton County Port Authority's project FAQ says AWS is proposing a hyperscale campus at 1488 S US 68 on a 471-acre parcel. The campus would include nine principal data center buildings totaling 1,920,299 square feet. Local project materials describe about $4 billion of investment and more than $25 million of AWS-funded shared public infrastructure; the FAQ was updated in January and March 2026 with public-meeting, site, cooling, noise, and water details. [Source: https://www.chooseclintoncountyoh.org/news/data-center-faqs; Date: 2026-01-28]; QA 2026-07-18: Added the building-area total disclosed in the Clinton County project FAQ.; Sources: https://www.chooseclintoncountyoh.org/media/userfiles/subsite_172/files/Proposed%20Investment%20by%20Amazon%20Data%20Services%20-%20Wilmington%20City%20Council%20-%20November%2025%2C%202025.pdf",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "EdgeConneX New Albany Data Center Campus",
    "state": "Ohio",
    "city": "New Albany",
    "county": "Licking County",
    "region": null,
    "status": "under-construction",
    "sponsors": "EdgeConneX; PowerConneX",
    "operators": "EdgeConneX; PowerConneX",
    "tenants": null,
    "totalSquareFeet": 1225000.0,
    "powerCapacityMW": 430.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-14",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-09",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported that EdgeConneX affiliate PowerConneX proposed a third on-site natural gas plant to power a planned New Albany data center campus. The 430 MW figure is proposed on-site generation capacity, not confirmed IT load. EdgeConneX's PowerConneX II project page describes a natural-gas-fired generation facility on about 48.9 acres with up to 216 MW intended to serve a data center on the same site. [Source: https://www.datacenterdynamics.com/en/news/edgeconnex-affiliate-proposes-430mw-natural-gas-plant-to-power-data-center-campus-in-new-albany-ohio/; https://www.edgeconnex.com/pcx-new-albany-energy-center-ii/; Date: 2026-04-14]; Sources: https://newalbanyohio.org/wp-content/uploads/2025/12/11.04.2025-2026-ANNUAL-BUDGET-PROGRAM-PROPOSED.pdf https://newalbanybusiness.org/news/2025/09/city-partner-vantrust-named-developer-of-year/ https://www.gongwer-oh.com/public/EDGECONNEX_INC_Scope.pdf https://newalbanyohio.org/natural-gas-power/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "EdgeConneX Ashville Data Center Campus",
    "state": "Ohio",
    "city": "Ashville",
    "county": "Pickaway County",
    "region": null,
    "status": "planned",
    "sponsors": "EdgeConneX",
    "operators": "EdgeConneX",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1800.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-02-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Ashville officials denied EdgeConneX's annexation request for a larger data center project in February 2026. The company planned a 680-acre campus across two parcels, owned about 200 acres in Ashville, and sought annexation of a neighboring roughly 490-acre parcel for a 1.8 GW substation and several data center buildings. The denial may require EdgeConneX to rethink size, capacity, and site plan; it was not reported as a full cancellation of the already owned Ashville parcel. [Source: https://www.datacenterdynamics.com/en/news/local-authorities-in-ashville-ohio-deny-annexation-request-for-data-center-project/; Date: 2026-02-05]; Sources: https://www.supremecourt.ohio.gov/pdf_viewer/pdf_viewer.aspx?pdf=1006385.pdf&source=DL_Clerk&subdirectory=2026-0906%5CDocketItems https://www.powerprogress.com/news/data-center-debut-for-wartsila-34sg-engine/8119270.article?zephr_sso_ott=KNDM17 https://www.wartsila.com/are/media/news/16-04-2026-wartsila-s-34sg-engine-makes-its-data-center-debut-with-new-412-mw-u-s-project-3740972 https://www.sciotopost.com/ashville-hosts-town-hall-on-annexation-data-center-plans-and-looming-water-infrastructure-crisis/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Open Sky",
    "state": "Oklahoma",
    "city": "Piedmont",
    "county": "Canadian County",
    "region": null,
    "status": "planned",
    "sponsors": "Cloverleaf Infrastructure; Cimarron ProjectCo LLC; Cimmaron DevCo LLC",
    "operators": "Cloverleaf Infrastructure; Cimarron ProjectCo LLC; Cimmaron DevCo LLC",
    "tenants": null,
    "totalSquareFeet": 2116800.0,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-05",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Cloverleaf's Project Open Sky is a proposed 633.55-acre Piedmont Technology & Energy Campus in Canadian County. The city PUD packet lists the applicant/developer entities and describes a data center, technology R&D, utility/service, and power-generation campus; the project website describes an over $1 billion taxable investment. KOKH reported on June 1, 2026 that the proposed Cloverleaf campus would require 1.5 GW of power and that the Piedmont Planning Commission recommended denial to the City Council. [Source: https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review; Date: 2026-06-01]; Sources: https://openskydatacenter.com/ https://www.piedmont-ok.gov/DocumentCenter/View/947/Project-Open-Sky---PUD https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/ https://openskydatacenter.com/cloverleaf-infrastructure-seeks-to-bring-project-open-sky-data-center-to-piedmont-along-with-millions-in-community-benefits/ https://cimarronelectric.com/2026/05/07/member-update/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Beltline Energy Yukon Data Center",
    "state": "Oklahoma",
    "city": "Yukon",
    "county": "Canadian County",
    "region": null,
    "status": "planned",
    "sponsors": "Beltline Energy; BLE Landholdings LLC",
    "operators": "Beltline Energy; BLE Landholdings LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-08",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Beltline Energy is pursuing a $1 billion hyperscale data center on 184 acres in Yukon along Route 66 west of the city's commercial core. The Journal Record reported that the August 2025 land sale and NDA process have triggered a mayoral recall effort and that water-agreement issues remain contested as of June 2026. [Source: https://journalrecord.com/2026/06/11/yukon-data-center-recall-effort-billion-dollar-project/; Date: 2026-06-11]; QA 2026-07-19: Retained the reported $1B proposal value and cleared unsupported exact power capacity.; Sources: https://okenergytoday.com/2025/08/data-center-proposed-in-yukon/ https://okenergytoday.com/2025/11/yukon-city-leaders-say-a-data-center-is-still-in-the-works/ https://investigatemidwest.org/2026/07/14/oklahoma-data-centers-water-use-loophole/ https://www.okenergytoday.com/2025/08/data-center-proposed-in-yukon/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Project Mustang Claremore Data Center",
    "state": "Oklahoma",
    "city": "Claremore",
    "county": "Rogers County",
    "region": null,
    "status": "planned",
    "sponsors": "Beale Infrastructure",
    "operators": "Beale Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Claremore's Project Mustang is a Beale Infrastructure data center campus planned for the Claremore Industrial Park. The City of Claremore posted the Claremore Mustang Data Center Economic Development Project Plan for May 4 and May 18, 2026 public hearings; KJRH reported that the City Council approved the tax incentive district and development plan, and quoted the city manager saying the deal could generate more than $400 million over 30 years without a utility-rate increase or new tax. [Source: https://www.kjrh.com/news/local-news/claremores-project-mustang-moves-forward-residents-split-on-data-center-development; Date: 2026-05-19]; Sources: https://bealeinfra.com/location/claremore/ https://claremore.com/news/city-council-approves-tax-increment-district-agreement-for-claremore-data-center-project/ https://claremore.com/datacenterprojectplan/ https://bealeinfra.com/locations/ https://krmg.com/2026/01/06/city-of-claremore-in-discussions-for-potential-data-center-project/ https://claremore.com/project-mustang-faq/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Potentia Oklahoma Campus 02",
    "state": "Oklahoma",
    "city": "Inola",
    "county": "Rogers County",
    "region": null,
    "status": "planned",
    "sponsors": "Potentia Inc.; Potentia Tulsa 1 LLC",
    "operators": "Potentia Inc.; Potentia Tulsa 1 LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 2000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-31",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Potentia's website lists Campus 02 in Oklahoma as a 2.0 GW development with Building 1 targeted for Q2 2027. Local reporting by Joe Crivelli ties the project to recent land acquisitions around Inola, including the JD Ranch area, and to a May 2026 Tulsa Port of Authority-Rogers County agenda item for a second amendment to a purchase agreement with Potentia Tulsa 1 LLC. [Source: https://www.joecrivelli.com/p/the-data-center-coming-to-inola-oklahoma; Date: 2026-05-31]; Sources: https://rockypointpark.org/ https://www.potentia.inc/parks/ https://www.joecrivelli.com/p/an-update-on-the-data-center-coming",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Lower Mount Bethel Tech Center",
    "state": "Pennsylvania",
    "city": "Lower Mount Bethel Township",
    "county": "Northampton County",
    "region": null,
    "status": "planned",
    "sponsors": "Peron Development; J.G. Petrucci Company",
    "operators": "Peron Development; J.G. Petrucci Company",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 5500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-26",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Peron Development and J.G. Petrucci Company announced they are developing a Lower Mount Bethel data center campus proposal. Later local reporting placed the proposal along Gravel Hill Road and Martins Creek Belvidere Highway and said the township planning commission was scheduled to review it on March 17. No reliable investment or MW figure was used from the cited source. [Source: https://lvb.com/proposed-lower-mt-bethel-data-center-rural-preservation/; Date: 2026-02-26]; Sources: https://www.expotechdatacenters.com/2026/07/12/we-dont-want-it-residents-tell-developers-eyeing-5-5b-data-center-in-slate-belt/ https://yournews.com/2026/04/17/6806405/i-dont-want-you-say-residents-fuming-data-center-farm/ https://www.lehighvalleypublicmedia.org/news/business/as-data-center-boom-approaches-lehigh-valley-officials-working-to-prepare/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Pennhurst Data Center",
    "state": "Pennsylvania",
    "city": "Spring City",
    "county": "Chester County",
    "region": null,
    "status": "canceled",
    "sponsors": "Penn Hurst Holdings DE LLC",
    "operators": "Penn Hurst Holdings DE LLC",
    "tenants": null,
    "totalSquareFeet": 1889300.0,
    "powerCapacityMW": 550.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "East Vincent Township supervisors unanimously denied Penn Hurst Holdings DE LLC's conditional-use application for a proposed 1.9 million-square-foot data center project at the former Pennhurst property near the Schuylkill River and Southeastern Veterans Center. The township project page confirms the conditional-use application covered parcels commonly referred to as 1205 Commonwealth Drive. [Source: https://www.foodandwaterwatch.org/2026/05/22/east-vincent-pa-supervisors-unanimously-reject-data-center-proposal/; Date: 2026-05-22]; Sources: https://www.eastvincent.org/vertical/sites/%7B5B8F1E55-6CA8-450E-BB40-12A8385B1313%7D/uploads/02_16_2026_GFT_CU_Review_w._TPD.pdf https://www.eastvincent.org/vertical/sites/%7B5B8F1E55-6CA8-450E-BB40-12A8385B1313%7D/uploads/East_Vincent_Township_-_CU-03-26-18866_-_Review_Letter.pdf https://www.baxtel.com/data-center/pennhurst-data-center https://www.springford.press/article/east-vincent-supervisors-deny-data-center-proposal-for-pennhurst-site https://www.eastvincent.org/index.asp?DE=66A36F14-8175-4B3D-8A4D-23727AFD8324&SEC=015E8651-3650-4039-87BA-9B4C74591337 https://www.eastvincent.org/vertical/sites/%7B5B8F1E55-6CA8-450E-BB40-12A8385B1313%7D/uploads/3_2026-03-11_-_Traffic_Statement_for_Conditional_Use_Application.pdf https://newprojectmedia.com/interview-data-center-developers-outline-plans-for-multi-billion-dollar-campus-at-historic-pennhurst-asylum-site-in-pa/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Atlas",
    "state": "Pennsylvania",
    "city": "South Whitehall Township",
    "county": "Lehigh County",
    "region": null,
    "status": "planned",
    "sponsors": "Edged Data Centers; CDE Acquisitions LLC; Jeras Corporation",
    "operators": "CDE Acquisitions LLC; Jeras Corporation",
    "tenants": null,
    "totalSquareFeet": 1556700.0,
    "powerCapacityMW": 725.0,
    "itLoadMW": null,
    "investmentUSD": 9000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030-04",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Edged's Project Atlas is still planned for roughly 410 acres at 2493 N. Cedar Crest Boulevard in South Whitehall Township, with the current plan scaled back to three buildings totaling about 1.5 million square feet and 725 MW, down from six buildings and more than 5.1 million square feet. DCD says earlier documents cited up to $9 billion of investment; retain that as an upper-bound prior estimate rather than confirmed scaled-back capex. [Source: https://www.datacenterdynamics.com/en/news/edged-eyes-725mw-data-center-campus-in-pennsylvania/; Date: 2026-07-08]; Sources: https://www.southwhitehall.com/Home/Components/Calendar/Event/2254/3?curm=6&cury=2026 https://www.lehighvalleypublicmedia.org/news/all/hyperscale-data-center-back-on-the-agenda-in-south-whitehall-township/ https://www.southwhitehall.com/home/showpublisheddocument/5988/639149533856230000",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Green Mountain",
    "state": "Pennsylvania",
    "city": "Archbald",
    "county": "Lackawanna County",
    "region": null,
    "status": "planned",
    "sponsors": "Project Green Mountain developer not publicly disclosed",
    "operators": "Project Green Mountain developer not publicly disclosed",
    "tenants": null,
    "totalSquareFeet": 1932000.0,
    "powerCapacityMW": 525.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-01-26",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Archbald Borough lists Project Green Mountain (Stavola Quarry) as a data center campus conditional-use application received January 26, 2026, with hearings held or scheduled on March 19 and May 11. Local coverage says residents packed the March 19 public hearing. [Source: https://www.archbaldpa.gov/departments/conditional_use_applications/index.php; Date: 2026-05-11]; Sources: https://www.yahoo.com/news/articles/archbald-hearing-reveals-project-green-000600690.html https://cms2.revize.com/revize/boroughofarchbaldpa/Documents/Government/Agendas%20and%20Minutes/2026/Agendas/Planning%20Commission/February%202026%20Agenda%20WS.pdf?t=202602020936120 https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Gravity",
    "state": "Pennsylvania",
    "city": "Archbald",
    "county": "Lackawanna County",
    "region": null,
    "status": "planned",
    "sponsors": "Archbald 25 Developer LLC; Western Hospitality Partners",
    "operators": "Archbald 25 Developer LLC; Western Hospitality Partners",
    "tenants": null,
    "totalSquareFeet": 1620000.0,
    "powerCapacityMW": 186.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-04",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Proposed Archbald data center campus on just over 186 acres, with six or seven two-story data center buildings depending on plan source. In 2026 reporting, the project remained in permitting/local approval disputes; state fast-track processing was reportedly on hold pending additional documentation, and tree clearing had occurred before earth-disturbance permits were issued. [Source: https://www.washingtonpost.com/nation/2026/04/26/archbald-pennsylvania-data-centers/; Date: 2026-04-26]; Sources: https://www.datacenterdynamics.com/en/news/plans-filed-for-16-million-sq-ft-data-center-campus-in-northeast-pennsylvania/ https://www.wvia.org/news/local/2026-05-01/fast-track-no-more-pa-kicks-archbald-data-center-campus-off-permit-program https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county https://www.pa.gov/agencies/dep/dep-regions/northeast-regional-office",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Wildcat Ridge AI Data Center Campus",
    "state": "Pennsylvania",
    "city": "Archbald",
    "county": "Lackawanna County",
    "region": null,
    "status": "planned",
    "sponsors": "Cornell Realty Management; LaBella Associates",
    "operators": "Cornell Realty Management; LaBella Associates",
    "tenants": null,
    "totalSquareFeet": 17200000.0,
    "powerCapacityMW": 1600.0,
    "itLoadMW": null,
    "investmentUSD": 2100000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Wildcat Ridge is a proposed Archbald data center campus on a roughly one-square-mile or 400-plus-acre wooded tract, with plans reported for 14 three-story data center buildings. DeSmog reported the zoning application indicated a 1.6 GW power need; other local reporting describes a $2.1 billion investment estimate and continuing 2026 public hearings. [Source: https://www.desmog.com/2026/03/11/data-centers-are-poised-to-engulf-a-pennsylvania-town/; Date: 2026-03-11]; Sources: https://www.datacenterdynamics.com/en/news/21bn-data-center-campus-proposed-in-archbald-pennsylvania/ https://jsg.legis.state.pa.us/resources/documents/ftp/publications/2026-01-28%202023%20HR170%20web%201.29.26.pdf https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county https://www.wvia.org/news/local/2026-01-29/archbald-council-hears-from-data-center-developer-eyeing-500-acre-site-possible-mine-water-use",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Liberty (Stream Data Centers Marion County)",
    "state": "South Carolina",
    "city": "Marion",
    "county": "Marion County",
    "region": null,
    "status": "canceled",
    "sponsors": "Stream Data Centers",
    "operators": "Stream Data Centers",
    "tenants": null,
    "totalSquareFeet": 4000000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 2400000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Stream Data Centers announced it would no longer move forward with Project Liberty in Marion County, citing utility timing constraints; the project had been passed by Marion County Council in January 2026 after non-disclosure agreements limited public disclosure. [Source: https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/; Date: 2026-06-11]; Sources: https://www.streamdatacenters.com/project-liberty/ https://www.datacenterdynamics.com/en/news/stream-data-centers-pulls-out-of-800m-south-carolina-data-center-says-utility-power-would-take-too-long/ https://www.thestate.com/news/local/environment/article316090463.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Spero (TigerDC SC1)",
    "state": "South Carolina",
    "city": "Spartanburg County (unincorporated)",
    "county": "Spartanburg County",
    "region": null,
    "status": "canceled",
    "sponsors": "TigerDC",
    "operators": "TigerDC",
    "tenants": null,
    "totalSquareFeet": 267000.0,
    "powerCapacityMW": 100.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-11-17",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "TigerDC formally withdrew Project Spero from consideration in Spartanburg County and said it would evaluate alternative sites after community opposition; the county had adopted a resolution backing the project on November 17, 2025, held a public hearing and second reading on February 16, 2026, and called a February 27 special meeting when the third reading appeared unlikely to proceed. [Source: https://spectrumlocalnews.com/sc/south-carolina/news/2026/02/27/data-center-proposal-withdrawn-in-spartanburg-county; Date: 2026-02-27]; Sources: https://projectspero.ai/ https://www.datacenterdynamics.com/en/news/tigerdc-pulls-planned-data-center-project-from-south-carolina-county-after-officials-deny-tax-deal/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Cielo Digital Infrastructure Cherokee County Campus",
    "state": "South Carolina",
    "city": "Gaffney",
    "county": "Cherokee County",
    "region": null,
    "status": "planned",
    "sponsors": "Cielo Digital Infrastructure",
    "operators": "Cielo Digital Infrastructure",
    "tenants": null,
    "totalSquareFeet": 1600000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 2100000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-06-24",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Cielo selected Cherokee County for its first South Carolina development, an approximately $2.1 billion data center at 000 Ford Road in Gaffney with four roughly 400,000-square-foot facilities and an associated electrical substation; initial operations were expected online by year-end 2028. [Source: https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development; Date: 2025-06-24]; Sources: https://www.datacenterdynamics.com/en/news/cielo-digital-infrastructure-plans-300mw-data-center-campus-in-south-carolina/ https://www.dcbyte.com/facility/gaffney/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Eagle Rock Partners Colleton County Data Center Campus",
    "state": "South Carolina",
    "city": "Walterboro area",
    "county": "Colleton County",
    "region": null,
    "status": "planned",
    "sponsors": "Eagle Rock Partners; Thomas & Hutton; Weyerhaeuser Company",
    "operators": "Eagle Rock Partners; Thomas & Hutton; Weyerhaeuser Company",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Thomas & Hutton and Eagle Rock Partners proposed an approximately 850-acre data center campus on rural timberland along Cooks Hill Road south of Walterboro in the ACE Basin; the site plan included nine large industrial buildings, more than 200 acres of wetlands within the project area, and possible expansion across a larger 2,600-acre tract. The proposal required a Colleton County Board of Zoning Appeals special exception, and the cited March 2026 source said no public hearing had yet been scheduled. [Source: https://www.scelp.org/news/colleton-data-center; Date: 2026-03-06]; Sources: https://www.colletoncounty.org/sites/default/files/uploads/agendas/2025.12.18_zba-agenda_hs.pdf https://www.selc.org/wp-content/uploads/2026/01/2026cp1500021-Summons-Complaint-and-Petition.pdf https://www.fitsnews.com/2025/12/19/ace-basin-data-center-draws-ire-at-zoning-appeals-meeting/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "DataBank South Dallas / Red Oak Campus",
    "state": "Texas",
    "city": "Red Oak",
    "county": "Ellis County",
    "region": null,
    "status": "under-construction",
    "sponsors": "DataBank",
    "operators": "DataBank",
    "tenants": null,
    "totalSquareFeet": 600000.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; colocation; enterprise; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DataBank announced a $2.0 billion construction loan for the first three of eight planned data centers on its new Red Oak campus. The first three buildings, DFW9, DFW10, and DFW11, have been leased and total 600,000 square feet and 180 MW; the financing accelerates construction and delivery by about 18 months. [Source: https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/; Date: 2026-04-21]; QA 2026-07-18: Added the disclosed 600,000-square-foot first-three-building total and cleared $2.0 billion from investment because DataBank identifies it as construction financing.; Sources: https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/ https://www.databank.com/resources/press-releases/databank-announces-development-of-480mw-data-center-campus-in-south-dallas/ https://www.tdlr.texas.gov/TABS/Search/Print/TABS2024020821",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "CloudBurst Central Texas Flagship Campus",
    "state": "Texas",
    "city": "San Marcos / New Braunfels area",
    "county": "Hays County; Guadalupe County",
    "region": null,
    "status": "under-construction",
    "sponsors": "CloudBurst Data Centers; Evolve Holdings; Data Center LB LP",
    "operators": "CloudBurst Data Centers; Evolve Holdings; Data Center LB LP",
    "tenants": null,
    "totalSquareFeet": 3000000.0,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 14500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; enterprise; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Guadalupe County approved a development agreement and estimated $500 million tax abatement for CloudBurst's 706-acre Central Texas campus. Reporting cites a planned $14.5 billion investment, 10 to 12 data center buildings totaling about 3 million square feet, three 400 MW phases, and an initial phase beginning in 2026 with completion expected in 2027. [Source: https://www.datacenterdynamics.com/en/news/706-acre-data-center-approved-for-development-outside-san-antonio-texas/; Date: 2026-04-22]; Sources: https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas https://ir.energytransfer.com/node/51471/pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Highlander SM One Francis Harris Lane Data Center",
    "state": "Texas",
    "city": "San Marcos",
    "county": "Hays County",
    "region": null,
    "status": "canceled",
    "sponsors": "Highlander SM One LLC; John Maberry affiliates",
    "operators": "Highlander SM One LLC; John Maberry affiliates",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 380.0,
    "itLoadMW": null,
    "investmentUSD": 1500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-17",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "San Marcos City Council voted 5-2 to deny land-use and rezoning changes for the proposed 199.49-acre Francis Harris Lane data center. Local reporting described a $1.5 billion proposal with five 76 MW buildings; the denial blocked the ordinances on first reading. [Source: https://universitystar.com/34645/news/city-council-votes-to-deny-francis-harris-lane-data-center-project/; Date: 2026-02-18]; Sources: https://san-marcos-tx.legistar.com/View.ashx?GUID=6A010949-0FA2-4BE8-B46C-8B4B7251F63B&ID=15057138&M=F https://www.sanmarcostx.gov/DocumentCenter/View/45853 https://www.datacenterdynamics.com/en/news/data-center-proposal-rejected-in-san-marcos-texas/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Edged Data Centers - Veale Ranch Fort Worth Campus",
    "state": "Texas",
    "city": "Fort Worth",
    "county": "Tarrant County",
    "region": null,
    "status": "planned",
    "sponsors": "Edged Data Centers; Endeavour; PMB Capital",
    "operators": "Edged Data Centers; Endeavour; PMB Capital",
    "tenants": null,
    "totalSquareFeet": 488770.0,
    "powerCapacityMW": 196.0,
    "itLoadMW": null,
    "investmentUSD": 1100000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Fort Worth considered but did not approve a city tax abatement for Edged's proposed Veale Ranch data center. The city delayed the March 31 vote, and Edged later rescinded the incentive application before the May 12 vote; KERA reported the facility itself remains proposed but its incentive status is unresolved. [Source: https://www.keranews.org/news/2026-05-18/as-fort-worth-prepares-to-hold-robust-discussions-on-growing-data-centers-residents-rally-together; Date: 2026-05-18]; Sources: https://edged.us/dallas https://www.star-telegram.com/news/local/article315814975.html https://municue.com/tx/tarrant-county/fort-worth/events/2026-03-04-city-council-to-consider-incentives-for-edc-fort-worth-llc https://www.datacenterdynamics.com/en/news/edged-eyes-second-dallas-fort-worth-campus/ https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026020386",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Black Mountain Fort Worth Data Center",
    "state": "Texas",
    "city": "Fort Worth",
    "county": "Tarrant County",
    "region": null,
    "status": "planned",
    "sponsors": "Black Mountain Energy; Black Mountain Power LLC; Fort Worth Power Core LLC",
    "operators": "Black Mountain Energy; Black Mountain Power LLC; Fort Worth Power Core LLC",
    "tenants": null,
    "totalSquareFeet": 2200000.0,
    "powerCapacityMW": 980.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-08",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Fort Worth Zoning Commission approved site-plan and signage changes for Black Mountain's southeast Fort Worth data center proposal, while related rezoning requests remained delayed. Local reporting describes more than 450 acres already rezoned, a planned 187-acre data center site, a 980 MW substation serving only the data center, and ongoing neighborhood opposition. [Source: https://www.keranews.org/news/2026-04-15/data-center-moves-forward-after-fort-worth-zoning-commission-vote; Date: 2026-04-15]; Sources: https://www.star-telegram.com/news/local/fort-worth/article315715413.html https://www.keranews.org/news/2026-04-15/data-center-moves-forward-after-fort-worth-zoning-commission-vote?_amp=true https://www.keranews.org/environment-nature/2025-10-01/data-center-on-431-acres-in-southeast-fort-worth-moving-forward-amid-environmental-concerns https://fortworthfuture.com/ https://www.star-telegram.com/csa-content/article315742446.html",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Crusoe Energy Nolan County Data Center",
    "state": "Texas",
    "city": "Sweetwater",
    "county": "Nolan County",
    "region": null,
    "status": "planned",
    "sponsors": "Crusoe Energy Systems",
    "operators": "Crusoe Energy Systems",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 7000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-13",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Nolan County commissioners approved a 10-year tax abatement for a Crusoe-led data center project. Local reporting describes a $7 billion, 200 MW facility expected to provide its own electricity, roughly 2,000 construction workers, and more than $3 million annually in PILOT payments plus more than $2 million annually in charitable contributions. [Source: https://ktxs.com/news/local/it-will-change-our-rural-town-tax-abatement-for-7-billion-texas-data-center-approved; Date: 2026-04-13]",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Project Aquila",
    "state": "Texas",
    "city": "Hillsboro area",
    "county": "Hill County",
    "region": null,
    "status": "planned",
    "sponsors": "RCM Hill LLC",
    "operators": "RCM Hill LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1235.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-28",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "RCM Hill sued Hill County over its May 2026 data-center moratorium, identifying Project Aquila as a proposed 1,235 MW data center campus. The developer said it had spent more than 16 months and nearly $1 million pursuing the project, secured contracts to buy more than 800 acres for more than $80 million, and obtained ERCOT electrical planning approvals; Hill County rescinded the moratorium on June 4 and replaced it with review requirements. [Source: https://www.keranews.org/energy-environment/2026-06-05/hill-county-drops-data-center-moratorium-after-lawsuit-adopts-new-review-requirements; Date: 2026-06-05]; Sources: https://ewscripps.brightspotcdn.com/54/ec/29d958b64382a3ae563a85139776/1.pdf https://www.tpr.org/news/2026-06-05/hill-county-drops-data-center-moratorium-after-lawsuit-adopts-new-review-requirements https://npr.brightspotcdn.com/0d/d0/b458a9064403a672d2ff490075e6/hill-county-lawsuit.pdf https://www.kwtx.com/2026/05/28/illegal-under-texas-law-data-center-developer-files-lawsuit-against-hill-county-moratorium/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "PowerHouse Austin / Caldwell Valley Data Center",
    "state": "Texas",
    "city": "Uhland area",
    "county": "Caldwell County",
    "region": null,
    "status": "planned",
    "sponsors": "PowerHouse Data Centers; Tract",
    "operators": "PowerHouse Data Centers; Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 700.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "PowerHouse is pursuing a roughly 500-acre data center development inside Tract's Caldwell Valley Technology Park near Uhland. DCD reported that PowerHouse filed a petition to release the proposed facility from Uhland's jurisdiction and proceed under Caldwell County jurisdiction; the broader Tract park is reported as capable of supporting up to 4 GW. [Source: https://www.datacenterdynamics.com/en/news/powerhouse-looking-to-build-500-acre-data-center-near-austin-texas/; Date: 2026-05-06]; Sources: https://www.bisnow.com/news/austin/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437 https://centexdatacenters.org/projects/powerhouse-data-center https://www.tract.com/news/tract-closes-on-two-incremental-acquisitions-adding-1458-acres-to-caldwell-valley-technology-park-in-caldwell-county-texas-bringing-total-campus-to-nearly-3000-acres/ https://www.co.caldwell.tx.us/page/article/1239",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Caldwell Valley Technology Park",
    "state": "Texas",
    "city": "Uhland / Lockhart area",
    "county": "Caldwell County",
    "region": null,
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 4000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-06-09",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Tract is developing a nearly 3,000-acre Caldwell Valley mega-campus in Caldwell County with reported capacity of about 4,000 MW and operations targeted for 2028. Regional reporting says the project is one of three Tract Austin-San Antonio corridor developments totaling about 3,600 acres and 5,200 MW. [Source: https://www.expressnews.com/business/article/texas-tract-data-centers-san-antonio-austin-22293012.php; Date: 2026-06-09]; Sources: https://www.tract.com/project/caldwellvalley/ https://www.tract.com/news/tract-closes-on-two-incremental-acquisitions-adding-1458-acres-to-caldwell-valley-technology-park-in-caldwell-county-texas-bringing-total-campus-to-nearly-3000-acres/ https://www.co.caldwell.tx.us/page/article/1239",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Applewhite Technology Park",
    "state": "Texas",
    "city": "San Antonio",
    "county": "Bexar County",
    "region": null,
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 720.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-06-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Tract is planning Applewhite Technology Park on San Antonio's South Side. Regional reporting describes the site as a 339-acre data center development with about 720 MW of capacity near Toyota and Texas A&M-San Antonio. [Source: https://www.expressnews.com/business/article/texas-tract-data-centers-san-antonio-austin-22293012.php; Date: 2026-06-09]; Sources: https://www.tract.com/project/applewhite/ https://www.expressnews.com/business/article/texas-tract-data-centers-san-antonio-austin-22293012.php/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Tract Medina Technology Park",
    "state": "Texas",
    "city": "Castroville area",
    "county": "Medina County",
    "region": null,
    "status": "planned",
    "sponsors": "Tract",
    "operators": "Tract",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-06-09",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Tract is planning Medina Technology Park adjacent to Microsoft's Castroville-area campus. Regional reporting describes the site as a 265-acre, 500 MW data center development in Medina County. [Source: https://www.expressnews.com/business/article/texas-tract-data-centers-san-antonio-austin-22293012.php; Date: 2026-06-09]; Sources: https://www.mysanantonio.com/business/article/data-centers-texas-22258766.php/ https://www.tract.com/project/medina-technology-park/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "EdgeConneX Cedar Creek Campus 2",
    "state": "Texas",
    "city": "Cedar Creek",
    "county": "Bastrop County",
    "region": null,
    "status": "planned",
    "sponsors": "EdgeConneX",
    "operators": "EdgeConneX",
    "tenants": null,
    "totalSquareFeet": 1459070.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1400000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-26",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "EdgeConneX filed two TDLR projects for EDCAUS11 and EDCAUS12 at 6682 FM 535 in Cedar Creek. Community Impact reported Campus No. 2 includes properties at 6682 and 6402 FM 535, about 951 acres, $1.4 billion in capital improvements, two currently proposed buildings, and seven additional buildings anticipated in later phases. [Source: https://communityimpact.com/austin/bastrop-cedar-creek/development/2026/06/09/town-halls-set-for-3-cedar-creek-data-centers-spanning-nearly-1500-acres/; Date: 2026-06-09]; Sources: https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026021187 https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026021191 https://communityimpact.com/bastrop-cedar-creek/government/edgeconnex-plans-second-data-center-campus-in-bastrop-county/ https://communityimpact.com/bastrop-cedar-creek/development/town-halls-set-for-3-cedar-creek-data-centers-spanning-nearly-1500-acres/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "QTS Eagle Mountain Data Center Campus",
    "state": "Utah",
    "city": "Eagle Mountain",
    "county": "Utah County",
    "region": null,
    "status": "under-construction",
    "sponsors": "QTS Data Centers; Layton Construction",
    "operators": "QTS Data Centers; Layton Construction",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 650.0,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-20",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Utah News Dispatch reported the 193-acre QTS campus in Eagle Mountain had topped out, was being built by Layton Construction and QTS Data Centers, included three buildings under construction since fall 2025, was expected to be completed later in 2026, and represented a $6 billion QTS commitment. Eagle Mountain City reported the first phase includes five data center buildings across about 193 acres and that crews placed the final beam on the first QTS building on April 17, 2026. The April 2026 Kem C. Gardner Policy Institute inventory lists QTS Eagle Mountain II in Utah/Fairfield as under construction in 2026 with 650 MW of nameplate capacity. [Source: https://www.newsfromthestates.com/article/eagle-mountain-193-acre-data-center-campus-set-be-done-year-big-water-promises | https://eaglemountain.gov/eagle-mountain-city-celebrates-major-milestone-with-qts-topping-out-ceremony/ | https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf; Date: 2026-04-17; 2026-04-20; 2026-04]; Sources: https://q.com/data-centers/eagle-mountain/ https://eaglemountain.gov/construction-restarts-on-qts-data-center-in-eagle-mountain/ https://q.com/news/layton-construction-and-qts-data-centers-celebrate-topping-out-of-data-center-campus-in-eagle-mountain/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "CyrusOne Dugway Proving Ground",
    "state": "Utah",
    "city": "Dugway Proving Ground",
    "county": "Tooele County",
    "region": null,
    "status": "planned",
    "sponsors": "CyrusOne; KKR; BlackRock; U.S. Army",
    "operators": "CyrusOne; KKR; BlackRock; U.S. Army",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-26",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; government; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The U.S. Army announced on March 26, 2026 that CyrusOne, a portfolio company jointly held by funds managed by KKR and BlackRock, was conditionally selected to enter exclusive negotiations for a commercial hyperscale data center on about 1,201 acres at Dugway Proving Ground. The Army described the selection as a major milestone but not a final deal, with initial operating capability at Dugway projected for fiscal year 2029. Cleanview's June 2026 project page reports 1,000 MW capacity and 2029 expected operation; the Army source is used for the dated primary approval/selection claim. [Source: https://www.army.mil/article/291360/army_reaches_conditional_agreement_with_private_industry_for_hyperscaled_data_centers | https://cleanview.co/data-centers/utah/2293/cyrusone-dugway-proving-ground; Date: 2026-03-26; 2026-06]; Sources: https://www.datacenterdynamics.com/en/news/us-army-taps-carlyle-and-cyrusone-to-develop-data-centers-on-army-owned-land/ https://www.bisnow.com/news/national/data-center-development/us-army-data-center-kkr-cyrusone-carlyle-133840 https://www.costar.com/article/902445188/pentagons-real-estate-mission-leasing-land-for-data-centers",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Nine Mile Data Center",
    "state": "Utah",
    "city": "Myton area",
    "county": "Duchesne County",
    "region": null,
    "status": "planned",
    "sponsors": "Nine Mile Data LLC; Energence Utah LLC; Jones and DeMille Engineering",
    "operators": "Nine Mile Data LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-11",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Jones and DeMille Engineering, on behalf of Energence Utah LLC, submitted a complete land-use application on March 11, 2026 for Nine Mile Data LLC to develop and operate a data center commercial use off Wells Draw Road in Duchesne County. The conditional-use permit covers four parcels totaling 960.32 acres and would be developed alongside separately reviewed solar and natural-gas power plant applications. Basin Now reported in April 2026 that appeals of the Planning Commission approval were scheduled before the County Commission. [Source: https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf | https://www.basinnow.com/public-hearing-scheduled-on-nine-mile-data-llc-conditional-use-permit/; Date: 2026-04-02; 2026-04]; Sources: https://duchesne.utah.gov/wp-content/uploads/2026/03/Wells-Draw-Energy-LLC-Natural-Gas-Power-Plant-Findings-Report-040226.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Google Botetourt County Data Center Campus",
    "state": "Virginia",
    "city": "Daleville",
    "county": "Botetourt County",
    "region": null,
    "status": "planned",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": 928000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-06-24",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Botetourt County's project page says Google publicly announced the Botetourt Center at Greenfield campus on June 24, 2025, bought a 312-acre parcel, submitted first grading permit applications in February 2026, and expects first data-center construction in calendar 2026 with first structure fit for occupancy in 2028. Google's project website describes three planned data center buildings, at least $10 million of expected annual local tax revenue per building, and at least 150 permanent on-site jobs once operational. Virginia Business reported a $3 billion project commitment by 2030. [Source: https://www.botetourtva.gov/1021/Google-Data-Center; https://www.botetourtcountydatacenter.com/; https://virginiabusiness.com/google-data-center-campus-botetourt-county-va/; Date: 2026; 2026; 2026-06-02]; Sources: https://www.nao.usace.army.mil/Media/News-Stories/Article/4428952/nao-2025-01857-project-raspberry-botetourt-virginia/ https://www.botetourtva.gov/1024/Google-Data-Center-Electricity https://www.deq.virginia.gov/news-info/shortcuts/topics-of-interest/google-s-project-raspberry https://aeptransmission.com/Virginia/DalevilleArea/docs/DalevilleArea_FactSheet%20FINAL.pdf https://www.datacenterdynamics.com/en/news/google-details-planned-data-center-in-botetourt-county-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Stack Infrastructure Berry Hill Megasite",
    "state": "Virginia",
    "city": "Berry Hill",
    "county": "Pittsylvania County",
    "region": null,
    "status": "planned",
    "sponsors": "Stack Infrastructure",
    "operators": "Stack Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 299.0,
    "itLoadMW": null,
    "investmentUSD": 100000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-18",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031-06",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Danville-Pittsylvania Regional Industrial Facility Authority approved a local performance agreement with Stack Infrastructure for a proposed data center campus at the Southern Virginia Megasite at Berry Hill. Agreement metrics require at least $73.5 billion investment and 2,050 jobs; Stack described a plan that could reach about $100 billion over three decades and 2,500 jobs over two decades. Stack said it could abandon the deal if Virginia's data center sales-and-use-tax exemption is eliminated. [Source: https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/; Date: 2026-05-18]; Sources: https://cardinalnews.org/2026/04/22/an-ai-data-center-at-megasite-will-create-2000-permanent-positions-pittsylvania-county-officials-promise/ https://www.wakg.com/2026/03/09/danville-pittsylvania-rifa-approves-sale-of-land-at-megasite-to-company-affiliated-with-data-centers/ https://cardinalnews.org/2026/05/19/a-data-center-project-in-pittsylvania-was-approved-monday-with-higher-investment-and-jobs-than-previously-announced/ https://www.datacenterdynamics.com/en/news/stack-set-to-acquire-site-in-pittsylvania-county-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Stack Infrastructure Stafford Technology Campus",
    "state": "Virginia",
    "city": "Stafford",
    "county": "Stafford County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Stack Infrastructure",
    "operators": "Stack Infrastructure",
    "tenants": null,
    "totalSquareFeet": 5500000.0,
    "powerCapacityMW": 1100.0,
    "itLoadMW": null,
    "investmentUSD": 4524000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-01-16",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Stack announced the 1+ GW Stafford Technology Campus in January 2025 as a 500-acre, four-subcampus development with 19 data centers and committed Dominion Energy power from six 300 MW substations. Data Center Dynamics reported on May 26, 2026 that Stack had topped out the first building, with 425,000-plus hours logged, about three million cubic yards of earth moved, and 4,000 feet of retaining walls built. At full build-out, the campus is reported to deliver over 1 GW across 19 data centers on 500 acres. [Source: https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/; https://www.datacenterdynamics.com/en/news/stack-tops-out-first-building-at-1gw-data-center-campus-in-stafford-county-virginia/; Date: 2025-01-16; 2026-05-26]; Sources: https://cdn.staffordcountyva.gov/Planning%20and%20Zoning/1%20IMPACT%20STATEMENT%20Stafford%20Technology%20Campus%2003-15-23.PDF https://www.datacenterdynamics.com/en/news/stack-plans-1gw-campus-in-stafford-county-virginia/ https://www.stackinfra.com/locations/americas/northern-virginia/stc/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Vantage VA4 Campus (Fredericksburg)",
    "state": "Virginia",
    "city": "Unknown",
    "county": "Stafford County",
    "region": null,
    "status": "planned",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 929000.0,
    "powerCapacityMW": 192.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-11-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Vantage announced a $2 billion, 192 MW VA4 campus in the Fredericksburg region, located in Stafford County. The campus will include three data centers on 82 acres totaling about 929,000 square feet, with the first building scheduled to open in late 2027. VEDP's November 7, 2025 release reports the same $2 billion investment and 50 permanent jobs. [Source: https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/; https://www.vedp.org/press-release/2025-11/vantage-stafford; Date: 2025-11-06; 2025-11-07]; Sources: https://vantage-dc.com/data-center-locations/north-america/fredericksburg-va https://vantage-dc.com/wp-content/uploads/2025/11/VDC_DataSheet_VA4_EN.pdf",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Province Group Powhatan Technology Park",
    "state": "Virginia",
    "city": "Powhatan",
    "county": "Powhatan County",
    "region": null,
    "status": "planned",
    "sponsors": "Province Group; Newport Equities LLC",
    "operators": "Province Group; Newport Equities LLC",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 365.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-10-27",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Powhatan County approved rezoning for a combined 181-acre campus off Page Road near Anderson Highway for a planned 2 million-square-foot data center. JLL described the combined campus as Powhatan Technology Park on 180 acres near Richmond with multiple transmission lines on site. Public project databases list planned capacity around 365 MW; this is third-party project tracking rather than an official county number. [Source: https://www.powhatanva.gov/DocumentCenter/View/9122/10292025-Press-Release---Data-Center; https://www.jll.com/en-us/newsroom/powhatan-county-approves-180-acre-data-center-development; https://cleanview.co/data-centers/virginia/1894/powhatan-technology-park; Date: 2025-10-29; 2025; 2026]; Sources: https://www.jll.com/en-us/newsroom/powhatan-county-greenlights-180-acre-data-center https://virginiabusiness.com/powhatan-approves-2-7b-data-center-campus/ https://www.datacenterdynamics.com/en/news/province-group-data-center-campus-gets-green-light-in-powhatan-county-virginia/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Meta Project Cornmaze Data Center - Beloit",
    "state": "Wisconsin",
    "city": "Beloit / Turtle",
    "county": "Rock County",
    "region": null,
    "status": "planned",
    "sponsors": "Panattoni Development Company; Cambrin LLC; Meta Platforms (reported, unconfirmed)",
    "operators": "Cambrin LLC; Meta Platforms (reported, unconfirmed)",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-05",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported that Panattoni had taken over the 430-acre Project Cornmaze proposal across the towns of Beloit and Turtle from Cambrin LLC, the entity previously tied by reporting to Meta's Wisconsin data-center filings. A June 9, 2026 update said Panattoni was seeking a cost-reimbursement agreement with the Town of Turtle, the board postponed consideration, and Panattoni characterized the project as still exploratory with no final decisions made. [Source: https://www.datacenterdynamics.com/en/news/real-estate-developer-panattoni-takes-over-meta-backed-data-center-proposal-in-southern-wisconsin/; https://www.datacenterdynamics.com/en/news/developer-panattoni-seeks-to-claw-back-cash-from-town-of-turtle-wisconsin-for-430-acre-data-center/; Date: 2026-05-19; 2026-06-09]; Sources: https://www.panattoni.com/cornmaze/ https://www.rockfordnewsfirst.com/2026/06/23/data-center-developer-sheds-light-1-billion-beloit-project-raising-community-concern/ https://www.wuwm.com/citizens-push-back-on-possible-data-center-in-town-of-beloit https://www.wpr.org/wp-content/uploads/2026/03/Request-Form_03135.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Viridian APECS Data Center Campus - Janesville",
    "state": "Wisconsin",
    "city": "Janesville",
    "county": "Rock County",
    "region": null,
    "status": "planned",
    "sponsors": "Viridian Partners; Viridian Acquisitions LLC",
    "operators": "Viridian Partners; Viridian Acquisitions LLC",
    "tenants": null,
    "totalSquareFeet": 3300000.0,
    "powerCapacityMW": 800.0,
    "itLoadMW": null,
    "investmentUSD": 8000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Janesville was negotiating with Viridian Partners for redevelopment of the former GM/JATCO site into an 800 MW, 11-building digital campus with a reported $8B investment. WTMJ reported the city was in a 120-day negotiation period for a purchase and sale agreement and that residents would vote on a referendum affecting large redevelopment decisions. Earlier WPR reporting described the site as a 250-acre brownfield and said Viridian would clean it up under a DNR-approved plan. [Source: https://wtmj.com/news/2026/02/10/janesville-residents-will-help-decide-future-of-a-proposed-data-center-via-referendum/; https://www.wpr.org/news/janesville-data-center-abandoned-gm-site; Date: 2026-02-10; 2025-11-12]; Sources: https://wtmj.com/wp-content/uploads/2026/02/Request-for-Proposal-RFP-Viridian-Partners.pdf https://www.forwardjanesville.com/blog/posts/looking-ahead-what-the-gm-jatco-decision-means-for-janesville",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Cassville Data Center Prospect",
    "state": "Wisconsin",
    "city": "Cassville",
    "county": "Grant County",
    "region": null,
    "status": "canceled",
    "sponsors": "Undisclosed",
    "operators": "Undisclosed",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-02-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Wisconsin Watch reported an undisclosed company was evaluating 400 to 500 acres in the town of Cassville for a possible $1B data center, described as very preliminary. By late April 2026, Cassville adopted an ordinance prohibiting data centers for up to two years and restricting land-use changes without town-board approval, effectively blocking the early-stage prospect unless circumstances change. [Source: https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/; https://wausaupilotandreview.com/2026/04/29/in-rural-wisconsin-a-town-rejects-a-plan-to-build-a-massive-data-center/; Date: 2026-02-09; 2026-04-29]; Sources: https://wisconsinwatch.org/2026/04/wisconsin-data-center-rural-town-cassville-rejects-plan-driftless-area-zoning/ https://civicmedia.us/news/2026/06/22/a-2-billion-proposal-then-silence-how-a-driftless-area-data-center-deal-fell-apart https://www.wglr.com/2026/04/02/proposed-data-center/",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Cloverleaf Wrightstown Data Center Prospect",
    "state": "Wisconsin",
    "city": "Wrightstown area",
    "county": "Brown County",
    "region": null,
    "status": "planned",
    "sponsors": "Cloverleaf Infrastructure",
    "operators": "Cloverleaf Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-19",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported on June 5, 2026 that Wrightstown's Village Board voted to hold a non-binding August 11 referendum on whether village officials should pursue data center projects after concerns about Cloverleaf's proposal. Cloverleaf had been discussing rezoning land for a data center development of up to 1 GW, but this remained a prospect rather than an approved project. [Source: https://www.datacenterdynamics.com/en/news/referendum-on-data-centers-to-be-held-in-wrightstown-wisconsin/; Date: 2026-06-05]; Sources: https://www.wpr.org/news/residents-speak-out-against-possible-data-center-in-northeast-wisconsins-village-of-wrightstown https://www.nbc26.com/news/local-news/wrightstown-works-with-cloverleaf-on-possible-data-center https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Balloonist Red Cedar / Menomonie Data Center",
    "state": "Wisconsin",
    "city": "Menomonie / Red Cedar",
    "county": "Dunn County",
    "region": null,
    "status": "planned",
    "sponsors": "Balloonist LLC",
    "operators": "Balloonist LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 450.0,
    "itLoadMW": null,
    "investmentUSD": 1600000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-09-05",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Public reporting identified Balloonist LLC's proposed $1.6B data center near Menomonie/Red Cedar on roughly 320 acres of farmland; later 2026 reporting described continuing local zoning review and public-comment activity after the project had been delayed and strongly opposed. No public source in the supplied event confirmed final withdrawal or cancellation by June 15, 2026. [Source: https://www.datacenterdynamics.com/en/news/data-center-in-red-cedar-wisconsin-could-be-16bn-investment/; https://www.weau.com/2026/03/02/city-menomonie-host-public-comment-opportunity-data-center-zoning/; Date: 2025-09-05; 2026-03-02]; QA 2026-07-19: A June 30 city update says the tax-incentive pause did not stop the project; the city expected to introduce a draft data-center zoning ordinance in August 2026.; Sources: https://www.wpr.org/news/wisconsin-cities-regulating-data-centers-as-lawmakers-consider-statewide-rules https://www.menomonie-wi.gov/DocumentCenter/View/2494/72425-Press-Release-Annexation-and-Rezoning-PDF https://extension.wisc.edu/files/2026/05/Data_Centers_Wisconsin-Accessible.pdf https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district https://www.menomonie-wi.gov/DocumentCenter/View/2544/82525-FAQ-Proposed-Data-Center-Project-Edited-PDF",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "White Oak Technology Park",
    "state": "Georgia",
    "city": "Appling",
    "county": "Columbia County",
    "region": null,
    "status": "planned",
    "sponsors": "Trammell Crow Company; CBRE",
    "operators": "Trammell Crow Company; CBRE",
    "tenants": null,
    "totalSquareFeet": 8076690.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 11600000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-04-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "research",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCD reported that Trammell Crow Company filed plans for White Oak Technology Park outside Augusta, with 8.076 million square feet of proposed buildings, including 8.004 million square feet of data centers. The Project JGK mass-grading filing appears to be a later land-disturbance phase tied to this broader data-center technology park; no project-level MW or capex was disclosed in the reviewed sources. [Source: https://www.datacenterdynamics.com/en/news/plans-filed-for-8-million-sq-ft-data-center-and-technology-park-outside-augusta-georgia/; Date: 2025-04-09]; Sources: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4443 https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4443 https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4443",
    "lastUpdated": "2026-06-15"
  },
  {
    "projectName": "Beacon Calvert Infrastructure Hub",
    "state": "Alabama",
    "city": "Calvert",
    "county": "Mobile County",
    "region": null,
    "status": "planned",
    "sponsors": "Beacon Data Centers; Beacon AI Centers; Nadia Partners",
    "operators": "Beacon Data Centers; Beacon AI Centers; Nadia Partners",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 6000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Beacon is proposing a $6 billion Calvert Infrastructure Hub on a 650-acre site between Highway 43 and Shepard House Road, with about 95 acres developed, two data center buildings, and first building completion targeted for 2027. Beacon says the project remains in planning, engineering, community engagement, and permitting review; it plans closed-loop cooling, no evaporative cooling, no backup diesel generators, about 1,000 peak construction jobs, and about 250 permanent jobs. [Source: https://mynbc15.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact; Date: 2026-07-03]; Sources: https://beacondatacenters.com/campuses/calvert/ https://w.media/beacon-commits-us-6-billion-to-alabama-data-center-hub/ https://www.lagniappemobile.com/news/mobile_county/ai-data-center-coming-to-calvert/article_fd08e7b7-8a83-4931-96b9-84997bcd4835.amp.html",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "US Space Command Redstone Arsenal Secure Data Center",
    "state": "Alabama",
    "city": "Redstone Arsenal",
    "county": "Madison County",
    "region": null,
    "status": "planned",
    "sponsors": "U.S. Space Command; U.S. Army Corps of Engineers",
    "operators": "U.S. Space Command; U.S. Army Corps of Engineers",
    "tenants": null,
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1800000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-12",
    "constructionStartDate": null,
    "expectedCompletionDate": "2031",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "government",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New project component. U.S. Space Command announced an April 1, 2026 industry day for a command-and-control facility on a 64-acre site at Redstone Arsenal that is set to include a secure data center. The SAM.gov notice described the visitor control center, vehicle inspection area, and secure data center as part of an estimated 700,000-square-foot facility; project-specific data center capacity and cost were not disclosed. [Source: https://www.datacenterdynamics.com/en/news/us-space-command-to-host-informational-session-about-new-facility-data-center-included/; Date: 2026-03-12]; Sources: https://sam.gov/opp/6d1cf80bb19248148ec41d18aa936e2d/view https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/FY2027_c1.pdf https://www.defensenews.com/news/your-military/2026/03/27/us-space-command-provides-update-on-phased-headquarters-relocation-to-alabama/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Luckett Road North and South Data Centers",
    "state": "Arizona",
    "city": "Marana",
    "county": "Pima County",
    "region": null,
    "status": "planned",
    "sponsors": "Beale Infrastructure",
    "operators": "Beale Infrastructure",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-01-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2029",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The Town of Marana describes Luckett Road North and Luckett Road South as separate from Project Blue, with roughly 600 total acres and each site estimated at 550-750 MW; the Town Council approved rezoning on 2026-01-06. AZPM reported on 2026-02-06 that opponents were pursuing a voter referendum after council approval, so the project remains planned rather than under construction. [Source: https://www.azpm.org/p/headlines/2026/2/6/225190-marana-residents-push-back-against-new-data-centers/; Date: 2026-02-06]; Sources: https://bealeinfra.com/key-insights-from-the-marana-arizona-town-council-meeting/ https://news.azpm.org/p/news-articles/2026/1/8/227908-marana-town-council-approves-rezoning-for-luckett-road-project-600-acre-hyperscale-data-center/ https://bealeinfra.com/location/marana/ https://www.maranaaz.gov/Government/Data-Centers/Luckett-Road-North-and-South-Data-Centers",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Huntley Page Data Center",
    "state": "Arizona",
    "city": "Page",
    "county": "Coconino County",
    "region": null,
    "status": "planned",
    "sponsors": "Huntley LLC",
    "operators": "Huntley LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-11-17",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported on 2025-11-24 that Huntley LLC proposed a 500-acre, 1 GW data-center campus in Page, Arizona, with Coconino County planning documents describing associated water demand and utility needs. Lake Powell Chronicle reported on 2026-06-23 that local residents were still seeking more detail on the deal, indicating the proposal remained active and contested during the target window. [Source: https://lakepowellchronicle.com/stories/decoding-the-strategic-ambiguity-of-the-huntley-data-center-deal,111313; Date: 2026-06-23]; Sources: https://www.datacenterdynamics.com/en/news/data-center-proposed-for-500-acre-site-in-page-arizona/ https://www.abc15.com/news/state/proposed-data-center-project-in-page-one-mile-from-horseshoe-bend https://www.outsideonline.com/outdoor-adventure/environment/data-center-horseshoe-bend/ https://cityofpage.org/wp-content/uploads/2026/01/ORDINANCE-Land-Sale-Huntley-Signed.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Southwest Crossing Data Center",
    "state": "Arizona",
    "city": "Casa Grande",
    "county": "Pinal County",
    "region": null,
    "status": "planned",
    "sponsors": "Ryan Companies",
    "operators": "Ryan Companies",
    "tenants": null,
    "totalSquareFeet": 1400000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 1600000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-01-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Data Center Dynamics reported on 2025-01-16 that Pinal County's Planning and Zoning Commission recommended approval for Ryan Companies' Southwest Crossing data-center campus on about 172 acres between Phoenix and Tucson, describing a four-building, 1.4 million-square-foot campus with roughly 400 MW of expected demand and an estimated $1.6 billion development cost. [Source: https://www.datacenterdynamics.com/en/news/400mw-data-center-campus-proposed-in-casa-grande-arizona/; Date: 2025-01-16]; QA 2026-07-18: Added the reported 1.4 million-square-foot full-campus area.",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Project Indo",
    "state": "Georgia",
    "city": "Cartersville",
    "county": "Bartow",
    "region": null,
    "status": "planned",
    "sponsors": "DataBank Holdings Ltd",
    "operators": "DataBank Holdings Ltd",
    "tenants": null,
    "totalSquareFeet": 1100000.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 2400000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-19",
    "constructionStartDate": null,
    "expectedCompletionDate": "2032",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Georgia DCA DRI #4761 identifies Project Indo as a DataBank Holdings Ltd technological-facility/data-center proposal at 218 Industrial Park Road in Cartersville. The initial form describes a 200 +/- MW critical IT load data center on about 69 acres with about 1,100,000 square feet of floor area; the Part 2 form reports an estimated $2.4B build-out value, about $23M in estimated annual local tax revenue, about 60 FTEs, and DCA records show an RDC finding dated July 15, 2026. [Source: https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4761; https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4761; https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4761; Date: 2026-06-19; 2026-07-15]; Sources: https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Yorkville Nexus V - Meyer Data Center",
    "state": "Illinois",
    "city": "Yorkville",
    "county": "Kendall County",
    "region": null,
    "status": "canceled",
    "sponsors": "Yorkville Nexus V LLC; Green Door Capital",
    "operators": "Yorkville Nexus V LLC; Green Door Capital",
    "tenants": null,
    "totalSquareFeet": 1294300.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 7200000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-01",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Shaw Local reported that the developers withdrew the Meyer data center proposal near the Caledonia subdivision after losing Yorkville City Council support; the revised request had sought data center rezoning for two western parcels totaling 91 acres while leaving a 37-acre eastern parcel as multifamily residential. [Source: https://www.shawlocal.com/kendall-county-now/2026/04/15/data-center-developer-drops-proposal-after-losing-yorkville-city-council-support/; Date: 2026-04-15]; Sources: https://www.yorkville.il.us/DocumentCenter/View/11743 https://www.yorkville.il.us/ArchiveCenter/ViewFile/Item/6749 https://www.yorkville.il.us/919/Meyer-Rezone",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "CyrusOne - Yorkville Campus",
    "state": "Illinois",
    "city": "Yorkville",
    "county": "Kendall County",
    "region": null,
    "status": "planned",
    "sponsors": "CyrusOne; C1 Yorkville LLC",
    "operators": "CyrusOne; C1 Yorkville LLC",
    "tenants": null,
    "totalSquareFeet": 1854800.0,
    "powerCapacityMW": 654.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2024-07-11",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Shaw Local reported on July 14, 2026 that the developers of the 228-acre CyrusOne Yorkville data center agreed to pay the city $15 million up front upon issuance of the first building permit and that Yorkville imposed water-use limits reducing allowed usage from 500,000 gallons per day to 40,000 gallons per day. [Source: https://www.shawlocal.com/kendall-county-now/2026/07/14/228-acre-cyrusone-data-center-agrees-to-pay-yorkville-15-million-up-front-city-imposes-water-use-limits/; Date: 2026-07-14]; Sources: https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus https://www.yorkville.il.us/940/C1-Yorkville-Cyrus-One-CHI-11-Data-Cente https://www.yorkville.il.us/DocumentCenter/View/13295 https://www.yorkville.il.us/DocumentCenter/View/13089",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Prologis Shelbyville Data Center (Project Hackman)",
    "state": "Indiana",
    "city": "Shelbyville",
    "county": "Shelby County",
    "region": null,
    "status": "planned",
    "sponsors": "Prologis",
    "operators": "Prologis",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 500.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-06",
    "constructionStartDate": null,
    "expectedCompletionDate": "2036",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Shelbyville Common Council approved annexation, rezoning, and an economic development agreement with Prologis for about 429 acres near State Road 44. The agreement references a possible multi-phase development of up to eleven data center buildings and about $2 billion of estimated investment; separate applications, permits, and regulatory approvals are still required before construction. [Source: https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364; Date: 2026-04-06]; Sources: https://shelbyville.in.gov/m/newsflash/Home/Detail/364 https://shelbyville.in.gov/DocumentCenter/View/1997/Shelbyville-2026-Economic-Development-Agreement52180152doc https://shelbyparks.com/AgendaCenter/ViewFile/ArchivedMinutes/_01072026-206 https://www.shelbyvilleprojecthackman.com/hackman-lp/ https://shelbyville.in.gov/AgendaCenter/ViewFile/ArchivedMinutes/_01072026-206",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Surge Development Knightstown Data Center",
    "state": "Indiana",
    "city": "Knightstown",
    "county": "Henry County",
    "region": null,
    "status": "planned",
    "sponsors": "Surge Development; GM Development",
    "operators": "Surge Development; GM Development",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-03-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "After Henry County officials approved zoning for a planned unit development, Surge Development and GM Development described a large data center site near I-70 and State Road 109 outside Knightstown. The project has no confirmed tenant yet, could build over eight to ten years, is being designed around onsite power generation, and the developer said the site could support roughly one gigawatt of generation capacity. [Source: https://www.brookvilleindiana.com/story/2026/03/11/news/developer-discusses-knightstown-data-center-proposal-after-henry-county-approval/1263.html; Date: 2026-03-11]; Sources: https://www.the765.com/story/2026/03/11/news/developer-explains-vision-for-proposed-knightstown-data-center/456.html https://www.hcremc.com/alerts/a-note-on-the-proposed-data-center-in-henry-county/ https://indianapublicradio.org/news/2026/01/henry-county-data-center-approved-at-last-commissioners-vote/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "QTS - Clinton Data Center Campus",
    "state": "Iowa",
    "city": "Clinton",
    "county": "Clinton County",
    "region": null,
    "status": "planned",
    "sponsors": "QTS Data Centers",
    "operators": "QTS Data Centers",
    "tenants": null,
    "totalSquareFeet": 5000000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-26",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "QTS says it is exploring a proposed data center campus in Clinton and remains in early planning. Local reporting places the potential campus north of U.S. Highway 30 and west of Mill Creek Parkway, and reports QTS statements describing a multibillion-dollar investment, thousands of construction jobs, hundreds of full-time positions, closed-loop cooling once operational, and QTS-funded energy infrastructure. Clinton City Council rejected a 120-day data center moratorium on June 9, 2026 by a 5-2 vote, leaving the city in a fact-finding and ordinance-development posture rather than halting the proposal. [Source: https://q.com/data-centers/clinton/ | https://www.kwqc.com/2026/05/26/clinton-discuss-data-center-concerns-amid-ai-growth/ | https://www.wvik.org/wvik-top-stories/2026-06-10/majority-of-clinton-city-council-vote-down-data-center-moratorium; Date: 2026-07; 2026-05-26; 2026-06-10]; QA 2026-07-18: Normalized the county and added the $10 billion contemplated investment reported July 16.; Sources: https://cityofclintoniowa.civicweb.net/document/454757/ https://www.iowapublicradio.org/ipr-news/2026-07-16/clinton-qts-hyperscale-data-center https://quadcitiesbusiness.com/multibillion-dollar-data-center-proposed-for-clinton/",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Digital Realty De Soto Data Center Development",
    "state": "Kansas",
    "city": "De Soto",
    "county": "Johnson County",
    "region": null,
    "status": "planned",
    "sponsors": "Digital Realty",
    "operators": "Digital Realty",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-06-22",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Digital Realty is planning a 600 MW data center campus after acquiring powered land in De Soto, Kansas; public project cost estimates were not finalized in the reviewed source. [Source: https://www.datacenterdynamics.com/en/news/digital-realty-plans-600mw-campus-in-kansas-acquires-investment-firm-columbia-capital/; Date: 2026-06-22]; Sources: https://investor.digitalrealty.com/node/30396/pdf https://investor.digitalrealty.com/static-files/c48b8fee-1eb8-4830-87b3-6c9d7bdd5396 https://www.digitalrealty.com/about/projects/de-soto https://www.desotoks.us/498/Digital-Realty-Data-Center",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Flint Hills Digital Campus",
    "state": "Kansas",
    "city": "Emporia",
    "county": "Lyon County",
    "region": null,
    "status": "planned",
    "sponsors": "Kanza Park Place LLC",
    "operators": "Kanza Park Place LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-06-02",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Kanza Park Place announced planning for a gigawatt-scale hyperscale data center campus at Emporia's Industrial Park IV, with an approximately 1,000-acre tentative plan pending zoning recommendations and final Emporia City Commission approval. [Source: https://kvoe.com/2026/06/02/plans-announced-for-flint-hills-digital-campus-in-west-emporia/; Date: 2026-06-02]; Sources: https://kvoe.com/2026/06/19/data-center-digital-campus-developer-pinkston-outlines-vision-for-project/ https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District https://kvoe.com/2026/06/07/data-center-rda-qa-on-resident-questions/ https://www.emporiarda.org/news-and-media/news-archive/p/item/67803/flint-hills-digital-campus-initiative-signals-major-economic-development-opportunity-for-emporia-and-lyon-county https://www.datacenterdynamics.com/en/news/gigawatt-scale-data-center-campus-proposed-in-kansas/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Prairie Horizon Data Campus",
    "state": "Kansas",
    "city": "near St. Marys",
    "county": "Pottawatomie County",
    "region": null,
    "status": "planned",
    "sponsors": "Beltline Energy",
    "operators": "Beltline Energy",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1200.0,
    "itLoadMW": null,
    "investmentUSD": 17000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2034",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Beltline Energy's Prairie Horizon Data Campus was described as a proposed Pottawatomie County data center that could use up to 1.2 GW of power; Beltline said the project is sited for access to existing transmission infrastructure, but county approvals and any final operator disclosure remained unresolved in the reviewed source. [Source: https://ecodevo.com/wp-content/uploads/2026/06/Pott_County_Response_Community_FAQ_Rnd-3_6.10.26.pdf; Date: 2026-06-10]; Sources: https://ecodevo.com/wp-content/uploads/2026/06/Pott_County_Response_Community_FAQs_5.27.26_v2.pdf https://1350kman.com/2026/06/officials-proposed-data-center-could-have-10-15-buildings-use-up-to-1-2-gigawatts-of-power/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Franklin-Simpson Data Storage and Service Center",
    "state": "Kentucky",
    "city": "Franklin",
    "county": "Simpson County",
    "region": null,
    "status": "planned",
    "sponsors": "TenKey LandCo I LLC",
    "operators": "TenKey LandCo I LLC",
    "tenants": null,
    "totalSquareFeet": 600000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 4800000000.0,
    "sizeNotes": "Three planned 200,000-square-foot facilities on roughly 200 acres",
    "announcedDate": "2026-01-16",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "TenKey LandCo proposed a Franklin-Simpson Data Storage and Service Center on about 200 acres near Exit 2 of I-65, with three 200,000-square-foot facilities over a three-year period and an estimated $1.6 billion investment for each facility. The Franklin Planning and Zoning Commission approved a preliminary development plan with conditions on March 3, 2026, while separate litigation over Simpson County's data-center ordinance remained active. [Source: https://www.wbko.com/2026/01/16/data-center-seeks-preliminary-site-development-plan-for-simpson-county/ | https://www.lpm.org/news/2026-03-05/feet-to-the-fire-preliminary-plan-for-franklin-data-center-approved; Date: 2026-01-16; 2026-03-05]; QA 2026-07-19: Added the 600,000-square-foot three-building total.; Sources: https://www.wnky.com/franklin-planners-table-data-center-proposal-until-february/ https://www.datacenterdynamics.com/en/news/data-center-proposal-in-franklin-kentucky-gets-approval-from-planning-and-zoning-commission/ https://www.wbko.com/2026/01/16/data-center-seeks-preliminary-site-development-plan-for-simpson-county/?outputType=amp https://www.wbko.com/2026/01/22/discussion-tabled-new-data-storage-service-centers-franklin/?outputType=amp https://www.wnky.com/data-center-developer-sues-simpson-county-over-zoning-authority/",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Raeden Gibraltar McLouth Steel Data Center",
    "state": "Michigan",
    "city": "Gibraltar",
    "county": "Wayne County",
    "region": null,
    "status": "planned",
    "sponsors": "Raeden",
    "operators": "Raeden",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 100.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Raeden proposed a 100 MW inference data center at the former McLouth Steel industrial/Superfund site at 27800 W. Jefferson Ave. Gibraltar City Council passed a one-year data center moratorium on March 9, 2026, creating a potential roadblock, but Raeden was moving forward with a community meeting. The project would use an existing industrial building, include natural-gas generation and a closed-loop cooling system, use about 600 gallons of water per day according to Raeden's COO, and employ an estimated 60 to 200 people. [Source: https://planetdetroit.org/2026/03/gibraltar-data-center-moratorium/; https://cityofgibraltarmi.gov/wp-content/uploads/2026/03/2026.03.31-Updated-Frequently-Asked-Questions.pdf; Date: 2026-03-11; 2026-03-31]; Sources: https://cityofgibraltarmi.gov/wp-content/uploads/2026/02/Raeden-Site-Plan-2.25.2026.pdf https://cityofgibraltarmi.gov/wp-content/uploads/2026/03/Raeden-Gibraltar-Presentation.pdf https://planetdetroit.org/2026/03/gibraltar-data-center-diesel-generators/ https://cityofgibraltarmi.gov/wp-content/uploads/2026/03/Townhall-Transcript.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Sansone York Township Toyota Land Data Center",
    "state": "Michigan",
    "city": "York Township",
    "county": "Washtenaw County",
    "region": null,
    "status": "canceled",
    "sponsors": "Sansone Group; Toyota North America",
    "operators": "Sansone Group; Toyota North America",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-12-17",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Sansone Group had explored a hyperscale data center on Toyota-owned land along Platt Road in York Township; Planet Detroit's December 2025 coverage described township discussion of a possible 1 GW data center. WEMU reported on April 30, 2026 that Sansone withdrew its purchase agreement after working to acquire more than 400 acres from Toyota, and township officials said the effort to convert the land from research-park use to heavy industry for a data center had fallen through. [Source: https://planetdetroit.org/2025/12/york-township-data-center-concerns/; https://www.wemu.org/wemu-news/2026-04-30/land-purchase-for-planned-data-center-in-york-township-falls-through; Date: 2025-12-17; 2026-04-30]; Sources: https://www.signatureassociates.com/firm-scraps-plan-to-purchase-toyota-land-for-data-center-south-of-ann-arbor/ https://www.idcnova.com/news/Developers-seek-another-AI-data-center-on-land-owned-by-Toyota-south-of-Ann-Arbor-4407",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "White Cloud Acres AI Data Center",
    "state": "Missouri",
    "city": "Maryville area",
    "county": "Nodaway County",
    "region": null,
    "status": "planned",
    "sponsors": "Scale Microgrids; White Cloud Acres LLC; ReLoad Energy",
    "operators": "Scale Microgrids; White Cloud Acres LLC; ReLoad Energy",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 6300000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-03",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "New project: Scale Microgrids, described as formerly ReLoad Energy, presented White Cloud Acres as a $6.3 billion AI data center and co-located natural-gas power plant along US Highway 71 about eight miles south of Maryville. The proposal includes a 600 MW generation facility dedicated to the data center, has no announced hyperscale tenant, and was described as targeting AI applications. [Source: https://www.kq2.com/news/2026/06/03/nodaway-county-commissioners-to-hold-meeting-with-scale-microgrids-about-proposed-data-center/; Date: 2026-06-03]; Sources: https://whitecloudacres.com/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Monarch Data Center",
    "state": "Nevada",
    "city": "Yerington",
    "county": "Lyon County",
    "region": null,
    "status": "planned",
    "sponsors": "Copia Power Devco, LLC",
    "operators": "Copia Power Devco, LLC",
    "tenants": null,
    "totalSquareFeet": 4600000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 12000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-07-08",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Lyon County's July 14, 2026 Planning Commission agenda described a requested Planned Unit Development zone change for the Monarch Data Center: 4.6 million square feet, 1,000 MW, eight two-story buildings up to 95 feet tall, 500 MW of battery energy storage, 500 MW of natural-gas backup generation, a substation, high-voltage power lines, and accessory uses on two RR-20 parcels totaling 505.40 acres. Pizen Switch Times reported on July 15, 2026 that the Planning Commission voted 4-3 to recommend approval to the Board of Commissioners after extensive public comment, so the project is still in public-review/planned status rather than fully approved for construction. [Source: https://www.lyon-county.org/DocumentCenter/View/14218/July-14-2026-Agenda; Date: 2026-07-14]; Sources: https://www.copiapower.com/interactive-map-collection/ru9ht9lachmjgoqnn73bq8grhyfjei-mhprk-gd4f3-yf9ax-93my9-9ftc2-rf7hh-jg6rr-224sc-t23mt-h5xp6-zw5cj-a9x2y-6c978-tthy2-7a46w-ejjen-ln25x-2jarn-e98nn-7yg8p https://pizenswitchtimes.com/wp-content/uploads/2026/07/Monarch_Data_Center-ATT_1_PUD_Narrative-2026-Jul-14.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Blackjack Data Center",
    "state": "Nevada",
    "city": "Pahrump",
    "county": "Nye County",
    "region": null,
    "status": "planned",
    "sponsors": null,
    "operators": null,
    "tenants": null,
    "totalSquareFeet": 800000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 18400000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Pahrump Valley Times reported that before Nye County's June 2026 temporary moratorium on processing new data center applications, the Blackjack Data Center had already been filed as a Pahrump-area proposal. It had not secured full county approval as of the July 15, 2026 article. Nye County scheduled a July 25 forum and an August 4 hearing on Bill No. 2026-11, which would prohibit data centers in Nye County communities without elected town boards. [Source: https://pvtimes.com/news/data-centers-generating-community-angst-187770/; Date: 2026-07-15]; Sources: https://www.aol.com/articles/nye-county-residents-mobilize-against-234603000.html https://currently.att.yahoo.com/att/residents-developers-during-pahrump-town-235237761.html https://www.mansetechcampus.com/about https://pvtimes.com/news/expert-panelists-weigh-in-on-manse-tech-data-center-189455/ https://mansetechcampus.com/nye-county",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Osprey Data Center",
    "state": "Nevada",
    "city": "Pahrump",
    "county": "Nye County",
    "region": null,
    "status": "planned",
    "sponsors": null,
    "operators": null,
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": null,
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": null,
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Pahrump Valley Times reported that Osprey Data Center is one of two Pahrump-area data center proposals already filed before Nye County's June 2026 temporary moratorium on new data-center applications. Neither Osprey nor Blackjack had secured full county approval as of July 15, 2026; the county scheduled a public forum for July 25 and an August 4 hearing on Bill No. 2026-11 concerning data-center prohibitions in some Nye County communities. [Source: https://pvtimes.com/news/data-centers-generating-community-angst-187770/; Date: 2026-07-15]; Sources: https://efiling.energy.ca.gov/GetDocument.aspx?DocumentContentId=101679&tn=264906 https://www.caiso.com/documents/appendix-d-board-approved-2024-2025-transmission-plan.pdf",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Treetop Companies East Fishkill Data Center",
    "state": "New York",
    "city": "East Fishkill",
    "county": "Dutchess County",
    "region": null,
    "status": "planned",
    "sponsors": "Treetop Companies; Donovan Drive Holdings LLC",
    "operators": "Treetop Companies; Donovan Drive Holdings LLC",
    "tenants": null,
    "totalSquareFeet": 1160000.0,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-07-17",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; enterprise; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Times Union reported that Treetop, through Donovan Drive Holdings LLC, entered a 1 GW East Fishkill data center into the NYISO queue in July 2025 after an earlier warehouse proposal for wooded parcels off Lime Kiln Road. The first 500 MW phase was described as slated for 2028, with a second 500 MW by 2030, but no formal town data-center application had been filed. On June 26, 2026, the East Fishkill Town Board unanimously approved a three-year moratorium on large data centers through 2029, materially delaying or blocking consideration of the project; Data Center Dynamics described the proposal as a 1.16 million-square-foot data center south of Old State Road and Interstate 52. [Source: https://www.timesunion.com/hudsonvalley/news/article/east-fishkill-halts-data-center-plans-three-years-22321152.php | https://www.datacenterdynamics.com/en/news/three-year-data-center-moratorium-passed-in-town-of-east-fishkill-new-york-state-blocking-planned-campus/; Date: 2026-06-26; 2026-06-26]; QA 2026-07-18: Added the reported 1.16-million-square-foot proposal area.; Sources: https://www.nyiso.com/documents/20142/56802634/03d_Q1738_SIS%20Scope_2-3-26-TPAS.pdf/23c43711-119f-f819-0f62-0d7775ff3eb6 https://www.timesunion.com/hudsonvalley/news/article/east-fishkill-data-center-plan-sparks-backlash-22270553.php https://hudsonvalley.news12.com/east-fishkill-to-pass-moratorium-on-data-centers-as-developers-float-possibility-of-project-in-town",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Energy Storage Solutions Kingsboro Data Center",
    "state": "North Carolina",
    "city": "Tarboro",
    "county": "Edgecombe County",
    "region": null,
    "status": "canceled",
    "sponsors": "Energy Storage Solutions LLC",
    "operators": "Energy Storage Solutions LLC",
    "tenants": null,
    "totalSquareFeet": 160000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 6400000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-04",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Energy Storage Solutions withdrew its proposed Edgecombe County AI data center in July 2026 while county officials were discussing a 24-month data center moratorium. The project was planned for the Kingsboro development area near Tarboro; the source describes an initial eight-phase 300 MW proposal on a 52-acre parcel, notes reports varied up to a possible 900 MW final campus, and states the developer had appealed an earlier denial. [Source: https://www.datacenterdynamics.com/en/news/north-carolina-ai-data-center-proposal-withdrawn-as-county-officials-mull-moratorium/; Date: 2026-07-15]; Sources: https://img1.wsimg.com/blobby/go/2e434bf2-5297-4284-9765-8cafdb6c80c3/downloads/cefde6b8-7f4d-4e24-884f-f66cfc5e83f1/Kingsboro%20Data%20Center%20Project.pdf?ver=1761160899499 https://mytarborotoday.com/public-hearing-on-data-center-resumes-at-monday-p2754-106.htm https://www.datacenterdynamics.com/en/news/developers-to-appeal-data-center-rejection-in-tarboro-north-carolina/ https://www.aterio.io/blog/tarboro-net-zero-carbon-capture-data-center-north-carolina",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Nakota AI Data Campus",
    "state": "North Dakota",
    "city": "Unknown",
    "county": "Unknown",
    "region": null,
    "status": "planned",
    "sponsors": "Nixxy, Inc.; Tachyon9 Corporation",
    "operators": "Nixxy, Inc.; Tachyon9 Corporation",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-29",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Nixxy announced that its proposed strategic combination with Tachyon9 is advancing the $1 billion Nakota Data Campus, a roughly 620-acre North Dakota AI infrastructure development designed for up to 1 GW of AI computing capacity. The first 120-150 MW of capacity is targeted for Q2 2027, subject to financing, regulatory approvals, and completion of the proposed transaction. The source locates the campus in North Dakota's energy corridor but does not identify a city or county, so those fields are null. [Source: https://www.businesswire.com/news/home/20260629639064/en/Nixxy-and-Tachyon-9-Unveil-%241-Billion-Carbon-Conscious-AI-Data-Campus-Designed-Around-Hydrogen-Power-Low-Water-Cooling-and-U.S.-Energy-Security; Date: 2026-06-29]; Sources: https://www.sec.gov/Archives/edgar/data/1462223/000168316826004843/nixxy_ex1001.htm https://www.nasdaq.com/press-release/nixxy-and-tachyon-9-unveil-1-billion-carbon-conscious-ai-data-campus-designed-around",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "AWS Project Galaxy Sidney Data Center",
    "state": "Ohio",
    "city": "Sidney",
    "county": "Shelby County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-27",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-12",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Sidney's proposed data-center FAQ says Project Galaxy is a proposed AWS data center on 210 acres within Sidney's northern corporation limits, with four planned data center buildings, two planned substations, up to 25 full-time jobs, construction expected to start in late 2026 if approved, and initial operations expected to begin in 2028. [Source: https://www.sidneyoh.com/526/Proposed-Data-Center-FAQ; Date: 2026-06-26]; Sources: https://www.sidneyoh.com/DocumentCenter/View/4356/80-25---Authorizing-a-CRA-Agreement---Amazon-Data-Services-Inc-PDF https://www.sidneyoh.com/DocumentCenter/View/4356/80-25---Authorizing-a-CRA-Agreement---Amazon-Data-Services-Incpdf https://www.datacenterdynamics.com/en/news/amazon-secures-tax-break-for-3bn-data-center-campus-in-sidney-ohio/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "AWS Marysville Innovation Park Data Center Campus",
    "state": "Ohio",
    "city": "Marysville",
    "county": "Union County",
    "region": null,
    "status": "planned",
    "sponsors": "Amazon Web Services",
    "operators": "Amazon Web Services",
    "tenants": null,
    "totalSquareFeet": 500000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-23",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Marysville's data-center FAQ describes a proposed AWS campus on approximately 227 acres in the Marysville Innovation Park, with four data center buildings, a substation, a water tower, stormwater ponds, generators, and an electric-switching station. The FAQ says construction could start in 2026 if approved, with initial operations expected in 2028. [Source: https://marysvilleohio.org/772/Data-Center-FAQs; Date: 2026-06-23]; Sources: https://www.datacenterdynamics.com/en/news/aws-gets-go-ahead-for-data-center-campus-in-marysville-ohio/ https://ryangrissinger.com/issues/data-centers/OH-DC-0020",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Meta Marysville South Data Center",
    "state": "Ohio",
    "city": "Marysville",
    "county": "Union County",
    "region": null,
    "status": "planned",
    "sponsors": "Meta; Anadonna LLC",
    "operators": "Meta; Anadonna LLC",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-26",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Reporting tied Meta, through Anadonna LLC, to a second Marysville-area data center proposal called Project Corgi. Marysville materials describe the South Project as about 800 acres southwest of the city, annexed and rezoned in March 2026, with final development-plan approval required before construction. [Source: https://www.datacenterdynamics.com/en/news/aws-and-meta-planning-data-centers-in-marysville-ohio/; https://marysvilleohio.org/772/Data-Center-FAQs; Date: 2026-04-10; 2026-06-23]; Sources: https://www.marysvilleohio.org/Archive/ViewFile/Item/6480",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Meta Piqua Data Center",
    "state": "Ohio",
    "city": "Piqua",
    "county": "Miami County",
    "region": null,
    "status": "planned",
    "sponsors": "Meta; Shaytura LLC",
    "operators": "Meta; Shaytura LLC",
    "tenants": null,
    "totalSquareFeet": 700000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-15",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Meta, operating through Shaytura LLC, has been tied to a proposed Piqua data center. City reporting and project summaries describe approximately 300 acres, about $3.5 million in land-acquisition activity, an initial road/agreement vote in April 2026, and the city planning a moratorium and standards updates for data-center development. [Source: https://www.dailycall.com/news/93914/piqua-oks-road-agreement-for-data-center-project; https://www.datacenterdynamics.com/en/news/meta-planning-data-center-in-piqua-ohio/; Date: 2026-04-16; 2026-05-02]; Sources: https://piquaoh.org/1673/Data-Center-Project https://www.piquaoh.org/m/faq https://piquaoh.gov/DocumentCenter/View/3279/Piqua-I-75-Exit-78-Business-and-Industrial-Park-Presentation--November-3-2025 https://www.datacenterdynamics.com/en/news/data-center-project-coming-to-piqua-ohio/ https://www.piquaoh.org/1673/Data-Center-Project https://www.piquaoh.org/DocumentCenter/View/3279/Piqua-I-75-Exit-78-Business-and-Industrial-Park-Presentation--November-3-2025-PDF",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Aligned CMH-02 Conesville Data Center Campus",
    "state": "Ohio",
    "city": "Conesville",
    "county": "Coshocton County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Aligned Data Centers",
    "operators": "Aligned Data Centers",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2024-11",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Aligned lists CMH-02 as an 82-acre Conesville Industrial Park campus with four buildings and 600 MW critical capacity. The company page says the first building was topped out in early 2026 and the site has phased delivery. [Source: https://www.aligneddc.com/data-centers/cmh-02-conesville/; Date: 2026-02-01]; Sources: https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/ https://aligneddc.com/northeast-ohio-data-centers/ https://www.datacenterdynamics.com/en/news/aligned-to-develop-200-acre-data-center-campus-in-coshocton-ohio/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Vantage OH2 Millersport Data Center Campus",
    "state": "Ohio",
    "city": "Millersport",
    "county": "Fairfield County",
    "region": null,
    "status": "planned",
    "sponsors": "Vantage Data Centers",
    "operators": "Vantage Data Centers",
    "tenants": null,
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 696.0,
    "itLoadMW": null,
    "investmentUSD": 2000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-06-01",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Vantage's OH2 project page describes a 154-acre Millersport campus with four data centers and 696 MW of capacity. Columbus Business First reported on March 26, 2026 that Vantage expects construction to begin in 2026 on a $2 billion campus and related on-site power plant. Distinct from the existing Vantage OH1 Campus in New Albany. [Source: https://www.vantagedatacenters.com/campuses/oh2/; https://www.bizjournals.com/columbus/news/2026/03/26/data-center-vantage-on-site-power-plant-natural-ga.html; Date: 2026-03-26]; Sources: https://vantagemillersportcampus.com/ https://www.datacenterdynamics.com/en/news/vantage-targets-data-center-campus-outside-columbus-ohio/ https://www.aol.com/articles/fairfield-county-data-center-draws-093000000.html",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Thor Urbana Data Center Campus",
    "state": "Ohio",
    "city": "Urbana",
    "county": "Champaign County",
    "region": null,
    "status": "planned",
    "sponsors": "Thor Equities Group",
    "operators": "Thor Equities Group",
    "tenants": null,
    "totalSquareFeet": 460000.0,
    "powerCapacityMW": 150.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2024-09-30",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Thor Equities announced the acquisition of a 62-acre Urbana campus with a 460,000-square-foot building for conversion to a data center. Data Center Dynamics reported the site had 150 MW of onsite utility power availability. [Source: https://www.datacenterdynamics.com/en/news/thor-equities-buys-ohio-industrial-site-for-data-center-conversion/; Date: 2024-09-30]; Sources: https://www.urbanaohiodatacenter.com/ https://www.wosu.org/2026-03-04/urbana-passes-moratorium-on-new-data-centers-leaving-1b-proposal-in-limbo?_amp=true https://www.datacenterdynamics.com/en/news/thor-equities-looks-to-build-460000-sq-ft-data-center-campus-near-urbana-ohio/ https://www.urbanaohio.com/uploads/1/2/4/6/124631710/project_overview_-_urbana_technolody_hub.pdf https://thordigital.com/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Grove City Data Center Campus",
    "state": "Ohio",
    "city": "Grove City",
    "county": "Franklin County",
    "region": null,
    "status": "planned",
    "sponsors": "Undisclosed developer",
    "operators": "Undisclosed developer",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 6900000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-26",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Columbus Business First reported Grove City officials were evaluating a proposed $6.9 billion data center and that City Council considered a temporary moratorium on data-center applications while writing local rules. Sponsor, capacity, and final site details were not disclosed in the report. [Source: https://www.bizjournals.com/columbus/news/2026/06/26/grove-city-data-center-69-billion-moratorium.html; Date: 2026-06-26]; Sources: https://grovecityohio.gov/697/Project-Maple---Preliminary-Development- https://www.grovecityohio.gov/DocumentCenter/View/4281/202605270016_SupplementalMaterials_ProjectMaple_PDP https://grovecityohio.new.swagit.com/videos/389664",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "OpenAI Stargate Lordstown Campus",
    "state": "Ohio",
    "city": "Lordstown",
    "county": "Trumbull County",
    "region": null,
    "status": "under-construction",
    "sponsors": "OpenAI; SoftBank; Oracle",
    "operators": "OpenAI; SoftBank; Oracle",
    "tenants": null,
    "totalSquareFeet": 6200000.0,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2025-09-22",
    "constructionStartDate": null,
    "expectedCompletionDate": "2026",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "OpenAI announced Lordstown as one of the first five new Stargate sites with SoftBank and Oracle in September 2025. Epoch AI's April 2026 construction-tracker update listed the Lordstown Stargate site among the largest new AI data center projects under active construction tracking. [Source: https://openai.com/index/five-new-stargate-sites/; https://epoch.ai/data-insights/ai-supercluster-construction-tracker; Date: 2025-09-22; 2026-04-16]; Sources: https://epoch.ai/data/ai-data-centers/directory/openai-stargate-lordstown https://www.datacenterdynamics.com/en/news/foxconn-and-softbank-to-manufacture-stargate-data-center-equipment-at-lordstown-ohio-facility/ https://www.theinformation.com/articles/softbank-invest-3-billion-factory-openai-data-centers https://www.wfmj.com/story/53107197/foxconn-begins-its-transformation-of-lordstown-facility-in-new-ai-data-center-plant",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Bitdeer Niles Data Center Campus",
    "state": "Ohio",
    "city": "Niles",
    "county": "Trumbull County",
    "region": null,
    "status": "planned",
    "sponsors": "Bitdeer",
    "operators": "Bitdeer",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 570.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-09-22",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; colocation",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Bitdeer said it was developing several Ohio data-center sites, including a Niles site with up to 570 MW of potential capacity. Local Niles reporting in April 2026 said city officials approved a study and planning steps tied to Bitdeer's proposed AI/data center development. [Source: https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-strategic-power-capacity-expansion-ohio; https://www.tribtoday.com/news/local-news/2026/04/niles-gives-ok-to-study-for-proposed-ai-data-center/; Date: 2025-09-22; 2026-04-09]; Sources: https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-february-2026-production-and-operations-update https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-reports-unaudited-financial-results-fourth-quarter-and-0 https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-september-2025-production-and-operations https://www.tribtoday.com/news/local-news/2026/04/niles-hears-from-potential-data-center-company/ https://www.vindy.com/news/local-news/2026/04/niles-hears-from-data-center-firm/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Bitdeer Clarington Hannibal Industrial Park Data Center",
    "state": "Ohio",
    "city": "Clarington / Hannibal",
    "county": "Monroe County",
    "region": null,
    "status": "planned",
    "sponsors": "Bitdeer",
    "operators": "Bitdeer",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 570.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2025-09-22",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; colocation; crypto",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Bitdeer identified the Clarington/Hannibal Industrial Park site as part of its Ohio power-capacity expansion, with up to 570 MW of potential capacity. Data Center Dynamics reported in February 2026 that Hannibal Development LLC sued affiliates of Bitdeer over the Monroe County site, so the project appears contested rather than canceled. [Source: https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-strategic-power-capacity-expansion-ohio; https://www.datacenterdynamics.com/en/news/bitdeer-sued-over-plans-for-ai-data-center-in-monroe-county-ohio/; Date: 2025-09-22; 2026-02-17]; Sources: https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-expands-power-capacity-pipeline-25-gw-570-mw-strategic-0 https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-september-2025-production-and-operations https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-june-2026-production-and-operations-update",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "IREN Oklahoma Data Center Campus",
    "state": "Oklahoma",
    "city": "Unknown",
    "county": "Unknown",
    "region": null,
    "status": "planned",
    "sponsors": "IREN",
    "operators": "IREN",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-02-05",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "IREN announced a 1.6 GW data center campus in Oklahoma spanning about 2,000 acres, with grid studies complete and power scheduled to ramp from 2028. The source did not identify the city or county. [Source: https://iren.com/resources/news/iren-oklahoma-1-6gw-data-center-campus; Date: 2026-02-05]; Sources: https://iren.com/data-centers/oklahoma https://www.sec.gov/Archives/edgar/data/1878848/000187884826000015/iren-20251231.htm https://iren.gcs-web.com/static-files/cb66edc1-790b-4460-8529-4f02c52217e0",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Beltline Energy Luther Data Center",
    "state": "Oklahoma",
    "city": "Luther",
    "county": "Oklahoma County",
    "region": null,
    "status": "planned",
    "sponsors": "Beltline Energy; BLE Land Holdings",
    "operators": "Beltline Energy; BLE Land Holdings",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 14000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-06",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Beltline Energy filed a zoning application for a proposed data center on about 320 acres on the northeast edge of Luther near the Redbud Energy Facility. The Luther Town Board adopted a six-month data center moratorium through at least Dec. 31, 2026, delaying Beltline's active rezoning application; reporting said Beltline estimated 420 jobs. [Source: https://journalrecord.com/2026/06/18/luther-moratorium-beltline-energy-data-center-proposal/; Date: 2026-06-18]; Sources: https://www.lutherhorizontechnologypark.com/ https://lutherregister.news/2026/06/15/luther-board-of-trustees-to-hold-wednesday-meeting-outside-as-the-public-weighs-in-on-a-data-center-application/ https://lutherregister.news/2026/06/06/data-center-application-filed-in-luther/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Verrus Oakline at Mill Creek Data Center Campus",
    "state": "Oregon",
    "city": "Salem",
    "county": "Marion County",
    "region": null,
    "status": "planned",
    "sponsors": "Verrus; Sidewalk Infrastructure Partners",
    "operators": "Verrus; Sidewalk Infrastructure Partners",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-14",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; enterprise",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Verrus is exploring a potential data center operation at Salem's Mill Creek Corporate Center and would likely move into formal pre-application if Salem is viable. Reported dedicated Oakline at Mill Creek project would comprise three buildings and a utility substation on 75 acres near Turner Road SE and Deer Park Drive SE; final capacity not yet finalized but starting in the dozens of megawatts. Expected 75 permanent jobs and more than $5 billion of taxable investment; described by Salem as the city's first data center. [Source: https://www.cityofsalem.net/Home/Components/News/News/2169/15; Date: 2026-07-14]; Sources: https://oaklineatmillcreek.com/ https://egov.cityofsalem.net/PACPortal/Permit/View/1221556 https://egov.cityofsalem.net/PACPortal/Attachment/Download?attachmentRsn=1351971&folderRsn=1221556",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Stonebridge Powder Mills Data Center Campus",
    "state": "Pennsylvania",
    "city": "North Beaver Township and Mahoning Township",
    "county": "Lawrence County",
    "region": null,
    "status": "planned",
    "sponsors": "Stonebridge Associates",
    "operators": "Stonebridge Associates",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": null,
    "itLoadMW": null,
    "investmentUSD": 15000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-15",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Stonebridge Associates filed for preliminary planning consent with North Beaver Township, Mahoning Township, and Lawrence County for a 16-building data center campus and electric substation at the 569-acre Powder Mills Site, a former dynamite/explosives manufacturing property off Route 551 at 3478 Howard Drive and McClelland Avenue. DCD reports Stonebridge intends to spend more than $15 billion and says Penn Power would supply electricity; IT capacity was not disclosed. [Source: https://www.datacenterdynamics.com/en/news/data-center-campus-proposed-at-former-dynamite-factory-site-in-lawrence-county-pennsylvania/; Date: 2026-07-15]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Keel Sharon Data Center Expansion",
    "state": "Pennsylvania",
    "city": "Sharon",
    "county": "Mercer County",
    "region": null,
    "status": "expansion",
    "sponsors": "Keel Infrastructure (formerly Bitfarms)",
    "operators": "Keel Infrastructure (formerly Bitfarms)",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 110.0,
    "itLoadMW": null,
    "investmentUSD": 5000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-02",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; crypto",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCD reports Keel's Sharon site is a former industrial site in western Pennsylvania with potential to reach 110 MW. The article places Sharon alongside Panther Creek and Scrubgrass as part of Keel's Pennsylvania AI/HPC pivot, with permitting for Panther Creek and Sharon expected over summer 2026. [Source: https://www.datacenterdynamics.com/en/analysis/pennsylvanias-appalachian-appeal/; Date: 2026-07-02]; Sources: https://www.pa.gov/agencies/oto/fasttrack/sharondatacenterproject https://keelinfra.gcs-web.com/static-files/ea5e30c6-b363-41b1-9052-90340a41a973 https://www.sec.gov/Archives/edgar/data/1812477/000121390025026575/ea023426801ex99-3_bitfarms.htm https://www.datacenterdynamics.com/en/news/zoning-board-of-sharon-pa-approves-planned-expansion-of-keel-infrastructures-existing-data-center-development/ https://www.lancasterfarming.com/farming-news/data-center-company-kicks-in-300-000-to-save-a-mercer-county-project/article_10a83db2-0eb9-5394-afdb-b773cf69a83a.html https://investor.bitfarms.com/news-releases/news-release-details/bitfarms-enters-agreement-develop-120-mw-us-provides-2025",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Keel Scrubgrass AI/HPC Data Center Campus",
    "state": "Pennsylvania",
    "city": "Kennerdell / Scrubgrass Township",
    "county": "Venango County",
    "region": null,
    "status": "expansion",
    "sponsors": "Keel Infrastructure (formerly Bitfarms)",
    "operators": "Keel Infrastructure (formerly Bitfarms)",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1300.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-07-02",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCD describes Scrubgrass as Keel's largest Pennsylvania project and its 'crown jewel.' Keel is targeting a 750 MW grid connection plus 550 MW of natural-gas capacity, roughly 1.3 GW total, at the former Stronghold/Bitfarms waste-coal and crypto-mining site as part of a pivot from crypto mining toward AI and high-performance computing data centers. [Source: https://www.datacenterdynamics.com/en/analysis/pennsylvanias-appalachian-appeal/; Date: 2026-07-02]; Sources: https://www.keelinfra.com/campuses/scrubgrass https://ir.keelinfra.com/static-files/3cd9bc9b-6cb9-4cd8-bdf6-ecef84ba988a https://financialfilings.com/filings/bitfarms-ltd-1/annual-report/2026/33123453/ https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/ https://ir.keelinfra.com/static-files/d364a410-7781-4307-a1a8-402db1bb5f1f",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "QTS / Lancium Hall County Clean Campus",
    "state": "Texas",
    "city": "Turkey",
    "county": "Hall County",
    "region": null,
    "status": "planned",
    "sponsors": "QTS Data Centers; Lancium",
    "operators": "QTS Data Centers",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1000.0,
    "itLoadMW": null,
    "investmentUSD": 10000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-13",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "QTS and Lancium announced a Hall County campus near Turkey on Lancium's Clean Campus. QTS will design, build and operate the data center buildings; Lancium will provide electrical and civil infrastructure with battery storage and solar resources. The project is expected to bring more than $10B in capital investment and use closed-loop cooling that does not consume water for cooling once operational. [Source: https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/; Date: 2026-07-13]; Sources: https://lancium.com/locations-hall-county/ https://q.com/data-centers/hall-county/ https://lancium.com/2026/07/13/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Rowan Temple Data Center Campus",
    "state": "Texas",
    "city": "Temple",
    "county": "Bell County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Rowan Digital Infrastructure",
    "operators": "Rowan Digital Infrastructure",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 300.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-27",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Rowan announced nearly $3B in green debt financing to support construction of a major turnkey hyperscale campus in Temple. The company said the financing supports a 300 MW Texas campus and that Rowan had broken ground earlier in 2026 on its flagship Temple development. [Source: https://rowan.digital/rowan-closes-3b-green-financing-for-turnkey-hyperscale-campus-in-high-growth-texas-market/; Date: 2026-05-27]; Sources: https://rowan.digital/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/ https://rowan.digital/portfolio/temple/ https://www.bizjournals.com/austin/news/2026/08/07/rowan-temple-data-centers-investments-pushback.html https://www.connectcre.com/stories/rowan-closes-on-3rd-temple-data-center-deal/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Edged Energy-Austin",
    "state": "Texas",
    "city": "Maxwell",
    "county": "Caldwell County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Edged Energy; Capital Land Investments I LP",
    "operators": "Edged Energy; Capital Land Investments I LP",
    "tenants": null,
    "totalSquareFeet": 869684.0,
    "powerCapacityMW": 200.0,
    "itLoadMW": null,
    "investmentUSD": 2800000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-05-04",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028-06",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "TDLR registration TABS2026019322 lists Edged Energy-Austin / Edged Energy at 11255 Hwy 142 in Maxwell as a privately funded new 869,684 square foot one-level building housing a data center, with data halls and administrative area. The filing lists a June 1, 2026 start date, June 30, 2028 completion date, $2.8B estimated cost, and current status 'Review Complete.' [Source: https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026019322; Date: 2026-05-04]; Sources: https://www.co.caldwell.tx.us/page/article/1247 https://www.datacenterdynamics.com/en/news/edged-files-to-develop-2-million-sq-ft-data-center-campus-outside-austin-texas/ https://baxtel.com/data-center/austin",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Galaxy Helios Phase 2",
    "state": "Texas",
    "city": "Afton",
    "county": "Dickens County",
    "region": null,
    "status": "under-construction",
    "sponsors": "Galaxy Helios II LLC; Galaxy Digital",
    "operators": "Galaxy Helios II LLC; Galaxy Digital",
    "tenants": null,
    "totalSquareFeet": 349594.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 1300000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-13",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027-08",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "TDLR registration TABS2026014893 lists Galaxy Helios Phase 2 / Helios 3 at 1003 FM 193 in Afton as a privately funded new one-story data center / office building totaling 349,594 square feet. The filing lists an April 6, 2026 start date, August 29, 2027 completion date, $1.3B estimated cost, and current status 'Review Complete.' [Source: https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026014893; Date: 2026-03-13]; QA 2026-07-18: Added the registered 349,594-square-foot building area.; Sources: https://www.sec.gov/Archives/edgar/data/1859392/000185939225000032/glxyq22025overview202508.htm https://www.galaxy.com/data-centers https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php/1000",
    "lastUpdated": "2026-07-18"
  },
  {
    "projectName": "Nightpeak Old Ocean Data Center",
    "state": "Texas",
    "city": "Sweeny area",
    "county": "Brazoria County",
    "region": null,
    "status": "planned",
    "sponsors": "Nightpeak Energy",
    "operators": "Nightpeak Energy",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 620.0,
    "itLoadMW": null,
    "investmentUSD": 3500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-03-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; colocation; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "The Real Deal reported Nightpeak's Old Ocean Data Center as a planned Brazoria County campus near Sweeny that county officials expected to proceed despite rejection of requested tax abatements. Meeting documents described two 310 MW hyperscale data centers plus two 310 MW combustion turbine power plants on a 158-acre site, with each data center estimated at roughly $1.5B and each power plant at roughly $250M; the project could begin energizing as soon as 2027, according to Nightpeak's website as reported by The Real Deal. [Source: https://therealdeal.com/texas/2026/03/13/brazoria-county-rejects-tax-break-for-3-5b-data-center/; Date: 2026-03-13]; Sources: https://nightpeak.energy/project/old-ocean-data-center/ https://www.bisnow.com/news/houston/data-center-development/houston-area-county-rejects-tax-abatement-for-35b-data-center-development-133616 https://brazoriacountytx.legistar.com/LegislationDetail.aspx?GUID=D202F620-7EAD-4CC8-9D33-1C7B2BDBE621&ID=7922308&Options=&Search=",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Skybox PowerCampus Texas - Wichita Falls",
    "state": "Texas",
    "city": "Wichita Falls",
    "county": "Wichita County",
    "region": null,
    "status": "planned",
    "sponsors": "Skybox Datacenters; Blue Owl Capital",
    "operators": "Skybox Datacenters; Blue Owl Capital",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 800.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": "Up to 2 million square feet across as many as seven buildings; 225 acres acquired with an option on 125 more",
    "announcedDate": "2026-02-19",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; colocation; enterprise; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCD reported Skybox's planned PowerCampus Texas in Wichita Falls after Forward Wichita Falls announced Skybox as developer. Skybox bought 225 acres at Wichita Falls Business Park through Texas Data Centers Campus LLC, with an option on another 125 acres; the first 150,000 square foot building could be operational by late 2028, up to seven buildings are planned, and Skybox's website listed the site as a 300-acre campus offering up to 2M square feet in collaboration with Blue Owl. [Source: https://www.datacenterdynamics.com/en/news/skybox-to-develop-data-center-campus-in-wichita-falls-texas/; Date: 2026-02-19]; QA 2026-07-19: Added the developer-reported full-build campus area.; Sources: https://www.skyboxdatacenters.com/locations/powercampus-texas https://www.linkedin.com/posts/skybox-datacenters_powercampus-skyboxdatacenters-digitalinfrastructure-activity-7430286291298238464--dTU https://www.aol.com/articles/major-data-center-project-could-232734000.html",
    "lastUpdated": "2026-07-19"
  },
  {
    "projectName": "Sailfish Comanche Circle Data Center",
    "state": "Texas",
    "city": "Tolar area",
    "county": "Hood County",
    "region": null,
    "status": "planned",
    "sponsors": "Sailfish Development; Sailfish Investors",
    "operators": "Sailfish Development; Sailfish Investors",
    "tenants": null,
    "totalSquareFeet": 8000000.0,
    "powerCapacityMW": 5000.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-02-10",
    "constructionStartDate": null,
    "expectedCompletionDate": "2027",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Texas Tribune reported Comanche Circle as a roughly 2,600-acre proposal near Tolar with plans for nine data center campuses and combined capacity of up to 5 GW near Vistra's Comanche Peak nuclear plant. KERA later reported Hood County commissioners voted 3-1 on June 9, 2026 to approve the concept plan without conditions and allow the project to move to the next review stage; KERA described the current proposal as a 2,100-acre campus, so acreage remains inconsistent across public reports. [Source: https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/ | https://www.keranews.org/government/2026-06-09/hood-county-approves-comanche-circle-data-center-without-conditions-after-contentious-meeting; Date: 2026-02-10; 2026-06-09]; Sources: https://texasscorecard.com/wp-content/uploads/2026/01/comanche-circle-concept-plan.pdf https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/ https://www.keranews.org/energy-environment/2026-01-13/hood-county-data-centers-comanche-circle?_amp=true https://www.chron.com/life/wildlife/article/texas-dinosaur-valley-data-center-21369830.php/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Red Butte Energy and Data Center Campus",
    "state": "Utah",
    "city": "Newcastle area",
    "county": "Iron County",
    "region": null,
    "status": "on-hold",
    "sponsors": "BrightNight",
    "operators": "BrightNight",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 1500.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-05-07",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml; cloud; enterprise; research",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "BrightNight's project page describes an Iron County campus about 8 miles north of Newcastle with more than 2 GW of hybrid power systems and a 1.5 GW data center, including 300 MW of solar, 1,200 MWh of battery storage, and 1.5 GW of natural gas power. Iron County says the Red Butte Data Center application was submitted May 4, 2026, deemed incomplete May 22, 2026, and is on hold under the county's 180-day moratorium adopted May 26, 2026. Status is recorded as planned because the application is on hold rather than canceled. [Source: https://brightnightpower.com/red-butte/ | https://ironcountyut.gov/planning/data-center-projects | https://ironcountytoday.com/2026/05/12/brightnight-to-host-community-open-house-for-proposed-red-butte-energy-campus/; Date: 2026-05-07; 2026-05-26; 2026-05-12]",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Volition Industries - Spanish Fork Data Center",
    "state": "Utah",
    "city": "Spanish Fork",
    "county": "Utah County",
    "region": null,
    "status": "planned",
    "sponsors": "Volition Industries; Bloom Energy",
    "operators": "Volition Industries; Bloom Energy",
    "tenants": null,
    "totalSquareFeet": 1000000.0,
    "powerCapacityMW": 400.0,
    "itLoadMW": null,
    "investmentUSD": 1000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-04-21",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "ai-ml",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Spanish Fork City Council minutes from April 21, 2026 describe a proposal to bring energy-independent data centers to Spanish Fork through a partnership with Volition using Bloom Energy fuel cells, closed-loop cooling, existing infrastructure, and buildings suitable for retrofit and expansion. The minutes say equipment value was estimated near $1 billion and that the Volition team would continue working with the city on ordinance updates, Enbridge infrastructure planning, and environmental documentation. Public records from Provo in March 2026 also identify Volition Industries as pursuing small-scale Utah Valley data centers, including a potential 30-40 MW site on Sierra Vista near Vox Fulfillment, but the Spanish Fork record is used for this row because it is the stronger dated city project source. [Source: https://www.utah.gov/pmn/files/1430163.pdf | https://www.utah.gov/pmn/files/1411989.pdf; Date: 2026-04-21; 2026-03-25]; Sources: https://noistatus.deq.utah.gov/status https://www.sltrib.com/news/2026/08/21/spanish-fork-data-center-what-know/ https://www.heraldextra.com/news/2026/aug/20/data-center-discussion-spanish-fork-city-council-delays-vote-for-amendments-that-could-pave-way-for-data-center/ https://volition.eco/compute",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Google Project Skye Chesterfield Campus",
    "state": "Virginia",
    "city": "Moseley area",
    "county": "Chesterfield County",
    "region": null,
    "status": "planned",
    "sponsors": "Google",
    "operators": "Google",
    "tenants": null,
    "totalSquareFeet": null,
    "powerCapacityMW": 900.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-06-29",
    "constructionStartDate": null,
    "expectedCompletionDate": "2028",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "USACE Norfolk District published Google's Project Skye permit notice on June 29, 2026. The proposed campus is south of Genito Road, east of Moseley Road, and north of Duval Road in Chesterfield County, and the permit application describes at least five data center buildings, three substations, parking, roads, utilities, and stormwater facilities. The application reports impacts to 17.99 acres of palustrine forested wetlands, 8,115 linear feet of stream channel, conversion of 7.23 acres of forested wetlands to emergent wetlands, and 125 linear feet of temporary stream impacts, with comments due July 28, 2026. DCD separately reported the property spans 887.7 acres. [Source: https://www.nao.usace.army.mil/Media/Public-Notices/Article/4524288/nao-2026-00282-vmrc-26-0360-project-skye-data-center-chesterfield-county-virgin/; https://www.datacenterdynamics.com/en/news/details-revealed-for-googles-project-skye-data-center-campus-in-chesterfield-county-virginia/; Date: 2026-06-29; 2026-06-29]; Sources: https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons https://www.scc.virginia.gov/docketsearch/DOCS/85pn01%21.PDF https://www.datacenterdynamics.com/en/news/dominion-to-build-new-high-voltage-lines-to-supply-proposed-900mw-data-center-in-chesterfield-county-virginia/ https://www.chesterfieldvadatacenter.com/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Tract Tuckahoe Technology Park",
    "state": "Virginia",
    "city": "Goochland area",
    "county": "Goochland County",
    "region": null,
    "status": "planned",
    "sponsors": "Tract; VALCO Goochland, LLC",
    "operators": "Tract; VALCO Goochland, LLC",
    "tenants": null,
    "totalSquareFeet": 3000000.0,
    "powerCapacityMW": 900.0,
    "itLoadMW": null,
    "investmentUSD": 3000000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-13",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Goochland County received a pre-application for a conditional use permit from VALCO Goochland, LLC (Tract) for a data center campus in the Technology Overlay District at TOD West. County calendar materials identify a July 23, 2026 community meeting and list the site at 44 Cobblestone Circle and 70 Fleetwood Lane. DCD reported Tract's plans show a multi-phase campus with 12 buildings, up to 900 MW at full build-out, and more than $3 billion of potential investment. [Source: https://www.goochlandva.us/1480/Tuckahoe-Technology-Park; https://www.goochlandva.us/Calendar.aspx?EID=6499; https://www.datacenterdynamics.com/en/news/tract-looks-to-develop-900mw-data-center-park-outside-richmond-virginia/; Date: 2026; 2026-07-23; 2026-07-13]; Sources: https://www.tuckahoetechparkinfo.com/facts https://thevirginiaflyover.com/wednesday-august-12-2026/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Project Tallmadge Strasburg Data Center",
    "state": "Virginia",
    "city": "Strasburg",
    "county": "Shenandoah County",
    "region": null,
    "status": "planned",
    "sponsors": "Takanock",
    "operators": "Takanock",
    "tenants": null,
    "totalSquareFeet": 2000000.0,
    "powerCapacityMW": 180.0,
    "itLoadMW": null,
    "investmentUSD": 4500000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-06-22",
    "constructionStartDate": null,
    "expectedCompletionDate": "2030",
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "government; research",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "DCD reported that Takanock is proposing an 87-acre Project Tallmadge data center near Interstate 81 Exit 296 and the Mercury Paper facility, with a 180 MW campus and 400 MW of front-of-the-meter on-site natural-gas generation. The town/Takanock fact sheet says the industrial site is use-by-right, site planning and land acquisition began in 2024-2025, additional permitting and construction are anticipated in Q3 2027, and the project would use a near-waterless cooling design and natural-gas turbines. [Source: https://www.datacenterdynamics.com/en/news/87-acre-project-tallmadge-to-be-built-in-strasburg-virginia/; https://www.strasburgva.com/media/22836; Date: 2026-06-22; 2026]; Sources: https://www.projecttallmadge.com/ https://www.wmra.org/2026-06-16/strasburg-residents-question-large-scale-data-center-plans https://www.shenandoahcountyva.gov/AgendaCenter/ViewFile/Agenda/_04162025-535",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Remington Technology Park",
    "state": "Virginia",
    "city": "Remington",
    "county": "Fauquier County",
    "region": null,
    "status": "under-construction",
    "sponsors": "PointOne Data Centers",
    "operators": "PointOne Data Centers",
    "tenants": null,
    "totalSquareFeet": 2500000.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": 1600000000.0,
    "sizeNotes": null,
    "announcedDate": "2026-07-09",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "cloud; hyperscale",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "PointOne announced on July 9, 2026 that Fauquier County's Board of Supervisors approved a rezoning amendment for the on-site natural-gas fuel-cell equipment yard planned for Remington Technology Park. PointOne says the approval is a milestone for the campus and commences construction; the project was originally approved in 2018. A June 16 PointOne announcement says the fuel cells are intended as behind-the-meter power generation for the proposed Fauquier County campus, replacing the earlier power-generation approach with lower-noise fuel-cell technology. Public source did not disclose a current MW or capex figure in the cited releases. [Source: https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard; https://www.pointonecorp.com/news/pointone-announces-plan-to-use-fuel-cell-technology-at-remington-technology-park-campus; Date: 2026-07-09; 2026-06-16]; Sources: https://www.pointonecorp.com/locations https://www.fauquiercounty.gov/home/showpublisheddocument/26517/637129535280130000 https://www.datacenterdynamics.com/en/news/pointone-secures-investment-partner-for-virginia-build-out/ https://www.fauquiercounty.gov/home/showpublisheddocument/48795/639124700015500000 https://rebusinessonline.com/pointone-development-to-deliver-1-6b-data-center-campus-in-northern-virginia/",
    "lastUpdated": "2026-07-17"
  },
  {
    "projectName": "Remington Digital Campus",
    "state": "Virginia",
    "city": "Remington",
    "county": "Fauquier County",
    "region": null,
    "status": "planned",
    "sponsors": "Gigaland",
    "operators": "Gigaland",
    "tenants": null,
    "totalSquareFeet": 847400.0,
    "powerCapacityMW": 600.0,
    "itLoadMW": null,
    "investmentUSD": null,
    "sizeNotes": null,
    "announcedDate": "2026-07-10",
    "constructionStartDate": null,
    "expectedCompletionDate": null,
    "actualCompletionDate": null,
    "numberOfPhases": null,
    "purpose": "other",
    "renewableEnergy": null,
    "pueTarget": null,
    "waterCooling": null,
    "certifications": null,
    "sustainabilityNotes": null,
    "economicImpact_jobs": null,
    "economicImpact_taxRevenue": null,
    "economicImpact_notes": null,
    "incentives_type": null,
    "incentives_value": null,
    "challenges": null,
    "notes": "Gigaland's project page identifies the Remington Digital Campus as a proposed digital campus in Remington, Virginia. PEC's July 10, 2026 review of Fauquier County portal materials says the revived Gigaland proposal is renamed Remington Digital Campus and was scheduled for a July 16 Planning Commission hearing. PEC describes the application as just over 200 acres between Lucky Hill, Strodes Mill, and Old Grassdale roads, with six data center buildings totaling nearly one million square feet, two municipal groundwater wells, a water treatment plant, a 125-foot water tower, two electrical substations, 136 backup diesel generators, and 600 MW of power demand. Treat these details as application/opposition-summary figures pending direct county-portal verification. [Source: https://www.gigaland.me/remington; https://www.pecva.org/region/fauquier/gigaland-new-packaging-same-harmful-impacts/; Date: 2026; 2026-07-10]; Sources: https://www.fauquiercounty.gov/government/departments-a-g/community-development/comprehensive-plan/comprehensive-plan-amendments https://baxtel.com/data-center/gigaland-remington-va",
    "lastUpdated": "2026-07-17"
  }
]